www.andassoc.com<br />
Regional Sewer Project<br />
Bland County, <strong>Virginia</strong><br />
<strong>Anderson</strong> & <strong>Associates</strong>, <strong>Inc</strong>. prepared a Preliminary Engineering Report to examine the feasibility of a<br />
wastewater collection and treatment system in and around Bastian. No public wastewater facilities existed<br />
in the area. Project components included approximately 84,000 lf of gravity sewer line, 243 manholes,<br />
15,000 lf of force main sewer line, two sewage pump stations, and a 200,000 gallon per day sequencing<br />
batch reactor (SBR) wastewater treatment facility.<br />
Several elements of the Bastian Community are benefiting from this project; existing and potential economic<br />
development in Bastian, I-77 Industrial Park, potential commercial development at the I-77/US<br />
Route 52 interchange, the two Rest Area/Visitor Centers on I-77, and residential areas with poor conditions<br />
for proper septic tank/drainfield operation (high ground water levels and low soil absorptive properties).<br />
The U.S. Department of Agriculture/Rural Development provided project funding in the form of a $3,335,900<br />
grant/$832,650 loan package. Additional funding included the <strong>Virginia</strong> Department of Transportation<br />
($1,800,000 grant), Appalachian Regional Commission ($500,000 grant), the <strong>Virginia</strong> Department of Environmental<br />
Quality ($300,000 grant/$500,000 loan) and Community Development Block Grant ($650,000<br />
grant).<br />
Firm’s Responsibility:<br />
Planning, Preliminary Design,<br />
Design, Construction<br />
Administration & Inspection<br />
Owner:<br />
Bland County<br />
Board of Supervisors<br />
P.O. Box 510<br />
Bland, VA 24315<br />
Mr. Rodney Ratliff<br />
(540) 688-4622<br />
Completion Date:<br />
2002<br />
Total Project Cost:<br />
$7,900,000<br />
The project served approximately 300 users including businesses, governmental entities, non-profit organizations<br />
and households in and around the community of Bastian.<br />