7.4 OTHER SCHEMES<br />

7.4.1 It is also noted that the following schemes could be implemented irrespective of the<br />

Byde Street closure or technological option moving forward or not.<br />

<br />

<br />

<br />

Improvements to parking across Bengeo on key junctions and near schools (Pro-forma<br />

CPK3), albeit it is noted that often parking acts as a natural traffic calming and may<br />

reduce the attractiveness of the through route;<br />

Old Cross Junction Improvements to retain signalised junction and provide shared surface<br />

(minimal kerb upstand) to encourage pedestrian crossing/movement, slow traffic and<br />

follow DfT Mixed Priority route treatment to make part of extended town centre with links<br />

to Sainsbury’s (Pro-forma PED25); and<br />

Pedestrian and cycle improvements across Bengeo (including Pro-forma CPM18 and<br />

PED25).<br />

7.5 NEXT STEPS<br />

7.5.1 Following the recommendations in this report as part of the Hertford and Ware Urban<br />

Transport Plan, the next steps are to undertake pre-Sainsbury’s monitoring. This will be<br />

undertaken once the UTP is endorsed by members in advance of Winter 2011 when<br />

Sainsbury’s is due to open.<br />

7.5.2 During this time further investigation will be undertaken into using ANPR technology<br />

rather than fixed types of closure.<br />

7.5.3 Only once the post-Sainsbury’s traffic situation is known will a decision be made on a<br />

way forward.<br />

34 Hertford and Ware UTP Stage 2 – Appendix D Bengeo 11500189-PT2