5.4 Procedure for bridges with steel carriageways<br />

The working processes are analogue to fastening to concrete components (See chapter 5.2).<br />

Basically there are three different methods:<br />

a) Support on a continuous beam, mounted before the end cross girder.<br />

b) Support on individual consoles with connection to the end cross girder<br />

c) Direct connection of the supporting sides of the joist box to the end cross girder<br />

The kind of construction strongly depends on structure and shall be planned, verified and proofed individually<br />

in detail. The technical approval covers no steel connections Start with the attachment of the cross<br />

section to the steel superstructure when installing.<br />

5.5 Control of the installalation dimension<br />

The bridge design engineer determines the temperature-dependent gap and installation dimensions. If there<br />

are no special arrangements, the expansion joints are adjusted in the workshop for a provisional structure<br />

temperature of +10 °C. The presetting already done in the factory and the relevant expected installation<br />

temperature must be registered on the approved drawings The dimensions for the temperature-dependent<br />

presettings can be obtained from the Tables on the final drawings.<br />

Picture 2: Example table for temperature dependent pre-adjustment<br />

Directly before inserting the construction into the recesses, the presetting must be checked by the construction<br />

supervision and, if required, readjusted by our fitters. If a correction of the presetting becomes necessary,<br />

this has to take place in the expected direction of movement. A higher structural temperature requires<br />

a closing, a lower structural temperature an opening of the construction. For that purpose the screws of the<br />

movable installation holders (see picture 3) have to be unscrewed and then again tightened firmly after<br />

adjustment.<br />

BAUTEIL : SCHWENKTRAVERSEN-DEHNFUGE DS160 BIS 1200<br />

BLOCK : 5 - EINBAUANWEISUNG SEITE: 27<br />

VORGANG : REGELPRÜFUNG NACH TL/TP FÜ (STAND: 03/05)<br />

ARCHIV NR.<br />

Regelprüfung<br />

Nr. 05/07 vom 20.12.07<br />

Diese Unterlagen sind Eigentum der MAURER SÖHNE GmbH & Co. KG. Jede Art der Vervielfältigung - auch auszugsweise - bedarf der Zustimmung.<br />

Formate und Inhalte sind urheberrechtlich geschützt!

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!