Duplex coatings<br />
A cantilever type bus shelter outside Arand Engineering ready for delivery.<br />
Lifting one of the finished bus shelters to its final position on site.<br />
bolts for each bus shelter. The anchor<br />
bolt cages were then sent for hot dip<br />
galvanizing. After the hot dip<br />
galvanizing process the anchor bolt<br />
cages were delivered to Exeo. They<br />
prepared the sites and made sure that<br />
all the anchor bolt assemblies were in<br />
the correct position, using a jig<br />
supplied to them by Arand<br />
Engineering. The jig was made to be<br />
placed over the anchor bolts and the<br />
cement slab was then cast by Exeo.<br />
The next step was to prepare the<br />
sites for the installation of the<br />
shelters. The bus shelters were<br />
checked with a spirit level to make<br />
sure they were completely level. The<br />
roof was especially critical and<br />
needed to be accurately level. If the<br />
levels were slightly out, the levelling<br />
nuts were adjusted.<br />
Next, washers and nuts were put onto<br />
the anchor bolts and the shelter was<br />
tightened into position. The anchor<br />
bolts were cut to the proper length of<br />
3mm above the top of the nut. All the<br />
nuts were then welded to the bolts<br />
continued on page 30...<br />
Specialists in<br />
hot dip galvanizing<br />
with quick turnaround times<br />
HOT DIP GALVANIZING<br />
TO APPROVED QUALITY<br />
STANDARDS<br />
20 Dekenah Street<br />
Alrode 1449<br />
P.O. Box 124581<br />
Alrode 1451<br />
Tel.: (011) 908-3411<br />
(011) 908-3418<br />
(011) 908-3420<br />
Fax: (011) 908-3329<br />
Volume 10 Issue 2 2013 Hot Dip Galvanizing Today 29