10.11.2014 Views

Wastewater (West Virginia) - Anderson & Associates, Inc.

Wastewater (West Virginia) - Anderson & Associates, Inc.

Wastewater (West Virginia) - Anderson & Associates, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

www.andassoc.com<br />

Raphine/Fairfield Sewer Study<br />

Rockbridge County, <strong>Virginia</strong><br />

Firm’s Responsibility:<br />

Design & Construction Phase Services<br />

Owner:<br />

Rockbridge County Public Service<br />

Authority<br />

150 South Main Street<br />

Lexington, VA 24450<br />

Ms. Karen Austin<br />

540-463-4329<br />

Completion Date:<br />

2007<br />

Based on the County Comprehensive Plan, and the support of the Board of Supervisors, the<br />

Rockbridge County PSA began plans to bring sewer service to the communities of Raphine<br />

and Fairfield. This effort has multiple positive effects on the County including the abandonment<br />

of two wastewater lagoons and the ability to provide service in areas with failing septic<br />

systems.<br />

Project Cost:<br />

$14,900,000<br />

This project included the upgrade and replacement of approximately 4.7 miles of an existing<br />

sewer trunk line, the installation of 3 pump stations and 3 force mains, with an approximate<br />

total length of 6 miles and new sewage collection lines with an approximate length of 9.2<br />

miles. This project required a joint permit application for multiple creek crossings and a gravity<br />

sewer bore of Interstate 81. Additionally, this project included approximately 1.5 miles for<br />

a new water transmission main to provide more reliable service to the North Lexington Water<br />

System.<br />

<strong>Anderson</strong> & <strong>Associates</strong>, <strong>Inc</strong>. provided surveying, design, environmental assessment, coordination<br />

for regulatory approval, construction phase services, as-needed field inspection, and<br />

record drawings for the project which was completed under budget.<br />

Focused on Service,<br />

Focused on You

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!