7.4 OTHER SCHEMES<br />
7.4.1 It is also noted that the following schemes could be implemented irrespective of the<br />
Byde Street closure or technological option moving forward or not.<br />
<br />
<br />
<br />
Improvements to parking across Bengeo on key junctions and near schools (Pro-forma<br />
CPK3), albeit it is noted that often parking acts as a natural traffic calming and may<br />
reduce the attractiveness of the through route;<br />
Old Cross Junction Improvements to retain signalised junction and provide shared surface<br />
(minimal kerb upstand) to encourage pedestrian crossing/movement, slow traffic and<br />
follow DfT Mixed Priority route treatment to make part of extended town centre with links<br />
to Sainsbury’s (Pro-forma PED25); and<br />
Pedestrian and cycle improvements across Bengeo (including Pro-forma CPM18 and<br />
PED25).<br />
7.5 NEXT STEPS<br />
7.5.1 Following the recommendations in this report as part of the Hertford and Ware Urban<br />
Transport Plan, the next steps are to undertake pre-Sainsbury’s monitoring. This will be<br />
undertaken once the UTP is endorsed by members in advance of Winter 2011 when<br />
Sainsbury’s is due to open.<br />
7.5.2 During this time further investigation will be undertaken into using ANPR technology<br />
rather than fixed types of closure.<br />
7.5.3 Only once the post-Sainsbury’s traffic situation is known will a decision be made on a<br />
way forward.<br />