08.11.2014 Views

Master Plan Re-exam - July 2012 - Marlboro Township, NJ

Master Plan Re-exam - July 2012 - Marlboro Township, NJ

Master Plan Re-exam - July 2012 - Marlboro Township, NJ

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

the township of marlboro master plan re<strong>exam</strong>ination report - july <strong>2012</strong><br />

• Work closely with the Historic Commission to develop a Historic Preservation <strong>Plan</strong>.<br />

• Endorse development of a storm water management master plan.<br />

• Encourage controlled and properly designed commercial and industrial development in<br />

areas so designed on the <strong>Master</strong> <strong>Plan</strong>. The extension of sewers should be encouraged to<br />

the LI Zone on Vanderburg Road and the CIR Zone along Route 79.<br />

• Establish a conservation <strong>Plan</strong> that will protect environmentally sensitive areas of the<br />

<strong>Township</strong> including wetlands, floodplains and steep slopes.<br />

• Propose local road improvements in order to alleviate specific problem areas.<br />

problems and objectives III - 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!