The Journal of Pandrol Rail Fastenings 2011 - Pandrol USA
The Journal of Pandrol Rail Fastenings 2011 - Pandrol USA
The Journal of Pandrol Rail Fastenings 2011 - Pandrol USA
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
PANDROL FASTCLIP<br />
Rosenqvist CD200 installation machine for FASTCLIP<br />
PANDROL MARK1V FASTCLIP installation machine<br />
SUCCESSFUL TRIALS OF PANDROL<br />
FASTCLIP FE<br />
<strong>Pandrol</strong> UK has been undertaking trials <strong>of</strong> the<br />
new ‘FASTCLIP FE’ rail fastening in Hungary,<br />
Romania and Norway. Each <strong>of</strong> these projects<br />
has used a different installation method and<br />
various combinations <strong>of</strong> machines and<br />
manpower. On all the sites, the work was<br />
completed quickly and efficiently and was well<br />
received by the local contractors.<br />
Vortok and Rosenqvist, both subsidiaries <strong>of</strong><br />
<strong>Pandrol</strong>, have also been involved in the<br />
development and implementation <strong>of</strong> the<br />
FASTCLIP FE system. An FE compatible version <strong>of</strong><br />
the successful Vortok Stressing Roller (the FeVSR)<br />
has been used successfully in Hungary, allowing<br />
for very quick and safe stressing operations.<br />
Rosenqvist’s high-output clipping machines are<br />
easily adjustable for use on FE assemblies,<br />
including the Clip Master units attached to the<br />
Rosenqvist SB60 Sleeper Changer, which was<br />
used in the Norwegian trial.<br />
<strong>Pandrol</strong> UK and other subsidiaries have<br />
further trials planned in the upcoming months<br />
including a heavy haul version going into tracks<br />
in Australia and Brazil.<br />
11