CHAPTER-1<br />
INTRODUCTION<br />
1.1 PERIOD COVERED:<br />
This is the fiftyone <strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> of Karnataka State Road Transport Corporation<br />
covering the activities of the Corporation for the financial year <strong>2011</strong>-12 i.e., from 1 st April <strong>2011</strong> to<br />
31 st March <strong>2012</strong>.<br />
1.2 MANAGEMENT:<br />
The amended RTC Act 1982 provides for the Management of the Corporation by the Board of<br />
Directors. The Board of Karnataka State Road Transport Corporation as on 31 st March <strong>2012</strong> consisted<br />
16 Directors and one invitee. All the Directors have been appointed by the State Government.<br />
1.3 ADMINISTRATIVE SET UP:<br />
During the year <strong>2011</strong>-12, one new Depot has been commissioned at Mangalore-3 (Kuntikana) on<br />
15-05-<strong>2011</strong> attached to Managalore Division. A new Division has been formed at Putur on 01-07-<strong>2011</strong><br />
by bifurcating Mangalore and Mysore® divisions. As on 31-03-<strong>2012</strong> <strong>KSRTC</strong> had 14 operating Divisions<br />
with 72 Depots under its jurisdiction besides 2 Regional Workshops, 3 Civil Engineering Divisions, one<br />
Printing Press, one Central Training Institute, 2 Regional Training Institutions and a Hospital.<br />
1.4 PASSENGER AMENITIES AND FACILITIES:<br />
The Corporation has accorded high priority to provide increased amenities to the travelling Public. As<br />
on 31-03-<strong>2012</strong>, there were 141 permanent Bus Stations besides, 31 Rural Wayside Shelters and 105 City<br />
Pick-up Shelters. The long distance Express and non-stop Services were further augmented to meet the<br />
needs of the Travelling Public. In order to provide more comfort to the traveling public 565 Mofussil<br />
(NAL), 129 Grameena Karnataka Sarige, 202 City, 21 Rajahamsa, 47 Karnataka vaibhav, 43 Non A/C<br />
sleeper, 24 Carona (Ambari sleeper), 38 Volvo Multi axle and 10 Mercedez Benz Multi axle, totaling to<br />
1079 new Buses were inducted during the year.<br />
As on 31-03-<strong>2012</strong>, in all 1307 long distance routes were operated with route length ranging from<br />
120 kms. to 1078 kms. The Corporation has operated 2708 Ordinary, 3141 Express, 2 semi deluxe,<br />
331 Rajahamsa , 2 Rajahamsa A/C, 48 Rajahamsa CS, 4 Meghadoota, 8 Carona (Ambari), 20 Sheetal,<br />
38 Non A/C Sleeper, 36 Carona Sleeper, 243 Airavatha (Volvo), 70 Multi axle (Volvo),10 Mercedez Benz,<br />
10 Mercedez Benz Multi axle, 46 Volvo (city), 227 city, 38 Marcopolo, 94 Semi Low Floor and<br />
61 Suburban Services as on 31-03-<strong>2012</strong>.<br />
- 1 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
1.5 OPERATIONAL EFFICIENCY:<br />
The Operational results of the vital parameters of <strong>2011</strong>-12 compared to 2010-11 are as under:<br />
1. Kms. operated increased to 9242.56 lakh during the year <strong>2011</strong>-12 as compared to 8707.67 lakh in<br />
2010-11.<br />
2 The Corporation has achieved average vehicle utilization of 362 kms during <strong>2011</strong>-12 as compared<br />
to 363 kms. of 2010-11.<br />
3. Tyre Life during <strong>2011</strong>-12 increased to 123759 kms. from 120036 kms. of 2010-11.<br />
4. Fuel efficiency during <strong>2011</strong>-12 in terms of KMPL has increased to 4.87 as compared to 4.85 which<br />
was achieved during 2010-11.<br />
5. The rate of breakdowns per 10,000 kms has decreased to 0.04 during the year <strong>2011</strong>-12 from 0.05 of<br />
2010-11.<br />
6. The rate of accidents per lakh kms. has decreased to 0.14 during the year <strong>2011</strong>-12 from 0.15 of<br />
2010-11.<br />
7. Earning per kilometer (on Traffic Revenue) has increased to 2286.7 paise during the year <strong>2011</strong>-12<br />
from 2031.5 paise of 2010-11.<br />
8. During the year <strong>2011</strong>-12, the Corporation has made profit of Rs. 1941.41 lakh as against Rs.<br />
6205.25 lakh profit made during 2010-11.<br />
1.6 INDUSTRIAL RELATIONS:<br />
Five meeting was held between the Management and the Labour representatives during the year<br />
<strong>2011</strong>-12 in order to resolve the issues and demands of the labour and to maintain harmonious relationship.<br />
There were no strikes reported during the year <strong>2011</strong>-12.<br />
The Corporation continued to extend all facilities to the workmen for the development of cultural<br />
and sports activities. The Corporation has also continued to extend medical, housing and other welfare<br />
benefits to its Employees.<br />
1.7 ANNUAL OPERATING PLAN <strong>2012</strong>-13:<br />
The Corporation formulated its Action Plan <strong>2012</strong>-13 through which, steps have been taken to<br />
improve the performance efficiency. Norms have been fixed not only to bring down the cost of operations,<br />
but also to improve various operational parameters. The gist of the plan is as follows.<br />
1. It is proposed to augment 350 Schedules.<br />
2. It is proposed to achieve a KMPL of 4.89<br />
3. It is proposed to achieve Vehicle Utilisation of 365 Kms.<br />
4. It is proposed to achieve Tyre life of 132000 Kms.<br />
5. It is proposed to add 919 new Vehicles to the existing Fleet by replacing 680 old Vehicles which are<br />
not fit for operation.<br />
- 2 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
6. It is proposed to operate 9832.53 lakhs Effective kms.<br />
7. It is expected to earn Gross Revenue of Rs.244512.38 lakh. (excluding subsidy to be received from<br />
Govt.)<br />
8. The Cost of operations is expected at Rs.248422.65 lakh.<br />
9. The proposed Loss is Rs. 3910.27 lakh on Gross Revenue (excluding subsidy to be received from<br />
the Govt.)<br />
10. It is expected to earn an EPKM of 2410.3 paise on Traffic Revenue.<br />
11. The expected CPKM is 2526.5 paise.<br />
12. It is contemplated to complete the Depot construction work undertaken at Sulya, Vijayanagar<br />
(Mysore), Hassan-2, Challkere and Udupi during <strong>2012</strong>-13.<br />
13 . It is planned to construct 8 new Bus Stations.<br />
1.8. ANNUAL PLAN <strong>2012</strong>-13:<br />
The total Capital Expenditure incurred by the Corporation during the year <strong>2011</strong>-12 for its<br />
developmental activities was Rs.34565.42 lakh as against the proposed amount of Rs.34243.24 lakh. The<br />
Corporation has been able to build 1079 Bus bodies during <strong>2011</strong>-12.<br />
The programme of Capital Expenditure that has been proposed and actually incurred during the year<br />
<strong>2011</strong>-12 are shown below.<br />
(Rs.in lakh)<br />
Sl.<br />
no.<br />
Programme Proposed Actual<br />
1 Land and Buildings 8500.00 8019.89<br />
2 Passenger Buses & Dept.vehicles. 22900.00 23649.99<br />
3 Environment Equipments 400.00 90.74<br />
4 JnnURM works 0.00 1450.92<br />
5<br />
Plant, Machinery,Equipment, Computer<br />
Hardware, Software and ETM’s etc.<br />
400.00 732.96<br />
6 JnnURM GEF-SUTP 2043.24 620.92<br />
Total 34243.24 34565.42<br />
The Corporation in its Budget Estimates <strong>2012</strong>-13 has a Capital Expenditure programme of Rs.30545.40<br />
lakh.<br />
The Corporation has planned to avail loan of Rs.7500.00 lakh from the consortium of Banks and<br />
other Financial Institutions during the year.<br />
*****<br />
- 3 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
CHAPTER-2<br />
MANAGEMENT<br />
2.1 COMPOSITION OF THE BOARD OF DIRECTORS:<br />
The Board of Karnataka State Road Transport Corporation consisted 16 Directors including Hon’ble<br />
Chairman and Hon’ble Vice-Chairman as on 31 st March <strong>2012</strong>. Out of 16 Directors, the Chairman and<br />
Vice-Chairman are non-official Directors. The remaining 14 Directors are Official Directors and among<br />
them one Director represents Central Government.<br />
All the Directors are appointed by the State Government. The Metropolitan Commissioner, BMRDA,<br />
Government of Karnataka is being invited to attend the Board Meetings as ‘Invitee’ in terms of Section<br />
19(a) of the BMRDA Act-1985.<br />
2.2 CHANGE OF BOARD OF DIRECTORS DURING THE YEAR <strong>2011</strong>-12:<br />
1. Sri. P.B.Ramamurthy, IAS., Principal Secretary to Government, Transport Deptartment has been appointed<br />
as Director on the Board of <strong>KSRTC</strong> vide Government Notification No: ¸ÁjE 05 ¸Á¸ÀA¸Éà <strong>2012</strong><br />
dated: 29-02-<strong>2012</strong> in place of Sri. M.K.Shankaralingegowda, IAS.<br />
2 Sri. M.K.Shankarlingegowda, IAS., Commissioner, Bruhat Bangalore Mahanagara Palike has been<br />
appointed as Director on the Board of <strong>KSRTC</strong> vide Government Notification No: ¸ÁjE 22 £À¸Á¸Éà <strong>2011</strong><br />
dated: 13-12-<strong>2011</strong>.<br />
3 Sri. T.Sham Bhatt, IAS., Transport Commissioner, Transport Department has been appointed as<br />
Director on the Board of <strong>KSRTC</strong> vide Government Notification No: ¸ÁjE 18 ªÁF¸Éà <strong>2011</strong><br />
dated: 28-07-<strong>2011</strong>.<br />
4 Sri. K.R.Srinivasa, IAS., Managing Director, BMTC has been appointed as Director on the Board of<br />
<strong>KSRTC</strong> vide Government Notification No: ¸ÁjE 07 £À¸Á¸Éà <strong>2011</strong> dated: 16-05-<strong>2011</strong>.<br />
5 Sri. N. Manjunatha Prasad, IAS., Managing Director, <strong>KSRTC</strong>, has been appointed as Director on the<br />
Board of <strong>KSRTC</strong> vide Government Notification No: ¸ÁjE 03 s¸Á¸ÀA¸Éà <strong>2012</strong> dated:25-01-<strong>2012</strong>.<br />
6 Sri. Bijay Kumar Singh, IPS., Director(S &V), <strong>KSRTC</strong>, has been appointed as Director on the Board of<br />
<strong>KSRTC</strong> vide Government Notification No: ¸ÁjE 109 s¸Á¸ÀA¸Éà <strong>2011</strong> dated:29-09-<strong>2011</strong>.<br />
7 Sri. Nandan Singh, Deputy Secretary (Transport), Ministry of Road Transport and Highways,<br />
Government of India, New Delhi has been appointed as Director on the Board of <strong>KSRTC</strong> vide<br />
Government Notification No: ¸ÁjE 227 s¸Á¸ÀA¸Éà <strong>2011</strong> dated:02-11-<strong>2011</strong>.<br />
8 Sri. G.N.Shivamurthy, KAS., Managing Director, NEKRTC,has been appointed as Director on the Board<br />
of <strong>KSRTC</strong> vide Government Notification No: ¸ÁjE 23 s¸Á¸ÀA¸Éà ªÁF¸Éà dated:19-08-<strong>2011</strong>.<br />
9 Sri. S.Padmanabhan, Director(Finance) and Financial adviser, <strong>KSRTC</strong> has been appointed as Director on<br />
the Board of <strong>KSRTC</strong> vide Government Notification No: ¸ÁjE 40 ¸Á¸ÀA¸Éà <strong>2011</strong> dated: 03-12-<strong>2011</strong>.<br />
- 6 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
With the above changes, the following is the composition of the Directors on the Board of K.S.R.T.C.<br />
as on 31-03-<strong>2012</strong>.<br />
Sl. No. Name & Address Official / Non-official<br />
1 SRI. R. ASHOKA,<br />
Hon’ble Minister for Home and Transport,<br />
Govt. of Karnataka and<br />
Hon’ble Chairman, <strong>KSRTC</strong>., Central Office,<br />
Bangalore.<br />
2 SRI. JAGGESH,<br />
Hon’ble Vice-Chairman,<br />
<strong>KSRTC</strong>., Central Office,<br />
Bangalore .<br />
3 SRI. L.V.NAGARAJAN, IAS.,<br />
Principal Secretary to Government,<br />
Finance Department.,<br />
Government of Karnataka,<br />
Vidhana Soudha, Bangalore.<br />
4 SRI. P.B.RAMAMURTHY, IAS.,<br />
Principal Secretary to Government,<br />
Transport Department, M.S.Buildings,<br />
Government of Karnataka,<br />
Bangalore.<br />
5 SRI. BHARAT LAL MEENA, IAS.,<br />
Commissioner,<br />
Bangalore Development Authority,<br />
Bangalore.<br />
6 SRI. I.S.N.PRASAD, IAS.,<br />
Principal Secretary to the Hon’ble Chief Minister,<br />
Government of Karnataka,<br />
Vidhana Soudha, Bangalore<br />
7 SRI. M.K.SHANKARALINGEGOWDA, IAS.,<br />
Commissioner,<br />
Bruhat Bangalore Mahanagara Palike,<br />
Bangalore.<br />
8 SRI. T.SHAM BHATT, IAS.,<br />
Transport Commissioner,<br />
Transport Department, M.S.Bulidings,<br />
Government of Karnataka,<br />
Bangalore.<br />
9 SRI. K.R.SRINIVAS, IAS.,<br />
Managing Director,<br />
BMTC, Central Office,<br />
Bangalore.<br />
10 SRI. N.MANJUNATHA PRASAD, IAS.,<br />
Managing Director,<br />
<strong>KSRTC</strong>, Central Office,<br />
Bangalore.<br />
CHAIRMAN<br />
(Non-Official)<br />
VICE-CHAIRMAN<br />
(Non-Official)<br />
DIRECTOR<br />
(Official)<br />
DIRECTOR<br />
(Official)<br />
DIRECTOR<br />
(Official)<br />
DIRECTOR<br />
(Official)<br />
DIRECTOR<br />
(Official)<br />
DIRECTOR<br />
(Official)<br />
DIRECTOR<br />
(Official)<br />
DIRECTOR<br />
(Official)<br />
- 7 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
11 SRI. BIJAY KUMAR SINGH, IPS.,<br />
Director (Security & Vigilance),<br />
<strong>KSRTC</strong>, Central Office,<br />
Bangalore.<br />
DIRECTOR<br />
(Official)<br />
12 SRI. NANDAN SINGH,<br />
Deputy Secretary (Transport),<br />
Ministry of Road Transport & Highways, Room<br />
No.141,Transport Bhavan, Sansad Marg,<br />
Government of India,<br />
New Delhi.<br />
13 SRI. MAAZ AHMED SHARIFF, KAS.,<br />
Director (Personnel & Environment),<br />
K.S.R.T.C., Central Office,<br />
Bangalore.<br />
14 SRI. G.N.SHIVAMURTHY, KAS.,<br />
Managing Director,<br />
NEKRTC, Central Office,<br />
Gulbarga.<br />
15 SRI. HEMARAJU,<br />
Managing Director, NWKRTC.,<br />
Central Office, Hubli.<br />
16 SRI. S.PADMANABHAN,<br />
Director(Finance) & FA,<br />
<strong>KSRTC</strong>., Central Office,<br />
Bangalore - 560 027.<br />
DIRECTOR<br />
(Official)<br />
DIRECTOR<br />
(Official)<br />
DIRECTOR<br />
(Official)<br />
DIRECTOR<br />
(Official)<br />
DIRECTOR<br />
(Official)<br />
1 SRI. YOGENDRA TRIPATHI,IAS.,<br />
Metropolitan Commissioner, BMRDA, Government of<br />
Karnataka,<br />
No.1, Ali Asker Road,<br />
Bangalore - 560 027.<br />
INVITTE<br />
(Official)<br />
2.3 NUMBER OF MEETINGS CONDUCTED, SUBJECTS PLACED AND RESOLUTIONS<br />
PASSED :<br />
During the year <strong>2011</strong>-12, five meetings (including one continued meeting)of the Board of Directors<br />
have been conducted. 104 subjects have been placed before the Board and 99 Resolutions passed.<br />
2.4 MAIN COMMITTEE:<br />
No Main Committee was constituted during the year <strong>2011</strong>-12<br />
Statement showing the information regarding the number of Board meetings attended by the<br />
Directors/Invitee during the year <strong>2011</strong>-12 is shown in Schedule-A.<br />
*****<br />
- 8 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
CHAPTER-3<br />
ADMINISTRATION<br />
3.1 SET-UP:<br />
During the year <strong>2011</strong>-12, a new Depot have been commissioned at Mangalore-3 (Kuntikana) on<br />
15-05-<strong>2011</strong> attached to Mangalore Division. To have more administrative convenience New Division<br />
Commissioned at Puttur w.e.f 01-07-<strong>2011</strong> by bifurcating Mysore® and Mangalore divisions. B.C.Road,<br />
Putur ,Dharmastala depots attached to Mangalore division and Mercara depot attached to Mysore ®<br />
division has been transfered to newly formed Putur Division w.e.f 01-07-<strong>2011</strong>.<br />
In continuation, Inter Model Transit Center (I.M.T.C) Construction work at Kuvempunagar and<br />
Ilawala have been completed and inaugurated on 09-04-<strong>2011</strong> and 10-04-<strong>2011</strong> respectively.<br />
During the year <strong>2011</strong>-12, the Awatar counter at Shantinagar which is under the administration<br />
control of Kempegowda Bus Station has been transferred and comes under the administration control of<br />
Bangalore (C) division with effect from 27-05-<strong>2011</strong><br />
With this, the Corporation had 72 Depots, 141 Bus Stations, 64 Control Points and 31 Rural Way<br />
side Shelters under its network of operations spread over in 15 Divisions (14 operating Divisions and one<br />
Bus Station Division) as at the end of 31-03-<strong>2012</strong>. The Divisionwise number of Depots, Bus Stations and<br />
Control Points and their details as on 31-03-<strong>2012</strong> are furnished in Table –1 and Schedule-B respectively.<br />
TABLE -1<br />
Sl.<br />
No.<br />
Division<br />
No of<br />
Depots<br />
No of Bus<br />
Stations<br />
No of Control<br />
Points<br />
1 Bangalore © 7 1 10<br />
2 Ramanagar 6 8 5<br />
3 Tumkur 6 16 6<br />
4 Kolar 5 6 4<br />
5 Chikkaballapura 5 8 8<br />
6 MCTD 3 5 4<br />
7 Mysore (Rural) 5 12 0<br />
8 Mandya 6 13 6<br />
9 Chamarajanagar 4 7 2<br />
10 Hassan 5 16 0<br />
11 Chikkamagalore 5 14 2<br />
12 Mangalore 4 2 6<br />
13 Putur 4 12 7<br />
14 Davangere 7 15 2<br />
15 KBS -- 6 2<br />
TOTAL 72 141 64<br />
- 9 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
3.2. STAFF POSITION AND STAFF RATIO:<br />
3.2.1) Staff position:<br />
The Corporation employed 36448 permanent employees as on 31-03-<strong>2012</strong> as against 34019<br />
employees as on 31-03-<strong>2011</strong>. The category-wise break-up of the total staff is given in Table-2.<br />
TABLE-2<br />
Sl.<br />
No.<br />
Category<br />
No. of Employees<br />
As on 31.03.<strong>2012</strong> As on 31.03.<strong>2011</strong><br />
a)<br />
b)<br />
Regular employees<br />
Class-I and II Officers<br />
Class-III and IV Officials:<br />
Drivers<br />
Conductors<br />
Drivers-cum-Conductor<br />
Traffic Supervisors<br />
Mechanical<br />
<strong>Administration</strong><br />
Civil Engineering<br />
Printing Press<br />
358<br />
11310<br />
5398<br />
8919<br />
1198<br />
6326<br />
2796<br />
57<br />
86<br />
363<br />
10434<br />
5749<br />
8015<br />
1144<br />
5321<br />
2853<br />
52<br />
88<br />
Total Class-III & IV 36090 33656<br />
Total Regular Employees (a+b) 36448 34019<br />
The strength of Class-I & II Officers was 358and accounted for 0.98% of the total permanent staff of<br />
the Corporation. The ratio of Officers to staff was 1:101 as on 31-3-<strong>2012</strong>.<br />
3.2.2) Recruitment:<br />
3.2.3) Staff ratio:<br />
1320 Driver-Cum-Conductors have been recruited during the year <strong>2011</strong>-12.<br />
The total staff strength (regular) working in the Corporation was 36448 for operating 7137 schedules<br />
as at the end of the year. The Divisional staff ratio per schedule was 4.92. The overall staff ratio of the<br />
Corporation per schedule (including the staff employed at the Regional Workshops and other Central<br />
Units) increased from 5.08 as on 31-03-<strong>2011</strong> to 5.11 as on 31-03-<strong>2012</strong>. The details of staff ratio as on the<br />
last day of the year under report with comparative figures for the previous year are given in Table-3. The<br />
Division-wise staff ratio details per Schedule/Vehicle held/Avg. Vehicles on road and Effective Kilometers<br />
performed per Employee per day are given at Appendix-5.<br />
- 10 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
TABLE-3<br />
Sl.<br />
No.<br />
Units<br />
Staff<br />
As on 31.3.<strong>2012</strong> As on 31.3.<strong>2011</strong><br />
Staff Ratio<br />
per Sch.<br />
Staff<br />
Staff Ratio<br />
per Sch.<br />
1<br />
2<br />
3<br />
Operating Divisions<br />
Regional Workshops<br />
Other Central Units<br />
35084<br />
600<br />
764<br />
4.92<br />
0.08<br />
0.11<br />
32659<br />
588<br />
772<br />
4.88<br />
0.09<br />
0.11<br />
Total 36448 5.11 34019 5.08<br />
As at the end of the year, there were 6465 Employees belonging to SC and 1729 Employees belonging<br />
to ST on the rolls accounting to 17.74% and 4.74% respectively to the total Employees. The category-wise<br />
working position of the SC and ST Employees in the Corporation as on 31-03-<strong>2011</strong> is indicated in<br />
Table - 4.<br />
TABLE-4<br />
Sl.<br />
No.<br />
Category<br />
Employees as on<br />
31-03-<strong>2012</strong><br />
Employees as on 31-03-<strong>2011</strong><br />
Total SC ST Total SC ST<br />
1<br />
2<br />
Class-I & II Officers<br />
Class-III & IV Officials:<br />
a) Traffic:<br />
i) Drivers, Conductors &<br />
Dr-cum-Crs.<br />
ii) Traffic Supervisors<br />
b) Mechanical<br />
c) <strong>Administration</strong> & Others<br />
358<br />
25627<br />
1198<br />
6326<br />
2939<br />
43<br />
4451<br />
237<br />
1135<br />
599<br />
15<br />
1199<br />
69<br />
389<br />
57<br />
363<br />
24198<br />
1144<br />
5321<br />
2993<br />
34<br />
4063<br />
229<br />
649<br />
595<br />
18<br />
1239<br />
60<br />
221<br />
127<br />
Total 36448 6465 1729 34019 5570 1665<br />
The Details of Male and Female employees in the Corporation during the year <strong>2011</strong>-12 and<br />
2010-11 is given in the Table -4a.<br />
TABLE -4a.<br />
Year<br />
Running<br />
staff Driver/<br />
Cond/<br />
Dri. Cum<br />
Cond.<br />
Work<br />
shop<br />
staff<br />
Officers<br />
(Admn.)<br />
Supervisors<br />
Others<br />
(Non<br />
Supervisor)<br />
Male Female Total<br />
<strong>2011</strong>-12 25627 6326 358 717 3420 33779 2669 36448<br />
2010-11 24198 5321 363 669 3468 31704 2315 34019<br />
3.3 TRAINING SCHEME AND FACILITIES:<br />
Training of employees belonging to various category including Officers has been continued in one<br />
Regional Training Institute, one Drivers Training Academy and one Central Training Institute of the<br />
Corporation during the year <strong>2011</strong>-12. The details of the employees undergone training are as follows:<br />
- 11 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
‣ 10704 employees of different category have been trained at the training centres of the Corporation.<br />
Apart from this,<br />
‣ 166 Officers have been sent to different training agencies like CIRT, NPC, GRSP, IPE, DPE and NIPM<br />
etc., for training.<br />
‣ Five officers have been sent to Dubai/Istanbul(Turkey) for study tour under ASRTU Corpus fund scheme,<br />
5 officers have been sent to London and Germany for Study tour under <strong>KSRTC</strong> HRD fund ,one officer<br />
was sent to Switzerland for study tour under sponsorship by ICICI and 2 officers were sent to Singapore<br />
for study tour under sponsorship by Government of India.<br />
‣ 195 students of BBM/MBA/MSW/M.Com/M.Sc/MFA/MCA have been trained in various Departments<br />
of the Corporation in Human Resources/Finance and other internship projects & field works.<br />
‣ 707 private persons have been trained in HPV Driving on payment of fee.<br />
3.4 DISCIPLINARY CASES AND THEIR DISPOSALS:<br />
The details of Disciplinary cases and their disposals during the year <strong>2011</strong>-12 as compared to previous<br />
year are shown in Table-5.<br />
TABLE – 5<br />
Sl.<br />
No.<br />
Particulars <strong>2011</strong>-12 2010-11<br />
1<br />
No. of cases pending as on the last day<br />
of the year<br />
11485 13750<br />
2 No. of cases detected during the year<br />
a) Conductors<br />
b) Drivers<br />
c) Driver-cum-Conductor<br />
d) Other Staff<br />
37329<br />
9096<br />
34303<br />
3378<br />
42322<br />
8879<br />
20729<br />
4047<br />
Total (a to d) 84106 75977<br />
3 No. of cases finalized:<br />
a) Dismissed/ Discharged/<br />
Terminated/Removed<br />
b) Suspended {As a specific<br />
punishment}<br />
c) Fined<br />
d) Other punishments<br />
518<br />
124<br />
35190<br />
49890<br />
490<br />
68<br />
48151<br />
29533<br />
Total (a to d) 85722 78242<br />
4 No. of cases pending as on the last day of the year 9869 11485<br />
Unit Heads are the Disciplinary Authorities for major punishment for Class – III & IV employees<br />
working in the units (excluding supervisory staff). The Depot Managers and other Divisional level<br />
Officers have continued to be empowered to impose minor penalties on Class-III & IV employees coming<br />
under their administrative control.<br />
- 12 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
3.5 RULES & REGULATIONS OF <strong>KSRTC</strong>:<br />
The following Rules/Regulations are in force in <strong>KSRTC</strong>.<br />
1. <strong>KSRTC</strong> Gratuity Regulations (01-04-1957).<br />
2. <strong>KSRTC</strong> Rules 1961.<br />
3. <strong>KSRTC</strong> Employees Leave Rules 1964.<br />
4. <strong>KSRTC</strong> Employees Contributory Provident Fund Regulations 1968.<br />
5. <strong>KSRTC</strong> Employees Medical Attendance Regulations 1970.<br />
6. <strong>KSRTC</strong> Servants Conduct & Discipline Regulations 1971.<br />
7. <strong>KSRTC</strong> Servants Payment of Advance for Purchase of Motor Car/Cycle/Scooter & Bicycles<br />
Regulations 1976.<br />
8. <strong>KSRTC</strong> Employees Promotion and Pay Regulations 1980.<br />
9. <strong>KSRTC</strong> Cadre & Recruitment Regulations 1982.<br />
10. <strong>KSRTC</strong> Employees Premature Retirement Regulations 1983.<br />
11. <strong>KSRTC</strong> Employees Deputation outside India Regulations 1983.<br />
12. <strong>KSRTC</strong> Employees Compulsory/Voluntary Retirement Regulations 1984.<br />
13. <strong>KSRTC</strong> Employees Performance Appraisal <strong>Report</strong> Regulations 1985.<br />
14. <strong>KSRTC</strong> In-service Recruitment Scheme 1997 with respect to class 11 post<br />
15. <strong>KSRTC</strong> In-service Recruitment Scheme 2009 with respect to class 111 Supervisory post<br />
16. Grant of Extra-ordinary Leave without Wages Scheme to the Employees of the Corporation.<br />
*****<br />
- 13 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
CHAPTER-4<br />
OPERATIONS<br />
4.1 NATIONALISATION SCHEME:<br />
During the year <strong>2011</strong>-12, no new Scheme of Nationalization has been taken up. However, the repeal<br />
of Contract Carriages (Acquisition) Act 1976 by the Government allowing Private Operators to operate as<br />
Contract Carriages through out the State is continued.<br />
4.2 OPERATIONS:<br />
‣ Operational jurisdiction of the Corporation is 17 Districts in the State of Karnataka.<br />
‣ Major part of the Operations is in rural area.<br />
‣ Operated 7137 Schedules covering 2651127 kms per day as on 31-03-<strong>2012</strong> as against 6697<br />
Schedules and 2509248 kms as on 31-03-<strong>2011</strong>.<br />
‣ Achieved a growth of 6.6% in Schedules and 5.7% in Schedule kms over previous year.<br />
‣ In Mysore City 181 City/Suburban Services, 35 Volvo (city), 38 Marco Polo and 94 Semi low floor<br />
Services have been operated. Also during the year under report, 48 city services in Tumkur, 20 city<br />
services in Hassan and 22 city services in Davangere have been introduced<br />
4.3 ROUTES, ROUTE KMs, SCHEDULES & SCHEDULE KMs:<br />
The Corporation has Operated 5554 Routes with an average Route length of 96.2 Kms as on<br />
31-03-<strong>2012</strong>.<br />
The details of Routes, Route kilometers, Schedules and Schedule kms. Operated as on 31-03-<strong>2012</strong><br />
with comparative figures of previous year are given in Table-6 and the Division wise details are given at<br />
Appendix-1.<br />
TABLE-6<br />
Sl.<br />
No<br />
Factor<br />
As on 31 st March<br />
Variation over previous<br />
year<br />
<strong>2011</strong>-12 2010-11 Actual % age<br />
1 No. of Routes 5554 5079* 475 9.4<br />
2 Route kilometers 534255 481424* 52831 11.0<br />
3 Avg. Route length (in kms.) 96.2 94.8* 1.4 1.5<br />
4 No. of Schedules 7137 6697 440 6.6<br />
5 Daily Schedule kms. 2651127 2509248 141879 5.7<br />
*Revised<br />
- 14 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
4.4 INTER-STATE ROUTES:<br />
Operation of Inter-State Services on reciprocal basis has been continued during the year <strong>2011</strong>-12 also.<br />
The details of Operation of Inter-State Services on reciprocal basis with the five neighbouring States are<br />
indicated in Table – 7.<br />
TABLE – 7<br />
Sl.<br />
No<br />
State<br />
No.of<br />
Routes<br />
No.of<br />
Schedules<br />
Sch. Kms.<br />
operated<br />
within the State<br />
Sch. Kms.<br />
operated out<br />
side the State<br />
Total<br />
Schedule<br />
Kms.<br />
1 Maharashtra 26 69 29586 12013 41599<br />
2 Andhra Pradesh 165 476 125127 87638 212765<br />
3 Tamilnadu 143 412 74686 90992 165678<br />
4 Kerala 71 154 30550 33757 64307<br />
5 Goa 12 28 10743 2261 13004<br />
Total 417 1139 270692 226661 497353<br />
4.5 CITY/ SUBURBAN SERVICES:<br />
City/Suburban Services have been operated in the City of Mysore. City services is also extended in<br />
the cities of Tumkur, Hassan and Davanagere during the year <strong>2011</strong>-12. Operation of City/Suburban<br />
Schedules as on 31-03-<strong>2012</strong> represented 3.70% of the total Schedule kms. In Mysore 123 City,<br />
67 Sub-Urban, 35 City Volvo, 38 Marcopolo and 94 Semi Low Floor Services have been Operated during<br />
the year. The extent of City/Sub-Urban Operations by the Corporation as on 31-03-<strong>2012</strong> is indicated in<br />
Table-8.<br />
TABLE – 8<br />
Sl.<br />
No.<br />
City<br />
As on 31.03.<strong>2012</strong><br />
Routes Route kms Schedules Schedule kms.<br />
1 Mysore 154 2506 351 81579<br />
2 Tumkur 16 154 48 9255<br />
3 Hassan 19 171 20 3573<br />
4 Davanagere 11 113 22 3717<br />
Total 200 2944 441 98124<br />
%to total services 3.6 0.55 6.18 3.70<br />
4.6.0 MOFUSSIL SERVICES :<br />
Mofussil Services operated by the Corporation have been scheduled to cover 2553003 Kms daily as at<br />
the end of the year under report, which formed 96.30% of the total Operations. Besides the Operation of<br />
Ordinary Services in rural area, the Corporation also operated some of the Services as Express, semi deluxe,<br />
Rajahamsa, Rajahamsa A/C, Karnataka Vibhav ,Sheetal, Meghadoota, Carona (Ambari), Carona Sleeper,<br />
Non A/C Sleepear, Airavatha (Volvo), Multi axle(Volvo) and Mercedez Benz Services. The extent of such<br />
Operations as on 31-03-<strong>2012</strong> are shown in Table –9.<br />
- 15 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
Sl.<br />
No.<br />
Type of service<br />
TABLE – 9<br />
Schedule<br />
kms.<br />
% to total<br />
Mofussil<br />
services<br />
% to total<br />
Operations<br />
1 Ordinary 847882 33.21 31.98<br />
2 Express 1310274 51.32 49.42<br />
3 Semi Deluxe 1374 0.05 0.05<br />
3 Rajahamsa 144995 5.68 5.47<br />
4 Rajahamsa A/C 1140 0.05 0.04<br />
5 Karnataka viabhav 24348 0.95 0.92<br />
6 Sheetal 9643 0.38 0.36<br />
7 Meghadoota 1088 0.04 0.04<br />
8 Carona (Ambari) 2156 0.09 0.08<br />
9 Carona sleeper 15872 0.62 0.60<br />
10 Non A/C sleeper 14988 0.59 0.57<br />
11 Airavat (Volvo) 114366 4.48 4.32<br />
12 Multi Axle (Volvo) 59993 2.35 2.26<br />
13 Mercedez Benz 4884 0.19 0.19<br />
Total 2553003 100.00 96.30<br />
4.6.1 Long Distance and Night Services:<br />
The Corporation continued to operate long distance Services providing direct and quick<br />
Transportation between Bangalore and various District Headquarters and other important places within<br />
the State and in the neighbouring States. 1153 long distance Routes with Route length ranging from 120<br />
Kms to 1078 kms has been in Operation as on 31-03-<strong>2012</strong>. Some of the long distance Services have been<br />
operated as night Services connecting all District Headquarters besides other important places in and<br />
outside the State.<br />
4.6.2 Express and Non- Stop Services :<br />
Express Services are continued to be operated by the Corporation with limited number of stops to<br />
provide quick and direct Transport Facility with Fare slightly higher than the Ordinary Services with a view<br />
to reduce journey time and avoid change over. Non-stop Services have also been continued to be operated<br />
on selected routes where direct passengers are more to reduce the journey time, which also cause savings on<br />
staff cost as these Services are operated without Conductors. Example Bangalore - Mysore,<br />
Bangalore-Tumkur, Bangalore - Kolar, Bangalore - KGF and Bangalore – Chennai etc., totaling to<br />
81 Services as on 31-03-<strong>2012</strong>. 3141 Express Services have been operated covering 1310274 kms. daily<br />
accounting 49.42% of the daily kms. operated on Mofussil Routes by the Corporation.<br />
4.6.3 Premier Services:<br />
To meet the needs of affluent sections of the Travelling Public and also to provide a comfortable<br />
journey particularly during night, the Corporation has operated Premier Services such as Rajahamsa ,<br />
Rajahamsa A/C, Karnataka vaibhava, Sheetal, Carona (Ambari), Carona Sleeper, Meghadoota and Airavatha<br />
(Volvo) Multi Axle (Volvo) and Mercedez Benz Services. 2 Semi deluxe,20 Sheetal, 331 Rajahamsa,<br />
- 16 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
2 Rajahamsa A/C, 48 Karnataka Vaibhava, 4 Meghadoota, 38 Non A/C Sleeper, 8 Carona(Ambari),<br />
36 Carona sleeper, 243 Airavatha (Volvo), 70 Volvo Multi Axle,10 Mercedez Multi axle,10 Mercedez Benz<br />
and 46 Volvo (city) Services have been in Operation as on 31-03-<strong>2012</strong>.<br />
4.7 Public Private Partnership :<br />
Private agents are appointed to Book Tickets in advance through computerized and manual system in<br />
Karnataka and nighbouring States of Tamilnadu, Kerala, Goa, Maharashtra, Andhra Pradesh and<br />
Pondicherry.<br />
4.8 FARE STRUCTURE:<br />
During the year <strong>2011</strong>-12, Bus Fares have been increased by 6.95% w.e.f<br />
Fare Structure is furnished in Schedule-‘ C’.<br />
25-06-<strong>2011</strong> The details of<br />
4.9 ADVANCE BOOKING & RESERVATION FACILITIES:<br />
To enable the Passengers to avail Ticket at their locality the Scheme of Advance Booking and Reservation<br />
Facilities have been brought in by the Corporation.<br />
There were totally 672 such Reservation Counters out of them 170 Counters (17 run by the<br />
Corporation, 137 run by the Private Agents and 16 by Bangaloreone) were at Bangalore alone covering all<br />
extension areas of Bangalore. In other places of Karnataka there were 297 Counters (61 run by the<br />
Corporation and 236 run by the Private Agents) and 205 Counters (11 run by the Corporation and 194<br />
run by the Private Agents) outside the State of Karnataka for facilitating the General Public to reserve their<br />
Seats in Advance for their journey where the Traffic Generation is considerably high. Advance Booking of<br />
Tickets Facility has been available with full Fare plus the Reservation Charge of Rs.5/- per Seat for Fare less<br />
than or equal to Rs. 200/- and Rs.10/-for Fare more than Rs.200/-. The system of Booking of Seats 30<br />
days in advance at the window booking Counters in Bus Stands and Private Reservation Counters has been<br />
continued. During the year <strong>2011</strong>-12 total no of seats booked through AWATAR is 7360312 and earned<br />
revenue of Rs.32630.00 lakh and it was 6610891 and earned revenue of Rs.26537.00 lakh during the<br />
corresponding previous year period 2010-11. The average seats booked and revenue realized per day from<br />
AWATAR advance reservation system during the year <strong>2011</strong>-12 is as under.<br />
Factors<br />
Avg. no. of seats<br />
booked/day<br />
Avg.<br />
revenue/day<br />
Total Bookings <strong>2011</strong>0 89.15 lakh<br />
E-Booking 5347 29.64 lakh<br />
4.10 PROGRESS OF OPERATIONS:<br />
The Corporation continued further consolidation of existing Services. Divisionwise achievement in<br />
the key area of Operations are furnished in Appendix-2. Some salient features are summarized in the<br />
following paragraphs.<br />
- 17 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
a) Kms covered:<br />
The details regarding Kms operated with comparative figures of the previous year are shown in Table – 10.<br />
TABLE – 10<br />
Sl.<br />
No.<br />
Particulars<br />
Period<br />
Variation over<br />
previous year<br />
<strong>2011</strong>-12 2010-11 Actual %age<br />
1 Kms.operated: (in lakh)<br />
a)Gross<br />
b)Effective<br />
c) Dead<br />
9691.56<br />
9242.56<br />
449.00<br />
9093.10<br />
8707.67<br />
385.43<br />
598.46<br />
534.89<br />
63.57<br />
6.03<br />
6.14<br />
16.49<br />
2<br />
Percentage of Dead Kms.to<br />
Effective kms.<br />
4.86 4.43 0.43 9.71<br />
3 Avg.daily Service kms. (in lakh) 25.25 23.86 1.39 5.83<br />
The total Service kms operated during <strong>2011</strong>-12 is 9242.56 lakh as against 8707.67 lakh Kms operated<br />
during 2010-11. The average Daily Service kms increased by 5.83% i.e. from 23.86 lakh kms to 25.25<br />
lakh Kms during <strong>2011</strong>-12. The percentage Dead kms to Effective kms for the year <strong>2011</strong>-12 was 4.86 as<br />
compared to 4.43 of 2010-11.<br />
b) Vehicles & Passengers Travelled :<br />
The details of Vehicles held in the operating Divisions (including Private Vehicles) and their<br />
Utilization during the year <strong>2011</strong>-12 with comparative figures of the previous year are shown in Table-11.<br />
TABLE-11<br />
Sl.<br />
No<br />
1<br />
Particulars<br />
Avg.no.of Buses held in the<br />
operating Divisions<br />
During the year<br />
Variation over<br />
previous year<br />
<strong>2011</strong>-12 2010-11 Actual %age<br />
7580.8 7131.3 449.5 6.30<br />
2 Avg.no.of Buses on road. 6969.1 6576.6 392.5 5.97<br />
3<br />
4<br />
%age Fleet Utilization<br />
(on operational Fleet).<br />
Avg.Vehicle Utilization<br />
(in Kms.)<br />
a) Gross<br />
b) Effective<br />
91.9 92.2 -0.3 -0.32<br />
380<br />
362<br />
379<br />
363<br />
1<br />
-1<br />
0.26<br />
-0.28<br />
5 Avg. seating capacity 52.0 52.0 -- --<br />
6<br />
7<br />
Total no. of Passengers<br />
carried (in lakh)<br />
Avg.no.of Passengers<br />
carried/day (lakh)<br />
8866.71 8076.61 790.10 9.78<br />
24.23 22.13 2.56 11.6<br />
- 18 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
The average number of Buses held by the Divisions rose from 7131.3 to 7580.8 The average number<br />
of Buses on road also increased by 392.5 or 5.97% i.e. from 6576.6 during 2010-11 to 6969.1 during<br />
<strong>2011</strong>-12. The percentage Fleet Utilization decreased to 91.9% during <strong>2011</strong>-12 from 92.2% of 2010-11.<br />
The average Vehicle Utilization on Gross kms per day increased to 380 Kms. from 379 kms and on<br />
Effective kms it has decreased to 362 from 363 which was in 2010-11. The Divisionwise analysis of<br />
Vehicles held and Fleet Utilization is shown in Appendix-4. The average Seating Capacity stood at 52.0 in<br />
<strong>2011</strong>-12.The total number of Passengers carried increased to 8866.71 during <strong>2011</strong>-12 from 8076.61 lakh<br />
during <strong>2011</strong>-12. The average Passengers carried per day too increased from 22.13 lakh to 24.23 lakh. The<br />
Divisionwise details of Breakdowns, Accidents, Regularity and Passengers traveled particulars are shown in<br />
Appendix-8.<br />
a) Luggage and Parcel Transport:<br />
The Luggage rate charged for Luggage booked by crew in the year <strong>2011</strong>-12 is as below. Personal<br />
Luggage upto 30 Kgs has been allowed free of charge per Adult Passenger and 15 Kgs per Child Passenger.<br />
The Luggage in excess of these limits has been charged at the rates given below.<br />
i) Luggage rates : 50 ps. per unit of 20 kgs upto two stages or part<br />
thereof subject to a minimum of Re.5.00.<br />
ii) Newspapers : 75 ps. per unit of 5 kgs. or part thereof irrespective of<br />
distance.<br />
b) Cloak Rooms and Catering Establishments:<br />
Cloak Room Facilities have been provided at some important Bus Stations with the objective of<br />
enabling the Travelling Public to keep their Luggage in safe custody. Articles of Baggage have been<br />
accepted for safe custody as per the rates shown below:<br />
Sl.<br />
No.<br />
Particulars Per Package (Rs.) Locker (Rs.)<br />
I<br />
Upto 30Kgs. for a span of 12 hours (Suitcase,<br />
Trunks, Bedding, etc)<br />
2.00 5.00<br />
II For next 12 hours or part thereof 3.00 6.00<br />
III For each subsequent 12 hrs. 5.00 8.00<br />
Basic amenities such as Toilets, Drinking Water etc., have been provided in all the Bus Stations<br />
constructed and maintained by the Corporation.<br />
There were 111 Refreshment Rooms, 23 Tea Stalls, 14 Cloak rooms and 904 other Commercial<br />
Establishments provided to cater to the needs of Traveling Public. The details of Amenities and Facilities<br />
provided as on 31-03-<strong>2012</strong> with comparative details as on 31-03-<strong>2011</strong> are given in Table-12.<br />
- 19 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
TABLE – 12<br />
Sl.<br />
No.<br />
Amenities<br />
As on<br />
31-03-<strong>2012</strong> 31-03-<strong>2011</strong><br />
1<br />
Bus Stations<br />
a) Permanent<br />
b) Temporary/Control points<br />
141<br />
64<br />
133<br />
42<br />
2 Rural Wayside Shelters 31 31<br />
3 City Pickup Shelters 105 105<br />
4 Refreshment Rooms 111 101<br />
5 Tea Stalls 23 13<br />
6 Cloak Rooms 14 13<br />
7<br />
Others (Stalls for Soft Drinks, Fruits, Pan<br />
Beeda, Books and Stationery etc.,)<br />
904 847<br />
e) Casual Contract Services:-<br />
In addition to regular Passenger Services, the Corporation has provided Buses to Public on Contract<br />
Basis on payment of prescribed charges based either on Kms. or on Duration. The Corporation also<br />
extended concessional rates to bonafide Students for educational purpose. The rates existed for Hiring of<br />
Buses on Causal Contract as on 31-03-<strong>2011</strong> are furnished in Schedule –D.<br />
f) Concession/Season Passes & Free Passes:<br />
Concessions extended by the Corporation to different categories of the Travelling Public/Students are<br />
detailed below.<br />
1. Student Bus Passes :<br />
The maximum distance for issue of Student Bus Pass from residence to School/College is 50 kms.<br />
i. Primary School Students Free for 10 months (upto 50 kms.)<br />
upto VII standard<br />
ii VIII, IX & X standard Rs.350/- for 5 months (upto 50 kms.)<br />
school (Boys) students. Rs.700/- for 10 months ( “ )<br />
iii VIII, IX & X standard Rs.265/- for 5 months (upto 50 kms.)<br />
school (Girls) students. Rs.525/- for 10 months ( “ )<br />
iv College students Rs.550/- for 5 months (upto 50 kms.)<br />
Rs.1100/- for 10 months “<br />
v I.T.I. students Rs.675/- for 6 months (upto 50 kms.)<br />
Rs.1350/- for 12 months “<br />
vi College students (Professional) Rs.700/- for 5 months (upto 50 kms.)<br />
Rs.1400/- for 10 months “<br />
vii Evening college/Ph.D., students Rs.1400/- for 10 months (upto 50 kms.)<br />
viii Processing charges<br />
Rs.60/- per pass each time<br />
- 20 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
2. 50% Concessional Travel Facility to the Drama Troupes/Yakshagana Troupes sponsored by the Karnataka<br />
Sangeetha Nataka Academy.<br />
3. Free passes to Olympians, Para Olympians and Arjuna awardees to travel in <strong>KSRTC</strong> buses.<br />
4. Free bus passes issued to National Showrya Prashasti award winning children’s upto the age of 18 years.<br />
5. Free Travel Facility to all Freedom Fighters in Rajahamsa Buses also, within and outside the State. For<br />
Freedom Fighters aged 75 years and above, Free Travel is allowed along with a Companion.<br />
6. Concessional Travel Facility has been extended to all the Physically Handicapped persons (for all four<br />
Corporations) within the State with a restricted travel upto 100 kms from the address given by them.<br />
7. Free Travelling coupons of Rs.2000/- will be given to Wife/ Widows of Freedom Fighters to travel with in<br />
and out side the State<br />
8. 25% Concession in Fare for Senior Citizen of age 65 years and above.<br />
9. Free Travel Facility to the totally Blind persons to travel within the State of Karnataka.<br />
10. Free Traveling Facility to Ex-MLAs & MLCs to travel within and outside Karnataka in any Bus along with<br />
a Companion.<br />
11. Free Traveling Facility to sitting MLAs & MLCs to travel within the State of Karnataka. They are issued<br />
with a Gold Card on production of which they can travel in any type of Bus within the State.<br />
12. Monthly passes to working Journalists at the rate of Rs.10/- per pass per month in City/Suburban Services<br />
without restriction on the number of Trips.<br />
13. Free passes given to Accredited Journalists working in their district and Bangalore based Journalists are<br />
permitted to travel throughout the state in all type of buses including Volvo.<br />
14. Home Guards (in uniform) are allowed to travel free in City Services while on duty.<br />
15. In Mofussil Services, Commuters with monthly passes are allowed to travel in a month by paying an<br />
amount equivalent to 20 round trips Fare of Ordinary Services between any two Destinations, subject to a<br />
maximum distance of 149.5 Kms.<br />
16. Weekly Passes under the name of Freedom Tickets are made available for travel within the State in different<br />
category of Buses for an entire week (7 days). Freedom Ticket holders of Rajahamsa Bus can travel outside<br />
the State also. The rates applicable are given below.<br />
Type of Vehicle<br />
Peak Months- Apr, May,<br />
Jun, Oct & Dec (in Rs.)<br />
Other Months in the<br />
year (in Rs.)<br />
Ordinary/<br />
Karnataka Sarige<br />
Rajahamsa-<br />
Executive/Semi-sleeper<br />
Adult 1000 900<br />
Child 550 500<br />
Adult 1900 1700<br />
Child 1000 900<br />
- 21 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
17. 3-4 days Passes under the name of Suvarna Karnataka are available for Travel within the State in different<br />
category of Buses for 3 days in the peak days of the week i.e. Friday, Saturday and Sunday. Likewise 4 days<br />
in non peak days of the week i.e. Monday, Tuesday, Wednesday and Thursday. The rates applicable are<br />
given below.<br />
SL.No Type of Bus Type of pass Rate (In Rs.)<br />
1 Ordinay/Express<br />
2<br />
Sheetal<br />
(A/C Karnataka sarige)<br />
3 Rajahamsa<br />
3 Days<br />
4 Days<br />
3 Days<br />
4 Days<br />
3 Days<br />
4 Days<br />
600/-<br />
600/-<br />
700/-<br />
700/-<br />
800/-<br />
800/-<br />
18. Daily Passes have been introduced for the first time in <strong>KSRTC</strong> for Commuters of Mysore City for Travel in<br />
City Services. The pass priced at Rs.35/- each is valid for a day upto midnight.<br />
19. Chartered Contract Services have been given to Schools/Colleges/Industrial establishments/Private factories<br />
and Educational institutions at the following rates.<br />
Sl.<br />
No.<br />
Type of Bus<br />
Rate per<br />
km(Rs.)<br />
g) Concession for <strong>KSRTC</strong> Employees:<br />
1 Mofussil (Ordinary) 22.00<br />
2 Karnataka Sarige 24.00<br />
3 Semi low floor 25.00<br />
4 Rajahamsa(0800 hours to 2000 hours) 30.00<br />
5 Volvo 58.00<br />
For Schools: Discount of Rs.2/- per km on the above rates<br />
For Colleges: Discount of Re.1/- per km on the above rates<br />
i) All <strong>KSRTC</strong> Class-III & IV Employees working at places where City Services have been operated are<br />
issued with Free Passes to report to the place of work and return to their home as per the Industrial Truce<br />
Settlement.<br />
ii) Free Passes without restriction of distance have been issued to all Employees and their families once in<br />
a year to Travel to any place in Buses operated by <strong>KSRTC</strong>.<br />
iii) All School and College-going children of <strong>KSRTC</strong> Employees have been issued with Free Pass to attend<br />
Schools and Colleges in City and Mofussil Services.<br />
h) Public Complaints:<br />
355 Public Complaints have been received during the year. The rate of Public Complaints per lakh<br />
Passengers was 0.15 during <strong>2011</strong>-12. All Complaints received from the Public are carefully investigated<br />
and suitable action taken wherever warranted.<br />
- 22 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
Suggestions received from the Commuters for improvement of the Services have been always given<br />
due consideration and appropriate action taken to implement them wherever such suggestions are<br />
acceptable.<br />
i) Special Services for Jathras/Fairs:<br />
Corporation has operated Special Services on occasions like Fairs, Jathras, Religious/Cultural/ Social<br />
celebrations etc., in all operating Divisions to cater to the increased Transport needs. During the year<br />
<strong>2011</strong>-12, Special Services have been operated on 45 occasions covering 23.06 lakh kilometers and realised<br />
an amount of Rs.627.98 lakh achieving an EPKM of 2723.2 paise.<br />
j) Quality of Services:<br />
The performance particulars with regard to Quality of Services provided during the year <strong>2011</strong>-12<br />
with comparative figures for the previous year are furnished below in Table –13. The Division-wise analysis<br />
is indicated in Appendix – 8.<br />
The overall rate of Breakdowns per 10000 kms was 0.04 and rate of Accidents was 0.14 per lakh kms.<br />
TABLE – 13<br />
Sl. No. Particulars <strong>2011</strong>-12 2010-11<br />
1<br />
%age Regularity<br />
a) Departures<br />
b) Arrivals<br />
96.1<br />
96.5<br />
95.3<br />
95.9<br />
2 Breakdowns per 10000 Kms. 0.04 0.05<br />
3 Accidents per lakh Kms. 0.14 0.15<br />
The Accident details for the year <strong>2011</strong>-12 compared to 2010-11 are shown in Table –14.<br />
TABLE-14<br />
Sl. No. Nature of Accident <strong>2011</strong>-12 2010-11<br />
1 Fatal 255 233<br />
2 Major 187 197<br />
3 Minor/Insignificant 837 848<br />
Total<br />
Rate per lakh kms.<br />
1279<br />
0.14<br />
1278<br />
0.15<br />
4 No of Fatalities 350 292<br />
5 No of persons injured 1770 1758<br />
- 23 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
4.11 PASSENGER AMENITIES :<br />
1. For the benefit of Traveling Public, <strong>KSRTC</strong> has opened Advance Reservation Counters in all Bus Stations<br />
located at the jurisdictional District and Taluk Headquarters within the State and neighboring States.<br />
2. Long distance Services are operated from MCTC Bus Stand, Shantinagar Bus Stand and Byappanahalli<br />
Bus Stand (NGEF) to decongest Kempegowda Bus Stand, also pickup points are provided in 25 places in<br />
Bangalore, 3 places in Mysore and one place in Mangalore.<br />
3. Concessional Passes are issued to Students and Physically Handicapped Persons.<br />
4. Free Passes are issued to Blind and Freedom Fighters.<br />
5. Passengers can book their Tickets upto 30 days in advance. It has made a provision to book the ticket round<br />
the clock.<br />
6. Booking of tickets can be made in the counters opened in neighboring states of Tamilnadu (75) , Kerala<br />
(39) , Andhra Pradesh (38) , Goa (7), Maharashtra (44) and Pondicherry (2).<br />
7. AWATAR (Any Where Any Time Reservation) System continued for advance booking of seats throughout<br />
the state of Karnataka and also important places in the neighboring States. Totally, there are 672<br />
Booking Counters out of which Bangalore City alone has 170 such Counters (Including 16 counters of<br />
Bangalore ONE).<br />
8. Seats Booking through Internet has been continued.<br />
9. It has provided “A/C waiting lounges” in Mysore Road Satellite Bus Station and Shantinagar Bus Station<br />
to provide better facility to the travelling public of premier service.<br />
10. To facilitate passengers Mobile ticket booking e-booking are introduced.<br />
11. Arrangements have been made for booking of tickets in Bangalore through “Bangalore one” centers<br />
(e-governance project of Government of Karnataka). Presently, Bangalore one is booking tickets at 60 of<br />
their centers in Bangalore city.<br />
12. To expand the franchisee network and to attract more number of applicants , the minimum qualification<br />
is relaxed from Degree to SSLC. The minimum education qualification criterion for places outside the<br />
state is removed.<br />
13. Apart from from Online AWATAR it was appointed manual booking agents at 8 selected places in and<br />
outside the state to compete with private operators. These agents are generally located in interior places<br />
and get passengers to our buses.<br />
14. Pickup points have been provided under AWATAR system at various places in Bangalore, Mangalore,<br />
Mysore, Chikkaballapur, Bidadi and various Inter-state places such as Mumbai, Pune, Shirdi, Hydrabad,<br />
panjim, Madagao, Puducherry,Coimbatore and Aleppy etc.<br />
- 24 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
15. A Cell has been established at <strong>KSRTC</strong> , Central office to provide support to the franchisees, redressal of<br />
passenger grievances regarding bookings, e-booking transactions and enquiries about mobile bookings.<br />
16. Discount of 10% on return Journey Fare has been allowed, if both “onward and return” Journey booked<br />
simultaneously.<br />
17. Group Discount of 5% on Fare has been given, if 4 or more number of seats have been booked in a single<br />
Ticket.<br />
18. 50% concession in the Fares for Artists of Drama/Yakshagana troupes to participate in programmes<br />
approved by the Karnataka Sangeetha Nataka Academy.<br />
19. Monthly Season Passes introduced-amount equivalent to 20 days paid for 30 days Journey.<br />
20. Free Transport Facility to passengers having Reservation Tickets to Travel from their locality to the Bus<br />
Station 2 hours before the Departure of Bus in City Services.<br />
21. Fares are reduced during day time for selected Services.<br />
22. Promotional Fares are charged on selected routes to maintain parity with Private Operators and attract<br />
Passengers to Travel in <strong>KSRTC</strong> Buses.<br />
23. Loaders are appointed at Mangalore, Puttur, Mysore ®, Chamarajanager, Mysore (U),Chikkaballapur and<br />
Kolar divisions. to solicit passengers to board <strong>KSRTC</strong> Buses, assist them to load/unload Luggage, inform<br />
about the Departures etc. in view of severe competition with Private Operators.<br />
24. Confirmation/cancellation/service cancellation information will be communicated to passengers through<br />
SMS.<br />
25. To encourage e-bookings the convenience fee (payment gateway charges) is being reduced from 2.5% of<br />
the fare to Rs. 10/- per seat.<br />
26. Telephone/Mobile numbers of the advance booking passengers are being printed on the trip sheets<br />
provided to conductor so as to contact passengers in needed.<br />
27. Reservation of 10% Commercial Stalls to Physically Handicapped persons.<br />
28. Accident Relief Fund - payment of Rs.2.50 lakh as compensation to the Dependent of the deceased<br />
Passenger of <strong>KSRTC</strong> Bus involved in an Accident, in addition to the regular Compensation awarded by<br />
MACT.<br />
29. Stationing of <strong>KSRTC</strong> Rescue Wagons on the Highways with Medical Facility to<br />
shift the accident victims to the nearest Hospitals.<br />
30. Advance reservation for <strong>KSRTC</strong>,NWKRTC ,NEKRTC and BMTC services can be done through<br />
Bangalore ONE counters also.<br />
- 25 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
31. Reserved seats for Lady Passengers in City, Suburban, Ordinary and Express Services. 14 seats have been<br />
reserved in City and Suburban Services and 9 seats in Moffusil Services like Ordinary and Express Services.<br />
Two Seats have also been reserved for Lady Passengers in Semi-Deluxe and higher class of Services having<br />
Advance Reservation Facility.<br />
32. Reserved two Seats for Physically Challenged Passengers in Ordinary and Express Services where there is<br />
no Advance Reservation Facility.<br />
33. Free bus passes issued to National Showrya Prashasti award winning children’s upto the age of 18 years.<br />
*****<br />
- 26 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
CHAPTER-5<br />
AUTO ENGINEERING<br />
5.1 FLEET POSITION:<br />
<strong>KSRTC</strong> has added 1079 new Vehicles to its Fleet and scrapped 716 Vehicles which were not fit for<br />
operation during the year <strong>2011</strong>-12. Thus, as on 31-03-<strong>2012</strong> the Fleet strength of the Corporation stood at<br />
7749. The number of Departmental Vehicles such as cars, jeeps, trucks, cranes, vans, etc., held by the<br />
Corporation as at the end of the year <strong>2011</strong>-12 was 304<br />
Makewise Fleet held as at the end of the year <strong>2011</strong>-12 is given in Table – 15. These Vehicles have<br />
been operated by 72 Depots of 15 Divisions (14 operating divisions and Bus station) and 13 Divisional<br />
Workshops at respective Division Headquarters where in heavy body repair, F.C. renewal, reconditioning<br />
of major aggregates and processing of Tyres etc. have been attended to. Volvo Vehicles have been<br />
maintained by the Corporation itself.<br />
TABLE-15<br />
Sl.<br />
No.<br />
Particulars<br />
1 Registered passenger buses<br />
a) Leyland<br />
b) Tata<br />
c) Swaraj Mazda (Mini)<br />
d) Volvo/volvo city/volvo M-axle<br />
e) Carona<br />
f ) Marcopolo<br />
g) Mercedez Benz/Multi axle<br />
h) Semi low floor<br />
Vehicles held as on<br />
31-03-<strong>2012</strong> 31-03-<strong>2011</strong><br />
2162<br />
4957<br />
16<br />
426<br />
48<br />
41<br />
20<br />
79<br />
2117<br />
4708<br />
47<br />
379<br />
24<br />
41<br />
10<br />
79<br />
Total (a to f) 7749 7405<br />
2 Departmental vehicles<br />
a) Cars/Vans<br />
b) Jeeps<br />
c) Trucks<br />
d) Others (Water tankers, Wrecker, Ambulance,<br />
Training bus, Cranes, Motor cycles,etc.)<br />
Total (a to d) 304 325<br />
86<br />
75<br />
83<br />
60<br />
74<br />
81<br />
97<br />
73<br />
Note : Including 24 Vehicles ( Tata-13,leyland-3 and Volvo-8) held at RWB and 11 Vehicles (Tata- 8,<br />
leyland -1and 2 Volvo) held at RWH.<br />
The makewise and unitwise break-up of Passenger Buses is furnished in Appendix-3. The make wise,<br />
age-wise composition of vehicles in terms of kms. performed including Private Vehicles is depicted in<br />
Table-16.<br />
- 27 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
TABLE-16<br />
Sl.<br />
No.<br />
Age<br />
Swaraj Mercedez Carona Semi low Marco<br />
Leyland Tata Volvo<br />
Total<br />
(in lakh<br />
Mazda Benz (Ambari)<br />
floor<br />
polo<br />
kms.) No. % No. % No. % No. % No. % No. % No. % No % No. %<br />
1 0-1 374 17.3 385 7.8 21 5.0 0 0.00 4 20.0 20 41.7 0 0 0 0 804 10.4<br />
2 1-2 296 13.7 376 7.6 44 10.6 3 18.8 6 30.0 8 16.7 34 43.0 41 100.0 808 10.5<br />
3 2-3 148 6.9 587 11.9 29 7.0 8 50.0 10 50.0 7 14.6 45 57.0 0 0 834 10.5<br />
4 3-4 66 3.1 472 9.6 48 11.5 3 18.8 0 0 9 18.7 0 0 0 0 598 7.7<br />
5 4-5 85 3.9 742 15.0 32 7.7 2 12.4 0 0 4 8.3 0 0 0 0 865 11.2<br />
6 5-6 255 11.8 1029 20.8 16 3.8 0 0.00 0 0 0 0 0 0 0 0 1300 16.9<br />
7 6-7 506 23.4 971 19.7 17 4.1 0 0.00 0 0 0 0 0 0 0 0 1494 19.4<br />
8 7-7.5 258 12.0 274 5.6 29 7.0 0 0.00 0 0 0 0 0 0 0 0 561 7.3<br />
9<br />
7.5 &<br />
above<br />
170 7.9 100 2.0 180 43.3 0 0.00 0 0 0 0 0 0 0 0 450 5.8<br />
Overall 2158 100.0 4936 100.0 416 100.0 16 100.0 20 100.0 48 100.0 79 100.00 41 100.0 7714 100.00<br />
Age in lakh<br />
km.<br />
4.42 4.46 6.66 2.44 1.87 1.74 2.07 1.58 4.50<br />
Note : Excluding 24 Vehicles ( Tata-13 , 3 leyland and 8 Volvo) held at RWB and 11 Vehicles (Tata-8, leyland-1<br />
and 2 Volvo) held at RWH.<br />
5.2 PURCHASE OF CHASSIS:<br />
<strong>KSRTC</strong> has placed purchase orders for supply of 650 chassis during the year <strong>2011</strong>-12, in addition to<br />
76 chassis outstanding against the previous years PO. Further 100 WB BS-1V chassis have been diverted<br />
to BMTC.<br />
The following Table -17 depicts details of orders placed supplied and outstanding against the<br />
purchase orders.<br />
TABLE-17<br />
Make<br />
Outstanding<br />
as on<br />
31-03-<strong>2011</strong><br />
Ordered<br />
during<br />
<strong>2011</strong>-12<br />
Diverted to<br />
BMTC<br />
Total<br />
Received<br />
during<br />
<strong>2011</strong>-12<br />
Outstanding<br />
as on<br />
31-03-<strong>2012</strong><br />
Tata 76 0 0 76 76 0<br />
Leyland 0 650 100 550 523 27<br />
Total 76 650 100 626 599 27<br />
5.3.1 PERFORMANCE OF VEHICLES, ASSEMBLIES AND TYRES.<br />
Table-18 shows the overall performance of Vehicles, Assemblies and Tyres (excluding Private Vehicles)<br />
during the year as compared with the previous year. The details of Divisionwise Performance of Fuel,<br />
Engine oil KMPL and Tyres are indicated in Appendix-6.<br />
- 28 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
TABLE-18<br />
Sl.<br />
No.<br />
1<br />
2<br />
3<br />
4<br />
Average age of Vehicles as on<br />
31 st March (in lakh Kms.)<br />
Average age of Vehicles as on<br />
31 st March (in Years.)<br />
% of Vehicles aged more than<br />
7.50 lakh kms.<br />
Average vehicle utilisation<br />
Particulars <strong>2011</strong>-12 2010-11<br />
4.50 4.18<br />
3.35 3.20<br />
4.70 3.82<br />
a) On Gross Kms. 380 379<br />
b) On Effective Kms. 362 363<br />
5 % Fleet utilisation<br />
a) Divisional fleet 91.9 92.2<br />
b) Overall fleet (including Regl.Workshops) 91.4 91.8<br />
6 % Vehicles off road during the year<br />
a) Operating divisions 4.4 5.0<br />
b) Overall (including Regl.Workshops) 4.4 4.9<br />
7 Rate of Breakdowns per 10000 Kms.<br />
a) Mechanical 0.03 0.04<br />
b) Other failures 0.01 0.01<br />
c) Total 0.04 0.05<br />
8 KMPL ( HSD) 4.87 4.85<br />
9 KMPL (Engine Oil Top up) 13240 10832<br />
Average life of Tyres (Kms.)<br />
a) New Tyre life 50343 43898<br />
10<br />
b) Retreaded Tyre life 22293 22176<br />
c) Total Tyre life 123759 120039<br />
d) Retreadability factor 3.45 3.58<br />
11 Average Battery Kms.(in lakh) 2.96 3.02<br />
12 Average Engine Kms.(in lakh)<br />
a) New 5.98 5.73<br />
b) Reconditioned 1.42 1.57<br />
13 Average FIP Kms. (in lakh)<br />
a) New 4.18 4.02<br />
b) Reconditioned 1.52 1.06<br />
- 29 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
5.3.2 BREAK-DOWNS:<br />
The overall rate of Breakdowns per 10,000 Kms. is 0.04 during the year <strong>2011</strong>-12 and it was 0.05<br />
during 2010-11. The cause-wise analysis of Breakdowns is shown in Table-19.<br />
TABLE-19<br />
Sl.<br />
No.<br />
Systems<br />
No. of<br />
% to total Rate per 10000 Kms<br />
Breakdowns<br />
<strong>2011</strong>-12 2010-11 <strong>2011</strong>-12 2010-11 <strong>2011</strong>-12 2010-11<br />
1 Electrical 184 210 4.73 4.75 -- --<br />
2 Engine (Power) 281 354 7.22 8.01 -- 0.01<br />
3 Transmission 1097 1261 28.19 28.53 0.01 0.01<br />
4 Front Axle & Steering 59 72 1.51 1.63 -- --<br />
5 Rear Axle 44 63 1.13 1.43 -- --<br />
6 Road wheels 16 9 0.41 0.20 -- --<br />
7 Brakes 335 363 8.60 8.21 0.01 0.01<br />
8 Spring 196 242 5.04 5.48 -- --<br />
9 Fuel 254 184 6.53 4.16 -- --<br />
10 Tyre puncture 765 846 19.66 19.14 0.01 0.01<br />
11 Miscellaneous 661 816 16.98 18.46 0.01 0.01<br />
Total 3892 4420 100.00 100.00 0.04 0.05<br />
5.4.1 PRODUCTION IN THE REGIONAL WORKSHOPS:<br />
The Corporation has two Regional Workshops located at Bangalore and Hassan, in which new Buses<br />
required are constructed in addition to reconditioning of assemblies. The two Regional Workshops have<br />
an annual production capacity of about 600 new Buses. Shortfall in the production capacity is outsourced<br />
either by engaging skilled labour on contract or through outside agencies. The Regional Workshops,<br />
Bangalore and Hassan in respect of various items during the year under report as compared with the<br />
previous year is shown in Table-20.<br />
- 30 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
Sl.<br />
No.<br />
Items<br />
TABLE-20<br />
1 New Bus bodies 455+444*+180**<br />
2<br />
Buses attended for:-<br />
No. of units produced during<br />
<strong>2011</strong>-12 2010-11<br />
887+465*+8**<br />
+11***<br />
a) Reconditioning 151 --<br />
b) Major repairs (Accdt./HBR) 63 164<br />
3<br />
Reconditioning/Repairs of<br />
Engine 1461<br />
1470<br />
( includes one Volvo<br />
engine)<br />
FIP 1576 1528<br />
Air compressor 1390 1328<br />
Automizer 8036 8271<br />
*Bus body built by outside agencies.<br />
** Bus body built by Contract labour.<br />
The details of production in each of the Regional Workshops compared with the previous year are<br />
furnished in Appendix-7.<br />
5.4.2 NEW BUS BODIES /VEHICLES:<br />
Out of 1079 new buses inducted during the year, 455 new buses have been built in the Regional<br />
Workshops of the Corporation at Bangalore and Hassan, 444 were built by private/ outside agencies and<br />
the remaining 180 were constructed by the Contract labour.. Table-21 indicates the typewise Buses constructed<br />
by different units during the year <strong>2011</strong>-12.<br />
TABLE-21<br />
Sl.<br />
No.<br />
Type of bus<br />
R.Ws.<br />
Bangalore<br />
R.Ws.<br />
Hassan<br />
Contract Labour<br />
BNG<br />
HSN<br />
Private/<br />
Outside<br />
Agencies<br />
Total<br />
1 Mofussil NAL 164 46 1 59 295 565<br />
2 Gramina sarige 20 106 3 129<br />
3 City 114 5 58 25 202<br />
4<br />
Carona<br />
( Ambari sleeper)<br />
24 24<br />
5 Rajahamsa 1 20 21<br />
6 Karnataka vaibhav 47 47<br />
7 Non A/C sleeper 30 3 10 43<br />
8 Volvo Multi Axle 38 38<br />
9 Mercedez Benz Multi axle 10 10<br />
Total 298 157 90 90 444 1079<br />
- 31 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
5.4.4.0 SALIENT FEATURES OF NEW BUSES INDUCTED<br />
5.4.4.1. Sailent features of Karnataka Vaibhav bus<br />
‣ The 12 Mtr. Long bus constructed on Tata 6200mm (244”) Wheel Base Chassis.<br />
‣ Bus fitted with 177 HP Engine conforming to Euro-III emission standards.<br />
‣ Brake provided with Hydrodynamic Retarder for increased safety.<br />
‣ 2 Nos. Roof ventilator cum emergency exits with inbuilt exhaust fan ensures sufficient flow of fresh air in<br />
the passenger saloon.<br />
‣ Full length of Emergency door with Pseudo steps for easy exit of passengers during exigencies.<br />
‣ Bus provided with Air Suspension at rear and Rubber Ended Weveller suspension at front with Telescopic<br />
Shock absorbers to ensure increased degree of comfort to the passengers.<br />
‣ Provided with 48 Nos. ergonomically designed 100mm reclining saloon passenger seats.<br />
‣ Provision for Audio and Video System for entertainment to the passengers.<br />
‣ The bus has dark gray tinted toughened wider window glasses for increased visibility and elegance.<br />
‣ Front panel is designed to increase the driver vision area and aesthetic look of the bus.<br />
‣ Approximately 4 Cu Mtr. luggage space provided for the passengers.<br />
‣ Provision for charging Mobile phones and Laptop for the passengers.<br />
‣ Elegant body painting with attractive graphics.<br />
- 32 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
5.4.4.2. Sailent features of NON A/C Sleeper coach<br />
‣ Body constructed in-house at Regional Workshop, Bangalore.<br />
‣ Constructed on Tata LPO 1618 TC/62, 6200mm (244”) Wheel Base chassis.<br />
‣ 180 HP Engine confirming to Euro-III.<br />
‣ Rubber ended Wevellar suspension at front and Air suspension at rear for better travel comfort.<br />
‣ Chassis fitted with “Voith” Hydrodynamic Retarder.<br />
‣ Laminated single front windshield glass of 67” height for better vision for driver.<br />
‣ Fitted with Bucket Type ergonomically designed Beds (Berths) manufactured by M/s.Corona Bus<br />
Manufactures for increased traveling comfort of passengers.<br />
‣ 32 Nos of Berths (16 Lower and 16 Upper) are provided.<br />
‣ Wider side windows of 1814 mm (71”) bay having 500 mm (20”) height dark gray tinted sliding glasses for<br />
better vision for passengers.<br />
‣ Full-length Emergency door of clear size 560mm (W) x 1300mm (H) provided on RH side behind rear<br />
axle for safety exit of passengers in case of emergency.<br />
‣ Foam padded elegant fabric for interior roof & for each compartment.<br />
‣ Provision for Mobile / Laptop Charging made for each passenger.<br />
‣ Side & Back luggage box having 3 Cu.mtr (approx) of luggage space.<br />
‣ Exterior body painting with PU High Solid paint and elegant graphic.<br />
- 33 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
5.4.4.3. Salient features of Air conditioned Multi-axle Mercedes-Benz bus<br />
‣ The 13.7 Mtr. long bus built on 0 500 RSD 2436 chassis developed exclusively for passenger transport are<br />
with 3 axles fitted with 8 Nos. 295/80R22.5 Radial tyres offers better stability and suspension for long<br />
distance travel.<br />
‣ Full Air Suspension fitted with 8 Air bellows (2 Air bellows at front and 6 Air bellows in the rear) to offer<br />
a high degree ride comfort.<br />
‣ Fitted with branded “Carrier - 353G-IV”make air-conditioner with excellent cooling effect to make the<br />
journey comfortable & cool.<br />
‣ Provided with 49+2 Nos. (42 seats with calf support) ergonomically designed reclining seats with two point<br />
seat belts on 5 seats.<br />
‣ Equipped with Mobile and Lap Top chargers.<br />
‣ Passenger saloon is provided with plush interiors, imported curtains, Entertainment system having DVD<br />
player with LCD monitors of 19” at front header and 17” at middle of bus length integrated with speakers<br />
for entertainment.<br />
‣ Green tinted Toughened window glasses for elegance.<br />
‣ Exclusively designed front panel to increase the drivers’ vision area and aesthetic of the bus.<br />
‣ Provided with luggage space of 11 Cu. Mtr.<br />
‣ This bus is fitted with Euro-III compliant 353PH engine having electronically controlled 0M 457 LA<br />
Electronic fuel injection management system.<br />
- 34 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
5.4.5 TYRE RETREADING PLANTS:<br />
The production details of Tyres i.e., Tyres processed during the year <strong>2011</strong>-12 for resole, repair &<br />
resole and repairs in the Tyre Retreading Plants established in various Divisions are given below.<br />
Sl.<br />
No.<br />
Division<br />
Resole<br />
Repair &<br />
Resole<br />
Repair<br />
Total<br />
1 Bangalore © 6747 2798 814 10359<br />
2 Ramanagara 5412 3692 557 9661<br />
3 Tumkur 9711 2973 361 13045<br />
4 Kolar 4877 3770 2249 10896<br />
5 Chikkaballapura 8938 2331 537 11806<br />
6 Mysore (U) 3139 1685 631 5455<br />
7 Mysore® 10952 7377 443 18772<br />
8 Mandya 5862 3023 152 9037<br />
9 Chamarajanagar 5214 2263 131 7608<br />
10 Hassan 11461 1820 1605 14886<br />
11 Chickmagalore 10399 2125 782 13306<br />
12 Mangalore 12584 2940 1369 16893<br />
13 Putur 6717 1762 169 8648<br />
14 Davanagere 7423 2472 2066 11961<br />
Total 109436 41031 11866 162333<br />
*****<br />
- 35 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
CHAPTER-6<br />
STORES<br />
6.1 STORES INVENTORY:<br />
The value of stock of stores material held by the Corporation as on 31-03-<strong>2011</strong> and the<br />
transactions made during the year <strong>2011</strong>-12 vis-a-vis the position during 2010-11 are given in Table - 22.<br />
TABLE – 22<br />
Sl.<br />
No.<br />
Particulars<br />
Value (Rs. in lakh)<br />
<strong>2011</strong>-12 2010-11<br />
1 Opening balance 3172.74 2835.76<br />
2 Addition due to purchase 113109.15 99006.43<br />
3 Total (1+2) 116281.89 101842.19<br />
4 Consumption during the year 113350.09 98669.45<br />
5 Closing balance 2931.80 3172.74<br />
The inventory holding of stores classified under major heads and the magnitude of the holdings in<br />
relation to the fleet strength as at the end of the year <strong>2011</strong>-12 with comparative figures of previous year are<br />
furnished in Table-23.<br />
TABLE-23<br />
Sl.<br />
No.<br />
Classification<br />
Inventory holding<br />
as on 31 st March<br />
(Rs. in lakh)<br />
Inventory holding<br />
per bus owned as on<br />
31 st March (in Rs.)<br />
Magnitude of the<br />
inventory held as on<br />
31 st March (month’s<br />
consumption)<br />
<strong>2011</strong>-12 2010-11 <strong>2011</strong>-12 2010-11 <strong>2011</strong>-12 2010-11<br />
1 Fuel<br />
2 Lubricants<br />
3<br />
Tyres, Tubes &<br />
Flaps<br />
4 Batteries<br />
5 Spare Parts<br />
6 Other Consumables<br />
7<br />
Tickets, Stationery &<br />
Uniforms<br />
TOTAL<br />
813.43<br />
(27.7)<br />
229.92<br />
(7.8)<br />
160.14<br />
(5.5)<br />
11.05<br />
(0.4)<br />
910.77<br />
(31.1)<br />
626.31<br />
(21.4)<br />
180.18<br />
(6.1)<br />
2931.80<br />
(100.0)<br />
646.92<br />
(20.4)<br />
206.83<br />
(6.5)<br />
136.79<br />
(4.3)<br />
8.43<br />
(0.3)<br />
1171.35<br />
(36.9)<br />
846.64<br />
(26.7)<br />
155.78<br />
(4.9)<br />
3172.74<br />
(100.0)<br />
NB: Figures in bracket indicate percentage to total<br />
- 36 -<br />
10497 8736 0.1 0.1<br />
2967 2793 2.1 2.5<br />
2067 1847 0.2 0.2<br />
143 114 0.4 0.4<br />
11753 15819 1.9 2.8<br />
8083 11433 1.1 1.5<br />
2325 2104 8.4 11.8<br />
37835 42846 0.3 0.4<br />
The total value of inventory of stores held by the Corporation as on 31-03-<strong>2012</strong> was Rs.2931.80<br />
lakh as against Rs. 3172.74 lakh held as on 31-03-<strong>2011</strong>.
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
Of the total inventory of stores held as on 31-03-<strong>2012</strong>, 21.4% or Rs.626.31 lakh accounted for other<br />
consumables and 31.1% or Rs.910.77 lakh accounted for spare parts. In relation to the fleet of the<br />
Corporation, the magnitude of the stock held as on 31-03-<strong>2012</strong> was Rs.37835 per bus of which Rs.8083<br />
represented other consumables and Rs.11753 represented spare parts.<br />
6.2 STORES PURCHASE AND CONSUMPTION:<br />
The value analysis of stores purchased and consumed during the year <strong>2011</strong>-12 with comparative<br />
figures of the previous year is shown in Table-24.<br />
TABLE-24<br />
Sl.<br />
No<br />
Classification<br />
Purchase<br />
Consumption<br />
Rs.in lakh Avg.per bus (Rs.) Rs.in lakh Avg.per bus (Rs.)<br />
<strong>2011</strong>-12 2010-11 2010-11 <strong>2011</strong>-12 2010-11 <strong>2011</strong>-12 2010-11<br />
1 Fuel 89540.34 77615.83 1174962 1083399 89373.83 77504.67 1172777 1081848<br />
2 Lubricants 1355.20 1019.81 17783 14235 1332.11 987.26 17480 13781<br />
3<br />
Tyres, Tubes &<br />
Flaps<br />
9595.72 7742.04 125917 108067 9572.37 7706.87 125610 107576<br />
4 Batteries 341.77 274.51 4485 3832 339.15 273.98 4450 3824<br />
5 Spare Parts 5626.30 5092.95 73829 71090 5886.88 5043.45 77249 70399<br />
6<br />
7<br />
Other<br />
Consumables<br />
Tickets,<br />
Stationery &<br />
Uniform<br />
6367.78 7087.65 83559 98933 6588.11 6995.42 86450 97645<br />
282.04 173.64 3701 2424 257.64 157.80 3381 2203<br />
Total 113109.15 99006.43 1484236 1381980 113350.09 98669.45 1487397 1377276<br />
The total value of stores purchased during the year <strong>2011</strong>-12 was Rs.113109.15 lakh as against<br />
Rs.99006.43 lakh during 2010-11. The average purchase of stores per vehicle increased from Rs. 1381980<br />
to Rs. 1484236<br />
The total value of stores consumed during the year <strong>2011</strong>-12 was Rs.113350.09 lakh as against<br />
Rs. 98669.45 lakh during 2010-11. The average consumption per vehicle went up from Rs. 1377276 to<br />
Rs. 1487397.<br />
6.3 IMPORT OF SPARE PARTS/MACHINERIES:<br />
The Spares required for Ticket Printing Machine were imported from M/S Atlantic Zeiser limited,<br />
United Kingdom at value of Rs.10.78 lakh during the period <strong>2011</strong>-12.<br />
6.4 DISPOSAL OF SCRAP MATERIALS AND VEHICLES:<br />
The total revenue realized from the sale of scrapped materials and vehicles in the tender-cum-auction<br />
sale was Rs.19.13 crore during <strong>2011</strong>-12 as against Rs.21.43crore realized during 2010-11. 716 scrapped<br />
vehicles were sold in the tender-cum-auction sale during the year under report as against 654 sold during<br />
2010-11.<br />
*****<br />
- 37 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
CHAPTER-7<br />
FINANCE<br />
7.0 The financial results of the working of the Corporation and the salient features of the Financial Management<br />
during the year <strong>2011</strong>-12 are detailed in the following paragraphs.<br />
7.1 CAPITAL STRUCTURE:<br />
The Capital contribution of the Corporation consists of Contribution from the participating Governments<br />
viz., the State and Central Government. In order to provide more Transport and Infrastructure<br />
Facility to the Commuters, Funds have been raised from the Commercial Banks for purchase of Buses. The<br />
Capital Investment of the Corporation is as shown in Table-25.<br />
TABLE – 25<br />
(Rs.in Lakh)<br />
Sl<br />
No<br />
Source<br />
Position<br />
as on<br />
31-03-<strong>2011</strong><br />
% to<br />
total<br />
Addition<br />
s<br />
during<br />
<strong>2011</strong>-12<br />
Withdrawal<br />
during<br />
<strong>2011</strong>-12<br />
Position<br />
as on<br />
31-03-<strong>2012</strong><br />
% to<br />
total<br />
1<br />
State Govt.:-<br />
a). Cap. Contr.<br />
b). Equity Capital<br />
0.00<br />
24278.94<br />
0.00<br />
14.21<br />
0.00<br />
0.00<br />
0.00<br />
0.00<br />
0.00<br />
24278.94<br />
0.00<br />
12.90<br />
2<br />
Central Govt.:-<br />
a). Cap. Contr.<br />
b). Equity Capital<br />
100.00<br />
4809.76<br />
0.06<br />
2.81<br />
0.00<br />
0.00<br />
0.00<br />
0.00<br />
100.00<br />
4809.76<br />
0.05<br />
2.55<br />
3<br />
4<br />
JnNURM+SDP+SUTP<br />
(contribution from<br />
State and Central)<br />
Inter. Resources<br />
(Depn. Reserve)<br />
6539.02 3.83 5277.19 8109.73 3706.48 1.97<br />
73704.86 43.13 3986.96 0.00 77691.82 41.28<br />
5 From Revenue 40060.39 23.44 4076.96 0.00 54137.35 28.76<br />
6<br />
Loans:-<br />
a). Comm.Banks<br />
b). KUIDFC<br />
21204.00<br />
184.44<br />
12.41<br />
0.11<br />
5000.00<br />
1100.00<br />
3864.00<br />
122.96<br />
22340.00<br />
1161.48<br />
11.87<br />
0.62<br />
Total 170881.41 100.00 9441.11 2096.69 188225.83 100.00<br />
7.2 CAPITAL RECEIPT:<br />
The Capital Investment of the Corporation increased from Rs. 170881.41 lakh as on 31-03-<strong>2011</strong> to<br />
Rs.188225.83 lakh with an addition of Rs.17344.42 lakh as on 31-03-<strong>2012</strong>.<br />
As such the Capital Structure of <strong>KSRTC</strong> stood at Rs.188225.83 lakh as at the end of 31-03-<strong>2012</strong>.<br />
The source of Capital Investment and the transactions during the year are detailed in Table-25. Of the<br />
total investment as on 31-03-<strong>2012</strong>, the contributions and the equity from the participant Governments<br />
represented 17.47%, (which includes contribution amount of Rs.3706.48 lakh from State and Central<br />
Govt. under JnNURM scheme), while the amount financed internally represented 70.04%, and loans<br />
constituted 12.49 %.<br />
- 38 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
7.3 CAPITAL EXPENDITURE:<br />
Sl.<br />
No.<br />
The composition of gross Capital Expenditure on fixed assets as at the end of the year under report,<br />
with net additions during the financial year is shown in Table-26.<br />
Item of Assets<br />
Position<br />
as on<br />
31-03-11<br />
% to<br />
total<br />
Gross<br />
addition<br />
including<br />
tr. from one<br />
category to<br />
other<br />
TABLE- 26<br />
Value<br />
of<br />
assets<br />
sold<br />
On a/c of<br />
tr.to<br />
assets<br />
adjust.<br />
a/c on<br />
reconcillat<br />
ion<br />
Written<br />
off<br />
On a/c of<br />
tr.from<br />
one<br />
category<br />
to<br />
other<br />
Position<br />
as on<br />
31-03-12<br />
1 Land 3116.48 1.82 340.48 1.55 11.25 0.00 0.00 3444.16 1.83<br />
2<br />
3<br />
Bldg. (including<br />
those in progress)<br />
Passenger<br />
Buses<br />
4 Dept. Vehicles 1174.12<br />
% to<br />
total<br />
34460.27 20.17 14084.00 52.93 3629.05 79.36 6404.59 38378.34 20.39<br />
116291.69 68.06 41631.61 0.00 499.11 8188.44 18616.49 130619.26<br />
0.69<br />
160.96 0.00 0.00 105.06 0.00 1230.02<br />
5 Plant & Mach. 7179.47 4.20 764.50 0.00 21.66 0.00 6.69 7915.62 4.21<br />
6<br />
Furniture<br />
& other<br />
equipments<br />
(Rs.in Lakh)<br />
855.04 0.50 65.89 0.00 0.00 0.00 4.53 916.40 0.49<br />
7 JnNURM assets 7766.38 4.54 7626.60 0.00 4154.15 0.00 6175.68 5063.15 2.69<br />
8 CWIP-ITS/IES 37.96 0.02 620.92 0.00 0.00 0.00 0.00 658.88 0.35<br />
Total 170881.41 100.00 65294.96 54.48 8315.22 8372.86 31207.98 188225.83 100.00<br />
With a net addition of Rs.17344.42 lakh to the fixed assets during the year <strong>2011</strong>-12, cumulative<br />
expenditure on fixed assets rose from Rs. 170881.41 lakh to Rs.188225.83 lakh as on 31-03-<strong>2012</strong>. Out of<br />
the total expenditure of Rs. 188225.83 lakh the total investments on passenger vehicles was to the extent of<br />
Rs.130619.26 lakh and constituted 69.39% of the total investments and Rs.41822.50 lakh (22.22%) on<br />
land and buildings while the balance of Rs.15784.07 lakh (8.39%) comprised other assets such as plant<br />
and machinery, furniture and other equipments including domestic vehicles, JnNURM assets and<br />
CWIP-ITS/IES<br />
7.4 REVENUE RECEIPT:<br />
The gross revenue turnover which was in the order of Rs. 207868.29 lakh during 2010-11 has been<br />
increased to Rs.231863.54 lakh during <strong>2011</strong>-12 representing an increase of 11.54% or Rs.23995.25 lakh.<br />
The detailed analysis of revenue receipts is given in Table-27.<br />
69.39<br />
0.65<br />
- 39 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
TABLE- 27<br />
Sl<br />
N<br />
o<br />
Particulars<br />
Amount (Rs.in lakh)<br />
% age to total<br />
Ps. per<br />
effective km<br />
2010-11 <strong>2011</strong>-12 2010-11 <strong>2011</strong>-12 2010-11 <strong>2011</strong>-12<br />
A<br />
Traffic revenue<br />
1 Passenger fare<br />
2.Passenger luggage<br />
3.Contract services<br />
4.Rev.from travel concession<br />
5.Fines collected<br />
6.Postal mail service<br />
162233.58<br />
1141.13<br />
6055.63<br />
7368.26<br />
55.42<br />
44.99<br />
194198.40<br />
1627.07<br />
5677.15<br />
9745.50<br />
62.13<br />
40.18<br />
78.04<br />
0.55<br />
2.91<br />
3.54<br />
0.03<br />
0.02<br />
83.75<br />
0.70<br />
2.45<br />
4.20<br />
0.03<br />
0.02<br />
1863.11<br />
13.10<br />
69.54<br />
84.62<br />
0.64<br />
0.52<br />
2101.13<br />
17.61<br />
61.42<br />
105.44<br />
0.67<br />
0.44<br />
Total – A 176899.01 211350.43 85.10 91.15 2031.53 2286.71<br />
B<br />
Other revenue :<br />
1.Advertisement<br />
2.Non tr. revenue<br />
3.Commercial<br />
establishment<br />
4.Financial income<br />
5.From sale of scrap<br />
6.Sale of land<br />
6. From subsidy<br />
135.31<br />
9562.99<br />
1779.85<br />
177.20<br />
2142.83<br />
7429.12<br />
9737.73<br />
119.20<br />
3716.01<br />
2546.87<br />
39.97<br />
1912.62<br />
734.45<br />
11348.93<br />
0.07<br />
4.60<br />
0.86<br />
0.09<br />
1.03<br />
3.57<br />
4.68<br />
0.05<br />
1.60<br />
1.10<br />
0.02<br />
0.83<br />
0.32<br />
4.89<br />
1.56<br />
109.82<br />
20.44<br />
2.03<br />
24.61<br />
85.32<br />
111.83<br />
1.29<br />
40.20<br />
27.56<br />
0.43<br />
20.69<br />
7.95<br />
122.79<br />
Total B 30965.03 20418.05 14.90 8.81 355.61 220.91<br />
C Net prior period adj. (+) 4.25 (+) 95.06 0.00 0.00 0.05 1.03<br />
D Gross Revenue(A+B+C) 207868.29 231863.54 100.00 100.00 2387.19 2508.65<br />
Of the total gross revenue Rs. 231863.54 lakh realised during the year under report, Rs.211350.43<br />
lakh constituting to 91.15 % of the total receipts represents Traffic Revenue and Rs.20418.05 lakh<br />
constituting 8.81 % represents miscellaneous receipts. The Corporation has received a subsidy of<br />
Rs.11348.93 lakh from the State Government during <strong>2011</strong>-12 towards concessions extended to various<br />
category of the commuters. The rate of gross earnings per effective Km during the year <strong>2011</strong>-12 is<br />
2508.65 paise, while the EPKM realised from traffic revenue is 2286.71 paise<br />
7.5 WORKING EXPENDITURE:<br />
The total Expenditure during the year <strong>2011</strong>-12 was Rs.229922.13 lakh as against Rs. 201663.02 lakh<br />
during 2010-11 indicating an increase of Rs.28259.11 lakh or 14.01 %<br />
An analysis of the total working expenses under major heads both in actuals and in terms of rate<br />
per km. with percentage break-up is furnished in Table-28.<br />
- 40 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
TABLE – 28<br />
Sl.<br />
No<br />
A<br />
Particulars<br />
Amount (Rs.in lakh) % to total Ps. per eff. Km.<br />
2010-11 <strong>2011</strong>-12 2010-11 <strong>2011</strong>-12 2010-11 <strong>2011</strong>-12<br />
Staff:-<br />
1). Traffic 37538.49 44801.75 18.61 19.49 431.10 484.73<br />
2). Work Shops & Maintenance 6029.18 7951.05 2.99 3.46 69.24 86.03<br />
3) .Others 4463.68 5755.82 2.21 2.50 51.26 62.28<br />
4). P. F. Welfare Etc. 14733.61 11837.36 7.31 5.15 169.20 128.07<br />
Total –A 62764.96 70345.98 31.12 30.60 720.80 761.11<br />
B<br />
1). Fuel (Diesel) 77504.67 89373.83 38.43 38.87 893.18 966.98<br />
2). Lubricants 987.26 1332.11 0.49 0.58 11.38 14.41<br />
3). Auto spare parts 5043.45 5886.88 2.50 2.56 58.12 63.70<br />
4). Tyres and tubes 7706.87 9572.37 3.82 4.16 88.82 103.57<br />
5). Batteries and electrical items 273.98 339.15 0.14 0.15 3.16 3.67<br />
6). Other consumables 2190.54 2170.28 1.09 0.95 25.24 23.48<br />
7). Reconditioning 2332.39 2604.54 1.16 1.13 26.88 28.18<br />
8. Taxes:-<br />
a). M V Tax 9637.56 11567.87 4.78 5.03 110.68 125.16<br />
b). Other Taxes on Vehicles 118.56 114.87 0.06 0.05 1.36 1.24<br />
Total taxes (a to b) 9756.12 11682.74 4.84 5.08 112.04 126.40<br />
9. Interest<br />
a). To Central Govt. 0.00 0.00 0.00 0.00 0.00 0.00<br />
b). To State Govt. 0.00 0.00 0.00 0.00 0.00 0.00<br />
c). On borrowings 1904.18 1932.96 0.94 0.84 21.87 20.92<br />
Total (a to c) 1904.18 1932.96 0.94 0.84 21.87 20.92<br />
10. Depreciation<br />
a). On Vehicles 17621.78 19315.73 8.74 8.40 203.08 208.99<br />
b). On other assets 1472.42 1676.96 0.73 0.73 16.91 18.14<br />
Total (a to b) 19094.20 20992.69 9.47 9.13 219.28 227.13<br />
Total B. 126793.66 145887.55 62.88 63.45 1456.11 1578.43<br />
C<br />
D<br />
Miscellaneous and Others 12018.12 13688.60 5.96 5.95 138.02 148.10<br />
Hired Vehicle charges 86.28 0.00 0.04 0.00 284.66 0.00<br />
GRAND TOTAL (A+B+C+D) 201663.02 229922.13 100.00 100.00 2315.92 2487.65<br />
The operating expenditure includes all items of revenue expenditure and also capital charges like<br />
depreciation, interest on capital and loans.<br />
- 41 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
7.6 WORKING RESULTS:-<br />
The Financial Results of the working of the Corporation and financial ratios indicating the trends in<br />
productivity of investment during the year <strong>2011</strong>-12 with comparative figures for the previous year are<br />
given in Table-29.<br />
TABLE -29<br />
Sl<br />
No<br />
Particulars 2010-11 <strong>2011</strong>-12<br />
1 Capital employed ( Mean – Rs. in lakh) 65858.50 68349.00<br />
2 Revenue turnover (Gross)<br />
a). Rs. in lakh<br />
b). Ratio to mean capital<br />
3 Total expenditure<br />
a). Rs. in lakh.<br />
b). As % age to Revenue<br />
4 Net profit/loss before Income Tax<br />
a). Rs. in lakh.<br />
b). As % age to mean Capital Employed<br />
5 Return on Capital (Net Profit + Int.charges)<br />
a). Rs. in lakh.<br />
b). % age return on Mean Capital<br />
207868.29<br />
3.16<br />
201663.02<br />
97.01<br />
6205.26<br />
9.42<br />
8109.43<br />
12.31<br />
231863.54<br />
3.39<br />
229922.13<br />
99.16<br />
1941.41<br />
2.84<br />
3874.37<br />
5.67<br />
The revenue turnover ratio has been increased to 3.39 during <strong>2011</strong>-12 from 3.16 of 2010-11. The<br />
expense ratio decreased to 99.16 during <strong>2011</strong>-12 from 97.01 of 2010-11. Net profit earned during the<br />
current year is Rs.1941.41 lakh as against the profit of Rs. 6205.26 lakh during 2010-11.<br />
- 42 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
7.7 FUNDS AND RESERVES:<br />
The position pertaining to various internal funds and reserves of the Corporation during the year<br />
<strong>2011</strong>-12 is furnished in Table-30.<br />
Table – 30<br />
(Rs.in Lakh)<br />
Sl<br />
No.<br />
Description of<br />
Fund<br />
Opening<br />
balance<br />
as on<br />
01-04-<strong>2011</strong><br />
During<br />
<strong>2011</strong>-12<br />
Additions<br />
On a/c of<br />
tr.from<br />
one cat.<br />
to other<br />
On a/c<br />
of written<br />
off assets/<br />
debits<br />
Deductions<br />
On a/c of<br />
tr. from<br />
one ctg.<br />
to another<br />
Closing<br />
balance<br />
as on<br />
31-03-<strong>2012</strong><br />
1 Depreciation 84496.03 21005.44 1873.13 8239.67 1917.60 97217.33<br />
2<br />
Insurance Fund for Vehicles<br />
(third party risk only)<br />
20.00 3424.09 0.00 3424.09 0.00 20.00<br />
3<br />
Insurance Fund for other<br />
Assets (including Vehicles)<br />
3873.89 687.45 0.00<br />
261.21<br />
0.00 4300.13<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
Insurance Fund for freight<br />
surcharges for risk in<br />
carriage of Parcels and<br />
Goods.<br />
<strong>KSRTC</strong> Employees Welfare<br />
& Passenger Amenities Fund<br />
General reserve Fund receipt<br />
from MP's fund<br />
Special Development plan<br />
(SDP Grants)<br />
JnNURM Grants for<br />
Buildings<br />
JnNURM Grants for Rolling<br />
stock<br />
40.57 0.00 0.00 0.00 0.00 40.57<br />
1287.33 531.83 0.00 503.43 0.00 1315.73<br />
53.90 0.00 0.00 53.90 0.00 0.00<br />
3112.77 2500.00 0.00 3438.49 0.00 2174.28<br />
2758.48 1743.15 0.00 4154.13 0.00 347.50<br />
0.00 0.13 0.00 0.00 0.00 0.13<br />
10 JnNURM Grants for ITS/IES 484.77 534.80 0.00 0.00 0.00 1019.57<br />
11 CFA Solar plan Grants 183.00 499.11 0.00 517.11 0.00 165.00<br />
Total 96310.74 30926.00 1873.13 20592.03 1917.60 106600.24<br />
The total internal fund balance as on 31-03-<strong>2012</strong> is Rs.106600.24 lakh. The total addition during the<br />
year to the various funds amounted to Rs.30926.00 lakh and the withdrawals on account of written off<br />
assets/debits to the extent of Rs.20592.03 lakh. The Corporation has utilised Rs.84090.61lakh from the<br />
Fund towards Capital expenditure programme and repayment of long-term loans.<br />
The balance shown against various funds in Table-30 are exclusive of the amount withdrawn as<br />
internal resources for the purpose of capital expenditure and repayment of Loans. The details of the funds<br />
so utilized up to 31.03.<strong>2012</strong> are shown in Table-31.<br />
- 43 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
TABLE – 31<br />
(Rs.in Lakh)<br />
Sl.<br />
No<br />
Funds utilized<br />
Opening<br />
balance<br />
as on<br />
01-04-<strong>2011</strong><br />
Additions<br />
during<br />
<strong>2011</strong>-12<br />
Withdrawals<br />
during<br />
<strong>2011</strong>-12<br />
Closing<br />
balance<br />
as on<br />
31-03-<strong>2012</strong><br />
1<br />
Depreciation Fund for Capital Expenditure<br />
and repayment of Loans<br />
73704.86 3986.96 0.00 77691.82<br />
2 Betterment Fund 0.00 0.00 0.00 0.00<br />
3<br />
4<br />
5<br />
Vehicle replacement reserve for Capital<br />
Expenditure<br />
<strong>KSRTC</strong> Employees Welfare & Passenger<br />
Amenity Fund<br />
Development rebate reserve and utilized for<br />
Capital<br />
0.00 0.00 0.00 0.00<br />
1287.33 531.83 503.43 1315.73<br />
0.00 0.00 0.00 0.00<br />
Total 74992.19 4518.79 503.43 79007.55<br />
Category wise pay scale in force as on 31-03-<strong>2012</strong> and rate of <strong>Annual</strong> contribution and amount of<br />
revenue expenditure of depreciation on movable and immovable property is shown in schedule–E and<br />
schedule–F respectively. Balance sheet as on 31 st March <strong>2012</strong>, Accounting policies, profit and Loss account<br />
for the year ended 31 st March <strong>2012</strong>, Net revenue appropriation account for the year ended 31 st March<br />
<strong>2012</strong> and the details of Capital expenditure for the year <strong>2011</strong>-12 are shown in Appendix 9,10,11,12 and<br />
13 respectively.<br />
*****<br />
- 44 -
Number of Depots<br />
Fleet held (As on the last day)<br />
80<br />
70<br />
60<br />
50<br />
40<br />
46<br />
48 49 50<br />
56<br />
59 60<br />
63<br />
69<br />
71 72<br />
9000<br />
8000<br />
7000<br />
6000<br />
5000<br />
4000<br />
4278 4346 4410<br />
4944<br />
5384<br />
5950<br />
6759 6914 6967<br />
7405<br />
7749<br />
30<br />
20<br />
10<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
3000<br />
2000<br />
1000<br />
0<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
Schedules (As on the last day)<br />
Addition of new vehicles<br />
7500<br />
6458<br />
6697 7137<br />
7000<br />
6500<br />
5478 5737 6206<br />
6000<br />
5500<br />
4984<br />
5000<br />
4615<br />
4500 3899 4050 4094<br />
4000<br />
3500<br />
3000<br />
2500<br />
2000<br />
1500<br />
1000<br />
500<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
2000<br />
1500<br />
1000<br />
500<br />
0<br />
1660<br />
1371<br />
1263<br />
1190<br />
1046<br />
1079<br />
995<br />
800<br />
685 665 657<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
1000<br />
800<br />
600<br />
400<br />
200<br />
Vehicles scrapped<br />
837<br />
701<br />
710<br />
716<br />
637<br />
660<br />
622 640<br />
476<br />
516 521<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
Effective kms. operated per day (In lakh)<br />
26<br />
25.25<br />
22.20 23.09 23.86 24<br />
22<br />
20.76<br />
18.92<br />
20<br />
17.51<br />
18<br />
14.70 15.36 15.92<br />
16 14.26<br />
14<br />
12<br />
10<br />
8<br />
6<br />
4<br />
2<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
1
Effective kilometers ( In crore)<br />
100<br />
92.43<br />
95<br />
90<br />
84.28 87.08<br />
85<br />
81.04<br />
80<br />
75.98<br />
75<br />
69.04<br />
70<br />
63.92<br />
65<br />
58.10<br />
60<br />
53.66 56.22<br />
55 52.05<br />
50<br />
45<br />
40<br />
35<br />
30<br />
25<br />
20<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
370<br />
360<br />
350<br />
Vehicle utilization (In kms.)<br />
367 367<br />
365<br />
365<br />
364<br />
363<br />
362<br />
362 362<br />
362<br />
360<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
Percentage Cancellation of kms.<br />
KMPL (HSD)<br />
4.0<br />
3.5<br />
3.7<br />
6.0<br />
4.88<br />
5.02 5.25 5.28 5.13<br />
5.07<br />
5.02 4.92 4.84 4.85 4.87<br />
2.4<br />
3.0<br />
4.0<br />
20 2.0<br />
24 2.4<br />
0.9<br />
1.0<br />
1.3<br />
1.8<br />
1.9<br />
1.6<br />
2.0<br />
0.0<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
0.0<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
Average age of vehicles (In lakh kms.)<br />
Load factor ( Percentage)<br />
6<br />
5<br />
4<br />
4.44 4.42 4.41<br />
4.23 4.11<br />
3.93<br />
3.61 3.66<br />
4.17 4.18<br />
4.50<br />
80<br />
60<br />
70.7<br />
69.0<br />
73.9<br />
70.7 68.6 70.2<br />
72.2<br />
70.8<br />
69.5<br />
72.8<br />
77.4<br />
3<br />
40<br />
2<br />
1<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
20<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
2
New tyrelife( in kms)<br />
Retreaded tyre life( in kms)<br />
60000<br />
30000<br />
50000<br />
40000<br />
38640 39220 40345 42166<br />
43911 44096 43612 45571<br />
45644<br />
43898<br />
50343<br />
25000<br />
20000<br />
27822 27781 27516 26535<br />
24826<br />
23607 23719 23489 23042<br />
22176 22293<br />
30000<br />
15000<br />
20000<br />
10000<br />
10000<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
5000<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
Total tyre life & Retreadedability factor<br />
Battery life( in lakh kms)<br />
150000<br />
3.80<br />
4.00<br />
140176 141774<br />
125004 129160 3.70<br />
125062<br />
123759<br />
125000<br />
120891<br />
121426 120039<br />
113904 113484<br />
3.60<br />
3.58<br />
3.50<br />
100000 3.55 3.43<br />
3.39<br />
347 3.47<br />
3.46 3.32<br />
3.45 3.40<br />
75000<br />
3.30<br />
3.22<br />
3.14<br />
3.20<br />
50000<br />
3.12<br />
3.10<br />
25000<br />
3.00<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
3.50<br />
3.00<br />
2.50<br />
2.00<br />
1.50<br />
1.00<br />
0.50<br />
3.21 3.26<br />
3.13<br />
3.07<br />
3.02 3.02 2.96<br />
2.79 2.86<br />
3.00<br />
2.94<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
Engine (New/RC) life( in lakh kms)<br />
FIP (New/RC) life( in lakh kms)<br />
6.00<br />
5.00<br />
4.00<br />
3.00<br />
2.00<br />
1.00<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
Engine New 4.40 4.87 5.47 5.45 5.55 5.29 5.36 5.13 5.52 5.73 5.98<br />
RC 1.37 1.47 1.74 2.18 1.97 2.09 2.14 1.93 1.67 1.57 1.42<br />
5.00<br />
4.50<br />
4.00<br />
3.50<br />
3.00<br />
250 2.50<br />
2.00<br />
1.50<br />
1.00<br />
0.50<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
FIP New 3.14 3.55 3.25 3.22 3.58 4.08 4.20 3.66 3.88 4.02 4.18<br />
RC 0.81 0.84 1.15 0.86 1.10 1.48 1.73 1.58 1.26 1.06 1.52<br />
3
Break downs<br />
Accidents<br />
8000<br />
7000<br />
6000<br />
5000<br />
4000<br />
3000<br />
2000<br />
1000<br />
0.12<br />
6065<br />
0.09<br />
7<br />
4657<br />
0.05<br />
2539<br />
0.05<br />
2604<br />
0.06<br />
3762<br />
0.08<br />
5193<br />
0.09<br />
6986<br />
6<br />
0.08<br />
6<br />
6316<br />
252<br />
5<br />
0.06<br />
4420<br />
3892<br />
0.14<br />
0.12<br />
0.10<br />
0.08<br />
0.06<br />
0.05<br />
0.04 0.04<br />
0.02<br />
1600<br />
1400<br />
1200<br />
1000<br />
800<br />
600<br />
400<br />
200<br />
0.17<br />
904<br />
0.18<br />
951<br />
0.16<br />
838<br />
0.17<br />
933<br />
0.18<br />
1122<br />
1125<br />
0.16<br />
0.18<br />
1400<br />
1393<br />
0.17<br />
1257<br />
0.15<br />
1278<br />
0.15<br />
1279<br />
0.19<br />
0.18<br />
0.17<br />
0.16<br />
0.15<br />
0<br />
0.00<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
0<br />
0.14 0.14<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
No. of Break down<br />
Rate per 10000 kms<br />
No. of Accidents<br />
Rate per 100000 kms<br />
Staff employed<br />
Staff ratio<br />
40000<br />
35000<br />
32100 33299 34019 36448<br />
6.00<br />
5.92<br />
5.83<br />
5.82<br />
5.84<br />
5.77<br />
5.76<br />
30000<br />
25000<br />
20000<br />
15000<br />
23085 23655 23626 24989 24866 27255 27505<br />
500 5.00<br />
5.40<br />
5.44<br />
5.64<br />
5.36<br />
5.41<br />
5.05<br />
5.11<br />
4.99<br />
4.62<br />
4.98<br />
5.05<br />
4.58<br />
4.83<br />
4.79<br />
5.33<br />
517 5.17<br />
4.64<br />
5.26<br />
516 5.16<br />
4.78<br />
5.17<br />
5.09<br />
4.59<br />
5.23<br />
511 5.11<br />
4.70<br />
10000<br />
4.00<br />
4.07<br />
5000<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
Per on road Vehicles Per Schedule per vehicle<br />
Effective kms. per employee per day<br />
Traffic revenue (Rs. in crore)<br />
80<br />
60<br />
40<br />
61.6<br />
62.2<br />
65.0<br />
63.7<br />
70.4<br />
69.4<br />
75.5<br />
69.2 69.3 70.1 69.3<br />
2400<br />
2200<br />
2000<br />
1800<br />
1600<br />
1400<br />
2113.50<br />
1768.99<br />
1429.53 1515.06<br />
1320.10<br />
1200<br />
1173.99<br />
20<br />
1000<br />
800<br />
600<br />
621.48<br />
989.12<br />
798.99<br />
680.63 749.16<br />
0<br />
400<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
200<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
4
Traffic rev. earned per ang. bus held ( in Rs.)<br />
Traffic rev. earned per employee per day (In Rs.)<br />
8000<br />
7000<br />
6000<br />
5000<br />
4000<br />
5215<br />
4063 4347 4665 4760<br />
5508<br />
5763<br />
5760<br />
5928<br />
6765<br />
7579<br />
1600<br />
1400<br />
1200<br />
1000<br />
800<br />
738 788<br />
866 876<br />
1090<br />
1180<br />
1311<br />
1220 1247<br />
1425<br />
1584<br />
3000<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
600<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
Gross revenue earned (Rs. in crore)<br />
Gross rev. earned per bus held (In Rs.)<br />
2400<br />
2200<br />
2000<br />
1800<br />
1600<br />
1400<br />
1200<br />
1000<br />
800<br />
600<br />
400<br />
200<br />
2318.64<br />
2078.68<br />
1639.36 1746.36<br />
1448.11<br />
1271.80<br />
1085.69<br />
685.65 730.57 790.83 895.46<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
9000<br />
8000<br />
7000<br />
6000<br />
5000<br />
4000<br />
3000<br />
2000<br />
8313<br />
7949<br />
6606 6833<br />
6305<br />
5856<br />
5525<br />
4391 4606 4900 4962<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
Gross rev. earned per employee per day (In Rs.)<br />
Revenue earned from advertisements (Rs. in lakh)<br />
1800<br />
1600<br />
1400<br />
1200<br />
1000<br />
800<br />
600<br />
1738<br />
1670<br />
1438 1399<br />
1437<br />
1278<br />
982 1196<br />
846<br />
915<br />
814<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
150<br />
140<br />
130<br />
120<br />
110<br />
100<br />
90<br />
80<br />
70<br />
60<br />
50<br />
40<br />
30<br />
20<br />
10<br />
34.38<br />
48.86<br />
60.10<br />
46.49 50.88<br />
72.53<br />
92.63<br />
123.58<br />
137.96 135.31<br />
119.20<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
5
2200<br />
2000<br />
1800<br />
1600<br />
1400<br />
1200<br />
1000<br />
800<br />
600<br />
400<br />
200<br />
Revenue earned from sale of scrapped vehicles<br />
& materials (Rs. in lakh)<br />
853.97 829.01<br />
1010.12 903.27 915.32<br />
1553.36<br />
1670.05<br />
1488.56<br />
2002.36 2142.83 1912.62<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
Revenue earned from commercial establishments<br />
(Rs. in lakh)<br />
2800<br />
2546.87<br />
2600<br />
2400<br />
2200<br />
2000<br />
1705.42 1709.19 1748.49 1779.85<br />
1800<br />
1495.73<br />
1600<br />
1400<br />
1266.101221.22 1329.46<br />
1200<br />
1000 861.15<br />
800<br />
650.24<br />
600<br />
400<br />
200<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
Variable cost per kilometer (In paise)<br />
Fixed cost per kilometer (In paise)<br />
1600<br />
1500<br />
1400<br />
1300<br />
1200<br />
1100<br />
1000<br />
900<br />
800<br />
700<br />
600<br />
500<br />
400<br />
300<br />
200<br />
579.0<br />
854.7<br />
721.2 739.4<br />
1417.3 1539.4<br />
1162.9 1165.0 1255.8 1257.2<br />
1040.2<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
1000<br />
800<br />
600<br />
400<br />
200<br />
948.3<br />
897.6<br />
756.8<br />
689.2 695.8<br />
584.6 586.3 601.00<br />
623.6<br />
606.1<br />
627.6<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
70<br />
65<br />
60<br />
55<br />
50<br />
45<br />
40<br />
35<br />
30<br />
25<br />
20<br />
15<br />
10<br />
5<br />
0<br />
16.52<br />
Financial Margin on Gross<br />
Revenue (Rs. in crore)<br />
32.74<br />
33.90<br />
25.87 26.63 26.78<br />
40.54<br />
57.71<br />
48.85<br />
62.05<br />
19.41<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
EPKM & CPKM ( In paise)<br />
3100<br />
2600<br />
2100<br />
1600<br />
1100<br />
600<br />
100<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
EPKM 1317.3 1361.4 1406.8 1541.3 1698.5 1842.0 1905.9 2022.8 2072.0 2387.2 2508.6<br />
CPKM 1285.5 1300.4 1360.8 1495.5 1656.6 1792.9 1852.5 1951.6 2014.1 2315.9 2487.7<br />
6
Components of Gross revenue during <strong>2011</strong>-12<br />
Other rev.<br />
3.9%<br />
(Rs.90.69crore) +<br />
Rs.0.95crore adj.)<br />
Subsidy<br />
4.9%<br />
(Rs.113.49 crore)<br />
Components of traffic revenue during <strong>2011</strong>-12<br />
Rs.56.77 crore (2.69%)<br />
From C.C<br />
Rs.97.46 crore (4.61%)<br />
From sale of<br />
passes<br />
Others<br />
Rs.1.02crore (0.05%)<br />
Luggage<br />
revenue<br />
Rs.16.27 crore (0.77%)<br />
Traffic<br />
revenue<br />
91.2%<br />
(Rs.2113.50 crore)<br />
Rs.1941.98 crore (91.88%)<br />
From Sale of<br />
tickets<br />
DISTRUBUATION OF COST IN PERCENTAGE<br />
<strong>2011</strong>-12<br />
DISTRIBUTION OF COST IN PERCENTAGE<br />
FOR <strong>2011</strong>-12<br />
Others 8.76<br />
Staff 30.60<br />
Staff 30.60<br />
Depreciation 9.13<br />
Staff<br />
Interest 0.84<br />
Fuel<br />
Others 30.53<br />
Staff<br />
M.V.tax 5.08<br />
Tyres & tubes<br />
Spares<br />
Fuel<br />
Spares parts 2.56<br />
M.V.tax<br />
Interest<br />
Others<br />
Depreciation<br />
Tyres & tube 4.16<br />
others<br />
Fue38.87<br />
Fuel 38.87<br />
DISTRIBUTION OF COST IN PAISE<br />
FOR <strong>2011</strong>-12<br />
DISTRIBUTION OF COST (RS. IN LAKH)<br />
FOR <strong>2011</strong>-12<br />
Staff 70345.98<br />
Others 759.6<br />
Staff 761.1<br />
Staff<br />
Others<br />
70202.32<br />
Staff<br />
Fuel<br />
Fuel<br />
Others<br />
Others<br />
Fuel 967.0<br />
Fuel 89373.83<br />
7
120<br />
110<br />
100<br />
90<br />
80<br />
70<br />
60<br />
50<br />
40<br />
30<br />
20<br />
10<br />
0<br />
Profit/M.V.Tax/ Subsidy from Govt<br />
(Rs. in crore)<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
profit 16.52 32.74 25.87 26.63 26.78 33.90 40.54 57.71 48.85 62.05 19.41<br />
M.V. tax 36.91 40.72 53.33 61.64 76.30 90.88 101.26 89.74 83.67 97.56 116.83<br />
Subsidy 43.13 21.00 10.62 63.53 60.00 52.10 81.81 70.73 77.80 97.34 113.49<br />
Medical reimbursement paid to<br />
employees (Rs. in lakh)<br />
700<br />
693.00<br />
650<br />
612.00<br />
600<br />
584.00<br />
550<br />
500<br />
431.50 467.32 440.00<br />
450<br />
400<br />
374.05<br />
350<br />
301.22<br />
300<br />
250<br />
230.21<br />
200 157.30<br />
150 112.47<br />
100<br />
50<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
35000<br />
30000<br />
25000<br />
20000<br />
15000<br />
10000<br />
5000<br />
Number of de-addicted checks &<br />
cases detected<br />
32630<br />
12<br />
22282<br />
9<br />
27694<br />
28<br />
14026<br />
15658<br />
30<br />
13258<br />
26<br />
32<br />
17<br />
11248<br />
37<br />
54<br />
18068 17270<br />
49<br />
46<br />
21253 21608<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
No. of checks No. of cases detected<br />
60<br />
50<br />
40<br />
30<br />
20<br />
10<br />
0<br />
300<br />
250<br />
200<br />
150<br />
100<br />
232<br />
180<br />
Number of De-addicted<br />
employees treated<br />
251 246<br />
149 151<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
212<br />
145<br />
160<br />
134<br />
110<br />
750000<br />
700000<br />
650000<br />
600000<br />
550000<br />
500000<br />
450000<br />
400000<br />
350000<br />
300000<br />
250000<br />
200000<br />
150000<br />
100000<br />
50000<br />
Number of Buses checked<br />
320635 325051 312628 314733<br />
268848<br />
374989<br />
564122<br />
642424<br />
738494<br />
680402<br />
735705<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
100<br />
90<br />
80<br />
70<br />
60<br />
50<br />
40<br />
30<br />
20<br />
10<br />
0<br />
43.55 45.18<br />
Pilferage amount and penalty<br />
collected (Rs. in lakh)<br />
53.32<br />
12.14 9.72 7.70 9.35<br />
40.85<br />
29.39<br />
4.46 5.70<br />
44.04<br />
70.79<br />
80.81 78.41 79.14<br />
91.96<br />
10.69 10.25 11.15 12.42 12.99<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
Pilferage amt.<br />
Penalty<br />
8
5<br />
Smoke emission checks<br />
No. of MVC/MFA cases disposed<br />
90000<br />
80000<br />
70000<br />
60000<br />
50000<br />
40000<br />
30000<br />
20000<br />
10000<br />
0<br />
1.45 1.23<br />
6092561101<br />
50488 52169 53567 50488<br />
44944 49890<br />
0.52<br />
0.47<br />
0.28<br />
0.52<br />
80719 82948<br />
73282<br />
1.60<br />
1.40<br />
1.20<br />
1.00<br />
080 0.80<br />
0.65 0.72 0.60<br />
0.22 0.27 0.46<br />
0.40<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
Number<br />
Percentage<br />
0.20<br />
0.00<br />
4000<br />
3000<br />
2000<br />
1000<br />
0<br />
2897<br />
2630<br />
1910<br />
2117 2162<br />
2114 2220<br />
1833<br />
1495<br />
1462 1453<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
Compensation paid<br />
(In MVC & MFA cases) (Rs.in crore)<br />
Expenditure incurred for infrastructure<br />
(Land & Building) (Rs.in crore)<br />
40<br />
35<br />
30<br />
25<br />
20<br />
15<br />
10<br />
5<br />
0<br />
34.24<br />
28.95<br />
25.88 26.58<br />
18.57<br />
20.01 21.05<br />
15.83 15.71<br />
11.40<br />
12.94<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
145<br />
125<br />
105<br />
85<br />
65<br />
45<br />
25<br />
5<br />
14.29<br />
9.88<br />
23.61 24.08<br />
17.15 20.80<br />
42.03<br />
56.36<br />
125.44<br />
33.48<br />
62.67<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
500<br />
450<br />
400<br />
350<br />
300<br />
250<br />
200<br />
150<br />
100<br />
50<br />
80.82 90.70<br />
Cumulative expenditure incurred for<br />
infrastructure (Land & Building) (Rs.in crore)<br />
114.31 138.39 155.54 176.34 218.37<br />
During <strong>2011</strong>-12 Rs.47.26 crore related to<br />
SDP works has been deleted in the cum. Exp.<br />
274.73<br />
442.41 457.82<br />
400.17<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
1435<br />
1360<br />
1285<br />
1210<br />
1135<br />
1060<br />
985<br />
910<br />
835<br />
760<br />
685<br />
610<br />
535<br />
460<br />
385<br />
310<br />
235<br />
160<br />
85<br />
10<br />
366.45<br />
7 4 . 5 2<br />
11.03<br />
36.93<br />
382.91<br />
7 6 .5 9<br />
14.36<br />
38.26<br />
Value of fixed assets (Rs. in crore)<br />
400.31<br />
9 2 .2 9<br />
22.25<br />
40.44<br />
500.8<br />
1 1 5 .7 0<br />
22.78<br />
43.46<br />
1 8.42<br />
6 1<br />
1 3 2 .0 0<br />
23.59<br />
53.95<br />
747.15<br />
1 5 1 .8 9<br />
24.43<br />
59.81<br />
922.34<br />
1 9 3 .6 8<br />
24.67<br />
65.86<br />
957.75<br />
2 4 9 .6 5<br />
25.06<br />
74.53<br />
2 4 . 0 7<br />
988.72<br />
3 0 4 .7 5<br />
30.77<br />
81.91<br />
7 6 . 8 1<br />
1162.92<br />
3 4 4 .6 0<br />
31.16<br />
92.47<br />
7 7 . 6 6<br />
1306.13<br />
3 8 3 .7 9<br />
34.44<br />
107.21<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
Buses Land Buildings Others JnNURM<br />
5 0 . 6 3<br />
9
Loan availed (Rs. in crore)<br />
Value of stores inventory held<br />
(Rs.in crore) (As on 31 st March)<br />
145<br />
125<br />
105<br />
85<br />
65<br />
45<br />
25<br />
5<br />
127.75<br />
117.00<br />
75.00<br />
79.16<br />
64.83<br />
55.86 59.33<br />
61.00<br />
33.13<br />
7.90<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
35<br />
30<br />
25<br />
20<br />
15<br />
10<br />
5<br />
31.73<br />
27.78 28.36<br />
29.32<br />
22.32<br />
19.70<br />
14.68<br />
16.23<br />
10.90 11.32 11.08<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
Net worth (Rs.in crore)<br />
Return on capital (Rs.in crore)<br />
480<br />
440<br />
400<br />
360<br />
320<br />
280<br />
240<br />
200<br />
160<br />
120<br />
80<br />
40<br />
0<br />
-40<br />
-80<br />
103.27<br />
67.21<br />
183.94<br />
284.58<br />
364.23<br />
450.40 446.77<br />
26.85<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
-78.08 -42.16 -14.27<br />
90<br />
80<br />
70<br />
60<br />
50<br />
40<br />
30<br />
20<br />
10<br />
89.37<br />
81.09<br />
73.92<br />
65.53<br />
58.57<br />
52.5757<br />
44.94<br />
43.50<br />
39.74 40.03<br />
38.74<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
Accumulated loss (Rs.in crore)<br />
100<br />
62.56<br />
43.15<br />
50<br />
0<br />
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 <strong>2011</strong>-12<br />
-50<br />
-100<br />
-67.7575<br />
-18.90<br />
-150<br />
-125.46<br />
-200<br />
-166.00<br />
-199.89<br />
-250<br />
-226.67<br />
-300<br />
-253.31<br />
-279.18<br />
-350<br />
-311.92<br />
10
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
CHAPTER-8<br />
CIVIL ENGINEERING<br />
8.1 LAND VALUE:<br />
In the revised Budget Estimates for the year <strong>2011</strong>-12, Rs.1000.00 lakh has been earmarked for<br />
purchase of Land. 19.00 acres of Land has been purchased at the cost of Rs. 295.00 lakh at different places.<br />
The extent of total Land held by the Corporation including KIMCO as on 31-3-<strong>2012</strong> was 1149.00 acres<br />
and its book value is Rs.4154.00 lakh.<br />
8.2 PROGRESS OF CIVIL WORKS:<br />
In the revised Budget Estimates <strong>2011</strong>-12 for Capital Expenditure on Buildings has been estimated at<br />
and provided Rs. 7500.00 lakh. This includes Rs. 25.00 crore released by the Govt. of Karnataka during<br />
<strong>2011</strong>-12 towards development of Transport Infrastructure Facilities to the commuters on the<br />
recommendations of Dr. Nanjundappa <strong>Report</strong> under the SDP scheme. During the year the Corporation<br />
by utilizing its Internal Resources and grants released by the Government under SDP scheme has takenup<br />
119 works (including 76 new works) at an approximate cost of Rs. 9445.16 lakh and spent<br />
Rs. 7487.40 lakh. The works takenup under these two Capital Expenditure heads separately are detailed<br />
below in the following paragraphs and the break-up of the committed works and the progress of<br />
expenditure during the year under report is furnished in Table-32. The cumulative expenditure on<br />
Buildings including the works in progress was Rs.44698.24. lakh as on 31-03-<strong>2012</strong>.<br />
a).<br />
b).<br />
Under SDP scheme 30 works have been taken up and out of which 7 works have been completed and the<br />
remaining 23 works are under progress. The Expenditure incurred as on 31-03-<strong>2012</strong> under this scheme<br />
during the year is Rs.1077.65 lakh.<br />
By utilizing the Internal Resources of the Corporation, it has taken up 89 works out of which 78 works<br />
have been completed and the remaining 11 works are under progress. The Expenditure incurred as on<br />
31-03-<strong>2012</strong> under this Head during the year is Rs.6409.75 lakh.<br />
TABLE- 32<br />
Sl.<br />
No.<br />
Particulars<br />
Estimated Expenditure<br />
No. of<br />
works<br />
- 57 -<br />
Cost<br />
(Rs. in<br />
lakh)<br />
Actual Expenditure<br />
No. of<br />
works<br />
Cost<br />
(Rs. in lakh)<br />
1 Depot 05 1095.53 05 435.62<br />
2 Bus Station 07 3486.63 07 2676.01<br />
3 Upgradation of Bus Stations 15 1415.00 15 990.47<br />
4 Upgradation of Bus Depots 18 1533.00 18 1001.42<br />
5 Misc. works 74 1915.00 74 2383.88<br />
Total 119 9445.16 119 7487.40
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
<strong>KSRTC</strong> has taken up construction of State-of-theArt bus station at Peenya Bangalore at a cost of<br />
Rs.36.00 crore. Sixteen bays have been proposed to accommodate parking of 1600 buses in the bus<br />
station. Further action is under progress to provide modern passenger amenities like dust proof parking<br />
area, sanitary block, seating arrangements, commercial facilities, park and ride facilities and different mode<br />
of transport facilities under one roof.<br />
8.3 WORKS UNDER JnNURM PROJECT :<br />
In addition to the above, under JnNURM paln construction of I.M.T.C at Illawala and Kuvempunagar<br />
have been completed and started functioning during the year. Civil work of I.M.T.C at Sathagalli is<br />
under progress. During the year <strong>2011</strong>-12 Rs.3.65 crore have been spent. The Cumulative amount spent<br />
under this project is Rs.102.83 crore as against the target of Rs.110.16 crore.<br />
8.4 TEMPORARY WORKS, REPAIRS AND MAINTENANCE :<br />
Apart from the permanent works of Capital in nature, number of semi-permanent, temporary, other<br />
repairs and maintenance works have also been taken up during the year under report. The expenditure<br />
incurred on such temporary, repairs and maintenance works during the year amounted to Rs.875.00 lakh.<br />
8.5 ACTION PLAN FOR THE YEAR <strong>2012</strong>-13<br />
It is contemplated to spend Rs.6500.00 lakh including purchase of Land and various committed<br />
works like construction of Depots, Bus Stations, Divisional Offices, Divisional Workshops and other<br />
miscellaneous works in the Action Plan for the year <strong>2012</strong>-13. It is expected release of Rs. 4000.00 lakh<br />
Budget Grants from the State Government for various civil works under SDP scheme.<br />
*****<br />
- 58 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
CHAPTER-9<br />
LABOUR<br />
9.1 WORKERS PARTICIPATION IN MANAGEMENT :<br />
In pursuance of the policy of the Government regarding workers participation in management,<br />
particularly at shop floor level, the Corporation has constituted ‘production-cum-grievance’ committee in<br />
all the Depots, Divisional Workshops, Regional Workshops and Printing Press. The suggestions made by<br />
the employees’ representatives are also considered if it is in the interest of the Corporation. It has also<br />
constituted bipartite committees such as P.F. trust and educational assistance fund committee.<br />
9.2 INDUSTRIAL DISPUTES:<br />
The Corporation employees have filed 1228 disputes in different Courts and 474 disputes have been<br />
decided during the year of report.<br />
9.3 PAID HOLIDAYS:<br />
The employees covered under the Factories Act and M.T.W. Act is entitled to 10 paid holidays in a<br />
calendar year. During the year of report, Rs.6.10 crore has been paid as additional wages to the employees<br />
who have worked in lieu of paid holidays.<br />
9.4 GRATUITY:<br />
Gratuity is paid in accordance with the <strong>KSRTC</strong> Gratuity Regulations or in accordance with the<br />
provisions of the Payment of Gratuity Act 1972, whichever is beneficial to the employees. The quantum of<br />
Gratuity is equal to half month’s pay (Pay + Dearness allowance) for each completed year of service as per<br />
the Act. As per the Regulations, the quantum of Gratuity is one month’s basic pay for each completed year<br />
of service.<br />
In respect of erstwhile KIMCO employees who have been absorbed in <strong>KSRTC</strong>, the payment of<br />
Gratuity is regulated in accordance with the Payment of Gratuity Act, 1972.<br />
During the year <strong>2011</strong>-12, 784 employees including employees who have taken Voluntary Retirement,<br />
resigned/dismissed from services and expired have been paid an amount of Rs.35.44 crore as Gratuity.<br />
9.5 EMPLOYEES PROVIDENT FUND SCHEME:<br />
The Provident Fund is regulated in accordance with the provisions of Employees Provident Fund and<br />
Miscellaneous Provisions Act 1952. Since <strong>KSRTC</strong> is an exempted Industry from EPF Act 1952, the Fund<br />
is managed by a trust consisting of the representatives of the Management and the Labour. An amount of<br />
Rs.73.42 crore has been paid as P.F. advance during the period of report.<br />
- 59 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
9.6 CANTEEN:<br />
With a view to providing canteen facilities to the employees, the Corporation Board vide Resolution<br />
No.6035, dated 27-02-1989, accorded approval for establishing and entrusting running of canteens at the<br />
Regional Workshops/Divisional Headquarters and Depots to the Co-operative Societies formed by the<br />
employees by extending certain facilities such as free building, actual expenditure towards installation of<br />
gas equipment, expenditure towards purchase of furniture, working capital, 80% minimum wages to<br />
canteen staff, actual expenditure towards consumption of gas, electricity and water and to extend similar<br />
facilities to the Co-operative canteens already functioning at Kolar, Mysore, Chickballapur, K.G.F and<br />
Chintamani. The Canteens at Regional Workshops, Bangalore and Hassan are run by the Corporation. As<br />
per CBR No.9113 dtd.26.08.2009, the <strong>Annual</strong> subsidy has been increased from October 2009 as under:-<br />
Canteen<br />
Regional Workshop Bangalore & Hassan<br />
Mysore and Kolar<br />
Chkkaballapura<br />
KGF & Chintamani Depot<br />
<strong>Annual</strong> Subsidy<br />
From Rs.40,000 to Rs.60,000/-<br />
From Rs.30,000 to Rs.40,000/-<br />
From Rs.15,000 to Rs.30,000/-<br />
From Rs.15,000 to Rs.20,000/-<br />
9.7 MEDICAL REIMBURSEMENT AND OTHER MEDICAL FACILITIES:<br />
Employees are entitled for Medical reimbursement as per <strong>KSRTC</strong> Employees (Medical Attendance)<br />
Regulations 1970. An amount of Rs.6.93 crore has been reimbursed towards the medical claims of<br />
employees during the year of report. Family Members and dependent parents are also eligible for<br />
reimbursement.<br />
Further, with a view to provide better medical facilities, so far 117 well equipped Private Hospitals<br />
recognized by the Government at different District Head Quarters, Taluk level including Bangalore Head<br />
Quarters and 7 Diagnostic Centers have been recognized by the Corporation. The employees and their<br />
family members can avail treatment in these Hospitals. During the year <strong>2011</strong>-12, nine more Private<br />
Hospital have been recognized additionally.<br />
9.8 COMPENSATION UNDER WORKMEN’S COMPENSATION ACT:<br />
During the year under report, an amount of Rs.32.79 lakh has been paid towards Workmen’s<br />
Compensation Amount to the eligible employees.<br />
9.9 FESTIVAL ADVANCE:<br />
All Class-III & IV employees and officers are entitled to a Festival Advance of Rs.3000/- in a calendar<br />
year recoverable in ten monthly installments. During the year <strong>2011</strong>-12 an amount of Rs.3.59 crore has<br />
been paid as Festival Advance.<br />
9.10 SPORTS & CULTURAL ACTIVITIES:<br />
Sports and Cultural competitions have been conducted at Central Office level and Divisional level<br />
and Rs.2.45 lakh has been spent towards Sports and Cultural Activities during the year of report.<br />
- 60 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
9.11 DEATH-CUM-RETIREMENT BENEFIT FUND:<br />
All employees of the Corporation are enrolled as members of this fund by contributing Rs.20/- each<br />
per month. Out of Rs.20/- an amount of Rs.7/- is set apart towards death coverage and the balance of<br />
Rs.13/- is credited to the employees savings account. In the event of death of an employee while in service,<br />
the DRBF Trust pays Rs.5,000/- towards funeral expenses, the balance of his contribution along with 8%<br />
interest plus Rs.25,000/- is being paid to the dependent of the deceased towards final settlement.<br />
The employees dismissed/ retired/resigned from services are entitled to get their contribution along<br />
with 8% interest as per the provisions of this fund.<br />
9.12 EDUCATIONAL ASSISTANCE FUND:<br />
Under the aegis of the Educational Assistance Fund, the Industrial Training Institute at Hassan has<br />
been functioning for the benefit of the employees’ children providing courses in the following 3 trades.<br />
1 Diesel Mechanic 1 Year<br />
2 Sheet Metal 1 Year<br />
3 Auto Electrician 1 Year<br />
All the trainees of the Institute were paid an amount of Rs.75/- each per month as stipend.<br />
The details of Educational Assistance provided to employee’s children are as follows:<br />
1 I.T.I. courses Rs.75/- per month<br />
2 Diploma courses Rs.110/- per month<br />
3 Graduataion- BE/BVSC courses Rs.900/-per semester<br />
4 Medical courses & Post-graduate courses Rs.225/- per month<br />
An amount of Rs.4.65 lakh has been paid towards scholarships to 214 students (children of<br />
employees/officers) studying in different disciplines.<br />
This educational assistance is extended to only one member of the employee’s family.<br />
9.13 BONUS:<br />
For the year <strong>2011</strong>-12, as per the amended Bonus Act, eligible employees have been paid statutory<br />
Bonus amounting to Rs.2.94 crore (not exceeding Rs. 3500/- in each case).<br />
9.14 LABOUR RELATIONS:<br />
The system of redressing the grievances/problems of employees at Divisional level and Central Office<br />
level is in practice. During the year of report there have been no strikes or incidences of Labour unrest and<br />
there has been harmonious Industrial Relations.<br />
- 61 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
9.15 LABOUR WELFARE MEASURES:<br />
1. Educational Loan:<br />
Under the scheme, educational loan upto Rs.1.00 lakh at 9.5% annual interest has been extended to<br />
the employees/officers whose children get admission to professional courses viz., BE, MBBS, BDS, BAMS<br />
etc. During the year of report, loan of Rs.24.83 lakh has been sanctioned to 58 children of Employees/<br />
Officers.<br />
2. Grant of Cash Award for Merit Students:<br />
Under the scheme, the children of Employees/Officers securing 70% and more marks in SSLC, PUC<br />
annual examinations and more than 60% marks in Degree examinations have been granted cash awards<br />
ranging from Rs.1000/- to Rs.4000/-. During the year of report 880 students have been granted cash<br />
awards to the tune of Rs.20.14 lakh.<br />
3. De-addiction Programme:<br />
A de-addiction programme under the name WAPPA (Work Place Alcohol Prevention Programme<br />
and Activity) has been implemented in <strong>KSRTC</strong> in the year 1997 to help alcohol addicts to over come the<br />
habit. A 40 bed unit for de-addication treatment has been established at <strong>KSRTC</strong> Jayanagar Hospital,<br />
Bangalore on 30-1-1999. The Corporation spends upto Rs.5000/- to each addicted employee towards the<br />
treatment. During the year <strong>2011</strong>-12, 110 employees have been treated for alcoholism.<br />
4. Establishment of the Preventive Medicine and Healthy Life Style Clinic:<br />
A Preventive Medicine & Healthy Life Style Clinic has been established on 28-01-2005 at <strong>KSRTC</strong><br />
Jayanagar Hospital, Bangalore to provide comprehensive health check up of all Employees. Similar Healthy<br />
Life Style Clinic has been established at Mysore on 01-07-2006. During the year of report, 375 Employees<br />
have under gone health checkup at Bangalore Clinic & 1193 Employees at Mysore clinic.<br />
5. Vima Yojane:<br />
Employees Family Welfare Scheme has been implemented in the Corporation from 01-02-2008. This<br />
scheme is voluntary and optional. Under the scheme, the dependent of the member Employee who dies<br />
while in service, is entitled to get a compensation of Rs. 3.00 lakh. The monthly premium of the scheme is<br />
Rs. 150/-out of which the Employee will contribute Rs. 100/- and the Employer Rs.50/-. During the year<br />
<strong>2011</strong>-12, Rs.4.17 crore has been paid as compensation under the scheme.<br />
6. <strong>KSRTC</strong> Saurya Prashasti Medal Scheme:<br />
Board of Directors of the Corporation has resolved and brought in <strong>KSRTC</strong> Saurya Prashasti medal<br />
Scheme vide resolution No 9129 dated 25-11-2009 to grant cash award upto the maximum of Rs. 20,000<br />
and Gold Medal for meritorious/ exemplary services and sacrifice rendered by the employees while<br />
discharging their legitimate duties after examining casewise. During the year <strong>2011</strong>-12 there have been no<br />
eligible employees to attain Saurya Prashasti Medal.<br />
****<br />
- 62 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
CHAPTER-10<br />
SECURITY AND VIGILANCE<br />
10.0.0 Security and Vigilance department consist of the following sections:<br />
1.Security<br />
2.Vigilance<br />
10.1.0 SECURITY SECTION:<br />
10.1.1 Main duty of the Security Department is to provide physical security to the property of the<br />
Corporation against theft, fire, pilferage and misappropriation etc., by the employees and the outsiders.<br />
The security personnel have reported cases of different type relating to theft, misuse and misappropriation<br />
of <strong>KSRTC</strong> property. Comparative figures of the cases reported during the year <strong>2011</strong>-12 and 2010-11 are<br />
shown in Table-33.<br />
TABLE – 33<br />
Sl.<br />
No.<br />
Nature of cases<br />
Number of cases<br />
<strong>2011</strong>-12 2010-11<br />
1 Theft of <strong>KSRTC</strong> property 19 10<br />
2 Misappropriation of <strong>KSRTC</strong> property:<br />
a) Misappropriation by the employees<br />
other than conductors.<br />
b) Misappropriation by the conductors<br />
4<br />
3<br />
5<br />
3<br />
Total<br />
7 8<br />
3 Loss or damage to <strong>KSRTC</strong> property. 44 29<br />
4 Total number of cases (1 to 3) 70 47<br />
5 Total amount involved (Rs.in lakh) 200.09 49.91<br />
10.1.2 The Security staff have also reported other cases wherein employees of the Corporation involved and<br />
the details as compared to corresponding period of previous year are shown in Table-34.<br />
TABLE– 34<br />
Sl.<br />
No.<br />
Nature of cases<br />
Number of cases<br />
<strong>2011</strong>-12 2010-11<br />
1 Assault 17 20<br />
2 Rude behavior 11 7<br />
3 Other miscellaneous cases 63 45<br />
Total number of cases(1to3) 91 72<br />
- 63 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
10.1.3 The department has ensured proper departmental action against errant employees by initiating<br />
disciplinary action. In case of theft and mis-appropriation complaints have been lodged in the<br />
jurisdictional police stations against erring employees and offending outsiders for ensuring legal action<br />
against them.<br />
10.1.4 ANALYSIS OF WORK DONE BY THE SECURITY PERSONNEL:<br />
The Security staff of the operating divisions and Regional Workshops have detected and reported<br />
cases of theft, mis-appropriation, loss and damage to the <strong>KSRTC</strong> property. The details are as under.<br />
a) Theft of <strong>KSRTC</strong> Property:<br />
The details of theft cases reported and enquired into during <strong>2011</strong>-12 as compared to previous year are<br />
furnished in Table-35.<br />
TABLE-35<br />
Year<br />
No. of<br />
cases<br />
Amount of<br />
property involved<br />
(Rs.in lakh)<br />
No. of<br />
employees<br />
involved<br />
No. of<br />
outsiders<br />
involved<br />
<strong>2011</strong>-12 19 1.43 11 10<br />
2010-11 10 0.88 25 05<br />
b) Misappropriation:<br />
(i) Other than conductors :<br />
Details of misappropriation cases reported against employees other than conductors in <strong>2011</strong>-12 and<br />
the related figures of previous year are given in Table-36.<br />
TABLE – 36<br />
Year<br />
No. of cases<br />
Amount involved<br />
(Rs. in lakh)<br />
<strong>2011</strong>-12 4 0.10<br />
2010-11 5 0.90<br />
(ii) Conductors :<br />
Details of misappropriation cases reported against conductors in <strong>2011</strong>-12 and the related figures of<br />
previous year are given in Table-37.<br />
Table-37<br />
Year No. of cases Amount involved (Rs. in lakh )<br />
<strong>2011</strong>-12 3 0.04<br />
2010-11 3 0.82<br />
- 64 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
c) Loss of damages to <strong>KSRTC</strong> Property:<br />
32 cases of loss of damage to <strong>KSRTC</strong> property due to agitation, strike, fire, etc., involving an amount<br />
of Rs.120.51 lakh are reported during the year <strong>2011</strong>-12 as against 20 cases involving an amount of<br />
Rs. 991.11 lakh during the previous year.<br />
10.1.5 FIRE ACCIDENTS:<br />
12 cases of fire accidents have been reported during the year <strong>2011</strong>-12 involving loss of property<br />
worth of Rs.56.17 lakh as against 9 cases of fire accidents reported involving loss of property worth of<br />
Rs.5.92 lakh during 2010-11.<br />
10.1.6 DACOITY/ROBBERY:<br />
During <strong>2011</strong>-12 a Dacoity/Robbery case have been reported in Bagepalli Depot of Chikkaballapura<br />
Division causing loss of Rs.6152/- to the Corporation. In 2010-11 an attempt of robbery case is reported<br />
in Mysore while carrying traffic revenue of Mysore depot-1 for remittance to bank.<br />
10.2.0 VIGILANCE SECTION:<br />
10.2.1 The Department takes cognizance of the petitions received and information gathered on various acts<br />
of omissions and commissions on the part of the officers and officials of <strong>KSRTC</strong> in their discharge of<br />
duties, indulging in corrupt practices etc., and arranges for proper enquiries. 541 petitions of all types have<br />
been received during the year <strong>2011</strong>-12. Out of them 447 petitions have been referred for enquiry. 27<br />
petitions have been forwarded to NWKRTC, 69 petitions to NEKRTC and 4 petitions to BMTC for<br />
action at their end. In 155 cases, enquiry reports have been sent to various disciplinary authorities for<br />
initiating action against the employees. 181 enquiry reports have been closed. 111 petitions are pending<br />
with Dy Chief Security & Vigilance Officers/Security & Vigilance Officers/ Divisional Security Inspectors<br />
of various divisions at enquiry stage.<br />
The monitoring work at Central Control Room at Central Office with the objective of receiving and<br />
managing information on various issues which affect the bus operations viz., Accidents, Breakdowns, Union<br />
activities, Strikes, Agitations, dharna’s survivellance system at Kempegowda Bus Station and Mysore City<br />
Bus Station have been connected to Central Control Room by making use of high end network technology<br />
for effective monitoring of the activities at these bus station round the clock has been continued.<br />
10.3.0 LINE CHECKING :<br />
10.3.1 Line Checking staff and the Security & Vigilance staff have detected and reported cases of pilferage by<br />
crew during their line checking duties. Emphasis has been laid to check pilfer-prone conductors and<br />
drivers. The details are as shown in Table – 38.<br />
- 65 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
TABLE – 38<br />
Year<br />
No. of<br />
buses<br />
checked<br />
No. of<br />
pilferage<br />
cases<br />
detected<br />
Pilferage<br />
amount<br />
involved<br />
(Rs. in lakh)<br />
Penalty<br />
imposed<br />
(Rs. in lakh)<br />
Passengers<br />
penalized<br />
<strong>2011</strong>-12<br />
2010-11<br />
735705<br />
680402<br />
76803<br />
65257<br />
12.99<br />
12.42<br />
91.96<br />
79.14<br />
104052<br />
99851<br />
10.4.0 PREVENTIVE CHECKS:<br />
Preventive checks have been conducted to ensure correctness of supply of HSD and its proper accountal.<br />
The details of preventive checks made as compared to previous year are as under<br />
Sl.<br />
No.<br />
Particulars <strong>2011</strong>-12 2010-11<br />
1 Checks on underground HSD tank 802 585<br />
2 Checks on IOC tankers enroute 283 63<br />
10.5.0 DETECTION OF CASES OF ALCOHOL CONSUMPTION:<br />
In order to ensure road safety and to avoid accidents, a scheme of identification of alcoholics and their<br />
treatment has been started. The Security staff are supplied with Breath Analysers to detect consumption of<br />
alcoholic drinks by the employees while on duty. A programme of De-addiction called “Work Place<br />
Alcohol, Prevention Programme and Activities (WAPPA)” has been continued during the year under<br />
review. Regular and extensive checkings were conducted by the Security staff. In all 21608 Checks on<br />
employees were made with Breath analyser. 46 cases of drunken while on duty were detected and the<br />
employees were sent to De-addiction centers to undergo the treatment to bring such employees to the main<br />
stream.<br />
10.6.0 ACCIDENTS MVC INVESTIGATIONS:<br />
Security & Vigilance Department has taken up investigations of genuineness of the claims made by<br />
the petitioners in MVC cases and as per Circular No.182 dt.15-5-2005 security officials are visiting fatal<br />
accident spot and are conducting investigation to know the causes of accidents. Investigation reports have<br />
been received in 179 Fatal accident cases during <strong>2011</strong>-12 and action on the guilty drivers is under progress<br />
by the concerned disciplinary authorities.<br />
10.7.0 ACTIONS ON THE REPORTS OF SECURITY & VIGILANCE STAFF:<br />
The Department had referred the reports submitted by Security & Vigilance personnel to the<br />
Competent Disciplinary Authorities for initiation of disciplinary action against the defaulters. The<br />
disposal particulars of the cases referred to various disciplinary authorities during the year <strong>2011</strong>-12 are as<br />
follows;<br />
- 66 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
a) Dismissal 01<br />
b) Termination/removal 00<br />
c) Pay reduction 100<br />
d) Recovery from pay 652<br />
e) Postponement of increment 103<br />
f) Censure 73<br />
g) Fine 237<br />
h) Exoneration 11<br />
i) Reverted to lower post 00<br />
10.8.0 AWARDS:<br />
In all 29 employees/officers of Security & Vigilance Department have been sanctioned reward<br />
amounting to Rs.12750/- in appreciation of their initiative and good work in detecting various cases of<br />
theft, pilferage etc., during <strong>2011</strong>-12.<br />
*****<br />
- 67 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
CHAPTER-11<br />
ENVIRONMENT INITIATIVES<br />
Environmental Initiatives undertaken by the Corporation during the year <strong>2011</strong>-12 are detailed below.<br />
11.0 Afforestation:<br />
A massive Afforestation programme is in place and 33,000 saplings have been planted at Bus Station/<br />
Depot/Divisional Office/Workshop areas of the Corporation. The Training Academy of Hassan has been<br />
identified for major Afforestation and water shed activity.<br />
11.1 Smoke Emission Checks:<br />
The Corporation has continued the programme of routine/surprise Smoke Emission Checks covering<br />
the entire Fleet at regular intervals. Totally 82,948 Vehicles have been checked for Smoke Emission levels<br />
(as shown below graphically) during the year under report and out of which 381 (0.46%) Buses found<br />
slightly above the limit. These Buses have been corrected and put back to operation.<br />
The limit of smoke level of heavy duty diesel Vehicles being 65 Hartridge, no Vehicle above the norm<br />
is allowed to operate. All the Vehicles have been tested for Emission level and a PUC (Pollution Under<br />
Control) sticker for the Emission Under Control is displayed on the Vehicles. A reward of Rs: 1000/- to a<br />
person identifying the operation of Vehicle with black smoke is in force w.e.f. 01.01.2008. Smoke meters<br />
have been provided to all the Depots<br />
11.2. Surprise Emmission Checks:<br />
As many as 10,885 Buses have been checked surprisingly at major Bus Stations of the Corporation<br />
and out of which 126 Buses were found above the norms (> 65 Hardridge units)<br />
- 68 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
11.3. Testing OF HSD :<br />
As many as 1842 HSD samples collected from various depots of the Corporation have been checked<br />
for the quality of the fuel supplied. Samples of HSD, Ethanol blended diesel, Ethanol, Bio Diesel samples<br />
are tested. The following points are tested in HSD samples.<br />
a) Flash point.<br />
b) ASTM density at 15 0 C Kg/m3.<br />
c) Kinematic Viscosity at 40 0 C CST.<br />
d) Distillation 90% volume recovery at 366 0 C IBP C.<br />
11.4. Rain Water Harvesting:<br />
Rain Water Harvesting has been implemented at some of the Depot/Bus stations/ Divisions of<br />
<strong>KSRTC</strong>. Further it has taken a decision to implement rain water unit to all the existing buildings in a<br />
phased manner and all the new upcoming constructions will be with Rain Water Harvesting system.<br />
11. 5. Water Quality Test :<br />
Quality of Water from sources like bore well, open well and other sources of all the depots of <strong>KSRTC</strong><br />
were tested and based on the value of hardness, fluoride, PH and chloride results. Softeners are being<br />
provided where ever the Quality of Water is poor/bad.<br />
- 69 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
11.6. Water Recycling Plant:<br />
Water Recycling Plant were installed for reuse of water for bus wash to 28 Depots of <strong>KSRTC</strong> and the<br />
remaining 44 Depot is under progress.<br />
11.7. Bio-Diesel/Alternate Fuels:<br />
Alternate Fuel trials with Bio-Diesel in the ratio of 90:10 have been completed with excellent results.<br />
Totally 5 Depots are identified in the first phase of implementation using bio diesel in the ratio of 10%<br />
(B10).<br />
Sl<br />
No<br />
Division Depots No. of Depots No. of Buses<br />
1 Mandya<br />
2 Chikkaballapura<br />
Mandya<br />
Maddur<br />
Chikkaballapura<br />
Chintamani<br />
Doddaballapura<br />
2 83<br />
3 166<br />
Total 5 249<br />
11.8. Diesel Ethanol Blend:<br />
Ethanol is Blended with Diesel at (7.7% Ethanol + 0.5% Solubilizer + 91.8% Diesel). Totally 21<br />
depots of <strong>KSRTC</strong> are commissioned for blending of Ethonol diesel.<br />
- 70 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
11.9. Solar Lighting System:<br />
45 numbers of 2 KW and 126 numbers of 300W Solar lights have been installed in the various rural<br />
bus stations and depots of <strong>KSRTC</strong> under MNRE funded project. Energy Audit is carried out at Depots,<br />
Divisional Workshop and Central Office for conservation and optimization of energy conservation.<br />
11.10. Hazardous Waste Management:<br />
A scientific method has been adopted for disposal of Hazardous waste like used lubricants, scrap<br />
batteries besides disposal of tyres, automobile scrap etc. Returns are filed to the KSPCB on regular basis.<br />
11.11 ISO 14001 / OHSAS 18001 / ISO 9001:<br />
OHSAS-18001: 2007 certification has been obtained for Central Offices and ISO-9001 &<br />
ISO-14001 for RWB. ISO-14001: 2004 for MCTC of KGBS is under progress. ISO 9001/14001 to 4<br />
Depots of Mysore division under the GEF project is still under progress.<br />
11.12. Seminars and Conferences:<br />
A Consultative committee has been set up to recommend for use of Ethanol. Seminars/Conferences<br />
have been organized every year for the World Environment Day. It was celebrated World Environment Day<br />
i.e., 5th of June <strong>2011</strong> and by planting of saplings. Upgradation of skill on new technologies is in<br />
continuous process.<br />
11.13. Innovative Projects:<br />
The Environment friendly Phenol Bonded Densified Compressed Bamboo Mat Boards as per<br />
IS 13958: 1994 being used as bus flooring which is much superior and better than the conventional<br />
compressed ply boards in respect of strength, longer durability, better dimensional stability and fuel<br />
efficiency.<br />
Diesel Particulate Filters and Flame arrestors for Ethanol dozed vehicles of Mysore City to reduce the<br />
smoke emission and ensure safety.<br />
- 71 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
CHAPTER-12<br />
INFORMATION TECHONOLOGY<br />
12.0 <strong>KSRTC</strong> has adopted Information Technology in its day-to-day operations and brought every staff<br />
under the Information Technology net. <strong>KSRTC</strong> is the leading State Transport Undertaking in the country<br />
to adopt Information and Communications Technology in its Administrative and operational processes.<br />
For its IT-enabled projects, <strong>KSRTC</strong> has received applause and many S.T.Us are following <strong>KSRTC</strong>’s IT way.<br />
<strong>KSRTC</strong> has been leveraging on Information Technology in its various progressive projects and the details<br />
of developments made during the year under report is given below.<br />
12.1 Any Where Any Time Advance Reservation (AWATAR):<br />
Karnataka State Road Transport Corporation has launched its “Any where Any Time Advance<br />
Reservation” system during April 2006. It is a web based passenger seat reservation system developed for<br />
<strong>KSRTC</strong> reservation system. AWATAR passenger reservation system facilitating online booking of<br />
passenger seats through- <strong>KSRTC</strong> counters, Franchisee Counters, Bangalore One counters, via-flightraja<br />
counters, Mobile booking and e-booking by individuals.. Tickets can be booked 30 days in advance<br />
including return journey tickets from selected destination. Contributing for the green revolution,<br />
e-ticketing passenger can now travel in the bus by showing the SMS alert delivered to them on<br />
confirmation of tickets booked.<br />
12.2 Prayanothsava - rewarding frequent commuters:<br />
30% discount for a passenger who books 4 travel tickets using the same user ID (for an e-ticket),<br />
discount is valid only for a single seat on the fourth ticket. The offer is initiated for honoring frequent<br />
commuters through this friendly measure.<br />
12.3 Service Search on Home page of Website:<br />
Service search facility provided to the passenger to know more about service availability, types of<br />
services, arrival and departure timings etc., The designe of the map is as under.<br />
- 72 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
12.4 Dynamic Map based Service Search:<br />
<strong>KSRTC</strong> implemented Map Based Dynamic service search for premium segment services to provide<br />
the real time information to the passengers. It displays Schedule name, Schedule number, Departure and<br />
Arrival timings, via places, Route distance, Pickup points and other related details.<br />
12.5 Increase in the Coverage of AWATAR:<br />
The franchisee counters increased substantially from 580 during 2010-11 to 672 during <strong>2011</strong>-12.<br />
The registered e-booking users have also rose to 20 lakh during <strong>2011</strong>-12 from 16 lakh during 2010-11.<br />
12.6 Awards:<br />
<strong>KSRTC</strong> won the National 1st FIEO and Telecom Technology award for successful implementation of<br />
mobile booking by Ministry of Commerce and Industry, GOI. It has won for successful implementation of<br />
AWATAR Online reservation system, project selected as IBM great mind challenger and business award for<br />
most innovative solution in automotive-<strong>2011</strong>.<br />
12.7 AWATAR performance:<br />
- 73 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
12.8 SAKAL Implementation:<br />
As per Karnataka Guarantee of services to citizen’s act, <strong>2011</strong>, all the services related to <strong>KSRTC</strong> viz.,<br />
issue of bus passes to school children, Accident Relief Fund, issue of bus passes to Physically challenged,<br />
issue of free bus passes to freedom fighters is implemented under SAKAL portal.<br />
12.9 Automated Driving Track System:<br />
During the year <strong>2011</strong>-12, about 18000 candidates participated in trade test conducted for selection of<br />
Drivers & Driver-cum-Conductors at Automated Driving Track system, Regional Training Institute of<br />
Hassan.<br />
12.10 Counselling for Selection of Depots and Division for Driver/Driver cum Conductors:<br />
Introduced computerized counseling system for allotment of posting for newly recruited 1320 nos. of<br />
Driver/Driver cum Conductors to Divisions and Depots according to roaster-cum-merit list for the first<br />
time among all the STUs.<br />
12.11 Electronic Ticketing Machines (ETMs)<br />
<strong>KSRTC</strong> has introduced Electronic Ticketing Machines (ETMs) in place of conventional pre-printed<br />
tickets in the year 2004 in one depot and has now implemented it in all the bus depots and routes of<br />
<strong>KSRTC</strong>. This is a major achievement in automating the process of issue of tickets, thereby reducing<br />
pilferage and reducing conductor time and drudgery. Now all the depots and routes in <strong>KSRTC</strong> are issuing<br />
tickets only through the ETMs, which is the first time in an organization in the country has completely<br />
shifted to the Electronic issue of tickets. During the year <strong>2011</strong>-12, newly started depots have also been<br />
provided with ETM’s and implemented completely with related software/technology/application.<br />
*****<br />
- 74 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
CHAPTER-13<br />
GENERAL<br />
13.1.0. PRINTING PRESS:<br />
The KST Press at Bangalore is functioning as an independent unit attached to Central Office during<br />
the year under report. As at the end of the year, the Press had a staff strength of 88 employees.<br />
13.1.1. PRODUCTION :<br />
The item wise production details during the period under report i.e., <strong>2011</strong>-12 as compared with those<br />
of previous year are furnished below in Table-39.<br />
Sl.<br />
No.<br />
TABLE – 39<br />
(Rs.in Lakh)<br />
Items <strong>2011</strong>-12 2010-11<br />
1 Loose Forms 216.95 231.81<br />
2 Pads 0.50 0.26<br />
3 Books, registers and others 3.20 1.91<br />
4 Ticket books 89.54 88.39<br />
5<br />
Ticket and luggage books supplied to other<br />
divisions/Corporations.<br />
89.50 89.53<br />
6 Luggage books 0.09 0.08<br />
Total 399.78 411.98<br />
13.1.2. VALUE OF TICKET BOOKS SUPPLIED:<br />
The conversion value of Ticket Books of various denomination supplied to operating units of the<br />
Corporation during <strong>2011</strong>-12 was Rs.1.33 crore as against Rs.1.33 crore of last year.<br />
13.1.3. ADDITIONAL WORKS UNDERTAKEN:<br />
During the period under report, the printing and supply of stationeries like Audit <strong>Report</strong>s, Board<br />
Meeting Notices, Visiting Cards, Invitation Cards, Monthly Passes, Scribbling Pads, Index Sheets for Board<br />
Meeting, Vokalath Forms, Enquiry Notices, New Year Greeting Cards and Ticket books for Navi Mumbai<br />
Transport Corporation(Bombay), Kadamba Transport Corporation (Goa) have been takenup. Further,<br />
production of ETM reels on trail basis is successfully under taken during the year.<br />
- 75 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
13.1.4. REVENUE EARNED BY DOING OTHER ORGANISATION JOBS:<br />
During the year under report KST press has taken up the printing work of other Transport<br />
Undertakings such as NWKRTC, NEKRTC, BMTC, Navi Mumbai Transport Corporation(Bombay)<br />
and Kadamba Transport Corporation (Goa). It has also taken up the printing work of other organisations<br />
such as Justice A.J.Sadashiva Commission of enquiry earned an amount of Rs.299.55 lakh. The details are<br />
shown in Table-4<br />
TABLE – 40<br />
(Rs.in Lakh)<br />
Sl.<br />
No.<br />
Organisation<br />
Revenue<br />
earned by<br />
supplying<br />
tickets<br />
Revenue earned<br />
by supplying<br />
stationeries<br />
Total<br />
1 B.M.T.C. 129.11 84.50 213.61<br />
2 N.E.K.R.T.C. 1.60 28.06 29.66<br />
3 N.W.K.R.T.C. 0.50 45.45 45.95<br />
Total 131.21 158.01 289.22<br />
4<br />
Supply of tickets & stationery items for other Corporations and<br />
organisations like Navi Mumbai Transport,Kadamba Transport Corporation<br />
and Justice A.J.Sadashiva Commission of enquiry.<br />
10.33<br />
Total (1 to 4) 299.55<br />
13.1.5. SCRAPPING OF PLANT & MACHINERIES:<br />
During the year <strong>2011</strong>-12 none of the Printing Machineries have been scrapped.<br />
13.1.6 DETAILS OF RAW METERIALS PURCHASED & CONSUMED:<br />
The details of raw materials purchased and consumed during the year <strong>2011</strong>-12 compared to previous<br />
year are as under.<br />
Sl.<br />
No.<br />
Description <strong>2011</strong>-12 2010-11<br />
1<br />
Paper used for printing of tickets in self driven rotary<br />
& letter press ticket machines.<br />
182607 kg. 184103 kg.<br />
2 Paper used for printing of stationery . 202460.50 kg. 231572.25 kg.<br />
Total 385067.50kg. 415675.25 kg.<br />
3<br />
Expenditure incurred on purchase of Raw materials<br />
like Ink, Paper, Nylo plate, Spare parts, ETM reels,<br />
computer stationery, pay slips, advance reservation<br />
tickets etc.<br />
Rs.474.57 lakh<br />
Rs.431.23 lakh<br />
- 76 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
13.2.0. LAW:<br />
The Corporation has 10505 cases pending before various Courts as on 31-03-<strong>2012</strong>. These cases<br />
have been pending from the level of Trial Courts, High Court and Supreme Court. The Trial Court cases<br />
are dealt at Divisional level by the Law Officers/Assistant Law Officers working at the Divisional level by<br />
coordinating with the Panel Advocates. Appeals, Writ Petitions and cases before Supreme Court are dealt at<br />
the Law Department at Central office level. The above cases comprise of Labour Court cases, Motor<br />
Vehicle Claim cases, Workmen’s Compensation, Gratuity, Consumer and Commercial cases etc.<br />
M.V.C cases pending before the MACTs :<br />
As on 01-04-<strong>2011</strong>, 4988 MVC cases were pending. During the year under report 1413+257* cases<br />
were received, 2640+257* cases have been disposed off, and out of which 668 cases are decided in favour of<br />
the Corporation and 1972 against the Corporation. The Divisionwise details are furnished in Table - 41.<br />
TABLE- 41<br />
(Rs.in Lakh)<br />
Division<br />
Pending<br />
as on<br />
01-04-11<br />
Received Disposed during the year<br />
during the<br />
year For Against Total<br />
Pending<br />
as on<br />
31-03-12<br />
Bangalore Central 620 217 113 262 375 462<br />
Ramanagara 431 110 68 167 235 306<br />
Tumkur 380 68 5 138 143 305<br />
Kolar 291 102 13 132 145+25* 223<br />
Chikkaballapura 195 120+51* 49 71 120 246<br />
Mysore city transport 378 57 89 121 210+33* 192<br />
Mysore Rural 428 50 12 270 282+47* 149<br />
Mandya 308 68 20 89 109+64* 203<br />
Chamarajanagar 179 60+30* 20 94 114 155<br />
Hassan 335 146 35 133 168 313<br />
Chikka magalore 332 174 37 134 171 335<br />
Mangalore 544 119 130 100 230+88* 345<br />
Putur 0 72+176* 15 15 30 218<br />
Davangere 567 50 62 246 308 309<br />
Total 4988 1413+257* 668 1972 2640+257* 3761<br />
*Total Cases transferred<br />
Matters pending before the Labour Courts/Industrial Tribunal :<br />
2649 cases were pending as on 01-04-<strong>2011</strong> and during year 595+53* cases were received. 505 Labour<br />
Court cases are decided in favour of <strong>KSRTC</strong> as against 914+53* disposals during the year. The Divisionwise<br />
details are furnished in Table - 42.<br />
- 77 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
TABLE- 42<br />
Division<br />
Pending<br />
as on<br />
01-04-11<br />
Received Disposed during the year<br />
during the<br />
year For Against Total<br />
Pending<br />
as on<br />
31-03-12<br />
Bangalore Central 263 185 13 47 60+5* 383<br />
Ramanagara 141 28 21 11 32 137<br />
Tumkur 232 98 23 32 55 275<br />
Kolar 346 15 50 68 118 115<br />
Chikkaballapura 190 19 31 45 76+18* 243<br />
Mysore city transport 249 27 79 26 105 171<br />
Mysore Rural 184 70 22 40 62 192<br />
Mandya 80 18 14 12 26+20* 52<br />
Chamarajnagara 32 9 9 8 17 24<br />
Hassan 402 30 129 13 142 290<br />
Chikkamagalore 231 17 25 26 51+10* 187<br />
Mangalore 65 8 17 12 29 44<br />
Putur 0 10+53* 22 20 42 21<br />
Davangere 234 61 50 49 99 196<br />
Total 2649 595+53* 505 409 914+53* 2330<br />
*Total Cases transferred<br />
Original suits pertaining to Commercial establishments and land matters:<br />
As on 01-4-<strong>2011</strong>, there were 21 Original Suits pertaining to Commercial establishments and Land<br />
Matters are pending at Divisional level. Out of these cases one case disposed in favour of the Corporation<br />
and 20 cases are pending as on 31-3-<strong>2012</strong>. Divisionwise Gratuity cases pending are given at table-43.<br />
Gratuity Matters Pending at the Divisional level:<br />
There were 893 gratuity cases of the divisions were pending before various Controlling authorities<br />
and Appellate authorities at High court as at the end on 01-04-<strong>2011</strong>. As at the end of 31-3-<strong>2012</strong>, 257<br />
cases have been disposed, out of which 77 cases are decided in favour Corporation during year under<br />
report.<br />
- 78 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
Division<br />
Pending<br />
as on<br />
01-04-11<br />
TABLE- 43<br />
Received Disposed during the year<br />
during the<br />
year For Against Total<br />
Further, the number of cases pertaining to Accident, Service, Labour and Commercial Matters<br />
disposed in favour/against <strong>KSRTC</strong> and pending before High Court/Supreme Court as on 31-03-<strong>2012</strong> and<br />
percentage of success rate before High Court for the period from 01-04-<strong>2011</strong> to 31-03-<strong>2012</strong> are shown in<br />
Table – 44and Table-45 respectively.<br />
Sl.<br />
No<br />
TABLE -44<br />
Cases pending before the High Courts and Supreme Courts :<br />
Pending<br />
as on<br />
31-03-12<br />
Bangalore Central 218 73 18 46 64 227<br />
Ramanagara 77 40 8 15 23 94<br />
Tumkur 85 6 3 11 14 77<br />
Kolar 32 25 0 26 26 31<br />
Chikkaballapura 52 13 1 10 11 54<br />
Mysore city transport 185 21 27 23 50 156<br />
Mysore Rural 68 8 7 25 32 44<br />
Mandya 12 6 0 12 12 6<br />
Chamarajnagara 0 3 0 0 0 3<br />
Hassan 44 2 5 8 13 33<br />
Chikkamagalore 68 14 8 3 11 71<br />
Mangalore 1 2 0 1 1 2<br />
Putur 0 0 0 0 0 0<br />
Davangere 51 21 0 0 0 72<br />
Total 893 234 77 180 257 870<br />
1. Accident Matters<br />
Particulars<br />
Cases<br />
pending<br />
as on<br />
01-04-11<br />
No of cases disposed<br />
Received<br />
during the year<br />
during<br />
the year Favour Against Total<br />
Pending<br />
as on<br />
31-03-12<br />
MFAs before High Court 1131 681 262 556 818 994<br />
SLPs before Supreme Court 21 8 0 2 2 27<br />
2. Service Matters<br />
WPs/WAs before High Court 199 41 101 55 156 84<br />
SLPs before Supreme Court 4 2 0 2 2 4<br />
3. Labour Matters<br />
WPs/WAas before High<br />
Court<br />
561 113 276 116 392 282<br />
SLPs before Supreme Court 2 0 0 0 0 2<br />
4. Commercial Matters<br />
WPs/WAs in High Court 34 30 24 4 28 36<br />
SLPs before Supreme Court 2 0 0 0 0 2<br />
Total High Court cases 1925 865 663 731 1394 1396<br />
Total Supreme Court cases 29 10 0 4 4 35<br />
- 79 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
As on 01-04-<strong>2011</strong>, 79 Gratuity cases were pending in High court. During the year <strong>2011</strong>-12, 49<br />
cases are received and 78 cases were disposed, out of which 59 cases decided in favour of Corporation<br />
and 43 cases are pending as on 31-03-<strong>2012</strong>.<br />
Table – 45<br />
Percentage of success rate of cases before High Court<br />
Labour 70.4%<br />
Service 64.7%<br />
Accident (MFA) 32.0%<br />
Commercial 85.7%<br />
Gratuity 75.6<br />
Overall 47.6%<br />
13.3.0 MARKETING & COMMUTER RELATIONS:<br />
<strong>KSRTC</strong> is committed to provide regular, reliable, comfortable and cost effective passenger Transport<br />
Services to the commuters with an exceptional track record of safety. The Marketing cell is created to<br />
perform various activities to increase load factor and profitability of the Corporation. The main objective is<br />
to provide efficient Transport Facilities to the passengers, redressal of passenger grievances, dissipating<br />
information regarding services, formation of package tours and innovating new market for the services.<br />
Following are the few Marketing Strategies adopted during the year <strong>2011</strong>-12.<br />
13.3.1 Delivery Expansion/Marketing Dimensions:<br />
To create visibility and awareness about the brand, to provide a consistent online presence for <strong>KSRTC</strong>,<br />
to motivate the audience to take action (Call or book online), Expand Online Reach & Brand Awareness,<br />
Enhance & Manage Online Reputation of <strong>KSRTC</strong>, Create Better Customer Relationship with<br />
Commuters, Robust Brand Monitoring, Popularize Public Transport among Public (especially new<br />
generation commuters)?, Engage Commuters, Feedback Management, Promote Offers, Increase Traffic to<br />
<strong>KSRTC</strong> Website, Increase Page Rankings Organically to interact with customers directly and understand<br />
different issues from the user’s perspective, initiated digital marketing.<br />
- 80 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
13.3.2 Website campaign:<br />
Website hosting, Website updating, Customizing the website, Bringing up Offers and Bringing up<br />
Banners on the website, New service introduction campaign, Campaign on any value added services like<br />
Mobile booking, call centre etc., Special service campaign done in the <strong>KSRTC</strong> website.<br />
13.3.3 Social media Marketing:<br />
Social media marketing is introduced in the website for effective/constant communication with the<br />
online users. These Social media marketing helped to Increase Traffic to <strong>KSRTC</strong> Website, Promote Offers,<br />
and Increase Page Rankings Organically and also maintain Feedback Management. And also to create<br />
strong online media presence and to bring positive change in customer attitude and interest in using <strong>KSRTC</strong><br />
as their preferred means of transport and also interact with commuters informally enhanced the online<br />
presence using social media.<br />
13.3.4 Facebook:<br />
Daily around 2500 users and monthly around 3000 users are active in the face book. So far around<br />
5274 users likes <strong>KSRTC</strong>.<br />
http://www.facebook.com/<strong>KSRTC</strong>.Karnataka<br />
Twitter : Around 1414 followers are present in the twitter account.<br />
https://twitter.com/<strong>KSRTC</strong>_Journeys<br />
- 81 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
13.3.5 Search engine Optimization:<br />
To increase page rankings in all popular search engines, SEO is implemented for keywords related to<br />
bus transport and for top destination on both Offsite and Onsite optimization.<br />
13.3.6 Email campaign:<br />
Implemented and sending emails/newsletter to all registered users through Email Campaign to<br />
promote offers and to create bonding with <strong>KSRTC</strong>. Regular updates will be sent to users through<br />
newsletters.<br />
13.3.7 Google Adwords campaign:<br />
Implemented Google adwords campaign for <strong>KSRTC</strong> on Google Search engine as a sponsored link on<br />
Google. Around 9 campaigns started with 2280 nos. of Keywords.Through Google Campaign so far 23.43<br />
lakhs clicks (new visitors to <strong>KSRTC</strong> website), 234.07 lakhs impressions have come for the <strong>KSRTC</strong><br />
campaign and 2.67 lakhs conversions (confirm ticket booked/payment on AWATAR application) have<br />
happened.<br />
- 82 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
13.3.8 Google maps campaign:<br />
Implemented Google ads for <strong>KSRTC</strong> reservation counters as sponsored link to facilitate users to get<br />
information about <strong>KSRTC</strong> reservation counters on Google places.<br />
13.3.9 Google Ads for Call Centre for Call Extension:<br />
Implemented Google ads for Call Centre to make awareness of our customer service.<br />
13.3.10 Mobile campaign:<br />
Implemented Mobile Marketing, which engage commuters with updates and messages, remind<br />
commuters about schedules and delays, sending m-ticket, Integrate mobile app with ticket booking<br />
systems, SMS alerts on ticket confirmation and cancellation etc.,<br />
13.3.11 Green Evolution in e-ticket:<br />
Implemented & popularised the Paperless ticketing, Passenger can now travel in the bus by showing<br />
SMS delivered to them on confirmation of the tickets booked, contributing for green revolution.<br />
13.3.12 Loyalty Program – Prayanothsava:<br />
For Rewarding frequent commuters, 30% discount on your 4th travel scheme is implemented in<br />
online reservation system, So Far around 1332 beneficiaries’ availed discount. After implementation of<br />
Prayanothsava Scheme around 41405 new users registered with <strong>KSRTC</strong>.<br />
- 83 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
13.3.13 CRM with Call Centre:<br />
Call centre is successfully implemented to create Better Customer Relationship with Commuters and<br />
the same is integrated with AWATAR Online reservation System.<br />
It helps commuters to get information or raise their queries, enquiries or complaints 24*7. Interactive<br />
Voice Response System, Complaint Registration and Tracking System, SMS Integration for Enquiry, Web<br />
Integration for Complaint Registration and Tracking System.Complaints would be registered with a unique<br />
tracking number and the same are sorted out in short time.Now it is easy to reach <strong>KSRTC</strong>. Call 08044554422<br />
or sms “ “ to 56006 or email to feedback @ ksrtc.org.<br />
13.3.14 Rural Survey:<br />
To study the market and to get passenger feedback, the following surveys were conducted.<br />
Commuter satisfaction of rural commuter satisfaction study conducted through IMRB.<br />
Rural commuter satisfaction study was undertaken in 5 taluks.<br />
90% of commuters preferred to travel by <strong>KSRTC</strong>.<br />
The feedback is continuously monitored and suitable actions are taken.<br />
Through rural survey we were able to identify weak points and improve the quality of service.<br />
13.3.15 To improve branding:<br />
<br />
<br />
<br />
<br />
<br />
<br />
Action taken to brand exterior and interior of the Karnataka Vaibhav buses in consultation with<br />
M/s Ogilvy and Mather. This Brand extension “Karnataka Vaibhav” with tagline “Travel in comfort”<br />
has become instant hit and commanding premium.<br />
Designed feedback forms to collect regular passenger feedback from online survey.<br />
Action taken to brand the Karnataka Sarige buses in consultation with M/s Ogilvy and Mather.<br />
Training on soft skills was organised for crew to enable them to build good communication skills to<br />
interact with passengers.<br />
For the first time Live TV was introduced in Airavat Club Class buses.<br />
AC lunges were opened at Shanthinagar and MCTC bus stands.<br />
13.3.16 Exhibitions and publicity.<br />
‣ To give wide publicity about Corporation’s services and facilities exhibition stall are put up on<br />
occasions<br />
‣ Designed and printed handbills, brochure, banners to give wide publicity about Corporation’s<br />
services and facilities.<br />
‣ Designed and displayed hoarding at bus stations.<br />
‣ Good public relations were maintained with media, public and all stake holders. This has helped<br />
building <strong>KSRTC</strong> brands in the print media and audio visual media.<br />
- 84 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
13.3.17 Awards:<br />
Corporation has bagged the following awards for its outstanding performance.<br />
‣ Union Transport Minister’s Trophy for the lowest Accident Record in 1998-2001.<br />
‣ Parisara award by Govt. of Karnataka-2001.<br />
‣ IRTE Prince Michael International Road Safety Award-2002.<br />
‣ Safety Award by Chartered Institute of Logistics & Transport 2001-02.<br />
‣ Petroleum Conservation Research Association Award-2001-02 & 2002-03.<br />
‣ Golden Peacock Environment Management Award-2003.<br />
‣ Golden Peacock Eco Innovation Award - 2004.<br />
‣ Prestigious Runner-up Award from PCRA for the best improvement in HSD KMPL during<br />
2001-02.<br />
‣ <strong>KSRTC</strong> adjudged Winner for the best improvement in HSD KMPL during 2002-03 & 2003-04.<br />
‣ OSHAS 18001, ISO 14001 & 9001 certification for conformance towards Occupational Health &<br />
Safety Management System standards.<br />
‣ Safety innovation Award for safety & quality by Institute of Engineers, New Delhi-2006.<br />
‣ Dubai Best Practices Award by Dubai Municipality for environment Management through<br />
multi pronged strategy India-2006.<br />
‣ EMPI Indian Express Indian Innovation Award-2006, New Delhi.<br />
‣ Bagged Award for Excellence-2008 from the Ministry of Urban Development, Central Government,<br />
for introducing 100% Electronic Ticketing Machine to issue tickets in the Mysore City for city<br />
operatins. 2008.<br />
‣ Award for Excellence-2009 for excellence in Urban Transport Projects under JnNURM initiatives<br />
for Urban transport projects-2009, and the Karnataka is the first state which has implemented<br />
Automated Electronic Driving test System for the Recruitment of Drivers in the State Road<br />
Transport Corporation<br />
‣ Golden Peacock Innovative Product/Service Award-2010.<br />
‣ National award for Exemplary implementation of e-Governance initiatives in <strong>2011</strong>-12 among PSUs<br />
category by DAR&PG, GOI for web based passenger reservation system.<br />
‣ Best Transport Corporation award-2010 from the British Quality Foundation<br />
‣ <strong>Annual</strong> Chief Minister’s Ratna Award-<strong>2011</strong>-12 for best performing meritorious State Public Sector<br />
Enterprise from Govt. of Karnataka.<br />
‣ Golden Peacock Eco-Innovation award 2010 for Eco friendly measures.<br />
‣ Deccan Chronicle Green Award initiative “ Green Warrior Award”<br />
‣ Awarded mBillionth South Asia-2010 in recognition of AWATAR Mobile booking.<br />
- 85 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
‣ Earth Care award –2010 for innovation in Environment and Climate protection.<br />
‣ India Pride award-2010 for Infrastructure Development and Transportation.<br />
‣ Golden Peacock Eco Innovation Award-2010.<br />
‣ The World is Open Award-2010 for successful implementation of ETM<br />
‣ Manthan South Asia Award-2010 for AWATAR implementation<br />
‣ Award of Excellence by Ministry of Urban Development Govt. of India 2010 for clean development<br />
mechanism<br />
‣ Public Relation Council of India (PRCI)- Best Public Service Campaign Award-2010.<br />
‣ Public Relation Council of India- Best Corporate Brochure Award-2010.<br />
‣ Rajiv Gandhi National Quality Award 2009<br />
‣ Best Employer Award-2010.<br />
‣ Edward de Bone’s Award-2010.<br />
‣ RASBIC award 2010<br />
‣ Global HR Excellence award 2010<br />
‣ UITP political Commitment award 2010<br />
Further during the year <strong>KSRTC</strong> has bagged the following AWARDS<br />
‣ Won the National 1st FIEO and Telecom Technology award for successful implementation of<br />
mobile booking by Ministry of Commerce and Industry, GOI.<br />
‣ Volvo sustainable mobility award <strong>2011</strong> for successful implementation of city service in Tumkur and<br />
Hassan cities.<br />
‣ “Award for Excellence-<strong>2011</strong>” for a unique public Transport Initiative in providing sustainable<br />
mobility for medium and small towns.<br />
‣ ASRTU National award for making highest profit among the STU’s.<br />
‣ PRCI Best “Coffee Table Book” Gold Award <strong>2012</strong><br />
‣ PRCI Best “ In –House Magzine (Vernacular)” Silver Award <strong>2012</strong><br />
‣ PRCI Best “ Best Corporate Film” Silver Award <strong>2012</strong>.<br />
13.3.18 Coffee Table Book:<br />
During the year <strong>2011</strong>-12 a commemorative Coffee Table Book brought out by Transport department<br />
to celebrate 50 years of its existence in the transport sector. This book makes an earnest effort to capture<br />
glimpses of its formative years, milestones, innovations, achievements, awards and future endeavors.<br />
- 86 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
13.4.0 INTERNAL AUDIT :<br />
The Corporation has fully implemented ETMs usage in all Depots, Internal Audit Department has<br />
deputed officials to check the operations of ETMs and its performance also Inspector of Accounts verify<br />
and the defects noticed during the inspection will be brought to the notice of the concerned officials for<br />
corrective actions.<br />
It has verified the implementation of Circular No.1423 dt:19.07.2010, 1432 dt:29.12.2010 and<br />
Circular No.1435 dt:15-02-<strong>2011</strong> as regarding pay fixation of the employees.<br />
It has verified the implementation of Court Order regarding payment of back wages and payment of<br />
benefits to the Voluntary retirement employees. The discrepencies noticed has been brought to the notice<br />
of the concerned officers to take necessary action. Also verified the AFR’s of <strong>2011</strong>-12 as on 31.03.<strong>2012</strong>.<br />
It has verified the allotment of Quarters and payment of Water charges, Electricity bills and Rent by<br />
the officials/Offciers as per the guidelines and Circular instructions as and when issued by Central Offices.<br />
The Conmptroller & Auditor General of India will take up the Audit of <strong>KSRTC</strong> Divisions through<br />
Sr. Resident Audit Officer. The team of Auditors will visit the Divisions every year, verify the records and<br />
issue Audit Paras through Inspection reports on observations noticed and if convincing reply is received<br />
from the Divisions Audit Paras are being considered for closure. The position of the Audit paras as on<br />
31.3.<strong>2012</strong> is as follows.<br />
Opening Balance as on 01-04-<strong>2011</strong> : 63<br />
Audit paras issued during <strong>2011</strong>-12 : 52<br />
Total Audit paras : 115<br />
Audit paras closed during <strong>2011</strong>-12 : 29<br />
Audit paras pending as on 31-03-<strong>2012</strong> : 86<br />
The Circulars, General Standing Orders, Rules and Regulations issued by Central Offices from time<br />
to time for implementation is being watched by the Internal Audit Department which has helped the<br />
Divisions to improve the performance. Similarly on observing and inspecting other issues of the<br />
Departments it has helped to perform duties carefully.<br />
13.6.0. ACCIDENT RELIEF FUND:<br />
Accident Relief Fund Trust has been formed w.e.f 01-06-2002 in order to provide immediate<br />
Financial Relief to the legal heirs of the Passengers who died in road accidents while traveling in <strong>KSRTC</strong><br />
buses.<br />
The relief paid by the ARF Trust is in addition to the MACT claims. The relief amount has been<br />
enhanced to Rs.2.50 lakh w.e.f 01-09-2008. Collection of ARF fee of Rupee one from a passengers<br />
travelling in <strong>KSRTC</strong> Buses has been discontinued with effect from 01-09-2008.<br />
The details of Settlement of claims & amount paid during the period under review is as under<br />
- 87 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
Year<br />
No. of Claims<br />
Relief Amount<br />
(Rs. in lakh)<br />
Total Amount<br />
(Rs. in lakh)<br />
<strong>2011</strong>-12 21 2.50 52.50<br />
13.6.1. OTHER INITIATIVES OF THE TRUST :<br />
‣ The trust has extended the immense service of providing immediate medical relief to the passengers<br />
injured in the road accidents wherein <strong>KSRTC</strong> buses involved. During the year <strong>2011</strong>-12 the<br />
Corporation has incurred Rs.195.25 lakh towards ex-gratia payments to the victims in accidents and<br />
it was Rs.90.34 lakh during 2010-11.<br />
‣ The trust owns and maintains 8 wreaker to carryout rescue operation in the accidents spot.<br />
‣ Two trust meetings on ARF trust has been conducted on 22-06-<strong>2011</strong> and 17-02-<strong>2012</strong> during the<br />
year under report.<br />
13.7.0 RIGHT TO INFORMATION ACT 2005:<br />
Karnataka State Road Transport Corporation being a Public Sector Undertaking has implemented the<br />
Right to Information Act-2005 after its publication in gazette vide Notification issued under<br />
No.DPAR-74/RTI/ 2005 (part-2) dated 11-10-2005.<br />
Public Information Officers / Asst. Public Information Officers and Appellate Authorities have been<br />
appointed in <strong>KSRTC</strong> at the Central/ Divisional/ Depot/Regional workshop level vide Notification<br />
No. KST/CO/ADM/SR/340/70/2005-06 dated 21-10-2005.<br />
The details of applications received/disposed off under Right to Information Act-2005 during the<br />
financial year <strong>2011</strong>-12 is as under.<br />
1 Total no. of applications received 3731<br />
2 Information provide to with in the due date 3380<br />
3 Information provide to after due date 477<br />
4 Replied to Government references 32<br />
5<br />
6<br />
Appeals received and<br />
Disposed off by the Appellate Authorities<br />
Complaints/Appeals received before Karnataka<br />
Information Commission<br />
77<br />
36<br />
13.8.0. QUESTIONS RECEIVED FROM CENTRAL/STATE LEGISLATURE:<br />
During the year under report 39 stared/unstared questions, one questions under rule 351, one<br />
question under rule 73, one question under rule 72 and one Zero hour question related to Legislative<br />
Assembly, 33 stared/unstared questions from Legislative Council totaling to 76 questions from the State<br />
Legislature have been received and replied on time.<br />
****<br />
- 88 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
SCHEDULE – A<br />
STATEMENT SHOWING THE NUMBER OF MEETINGS ATTENDED BY THE BOARD<br />
OF DIRECTORS DURING THE YEAR <strong>2011</strong>-12<br />
Sl.<br />
No<br />
Name<br />
Director/<br />
Invitee<br />
Period of Office<br />
From<br />
To<br />
No. of<br />
Board<br />
meetings<br />
attended<br />
1 Sri. R.ASHOKA,<br />
Hon’ble Minister for Transport,<br />
Govt. of Karnataka and<br />
Hon’ble Chairman, <strong>KSRTC</strong> Bangalore<br />
Chairman<br />
01-04-<strong>2011</strong><br />
16-08-<strong>2011</strong><br />
28-07-<strong>2011</strong><br />
31-3-<strong>2012</strong><br />
5<br />
2 Sri. JAGGESH,<br />
Hon’ble Vice Chairman. <strong>KSRTC</strong><br />
Bangalore<br />
Vice<br />
Chairman<br />
01-04-<strong>2011</strong> 31-03-<strong>2012</strong> -<br />
3 Sri. S.K.DASH, IAS.,<br />
Joint Secretary (T),<br />
Dept . of Road Transport & Highways,<br />
Government of India, New Delhi.<br />
4 Sri. L.V NAGARAJAN, IAS.,<br />
Principal Secretary to Government,<br />
Finance Department,<br />
Government of Karnataka. Bangalore<br />
5 SRI. P.B.RAMAMURTHY, IAS.,<br />
Principal Secretary to Government,<br />
Transport Department, M.S.Buildings,<br />
Government of Karnataka, Bangalore.<br />
6 Sri. BHARATLAL MEENA, IAS.,<br />
Commissioner,<br />
Bangalore Development Authority,<br />
Bangalore.<br />
7 Sri. I.S.N. PRASAD., IAS.,<br />
Principal Secretary to<br />
Hon’ble Chief Minister,<br />
Government of Karnataka. Bangalore.<br />
Director 01-04-<strong>2011</strong> 30-06-<strong>2011</strong> -<br />
Director 01-04-<strong>2011</strong> 31-03-<strong>2012</strong> 1<br />
Director 29-02-<strong>2012</strong> 31-03-<strong>2012</strong> 1<br />
Director 01-04-<strong>2011</strong> 31-03-<strong>2012</strong> 3<br />
Director 01-04-<strong>2011</strong>0 31-03-<strong>2011</strong> -<br />
8 Sri. M.K.SHANKARALINGEGOWDA.,<br />
IAS.,<br />
Principal Secretary to Government,<br />
Transport Department, Govt. of<br />
Karnataka. Bangalore<br />
Commissioner, BBMP<br />
Director<br />
01-04-<strong>2011</strong><br />
13-12-<strong>2011</strong><br />
07-12-<strong>2011</strong><br />
31-03-<strong>2012</strong><br />
4<br />
-<br />
9 Sri. SYED ZAMEER PASHA, IAS.,<br />
Managing Director, BMTC, Bangalore<br />
10 Sri. GAURAV GUPTA, IAS.,<br />
Managing Director, <strong>KSRTC</strong>. Bangalore.<br />
11 SRI. T.SHAM BHATT, IAS.,<br />
Transport Commissioner,<br />
Transport Department,<br />
Government of Karnataka, Bangalore<br />
Director 01-04-<strong>2011</strong> 18-05-<strong>2011</strong> -<br />
Director 01-04-<strong>2011</strong> 25-01-<strong>2012</strong> 4<br />
Director 28-07-<strong>2011</strong> 31-03-<strong>2012</strong> 2<br />
- 89 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
-2-<br />
12 Sri. K.R.SRINIVAS, IAS.,<br />
Managing Director, BMTC, Bangalore.<br />
13 Sri. N.MANJUNATH PRASAD,IAS.,<br />
Managing Director, <strong>KSRTC</strong>, Bangalore.<br />
14 SRI. BIJAY KUMAR SINGH, IPS.,<br />
Director (Security & Vigilance),<br />
<strong>KSRTC</strong><br />
Bangalore<br />
15 SRI. NANDAN SINGH,<br />
Deputy Secretary (Transport),<br />
Ministry of Road Transport & Highways,<br />
Government of India,<br />
New Delhi.<br />
16 Sri. MAAZ AHMED SHARIFF, KAS.,<br />
Director (Personnel & Environment)<br />
<strong>KSRTC</strong>, Bangalore.<br />
17 Sri. SHANKAR PATIL, KAS., Managing<br />
Director, NEKRTC,Gulbarga.<br />
18 Sri. G.N.SHIVAMURTHY,KAS.,<br />
Managing Director, NEKRTC,Gulbarga.<br />
19 Sri. HEMARAJU, Managing Director,<br />
NWKRTC, Hubli.<br />
20 Sri. K.A.RAJKUMAR,<br />
Director (Operation), <strong>KSRTC</strong>, Bangalore.<br />
21 Sri. S.PADMANABHAN,<br />
Director (Finance) and FA, <strong>KSRTC</strong>,<br />
Bangalore.<br />
Director 18-05-<strong>2011</strong> 31-03-<strong>2012</strong> 4<br />
Director 25-01-<strong>2012</strong> 31-03-<strong>2012</strong> 1<br />
Director 29-09-<strong>2011</strong> 31-03-<strong>2012</strong> 2<br />
Director 02-11-<strong>2011</strong> 31-03-<strong>2012</strong> -<br />
Director 01-04-<strong>2011</strong> 31-03-<strong>2012</strong> 5<br />
Director 01-04-<strong>2011</strong> 15-07-<strong>2011</strong> 4<br />
Director 19-08-<strong>2011</strong> 31-03-<strong>2012</strong> 3<br />
Director 01-04-<strong>2011</strong> 31-03-<strong>2012</strong> 5<br />
Director 01-04-<strong>2011</strong> 29-02-<strong>2012</strong> 4<br />
Director 03-12-<strong>2011</strong> 31-03-<strong>2012</strong> 1<br />
1 Sri. SUBIR HARI SINGH, IAS.,<br />
Metropolitan Commissioner, BMRDA<br />
Bangalore.<br />
2 Sri. M SHIVAKUMAR,IAS.,<br />
Metropolitan Commissioner, BMRDA<br />
Bangalore.<br />
3 Sri. YOGENDRA TRIPATHI,IAS.,<br />
Metropolitan Commissioner, BMRDA<br />
Bangalore.<br />
Invitee* 01-04-<strong>2011</strong> 30-09-<strong>2011</strong> -<br />
Invitee* 30-09-<strong>2011</strong> 06-02-<strong>2012</strong> -<br />
Invitee* 06-02-<strong>2012</strong> 31-03-<strong>2012</strong> -<br />
* By virtue of sec. 19(a) of the BMRDA Act 1985, the Metropolitan Commissioner, BMRDA, has<br />
attended the Board meetings as an INVITEE.<br />
- 90 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
Division wise details of Depots, Bus Stations and Control Points<br />
As on 31-03-<strong>2012</strong><br />
SCHEDULE – B<br />
Sl.<br />
No<br />
Division Depot Bus station Control point<br />
01 Bangalore©<br />
Depot-1,Depot-2<br />
Depot-3,Depot-4<br />
Depot-5,Depot-6<br />
Nelamangla (7)<br />
Nelamangala<br />
(1)<br />
Shantinagara, Tirupati,<br />
Chennai,Coimbatore<br />
(Gandhinagara),<br />
Coimbatore(Mettupalya),<br />
Trishur,ooty, Puna,<br />
Mumbai(Central),.Hosure<br />
(10)<br />
02 Ramanagar<br />
KKP,AKL,CPT,<br />
HRH,RMN,MGD<br />
(6)<br />
Kanakapura,Satnur,<br />
Kodihalli,Anekal,<br />
Channapatna,Harohalli,<br />
Dodda Maralavadi<br />
Ramanagar, ,<br />
(8)<br />
Kalasipalya-Hosuru,<br />
Kalasipalya-<br />
Kanakapura,Bidadi,<br />
Magadi,<br />
Hosur<br />
(5)<br />
03 Tumkur<br />
TMK,KGL,TVK,<br />
SIRA,PGD,TPT<br />
(6)<br />
Tumkur, Gubbi, Nitur,<br />
Dabaspet,Koratagere, Hebburu,<br />
Kunigal. Amrutturu,<br />
Solur,Turuvekere,<br />
Chikkanayakanahalli, Sira,<br />
Kallambella, Madhugiri,<br />
Tiptur, Nonavinakere<br />
(16)<br />
Kyatasandra,<br />
Heggere,Huliyurudurga<br />
Hosadurga.K.B.Cross,<br />
Pavagada<br />
(6)<br />
04 Kolar<br />
KLR,KGF,SVP,<br />
MLR,MBL(5)<br />
Kolar,KGF, Srinivasapura,<br />
Srinivasapura mini,<br />
Mulabagilu,Bangarpet,(6)<br />
Vemagal,<br />
Hosakote, Chittur,<br />
Narasapura,(4)<br />
05 Chickballapura<br />
CBP, DBP,<br />
CNT,BGP,<br />
GWB, (5)<br />
Chikkaballapura,<br />
Chintamani, Bagepalli,<br />
Gowribidanoor,<br />
Doddaballapura,<br />
Gudibande,Mandikal,<br />
Sidlagatta, (8)<br />
Chikkaballapura,<br />
Doddaballapura,<br />
Manchenahalli, Vijayapura,<br />
Devanahalli,Madanapalli,<br />
Hindupura,Cavery Bhavan<br />
Bangalore (8)<br />
06<br />
Mysore City<br />
Transport<br />
Bannimantap,<br />
Kuvempunagar<br />
Satagalli, (3)<br />
CBS, R.S.Naidunagar,<br />
Kuvempunagar llawala,<br />
Kumbarakoppal<br />
(5)<br />
Infosys,KRS, Jayapura,<br />
Chamundi Betta<br />
(4)<br />
07 Mysore Rural<br />
Moffusil Depot-1<br />
Moffussil Depot-2,<br />
KRG,HUN,<br />
HD Kote<br />
(5)<br />
MBS, K.R.Nagar, Mirle,<br />
Saligrama,Hosur, Bettadapura,<br />
Ravandur, Kittur, Hunasuru,<br />
Periyapatna, H.D.Kote, Saragur<br />
(12)<br />
--<br />
08 Mandya<br />
MDY,MDR,MLV,<br />
NGML,K.R.PET<br />
PNDPR (6)<br />
Mandya, Maddur, Malavalli,<br />
Nagamangla, K.R.Pet,<br />
Pandavapura, Bannuru,<br />
Belakawadi,Halguru,<br />
Adichunchanagiri,Kikeri,<br />
Sirangapatna, , Melukote,<br />
(13)<br />
Bellur, M-Koppalu, Bheriya,<br />
Koppa, Chinakurali,<br />
Holalu(6)<br />
- 91 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
-2-<br />
09<br />
Chamaraja<br />
nagar<br />
CRN,GPT,KLG,<br />
NGN,(4)<br />
Chamarajanagara, Terkanambi,<br />
Gundlupet, Begur, Hullahalli,<br />
Nanjangudu,M.M.Hills, (7)<br />
Yalanduru,Kollegala,<br />
(2)<br />
10 Hassan<br />
HSN,CRP,RNP,<br />
HNP,ARK,<br />
(5)<br />
Hassan old Bus stand, Hassan<br />
New Bus stand,<br />
Channarayapatna,Holenarsipura,<br />
,Ramanathapura ,Arkalgudu<br />
Alur, Halebidu,<br />
Konanur, Shravanabelagula,<br />
Shanthigrama, Hallimysore,<br />
Salgame, Nuggenahalli,<br />
Dudda, Gorur,<br />
(16)<br />
--<br />
11 Chikkmagalur<br />
CKM,ARS,SKP,<br />
KDR,MDG<br />
(5)<br />
Chikkamagalur, Arasikere,<br />
Sakalespura, Mudigere,Kadur,<br />
Birur,Tarikere,<br />
Kottigehara, Belur,Javagal,<br />
Banavara, J.C.Pura,<br />
Panchanahalli,Gandsi<br />
(14)<br />
Shringeri,Kodlipet<br />
(2)<br />
12 Mangalore<br />
MNG-1, MNG-2,<br />
MNG-3,CDP,<br />
(4)<br />
Mangalore,<br />
Cundapura,<br />
(8)<br />
Pumpwell,Kasargodu,<br />
Udupi Karkala,<br />
Manipal State Bank,<br />
(6)<br />
13 Puttur<br />
PTR,DSL,MDK,<br />
B.C.Road.<br />
(4)<br />
Puttur, Dharmastala, Madikeri,<br />
Subramanya,<br />
Sulya , Ujire,Vittla, Nellyadi,<br />
Kushalnagara, Somavarapet,<br />
Virajapet, Hebbale (12)<br />
Bellare,Uppinangadi,<br />
Dharmastala Old Bus Stand,<br />
Belthangadi,B.C.Road,<br />
Moodabidare,<br />
Gonikoppa (7)<br />
13 Davanagere<br />
DVG,SMG, CDG,<br />
HRH,BVT,<br />
SGR, HRPN<br />
(7)<br />
Davanagere, Shivamogga,<br />
Holaluru, Honnali, Chitrradurga,<br />
Hiriyur, Sirigere,<br />
Bharamasagara,<br />
Harihara, Malebennur,<br />
Bhadravati, sagara,<br />
Harappanhalli, Chigateri,<br />
Bennehalli (15)<br />
Challakere, Chennagiri<br />
(2)<br />
14 KBS ----<br />
Kempegowda Bus Station,<br />
MCTC,NGEF,Peenya,<br />
Devanahalli, Balekaymandi (6)<br />
Nelamangala, Hosakote<br />
(2)<br />
Total 72 141 64<br />
- 92 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
FARE STRUCTURE WITH EFFECT FROM 25-06-<strong>2011</strong><br />
SCHEDULE – C<br />
1. Ordinary Service 43.00 paise per km. subject to a minimum fare Rs. 6.00 for a stage of<br />
6.5 kms. or part thereof.<br />
2. Express<br />
Service<br />
3. Ultra-Deluxe (Rajahamsa)<br />
Services<br />
65.70 paise per km. subject to a minimum fare Rs. 7.00 for a stage of<br />
6.5 kms. or part thereof.<br />
102.00 paise per km. subject to a minimum fare Rs. 10.00 for a<br />
distance equal to 1 chargeable stage or part thereof.<br />
4. Sheetal A/C services 80.00 paise per km. subject to a minimum fare Rs. 10.00 for a<br />
distance equal to 1 chargeable stage or part thereof.<br />
5. Meghadooth services 114.00 paise per km. subject to a minimum fare Rs. 10.00 for a<br />
distance equal to 1 chargeable stage or part thereof.<br />
6. Carona (Ambari). 134.50 paise per km. subject to a minimum fare Rs. 10.00 for a<br />
distance equal to 1 chargeable stage or part thereof.<br />
7. Volvo 143.00 paise per km. and subject to market conditions.<br />
8. City Services and Sub-urban<br />
Services<br />
45.60 paise per km. stage length of 2 kms.<br />
FARE CHARTS FOR CITY AND SUB-URBAN SERVICES<br />
Chargeable<br />
stages<br />
Adult<br />
(Rs. Ps.)<br />
City services<br />
Child<br />
(Rs. Ps.)<br />
Sub-urban services<br />
Adult<br />
(Rs. Ps.)<br />
Child<br />
(Rs.Ps.)<br />
1 4.00 2.00 4.00 2.00<br />
2 5.00 3.00 5.00 3.00<br />
3 8.00 4.00 8.00 4.00<br />
4 9.00 5.00 9.00 5.00<br />
5 9.00 5.00 9.00 5.00<br />
6 9.00 5.00 9.00 5.00<br />
7 10.00 5.00 10.00 5.00<br />
8 10.00 5.00 10.00 5.00<br />
9 10.00 5.00 10.00 5.00<br />
10 10.00 5.00 10.00 5.00<br />
11 10.00 5.00 10.00 5.00<br />
12 10.00 5.00 10.00 5.00<br />
13 11.00 6.00 11.00 6.00<br />
14 11.00 6.00 11.00 6.00<br />
15 11.00 6.00 11.00 6.00<br />
16 11.00 6.00 11.00 6.00<br />
17 11.00 6.00 11.00 6.00<br />
18 11.00 6.00 11.00 6.00<br />
19 11.00 6.00 11.00 6.00<br />
20 11.00 6.00 11.00 6.00<br />
- 93 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
CASUAL CONTRACT RATES (as on 31-03-<strong>2012</strong>)<br />
SCHEDULE – D<br />
Type of Bus<br />
No. of<br />
Seats<br />
Rate per km<br />
(Rs.)<br />
Minimum<br />
Kms.per day<br />
Minimum amount<br />
per day (24<br />
hrs.basis) (Rs.)<br />
On hourly basis<br />
(Min.40 Kms per<br />
hour) (Rs.)<br />
Moffusil 61/51 23 300 6900 920<br />
Karnataka Sarige 56/51 26 300 7800 1040<br />
Karnataka Sarige (12-meter chasis) 65 31 300 9300 1240<br />
Rajahamsa-Executive 39/36 33 350 11550 1320<br />
Rajahamsa-Semi Sleeper 31 34 350 11900 1360<br />
Rajahamsa (12-meter chasis) 44 38 350 13300 1520<br />
Sheetal 60 46 350 16100 1840<br />
Carona 43 44 400 17600 1760<br />
Volvo-Semi Sleeper 45/36 61 500 30500 2440<br />
Mysore city volvo service 38 56 300 16800 2240<br />
Semi Low Floor 42 28 250 7000 1120<br />
Karnataka Vaibhava* 44 38 350 13300 1520<br />
TERMS AND CONDITIONS:<br />
1. Re. 1/- Concession to Students of recognised Schools and Colleges of the state (including Intere state<br />
Travel<br />
2. Kilometers will be calculated from Depot out to Depot in.<br />
3. Booking has to be done at least 3 days in advance with full details of the tour programme.<br />
4. Payment has to be made in advance alongwith 20% refundable security deposit, Drivers OT and<br />
Infrastructure Development Cess.<br />
5. In case of Inter-state contract, permit charges and entry tax shall be extra.<br />
6. Furnishing of passenger list is compulsory in case of Inter-state contract.<br />
7. A day means 24 hours from the time of departure from the Depot.<br />
8. In case of delayed arrival, extra amount will be recovered on hourly basis as per above rates.<br />
upto 5 hours delay.<br />
9. Rs.1000/- shall be levied as special fee per Bus for more than two days Inter state causal contract<br />
10. Re.1/- shall be levied for each Km. on inter state services ( on all type of vehicle)<br />
- 94 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
SCHEDULE – E<br />
CATEGORYWISE PAY SCALES IN FORCE AS ON 31ST MARCH <strong>2012</strong><br />
Designation<br />
Scale of Pay<br />
Chairman<br />
Vice Chairman<br />
Managing Director<br />
Director (P&E)<br />
Director (S&V)<br />
Director (Technical)<br />
Director (Operation)<br />
Director (Finance/FA)<br />
General Manager (Personnel)<br />
To be appointed by the Government<br />
To be appointed by the Government<br />
To be appointed by the Government<br />
To be appointed by the Government<br />
To be appointed by the Government<br />
To be appointed by the Government<br />
To be appointed by the Government<br />
To be appointed by the Government<br />
To be appointed by the Government<br />
CLASS-I (SUPERTIME SCALE) OFFICERS<br />
General Manager (Technical)<br />
General Manager (Traffic)<br />
Rs.26950-750-32950-850-34650<br />
(10 Years)<br />
Chief Accounts Officer-Cum-Financial Adviser<br />
(To be appointed by the Government)<br />
CLASS-I (SELECTION GRADE) OFFICERS<br />
Chief Personnel Manager (Disciplinary)<br />
Chief Accounts Officer (I.A)<br />
Chief Planning & Statistical Officer<br />
Chief Mechanical Engineer<br />
Controller of Stores & Purchase<br />
Chief Law Officer<br />
Chief Civil Engineer<br />
Chief Traffic Manager<br />
Rs.21670-650-24920-750-30170-<br />
Chief Medical Officer 850-33570<br />
Manager (HRD)<br />
(16 Years)<br />
Chief Systems Manager<br />
Chief Marketing Manager<br />
Principal (CTI)<br />
Senior Divisional Controller<br />
- 95 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
Designation<br />
Scale of Pay<br />
CLASS-I (SENIOR) OFFICERS<br />
Chief Labour & Welfare Officer<br />
Chief Security & Vigilence Officer<br />
Dy.Chief Personnel Manager<br />
Dy.Chief Accounts Officer<br />
Dy.Controller of Stores & Purchases<br />
Senior Medical Officer<br />
Secretary<br />
Executive Engineer (Civil)<br />
Rs.18880-500-19880-580-21620-650-<br />
Controller of Printing & Stationery 25520-750-31520 (19 Years)<br />
Divisional Controller<br />
Deputy Chief Traffic Manager<br />
Deputy Chief Systems Manager<br />
Principal (RTI)<br />
Works Manager<br />
Chief Public Relations Officer<br />
Chief Statistical Officer<br />
Mechanical Engineer<br />
Deputy Chief Law Officer<br />
CLASS-I (JUNIOR) OFFICERS<br />
Administrative Officer<br />
Accounts Officer<br />
Divisional Traffic Officer<br />
Divisional Mechanical Engineer<br />
Dy.Superintendent (Regional Workshops)<br />
Stores Officer<br />
Law Officer<br />
Dy.Chief Labour Welfare Officer<br />
Medical Officer<br />
Dy.Controller of Printing<br />
Rs.17690-500-18690-580-20430-650-<br />
Systems Manager 24980-750-28730<br />
Dy.Chief Security & Vigilance Officer (17 Years)<br />
Statistical Officer<br />
Senior Personal Secretary<br />
Asst.Executive Engineer (Civil)<br />
Asst.Executive Engineer (Electrical)<br />
Training Manager<br />
Estate Officer<br />
Senior Depot Manager<br />
Sports Officer<br />
Public Releations Officer<br />
- 96 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
Designation<br />
Scale of Pay<br />
CLASS-II OFFICERS<br />
Labour Welfare Officer<br />
Asst.Administrative Officer<br />
Asst.Accounts Officer<br />
Assistant Statistical Officer<br />
Assistant Traffic Manager<br />
Assistant Mechanical Engineer<br />
Assistant Stores Officer<br />
Personal Secretary<br />
Assistant Law Officer<br />
Rs.13360-430-15080-500-16580-580-<br />
Assistant Controller of Printing 18900-650-24100<br />
Security & Vigilence Officer (19 Years)<br />
Depot Manager<br />
Marketing Manager<br />
Assistant Engineer (Civil)<br />
Assistant Engineer (Elec.)<br />
Assistant Systems Manager<br />
Assistant Superintendent (Regl.Workshops)<br />
Assistant Training Manager<br />
Special Officer (Rehabilitation)<br />
CLASS-III EMPLOYEES<br />
Assistant Works Superintendent<br />
Assistant Traffic Superintendent<br />
Supervisor (Electrical)<br />
Junior Engineer (Civil Special Grade)<br />
Rs.9050-340-10070-390-12800-440-<br />
Junior Engineer (Electrical Special Grade) 15440<br />
Personal Assistant (16 Years)<br />
Superintendent (Stores)<br />
Superintendent (Systems)<br />
Superintendent (<strong>Administration</strong>)<br />
Superintendent (Accounts)<br />
Superintendent (Statistics)<br />
Senior Driver<br />
Traffic Inspector<br />
Chargeman<br />
Chargeman (Printing)<br />
Divisional Security Inspector<br />
Inspector of Accounts<br />
Junior Engineer (Civil / Electrical)<br />
Rs.8410-220-8850-280-9690-340-<br />
Draftsman 11390-390-13340-440-14660<br />
Stenographer (Sr.)<br />
(18 Years)<br />
Store Keeper<br />
Supervisor (Accounts)<br />
Supervisor (<strong>Administration</strong>)<br />
Supervisor (Statistics)<br />
Supervisor (Systems)<br />
- 97 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
Designation<br />
Scale of Pay<br />
Leading Hand/Head Artisan<br />
Proof Examiner<br />
Assistant Supervisor (Electrical)<br />
Senior Compositor<br />
Senior Machine Operator<br />
Ticket Verifier<br />
Assistant<br />
Junior Stenographer<br />
Assistant Accountant<br />
Rs.7520-170-8030-220-8470-280-9310-340-<br />
Statistical Assistant 11010-390-13740<br />
Assistant Store Keeper<br />
(20 Years)<br />
Cashier (Senior)<br />
Assistant Security Inspector<br />
Boiler Attendent<br />
A. C. Electrician<br />
Staff Nurse<br />
Computer Operator<br />
Time Keeper<br />
Senior Binder<br />
Senior Data Entry Operator<br />
Assistant Traffic Inspector<br />
Artis an<br />
Compositor<br />
Binder<br />
Machine Operator<br />
Electrician<br />
Rs.7020-130-7280-170-7960-220-8400-280-<br />
Mechanic (Press)/Ticket Verifier 9240-340-10600<br />
Assistant Draughtman (15 Years)<br />
Sub-Overseer<br />
Work Inspector<br />
Watch & Ward Inspector<br />
Traffic Controller<br />
Security Havaldar<br />
Pharmacist<br />
JA -cum- data entry operator<br />
Typist<br />
Rs.6330-90-6510-130-7160-170-8010-220-<br />
Cashier (Junior) 8450-280-9290-340-9970<br />
Receptionist<br />
(19 Years)<br />
Tracer<br />
X-Ray Technician<br />
Junior Laboratory Technician<br />
Receptionist<br />
- 98 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
Designation<br />
Scale of Pay<br />
Driver Rs. 6230-90-6410-130-7190-170-8040-220-8480-<br />
280-9320-340-10000 (20 Years)<br />
Assistant Artisan<br />
Assistant Compositor<br />
Assistant Binder<br />
Rs.6230-90-6410-130-7190-170-8040-220-8920<br />
Assistant Machine Operator<br />
(17 Years)<br />
Checker & Packer<br />
Care Taker-cum-Cook<br />
Conductor<br />
Cook (Canteen)<br />
Rs.5850-70-5990-90-6350-130-7130-170-7980<br />
Security Guard<br />
(17 Years)<br />
Technical Assistant<br />
CLASS- IV EMPLOYEES<br />
Havaldar<br />
Rs.5770-70-5980-90-6430-130-7210-170-7890<br />
Assistant Cook (Canteen)<br />
(18 Years)<br />
Cashier (Canteen)<br />
Helper (Gardening & Head Mali)<br />
Helper (Printing)<br />
Helper (Security)<br />
Helper (Helper-cum-Room Boy Security)<br />
Helper (Office)<br />
Helper (Home Orderly)<br />
Helper (Cycle Orderly)<br />
Helper (Sweeping)<br />
Rs.5690-70-6040-90-6490-130-7270-170-7610<br />
Helper (Gardening) (18 Years)<br />
Helper (Gardening Mali)<br />
Helper (Sweeping-cum-Mali)<br />
Tea/Coffee Maker<br />
Supplier (Canteen)<br />
Grinder (Canteen)<br />
Cleaner (Canteen)<br />
Attender<br />
Dresser<br />
- 99 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
SCHEDULE – F<br />
DEPRECIATION<br />
Sl.<br />
No.<br />
A<br />
B<br />
C<br />
Type of Assets<br />
Assumed Life<br />
In<br />
Years<br />
In Kms<br />
Rate of <strong>Annual</strong><br />
Contribution<br />
Amount of<br />
Revenue<br />
Exp. in <strong>2011</strong>-12<br />
( Rs. in lakh )<br />
Incidence<br />
in Ps.per<br />
km.<br />
Buses<br />
1) Medium vehicles such as Leyland/TMB & others 10 560000 Based on kms. 17081.85 197.91<br />
2) Volvo vehicles 15 1000000 Based on kms. 2236.40 365.84<br />
Departmental Vehicles.<br />
1.Domestic trucks 4 0.00<br />
2.Departmental vehicles such as Cars, 6 1/6 of the original cost 61.09 0.66<br />
Station Wagons, Jeeps, Motor Cycles<br />
Buildings & Fixtures<br />
1.Pucca Buildings 40 2.5% of the original cost 831.41 9.00<br />
2.Temporary Buildings and Sheds 4 2.5% of the original cost 83.01 0.90<br />
D<br />
E<br />
F<br />
Plant & Machinery<br />
1.Light Mechanical & Electrical 20% of the original cost 76.36 0.83<br />
Equipments.<br />
2.Heavy Mechanical & Electrical 10% of the original cost 82.37 0.89<br />
Equipments.<br />
3.Tyre retreading machinery 12.56 0.14<br />
4.Ticket machines - Press 10.44 0.11<br />
5. Environment machineries 47.83 0.52<br />
Misc. Equipments<br />
1.Computer hardware and allied 20% of the original cost 247.33 2.68<br />
Equipments.<br />
2.Furniture & fictures 10% of the original cost 48.62 0.53<br />
3.Hand Ticket Machines 11.83 0.13<br />
4.Fire Fighting Equipments 0.75 0.01<br />
5.Medical Equipments 20% of the original cost 1.56 0.02<br />
6.Amenity Equipments 9.65 0.10<br />
7.Photographic Equipments 3.21 0.03<br />
8. Electronic tickting machine 113.55 1.23<br />
9. Electronic equipments 33.52 0.36<br />
10. Xerox & fax machines 12.10 0.13<br />
Interest on Capital<br />
6.25% of the capital provided -- --<br />
by the participating Governments<br />
- 100 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
Appendix -10<br />
ACCOUNTING POLICIES<br />
The Corporation has adopted Enterprise Resource Planning, an accounting package - Oracle Financials<br />
w.e.f. 01.02.2000. The Accounts of the Central Offices along with the accounts of all the Units of the<br />
Corporation at Trial Balance level are maintained in Oracle Financials.<br />
1. The Corporation follows Mercantile System of accounting and recognizes Income and Expenditure on<br />
accrual basis except otherwise stated specifically.<br />
2. Expenditure on Reconditioning of Vehicles is treated as revenue expenditure (Repairs & Maintenance)<br />
irrespective of its life.<br />
3. Fixed Assets are stated at cost. These costs are not adjusted to reflect the impact of changing value in<br />
purchasing power of money. Further, the Financial Statements are based on historical costs.<br />
4. (a) Depreciation on vehicles is calculated on actual KMs basis assuming the life of the vehicle as 5.60<br />
lakhs KMs for the purpose of the depreciation, as this method enables charging of depreciation equitably<br />
linked to the usage of vehicle and does reflect the true and fair cost of the depreciation.<br />
(b) Depreciation on Swaraj Mazda vehicles is also being calculated on the actual KM basis assuming the<br />
life of the vehicles as 5.60 lakhs KMs. only, on par with the other vehicles of the Corporation. The depreciation<br />
on vehicles, which are off the road for the whole year, is not provided for.<br />
(c) In respect of Volvo vehicles, the depreciation is being worked out at the rate of minimum of 1.00 lakh<br />
KM basis assuming the life of the vehicles, as 10.00 lakhs KMs based on the Govt. order No. SAREE/4/<br />
SASUMSO 2007 dated 27/03/07.<br />
(d) Depreciation on other Assets is provided on straight-line method at the following rates. Depreciation<br />
on assets acquired during the year is being provided on monthly prorata basis.<br />
Buildings 2.5%<br />
Computer Hardware 20%<br />
Heavy Duty Plant & Machinery 10%<br />
Medical Equipment 20%<br />
Light Duty Plant & Machinery 20%<br />
Furniture, Fixtures & others 10%<br />
5. MV Tax is calculated and provided for at 5% plus cess of 11% on tax, on the revenue realized during the<br />
year excluding the revenue realized in the territory of Maharashtra State as per G.O. No.FTD 114 TMT 89<br />
dated 08.06.1990.<br />
- 111 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
6. As per directions of RPFC, the share of Employer contribution to PF should be 12% on basic and DA and<br />
the same is being followed.<br />
7. The Corporation has been settling the gratuity claims of the employees as per the existing provisions out of<br />
its revenues.<br />
8. a) Materials received in the Units of <strong>KSRTC</strong> not taken on charge as on the date of closure of accounts<br />
due to non-completion of Inspection formalities are not accounted in the books of Accounts.<br />
b) Materials issued to workshops for their immediate requirements from Stores are treated as consumption.<br />
Hence, the value of materials lying on shop floor at the end of the year is not taken into stock.<br />
9. The minimum compensation payable under No fault liability clause as per section 140 of the Motor<br />
vehicle Act-1988 is carried in the Accounts for a period of 4 years. Any claims received for the earlier<br />
years will be treated on cash basis.<br />
10. Income from sale of scrap is derived only when the materials/scraped buses are lifted by the bidders and<br />
hence accounted on cash basis.<br />
11. The expenditure disclosed under deferred revenue expenditure is amortized as follows.<br />
a) Major assemblies fitted to the vehicles- for 5 years.<br />
b) Civil works like asphalting and re-chip carpeting, rewiring etc for 3 years.<br />
c) Cost of refurbishing of buses for 3 years.<br />
12. The deposits outstanding for more than 3 years are to be transferred to miscellaneous revenue. Wherever<br />
contracts/works continued for more than three years, such deposits are continued in the deposit Account.<br />
13. Liability on civil works is provided on the basis of certified bills.<br />
14. Grants received from JNNURM/SDP and other Grants are accounted under Reserves & Surplus. The<br />
principles under Accounting Standard – 12 are broadly followed in this regard.<br />
15. The figures are rounded off to the nearest of lakh rupees.<br />
- 112 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
NOTES FORMING PART OF BALANCE SHEET AND PROFIT AND LOSS ACCOUNT.<br />
1. The Stock of Stores on hand at the close of the financial year has been valued at weighted average price and<br />
they consist of the following:<br />
(Rs. In lakh)<br />
a) Serviceable Stores 2870.57<br />
b) Obsolete Stores 50.09<br />
(Realizable value 30%<br />
approximately)<br />
c) Surplus Stores 11.14<br />
2. Provision has been made for doubtful debts and advances to the extent of Rs.39.68 lakh.<br />
3. Provision for all liabilities acknowledged as debt has been made in the Accounts for the accounting year.<br />
4. Motor Vehicle Compensation claims awarded on or before 31 st of March <strong>2012</strong> and accepted by the<br />
Corporation up to the end of April <strong>2012</strong> have been accounted for in the Books of Accounts.<br />
5. Claims of the following nature are in dispute / pending in courts or with appellate authorities as on<br />
31 st March <strong>2012</strong> and are treated as contingent liability.<br />
Nature of the claim<br />
No. of cases<br />
pending<br />
Rs. In crore<br />
a. Motor accident compensation<br />
Claims<br />
4193 364.92<br />
b. Departmental Enquiry 11 0.52<br />
c. Excise duty on bus body<br />
building at R.W.B.<br />
d. Property tax of KBS for the<br />
period from 1989-90 to 98-99<br />
e. Penalty on M.V.Tax during<br />
the year 1996-97 to 2005-06<br />
- 39.43<br />
- 0.30<br />
- 36.86<br />
f. Income Tax liability as per<br />
the Asst. Order for the A.Y. 2009-10 -<br />
77.31<br />
2. 2190 Vehicles worth Rs.337.88 Crore and 171 vehicles wroth Rs.62.66 Crore have been hypothecated to<br />
Bank of Maharashtra and Punjab & Sind Bank respectively as security towards financial assistance<br />
extended to <strong>KSRTC</strong>, for purchase of chassis and building bodies thereon as on 31.03.<strong>2012</strong>. Further the<br />
Corporation has availed a loan of Rs.9.83 Crore from M/s KUIDFC under the mega city scheme for the<br />
- 113 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
project of construction of Modern Satellite Bus Terminal in MCTC land at Mysore Road Bangalore.<br />
According to the terms and conditions of the agreement <strong>KSRTC</strong> and KUIDFC are the joint owners of the<br />
property pertaining to the project till the loan is fully paid back along with interest. Apart from this<br />
M/s KUIDFC has sanctioned a Mega City Scheme loan of Rs.16.00 Crs. being 50% of the project cost for<br />
construction of Satellite Bus Station at Peenya, out of which Rs.11.00 Crore has been availed by the<br />
Corporation during <strong>2011</strong>-12. The repayment of the said loan commences from June-2013. However<br />
payment of interest is being made from Sept.-<strong>2011</strong> it self.<br />
3. The Government of Karnataka vide order No.CI 33 CIS 92 Bangalore dated 12.5.1995 read with order<br />
No.CI 11:CIS 95 Bangalore dated 11.1.96 and read with order No. CI 10 (II) CIS 2000 dated 23.07.2001<br />
have ordered to take over the assets and liabilities of erstwhile KIMCO. Accordingly the assets and<br />
liabilities of Rs. 2207.38 lakh have been incorporated in the books of accounts of <strong>KSRTC</strong>.<br />
a) Out of the total liabilities of Rs.2207.38 lakh, the Corporation has discharged a liability of Rs.2145.83<br />
lakh as on 31.03.<strong>2012</strong>.<br />
b) The following are the liabilities to be discharged.<br />
In lakh<br />
(i) Legal cases 35.00<br />
(ii) Gratuity 26.55<br />
Total 61.55<br />
4. The Corporation has been filing income tax returns every year and being assessed by the Additional<br />
Director of Income tax ,Trust Circle- 3(1) , Bangalore in the status of a Charitable institution.<br />
Consequent to the Amendment made by the Finance Act, 2008 with effect from 1.4.2008 to the<br />
term charitable Institution , the Director of Income tax (Exemptions), Trust circle has cancelled the<br />
registration granted to the corporation as a Charitable institution vide his order No.DIT (E)/<strong>KSRTC</strong>/<br />
AAACV6497R/ITO(E-1)/<strong>2011</strong>-12 Dt.21-11-<strong>2011</strong>.<br />
Subsequently, based on the cancellation order passed by the Director of Income tax (Exemptions),<br />
Trust Circle, the Additional Director of Income tax (Exemptions) Trust circle proceeded to assess the<br />
Corporation as an AOP for the Asst. year 2009-10.<br />
However our Corporation has not concurred with the action of the Director of Income tax Trust<br />
Circle and has contested the order of cancellation as a Charitable organization before the Income tax<br />
Appellate Tribunal and the assessment proceedings before the Commissioner of Income tax ( Appeals).<br />
Both the matters are pending.<br />
9. The Service Tax remittances are being made at the Unit level and the returns are being filed periodically.<br />
10. The Sales Tax Returns are filed at the Unit level and the assessment is being done periodically.<br />
- 114 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
11. The actuarial valuation in respect of Gratuity liability has been arrived at Rs.79.88 Crore and necessary<br />
provision has been made in the books of Accounts of the Corporation excluding the share of <strong>KSRTC</strong> in the<br />
Gratuity Fund Trust.<br />
12. The expenditure arising out of Encashment of leave to the retired employees, is being met out of revenues<br />
of the Corporation.<br />
13. As per Accounting Policy No.6 the PF contribution is made at 12% for the year, as there was no cash loss<br />
during the previous year.<br />
14. As on 31.03.12, both the Regional workshops Bangalore /Hassan were holding 101 scrap vehicles. These<br />
vehicles have already been removed from the assets of the Corporation. Hence, the value of assets shown in<br />
the balance sheet is exclusive of these assets. The approximate realizable value of these scrap buses would be<br />
Rs.151.50 lakh.<br />
15. a) Materials received in the units to the extent of Rs.7.02 lakh are not taken on charge as the<br />
inspection formalities are not completed as on 31.03.12. Hence the value of inventories held in the<br />
books of Accounts as on 31.03.12 is exclusive of these materials.<br />
b) The Capital liability on account of Civil Contracts pertaining to on going works, for which work<br />
orders issued but are still in progress, is to the extent of Rs.52.15 Crore.<br />
c) Further there is Capital liability to the extent of Rs.102.30 Crs. towards procurement of bus chassis/<br />
body building/ PMEs for which purchase order/work order issued during the year, but yet to be received/<br />
completed.<br />
d) Capital Liability pertaining to JNNURM Works is of the order of Rs. 7.29 Crore.<br />
16. The Corporation had purchased 9 acres of land belonging to M/s MCTC Ltd., at a cost of Rs.10.00 Crore<br />
Out of the 9 acres of land, 2 acres and 20 guntas only has been registered in favour of the Corporation<br />
during 2003. The remaining land is yet to be registered in favour of the Corporation. Necessary steps have<br />
been taken to complete the formalities of registration which are in progress. Further, the State Government<br />
has exempted the Corporation from payment of Registration fees (Rs.22.65 lakh). The said liability<br />
towards Registration fee has not been incorporated in the books of Accounts of the Corporation.<br />
17. The Government of Karnataka have sanctioned a ways and means loan of Rs.5.00 Crore to <strong>KSRTC</strong> during<br />
the year 1997, which was to be repayable in five equal installments of Rs.1.00 Crore per month commencing<br />
from March 1997. Consequent upon the restructuring and division of <strong>KSRTC</strong> an amount of Rs.72.10<br />
lakh. Rs.104.65 lakh and Rs.86.95 lakh was transferred to BMTC, NWKRTC and NEKRTC respectively.<br />
The share of <strong>KSRTC</strong> i.e. Rs.2.36 Crore has been repaid during November 07. Further interest liability to<br />
the extent of Rs.302.54 lakh has been settled vide Government Order no.SARIE37 SASUMYO 2010<br />
Dt.25/03/<strong>2011</strong>, out of the student subsidy amount released to the corporation. However no provision for<br />
penal interest at 6% p.a. has been made in the books of accounts of the corporation, which works out to<br />
Rs.151.26 lakh.<br />
- 115 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
18. The crew is eligible for incentive @ 2% on revenue collections on completion of their duties. Since the<br />
incentive payment is linked with the attendance of the Driver/Conductors, provision towards incentive on<br />
the night out collection has not been made in the accounts of <strong>2011</strong>-12. The estimated expenditure of<br />
incentive on this revenue will be about Rs.4.97 lakh.<br />
\19. The Corporation is providing drinking water, blankets etc to the passengers of premium services. The cost<br />
of these passenger amenities to the extent of Rs.503.43 lakh has been debited to passenger amenity fund as<br />
the expenditure is incurred for the welfare of passengers.<br />
20. The Bank balance has been arrived at after reducing the excess drawal of Rs.223.59 Lakh in respect of<br />
Corporation Bank and Bank of Maharashtra.<br />
21. No dues have remained unpaid as on 31-03-<strong>2012</strong> in respect of the Micro, Small and Medium Enterprises<br />
of State.<br />
22. An amount of Rs.375.00 lakh has been provided for in the accounts towards bonus liability for the year<br />
<strong>2011</strong>-12. However, this liability has not been considered for calculation of absorption of overheads in<br />
respect of Civil Engineering/Regional Workshops with a view to effect it while booking the actual<br />
expenditure as and when it is incurred at the respective units.<br />
23. Town Municipality of Chikkanayakanahalli has given a land measuring 1 acre and 25 Guntas to the<br />
Corporation free of cost during 1987 for Public Utility purpose. Accordingly, the Corporation has<br />
constructed a Bus Stand during 2002-03, by taking possession of the land. Further, the Corporation has<br />
taken up the matter with Urban Development Authorities to complete the formalities like Khata transfer<br />
etc., so as to get the land registered in favour of the Corporation and the matter is under progress.<br />
24. The Corporation has received Rs.7.35 Crore from Health Department towards transfer of land measuring<br />
5 acres as well as approach road of 23 guntas at Chikkaballapur. The amount so released over and above the<br />
net book value has been recognized in the P & L account of the corporation for the current year<br />
<strong>2011</strong>-12, treating it as profit on sale of asset as per the Accounting Standards issued by the Institute of<br />
Chartered Accountants of India. The said revenue has been utilized for the acquisition of other assets<br />
during the year.<br />
25. The BMRCL has released Rs.11.00 Crore for construction of Bus Depots/Terminals, out of which an<br />
amount of Rs.10.48 Crore is charged off to the assets capitalized till the end of this year.<br />
26. The Corporation has taken up two projects under the JnNURM scheme of Central Government at Mysore.<br />
The details of which are as follows.<br />
- 116 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
a) Rolling stock :<br />
(Rs.in Lakh)<br />
1 Project Cost 1.Volvo Buses - 30<br />
2.Tata Buses - 41<br />
3.Leyland Buses-79 150 Buses 5030.00<br />
2 Funding pattern<br />
1.GOI – 80%<br />
2.GOK -10%<br />
3.<strong>KSRTC</strong>-10%<br />
3 Cost of Buses 1.Volvo Buses - 30 2330.40<br />
2.Tata Buses - 41 1013.39<br />
3.Leyland Buses-79 1437.95 4781.74<br />
4 Amount Received 1 GOI 2735.00<br />
2 GOK (Including VAT) 927.80 3662.80<br />
The corporation has inducted 150 Buses at Mysore City by the end of Feb.2010. Further the Govt of<br />
India has released Rs.2735.00 lakh as against the sanction of Rs.3646.40 lakh leaving the balance of<br />
Rs.911.40 lakh to be received.<br />
b) Civil Engineering Works.<br />
(Rs.in Lakh)<br />
Particulars<br />
Estimated<br />
cost<br />
Tender<br />
approved<br />
cost<br />
Funding pattern<br />
1.GOI 80% of 8525.00<br />
Development of Transport<br />
Infrastructure facilities<br />
8525.00 11016.00<br />
2.GOK 10% of 8525.00<br />
3.<strong>KSRTC</strong> 10% of 8525.00<br />
4 Approved Cost (11016.00-<br />
8525.00) = 2491.00<br />
Project wise financial progress achieved up to 31-03-<strong>2012</strong><br />
- 117 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
Sl.<br />
No.<br />
Projects Name<br />
Estimate<br />
cost<br />
(In lakh<br />
Approved<br />
cost<br />
(Rs. in lakh)<br />
Progress achived upto 31-03-12<br />
and amount Capitalised under<br />
AH 310801 (Rs. in lakh)<br />
1 Up gradation of Mysore<br />
City Bus Station<br />
2 Up gradation of Moffsil<br />
Bus Station<br />
3 IMTC at Sathagalli with<br />
Depot<br />
1187.00 1597.00 1503.75<br />
1801.00 2353.00 2952.94<br />
2848.00 3661.00 3734.77<br />
4 IMTC at Kuvempunagara 1423.00 1836.00 1755.70<br />
5 IMTC at<br />
R.S.Naidunagara<br />
474.00 600.00 880.37<br />
6 IMTC at Ilawala 464.00 601.00 504.00<br />
7 P & TAC at Chamundi<br />
Hills<br />
328.00 368.00 52.98<br />
8 DPR Cost 84.40<br />
Total 8525.00 11016.00 11468.91<br />
Further, the details of assets charged against grant capitalized under JNNURM, during the year<br />
2009-10, 2010-11 and <strong>2011</strong>-12 are as under.<br />
(Rs.in Lakh)<br />
Sl.<br />
No<br />
Particulars<br />
Amount<br />
Charged<br />
to Grant<br />
2009-10 2010-11 <strong>2011</strong>-12 Grand Total<br />
<strong>KSRTC</strong><br />
Asst.<br />
Amount<br />
Charged<br />
to Grant<br />
<strong>KSRTC</strong><br />
Asst.<br />
Amount<br />
Charged<br />
to Grant<br />
<strong>KSRTC</strong><br />
Asset<br />
Total of<br />
Grant<br />
Total of<br />
<strong>KSRTC</strong><br />
Asset<br />
1 Up gradation of<br />
City Bus station<br />
At Mysore<br />
1068.30 325.75 0.00 37.32<br />
11.75 60.64 1080.05 423.71<br />
2 IMTC at<br />
Sathagalli Depot 155.13 17.23 0.00 0.00 2436.35 1126.06 2591.48 1143.29<br />
3 Up gradation of<br />
Mofussil. Bus<br />
Station at<br />
Mysore(DPR<br />
Cost added)<br />
4 IMTC at<br />
R.S.Naidu Nagar<br />
5 IMTC at<br />
Kuvempu Nagar<br />
6 IMTC at<br />
Yelawla<br />
7 PTAC<br />
Chamundi Hills<br />
0.00 0.00 1705.30 1125.42 66.57 273.20 1638.73 1398.62<br />
0.00 0.00 426.60 432.21 4.69 16.87 431.29 449.08<br />
1294.80 460.90 1294.80 460.90<br />
422.20 81.80 422.20 81.80<br />
50.93 2.04 50.93 2.04<br />
Total 1223.43 342.98 2131.90 1594.95 4154.15 2021.51 7509.48 3959.44<br />
- 118 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
27. The Corporation has received Rs.25.00 Crore towards Special Development Plan (SDP) Grants, from the<br />
Government of Karnataka during 2009-10, 2010-11 and <strong>2011</strong>-12. The year wise details of Assets created<br />
against the Grant received are as under.<br />
(Rs. in Crore)<br />
Sl.<br />
No<br />
Year<br />
Amount<br />
Asset created as at<br />
the end of the year<br />
1 2009-10 25.00 23.78<br />
2 2010-11 25.00 18.49<br />
3 <strong>2011</strong>-12 25.00 10.99<br />
28. During the year <strong>2011</strong>-12 the Corporation has received Rs.4.99 Crore from Directorate of Urban Land<br />
Transport (DULT) for introduction of City buses in two/three tier cities namely Hassan, KGF, Davangere.<br />
29. The corporation has submitted DPR’s to the Ministry of Road Transport and Highways (MoRTH) to<br />
infuse Information Technology in the Transport sector to improve the Bus services at an estimated cost of<br />
Rs.8.76 Crore Further MoRTH has released 1.65 Crore. out of GOI share of Rs.3.30 Crore as Central<br />
financial assistance during 2010-11, being first installment for implementation of this project. Balance of<br />
Rs.1.65 Crore is yet be received.<br />
30. The Ministry of Urban Development (MOUD) is working with Global Environment Facility (GEF) to<br />
prepare Sustainable Urban Transport Program (SUTP) to reduce GHG emissions in the urban transport<br />
sector.<br />
Under this scheme the <strong>KSRTC</strong> will be implementing Innovative Environment System (IES) as well as<br />
Intelligent Transport System (ITS) at Mysore City, covering 500 Buses,105 Bus stops,6 Bus Terminals and<br />
45 platforms. The corporation is implementing ITS at Mysore City under World Bank’s GEF-SUTP<br />
programme with the financial aid from World Bank, Government of India (JnNURM and MoUD) and<br />
Government of Karnataka. The estimated cost of the project is Rs.27.27 Crore The work under the project<br />
is under progress. The contract for implementation of the project has been awarded to M/s CMC Ltd.<br />
Bangalore. Further, M/s IBI Pvt. Ltd. has been appointed as Project Management Consultants and the<br />
work of Monitoring and Evaluation of the Project has been entrusted to M/s ICT India Pvt. Ltd.<br />
31. The Corporation has received Rs.18.00 lakh being 50% of the Central Financial Assistance (CFA) through<br />
the Ministry of New and Renewable Energy (MNRE) towards installation of Solar Lighting System in<br />
various divisions. The project is nearing completion.<br />
32. The Corporation has received Rs.10.00 Crore by way of an advance being 50% of the sanction amount of<br />
Rs.20.00 Crore vide GO No SARIE 273 SAEPA <strong>2011</strong> Dt.02-03-<strong>2012</strong> through the Transport<br />
Commissioner, who in turn has entrusted the work of construction of Drivers Training Track for Heavy<br />
vehicles at Singanayakanahalli, Bangalore and Gamanagatti, Dharwad. Accordingly the Corporation will<br />
undertake and complete the said CE works by utilizing the amount so received for the purpose.<br />
- 119 -
<strong>Annual</strong> <strong>Administration</strong> <strong>Report</strong> <strong>2011</strong> - <strong>2012</strong><br />
33. With a view to provide better amenities to the commuters, the Corporation has entered in to a<br />
Lease-Cum–Development Agreement, under Public Private Participation (PPP), for a period of 33 years,<br />
with M/s Patil Constructions & Infrastructure Pvt. Ltd. and M/s Ramanashi Infrastructure to develop<br />
Commercial Complex at Hassan and Mangalore respectively. At both the places, the Corporation has<br />
provided its own land to the developers. Under the project M/s Patil Constructions & Infrastructure Pvt.<br />
Ltd. and M/s Ramanashi Infrastructure have remitted Rs.1.50 Crore and 1.00 Crore respectively towards<br />
land premium apart from lease rentals which is non-refundable. Initial formalities are completed and the<br />
projects are under progress.<br />
34. The Corporation during the year <strong>2011</strong>-12 has repaid the capital loan to the extent of Rs.39.87 Crore.<br />
Sd/-<br />
(S.Padmanabhan)<br />
DIRECTOR (Finance)/FA<br />
Sd/-<br />
(N.Manjunatha Prasad)<br />
Managing Director<br />
Dated : 08-06-<strong>2012</strong><br />
Place : Bangalore<br />
- 120 -