Cobb County 2030 Comprehensive Transportation Plan (CTP)
Cobb County 2030 Comprehensive Transportation Plan (CTP)
Cobb County 2030 Comprehensive Transportation Plan (CTP)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Roadway Improvements<br />
• 137 total<br />
– Widenings = 50<br />
– New roadways, extensions/connectors = 9<br />
– Major intersection improvements (grade separation,<br />
realignment, new interchange) = 28<br />
– Operational (access management, shoulder widening,<br />
corridor improvements) = 30<br />
– Operational intersection improvements (turn lanes,<br />
signalization) = 36<br />
*Some projects include two types of improvements (e.g., widening and major intersection improvements)<br />
<strong>Cobb</strong> <strong>County</strong> <strong>Comprehensive</strong> <strong>Transportation</strong> <strong>Plan</strong>