<strong>COCHIN</strong> <strong>SHIPYARD</strong> <strong>LIMITED</strong><br />
(A Government of <strong>India</strong> Enterprise)<br />
P.O. BAG NO.1653 <strong>COCHIN</strong>-682 015 INDIA<br />
Tel. No. +91(484) 2361181/2351181/2366340<br />
Fax No. +91(484) 2370897/373902<br />
E– Mail: dgmcivil@cochinshipyard.com<br />
Web: www.cochinshipyard.com<br />
No. CIV/013/2012/AGM (CE) 17-07-2012<br />
RE - TENDER NOTICE<br />
Sealed competitive tenders in the prescribed form are invited on behalf of Cochin Shipyard<br />
Limited from experienced contractors for the under mentioned work, so as to reach the<br />
undersigned on or before the date and time mentioned below:<br />
Name of Work<br />
Earnest Money to be deposited<br />
: CONSTRUCTION OF REST PLACE AND<br />
SUPERVISORS CABIN OUTSIDE<br />
MAINTENANCE SHOP<br />
Cost of Tender Form : Rs. 250/- + S.T (5%)<br />
: ` 36, 000/-(Rupees Thirty Six Thousand only)<br />
(Those who download the tender form from website also will be required to remit the cost along<br />
with the tender documents in the form of DD drawn in favour of Cochin Shipyard Ltd)<br />
Last date and time of issue of tender forms : 30-07-2012 upto 15.00 hrs.<br />
Last date and time of receipt of tender<br />
Date and time of opening of tender Box<br />
(Price bid of those tenderers who submitted<br />
EMD and certificate signed by the contractor<br />
will be opened on a later date)<br />
: 31-07-2012 upto 14.00 hrs.<br />
: 31-07-2012, 14.30 hrs.<br />
Time of completion of Work<br />
: 4 Months<br />
Short description of Work<br />
: Work involves providing Earth Work Excavation<br />
(35m 3 ), PCC 1:4:8 (20m 3 ), PCC 1:2:4 (3m 3 ), Random<br />
Rubble Masonry (35m 3 ), Brickwork in CM 1:5 (30m 3 ),<br />
Plastering with CM 1:4, 12 thick (300m 2 ), Structural<br />
truss work using M.S pipes, Powder coated Aluminum<br />
Sliding door, Powder coated Aluminum Openable
2<br />
Door, Powder coated Aluminum Super Sliding window,<br />
Roofing with Aluminum powder coated tile profile<br />
sheets(180m 2 ), Ceramic tile flooring (140m 2 ), Weld<br />
mesh fixing (75 m 2 ) PVC ceiling (130m 2 ), Supply and<br />
fabrication of MS lockers ( 6T) & allied works etc.<br />
The price bid of only those contractors who have submitted proof of remittance of EMD, cost of<br />
tender forms and certificate signed by the contractor shall only be opened on a later date after<br />
giving notice to the bidders. The rates quoted should be inclusive of all taxes and duties.<br />
The tender documents can be obtained from the office of the undersigned during office hours till<br />
the last date and time of issue of <strong>Tenders</strong>. All the tender documents (NIT, General conditions of<br />
contract, special conditions, specification and tender schedule) are available on Cochin<br />
Shipyard’s website www.cochinshipyard.com and Govt. Website http://tenders.gov.in. Tenderers<br />
can download the forms and use the same for submission of the tenders.<br />
Those bidders who have submitted tender against the first tender have the liberty to keep the first<br />
price bid valid for the retender or submit a fresh price bid. Also those bidders who have already<br />
submitted EMD for the first tender need not submit again. If the bidders who have submitted<br />
tender against the first tender is submitting fresh price bid then cost of tender form has to be<br />
remitted<br />
S/d<br />
Chief General Manager (Tech)
3<br />
CIVIL ENGINEERING DEPARTMENT<br />
File No. CIV/013/2012/AGM (CE)<br />
SPECIAL CONDITIONS<br />
NAME OF WORK: CONSTRUCTION OF REST PLACE AND SUPERVISORS CABIN<br />
OUTSIDE MAINTENANCE SHOP<br />
1. The conditions enumerated below are in addition to the General conditions of contract given<br />
in “Conditions of contract and instructions to Tenderers of CSL” and will have precedence<br />
over them.<br />
2. “General Conditions of Contract (GCC) and Instructions to Tenderers” is available in the<br />
CSL website. The tenderer shall submit his tender document including GCC. Although, it is<br />
permissible to submit the tender without the copy of GCC, while entering into agreement by<br />
the successful tenderer, the GCC shall be duly signed by both the parties and form part of the<br />
agreement. As such, it is deemed that the tenderer has made reference to the GCC in the<br />
website or otherwise, and has full knowledge of its contents, although it is not signed and<br />
attached with the tender.<br />
3. In the General Conditions of Contract DGM (Civil) should be read as CGM (Tech) who will<br />
be the Engineer- in- charge.<br />
4. All corrigenda, addenda, amendments and clarifications to Tender Specifications will be<br />
hosted in the website www.cochinshipyard.com and not in the newspaper. Bidders shall keep<br />
themselves updated with all such developments till the last date and time of submission of<br />
tender.<br />
5. The tender for the work will be based on Single Bid system. The tender has to be submitted<br />
in two covers.<br />
5.1 Cover A:<br />
Cover A shall contain EMD for ` 36, 000/-(Rupees Thirty Six Thousand only) in the<br />
form of DD/TDR drawn in favour of Cochin Shipyard Limited and the following<br />
Certificates signed by the contractor.<br />
1. “ I / WE COMPLY WITH ALL CONDITIONS OF TENDER BY CSL AND<br />
CONFIRM THAT RATES QUOTED IN THE PRICE BID ARE INCLUSIVE OF<br />
ALL TAXES AND DUTIES INCLUDING SERVICE TAX IF APPLICABLE. I /<br />
WE ALSO CONFIRM THAT COVER B (PRICE BID) DO NOT CONTAIN ANY<br />
CONDITIONS ”<br />
Signature of Contractor
4<br />
2. “ I / WE HAVE NOT MADE ANY PAYMENT OR ILLEGAL GRATIFICATION<br />
TO ANY PERSON/AUTHORITY CONNECTED WITH THE BID PROCESS SO<br />
AS TO INFLUENCE THE BID PROCESS AND HAVE NOT COMMITTED ANY<br />
OFFENCE UNDER THE PC ACT IN CONNECTION WITH THE BID.<br />
Cover B:<br />
Financial /price bid - shall contain the rates and amount for each item of work. There<br />
shall not be any clause, added by the tenderers in the price bid.<br />
5.2 The cover A & cover B shall then put together in another cover marked Cover C,<br />
which shall be sealed and superscribed with name of work, the address & Contact No.<br />
of contractor.<br />
5.3 Cover C shall be opened at 14:30 hrs on 31/07/2012 at the office of Civil<br />
Engineering. At first cover A containing EMD and certificates from the contractor<br />
shall be opened. In case the earnest money is not deposited or is not in order, the<br />
tender shall be returned to the tenderer unopened either on the spot, if the tenderer is<br />
present, or later by post. Only a mention to this effect shall be made in the tender<br />
opening register.<br />
5.4 Price bid (cover B) of those tenders who have submitted EMD and the undertaking<br />
that Cover B do not contain any conditions shall only be opened on a later date after<br />
giving notice to the bidders. The notice shall be served by Post or Fax or E-mail or<br />
telephonically informing to the contractor.<br />
6 Late tenders, tenders with conditions and conditional rebates/discounts will be summarily<br />
rejected.<br />
7 The acceptance of a tender will rest with CGM (Tech) who does not bind himself to accept<br />
the lowest tender and reserves to himself the authority to reject any or all of the tenders<br />
received without assigning any reason.<br />
8 The tenderer should keep open the validity of the tender normally for 90 days from the date<br />
fixed for its opening. Should any tenderer withdraw his tender before this period, or makes<br />
any modifications in the terms and conditions of the tender which are not acceptable to CSL,<br />
the earnest money deposited by the tenderers shall be forfeited.<br />
9 If any difference is found in different parts of the tender documents, the following will be in<br />
order of precedence.<br />
(i) Schedule<br />
(ii) Special conditions<br />
(iii) Condition of contract and instructions to tenderers.<br />
Signature of Contractor
5<br />
10 Rates shall be both in figures and words. Rates quoted should be in <strong>India</strong>n Rupees inclusive<br />
of all taxes and duties, including service tax if any, in accordance with the tender schedule.<br />
11 The rates quoted by the contractor shall be for finished items of works including supplying<br />
appropriate materials, labour, equipment/tools, conveyance etc. all complete, unless specified<br />
in the tender schedule.<br />
12 The tenderers are expected to have inspected the site, before quoting, read the conditions<br />
thoroughly and understand the works in all respect. Clarifications, if any may be obtained<br />
from the CGM (Tech) before the tender is submitted, and if clarifications/details are not<br />
obtained before the tender is submitted, no claim on this account will be admitted.<br />
13 The contractor is expected to acquaint himself with the site conditions, labour situation, wage<br />
and benefits applicable to labourers, working hours, out turn of work by labour and the<br />
fluctuations which are likely to happen till the work is completed on all the above aspects<br />
prior to quoting the rates. The submission of a tender by tenderer implies that he has made<br />
himself aware of all the above situations and conditions. Any extra claim on this account will<br />
not be entertained.<br />
14 The site being infront of Canteen Building, all precautions shall be taken to see that<br />
minimum disturbance is caused to the normal functioning of the canteen. The contractor shall<br />
not cause any obstruction in the premises of canteen especially in the front yard and the roads<br />
while storing/keeping the materials/tools/equipment. All care shall be taken to keep the<br />
premises clean without dumping any debris as far as possible.<br />
15 The contractor shall provide green shade nets in the executing site to prevent dust pollution<br />
to nearby working areas at no extra cost. The contractor shall taken into consideration the<br />
above aspect while quoting for the work.<br />
16 While undertaking the work extra care shall be taken to prevent any leakage of cement<br />
slurry/rain water or falling of dismantled materials etc. Necessary protective arrangements as<br />
approved by the Engineer-in charge shall be provided for this by the contractor at his own<br />
cost.<br />
17 The contractor shall thoroughly study the specifications and drawings and<br />
errors/omissions/modifications if any shall be brought to the notice of the Engineer-in-<br />
Charge well in advance so that a final decision in the matter could be given in time.<br />
18 10% of the bill amount (less EMD) will be deducted as security deposit from running<br />
account bills and the same shall be released after the successful completion of the<br />
observation period of 6 months.<br />
Signature of Contractor
6<br />
19 The time of completion of work of 4 months shall be reckoned from the 7 th day of the date of<br />
issue of the work order or the date of handing over the site whichever is later.<br />
20 The contractor shall submit a detailed time schedule in conformity with the completion time<br />
stipulated in the tender within 7 days from the date of issue of letter awarding the work.<br />
21 The contractor or his authorized technically qualified representative shall be available at CSL<br />
throughout the period of contract for receiving instructions from department, arranging and<br />
executing the work.<br />
22 The Contractor / representative shall report at the office of the Engineer-in-charge on all<br />
working days before 8:30 hrs and receive instruction regarding the works.<br />
23 The Contractor may have to work round the clock including holidays, if required to complete<br />
the work in time without any extra cost. However works executing out of office hours and<br />
holiday shall be informed to the Engineer-in-charge well advance and get his clearance.<br />
24 The normal working time of the CSL is from 8.15 A.M. to 5.00 P.M on all weekdays and<br />
Saturdays with half an hour interval from 12.15 noon to 12.45 P.M. All Sundays, second<br />
Saturday and fourth Saturday are holidays. If the Contractor wishes to carry out the work<br />
beyond normal working hours and or on holidays, he should get specific approval from the<br />
Engineer-in-Charge for the same. Necessary supervision will be arranged by the department.<br />
25 The completion of work may entail working in rainy season also. The contractor shall take<br />
such an eventuality into consideration while quoting for the work. No extra rate will be<br />
admissible for work in monsoon/ rainy season.<br />
26 The successful tenderer will be required to execute an agreement at his expense on proper<br />
value Kerala State Stamp Paper in the prescribed departmental form.<br />
27 In the event of the tenderer, after the issue of work order by CSL, failing / refusing to execute<br />
the agreement, the tenderer shall be deemed to have abandoned to the contract and such an<br />
act shall amount to and be construed as the contractors calculated and the willful breach of<br />
the contract, the cost and consequence of which shall be to the sole account of the tenderer<br />
and upon such an event CSL shall have full right to claim damages therefore either together<br />
with or in addition to the forfeiture of Earnest Money Deposit.<br />
28 The contract shall come into effect on the date of signature of both the parties on the contact<br />
(effective date) and shall remain valid until the completion of the obligation of the parties<br />
under the contract. The deliveries, supplies and performance of the service shall commence<br />
from the effective date of the contract.<br />
Signature of Contractor
7<br />
29 All notices / written orders issued by CSL to the contractor under the terms of the contract<br />
shall be served by sending by Post or Fax or Email or delivering the same to the contractors<br />
authorized site official nominated for this purpose.<br />
30 The Cochin Shipyard is an International Ship & Port Facility Security (ISPS) code compliant<br />
Shipyard and the contractor is obliged to comply with the provisions of the code in force and<br />
as amended from time to time. The site for the proposed work is a protected area and hence<br />
security rules and regulations including obtaining work permits, obtaining entry / exit passes<br />
including photo passes for men, vehicles and materials etc. for entering the area shall be<br />
observed by the contractor. Contractor/workers should produce police clearance certificate,<br />
passport or any other photo ID cards approved by CSL and Medical Fitness Certificate,<br />
issued by recognized medical practitioner (Allopathy) to get entry pass to Shipyard area.<br />
31 All labour, skilled or unskilled shall be provided by the contractor. Settling any dispute with<br />
the labour/ subcontractor will be contractor’s responsibility. The workers engaged for works<br />
should have sufficient knowledge and experience in the respective fields. This shall be<br />
proved to the Engineer-in-charge.<br />
32 If the contractor abandons the contract or fails to commence the work in time or suspend the<br />
work for long duration (15 days), without valid reasons acceptable to CSL, labour dispute<br />
with their workers, poor safety records etc CSL will terminate the contract and arrange the<br />
work at the risk and cost of the contractor. In such case EMD & Security Deposit will be<br />
forfeited forthwith.<br />
33 The tender documents and drawings are to be returned along with the tender, duly signed by<br />
the contractor in all pages.<br />
34 The contractor shall bring all necessary machinery and equipments required for the work.<br />
35 Contractor shall be permitted to use artificial crushed sand (fine aggregate) in place of “clean<br />
river sand” subject to the approval Engineer in charge<br />
36 Cochin shipyard reserves the right to award the work to one or more contractors or delete any<br />
part of the work from the scope of the contract or cancel the tender without assigning any<br />
reason.<br />
37 The work shall be carried out without damaging any of the existing structures/ structures<br />
under construction/ underground pipelines or cables etc in the locality. If any damage occurs<br />
to the CSL property, by the contractor’s operation shall be compensated / made good at<br />
contractor’s risk and cost to the satisfaction of the Engineer-in-Charge of the works, failing<br />
which department will do the rectification work and the cost incurred will be recovered from<br />
his bill or from security deposit.<br />
Signature of Contractor
8<br />
38 Relevant I.S. codes are to be followed for all items of work, any deviation for the work are<br />
found with this tender documents, <strong>India</strong>n Standard specifications and Kerala Public Works<br />
Department specifications are to be followed. If specifications are silent about any aspect,<br />
other codes as directed by the Engineer-in-charge will be followed. In the absence of any<br />
code dealing with particular aspect, sound engineering practice shall prevail. Decision of the<br />
Engineer-in-charge in this respect will be final. In case there is a difference between <strong>India</strong>n<br />
standard code and KPWD specification, the former shall prevail.<br />
39 All materials to be used on the work will have to be got approved by the Engineer-in-charge<br />
before use. Unless otherwise decided by the Engineer-in-charge all the materials are to be<br />
procured by the contractor.<br />
40 For the construction purpose, the entire site will be handed over. If this is not possible due to<br />
reasons, which cannot be anticipated now, the site will be handed over in parts. Proportionate<br />
extra time will be granted if found necessary by the Engineer in Charge and the decision of<br />
Engineer in Charge shall be final.<br />
41 Delay compensation as per clause 2 of GCC will be levied on the final value of the whole<br />
work when the site is handed over in one stretch. When the site is handed over in Phases with<br />
separate period of completions, delay compensation as per clause 2 of GCC will be levied on<br />
the value of the phase of which completion is delayed.<br />
42 The contractor shall at his risk and cost make all arrangements and shall provide all facilities<br />
as the Engineer-in-charge may require for collection, preparing, forwarding and testing the<br />
required number of samples for test (or for analysis) to places as may be directed by the<br />
Engineer-in-charge. The charges for testing to be borne by the contractor.<br />
43 Contractor shall work in close co-ordination with other agencies working in the same work<br />
site at the same time. The space for storage of materials for each work should also be decided<br />
by mutual agreement among the contractors working in the same area. CSL will not entertain<br />
any claim regarding non-availability of space for storing materials nor can enter into any<br />
discussion to settle the dispute between contractors regarding usage of space for storing<br />
materials etc.<br />
44 Electric power supply from KSEB grid is available in CSL but cannot ensure uninterrupted<br />
power supply. There can be restriction in supply of power by KSEB. Contractors shall take<br />
note of this situation.<br />
45 The Following services will be issued free of cost depending on availability. Contractor has<br />
to make his own arrangements to avail the same at his risk and subject to satisfying statutory<br />
rules and regulations if any.<br />
Signature of Contractor
9<br />
a. Electricity<br />
b. Water<br />
c. Oxygen<br />
d. Acetylene<br />
e. Carbon dioxide<br />
f. LPG<br />
g. CSL cranes / Fork lifts / Trailer<br />
46 Any cement that the Engineer-in-charge considers has become stale or unsuitable through<br />
absorption of moisture from the atmosphere or otherwise due to improper transport/ storage/<br />
handling by the contractors shall be rejected.<br />
47 Any admixture if found necessary for concrete items by the contractor to suit his work could<br />
be provided by him at his own cost with prior approval of the Engineer-in-charge. No extra<br />
payment will be made for the same by CSL.<br />
48 Empty cement bags are to be stacked in bundles and to be cleared from site at contractor’s<br />
expense as directed by the Engineer-in-charge.<br />
49 Waste materials are to be cleared from site on a day-to-day basis. Each area of working is to<br />
be cordoned off with necessary signboards and barriers to ensure safe transportation of men<br />
and material by CSL in the area as directed by the Engineer-in-charge.<br />
50 CGM (Tech) shall have the right to take possession of or use completed or partially<br />
completed part of the work. Such possession or use shall not be deemed to be an acceptance<br />
of such work. After completion of all the works, the contractor has to clear all the debris and<br />
make the area neat and tidy at the site. The final bill shall be paid only after the certification<br />
by safety department to this effect.<br />
51 It is the responsibility of the contractor to follow all safety rules and regulations in force,<br />
during the currency of contract in CSL, and any violation of the same during the course of<br />
work will be at the risk and cost of the contractor and will attract penal action. Copy of CSL<br />
Safety manual is available in the Office of CGM (Tech) and the same may be referred before<br />
quoting the rates.<br />
52 Any violation of Safety rules by the contractor, safety department will impose penalty of Rs<br />
1000/- to Rs 5000/- depending on the gravity of violation. Action for debarring the contractor<br />
also will be taken in case of repeated violation. Any accident caused due to safety violation<br />
and any damage to the company property suitable penalty will be imposed by CSL including<br />
termination of contract, if required.<br />
Signature of Contractor
10<br />
53 The contractor shall not construct any structure, even of temporary nature, for any purpose at<br />
site, except with the written permission of the Engineer-in-Charge of the work and any<br />
construction so put up shall be removed by the contractor whenever the Engineer-in- Charge<br />
calls upon the contractor to do so.<br />
54 The quantities given in the Schedule of quantities are only approximate and payment will be<br />
made as per actual quantity of work done and rate finalized.<br />
55 The drawings given in the tender documents are only for tendering purpose. Final detailed<br />
drawings are to be issued during execution at site. There may be changes in drawing as per<br />
the requirement of Cochin Shipyard Limited and the quantity may vary on execution of<br />
works and no extra claim on rates will be entertained.<br />
56 For all items brought from outside to be used/ consumed on the work, Material<br />
Declaration forms with work order number shall be obtained from Security section and the<br />
same shall be submitted at the office of the Engineer-in-Charge.<br />
57 For works at height and excavation / trench openings and night work, Work permit from<br />
safety department has to be obtained.<br />
58 Welding Sets without ELCB and Safety Relay will not be permitted at site. Necessary<br />
instructions regarding safety shall be strictly adhered to by the agency during the course of<br />
the work.<br />
59 For the completed items of the work 75% of the net amount payable on each bill can be paid<br />
as advance by CSL at the discretion of CGM (Tech), on a request by the contractor and on<br />
the recommendation of the Engineer-in-charge.<br />
60 The contractor shall be responsible for the true and proper setting out of the works and for<br />
the correctness of the position, levels, dimensions, and alignment of all parts of the works<br />
and for the provision of all necessary instruments, appliances and labour in connection<br />
therewith. If at any time during the progress of the work any error shall appear or arise in the<br />
position, level, dimension or alignment of any part of the work, the contractor on being<br />
required to do so by the Engineer in charge, shall at his cost rectify such errors to the<br />
satisfaction of the Engineer in charge. The checking of any setting out or of any line or level<br />
by the Engineer in charge shall not in any way relieve the contractor of his responsibility for<br />
the correctness thereof. The contractor shall provide all necessary instruments, appliances<br />
and labour required for the Engineer in charge for checking, if any, of the setting out. The<br />
contractor shall carefully protect and observe all bench marks, site levels, pegs and other<br />
things used in setting out the works.<br />
Signature of Contractor
11<br />
61 The tenderer shall specify the PAN No: allotted to him so that DGM (Fin) can ascertain his<br />
liability to the Income Tax Department. The income tax/KVAT/ any other statutory taxes, as<br />
per the rules /directions of the concerned departments, prevailing in force at the time of<br />
payment of bills will be deducted while making payment or when crediting the amount to the<br />
account.<br />
62 The contractors registered under the Kerala Value Added Tax Act, 2003 shall produce a<br />
Liability Certificate, along with the bill, in relation to the works contract, from the Assessing<br />
Authority showing the tax liability or tax remittance as the case may be and the works<br />
contract tax deduction will be made accordingly. Otherwise Works Contract tax @8% plus<br />
CESS as applicable in the case of registered contractors and @10% plus CESS as applicable<br />
in the case of unregistered contractors will be deducted from the payment released against the<br />
contract.<br />
63 All rejected materials shall be removed with in 3 days from the date of written order to that<br />
effect. In case the rejected materials are not removed within the specified period mentioned<br />
above the same will be removed by CSL at the cost and risk of the contractor.<br />
64 CSL is an ISO 9001, ISO 14001 and ISO 18001 certified firm. All the contractors and<br />
subcontractors shall comply with the measures related to the Quality, Health, and Safety &<br />
Environment (QHSE) policy of CSL. Any clarification related to IMS requirements of the<br />
yard, may be obtained by the contractor from the Engineer in charge or the authorized<br />
representative of the contract, prior to the commencement of work<br />
65 The final bill shall be paid within three months from the date of submission of claim (bill) by<br />
the contractor or completion of all the items of work or date of acceptance of the bill by both<br />
parties which ever is later.<br />
66 It will be mandatory for the bidders to indicate their bank account numbers and other relevant<br />
E-payment details so that payments could be made through ECS/EFT mechanism instead of<br />
payment through cheques, wherever feasible.<br />
67 Secured advance shall be given for non-perishable materials as provided in Clause 15 of<br />
Conditions of Contract of GCC. Cement, Sand and different grades of hard granite broken<br />
stones will not considered as a non-perishable item. For materials brought without valid<br />
material Declaration forms issued from CISF Security section of CSL, Secured advance shall<br />
be paid against a Bank Guarantee for an equivalent amount. Decision of the Engineer in<br />
Charge to this aspect will be final.<br />
68 Ground rental charges at the prevailing rate of Rs 5 per Sqm per month will be levied from<br />
the contractor and will be recovered from the payment due to the contractor for the land<br />
Signature of Contractor
12<br />
allotted by CSL to him for setting up temporary office space and the same will be recovered<br />
from the payment due to the contractor. However, no rental charges will be levied for the<br />
material storage area allotted.<br />
69 The contractor shall report to the Engineer-in-Charge details of any accidents as soon as<br />
possible after its occurrence. In the case of any fatal or serious accident, the contractor shall<br />
in addition, notify the local police authorities immediately by available means.<br />
70 Supply of cement shall be taken in 50kg bags bearing manufacture’s name and ISI marking.<br />
Samples of cement arranged by the contractor shall be taken by the Engineer-in-Charge.<br />
71 All materials not herein detailed and fully specified but which may be required for use on<br />
works, shall be subjected to the approval of the Engineer-in-Charge without which they shall<br />
not be used anywhere in the permanent works.<br />
72 CSL shall not be liable for, or in respect of, any damages or compensation payable at law in<br />
respect or in consequence of any accident or injury to any workmen or other person in the<br />
employment of the contractor or any sub-contractor, except an accident or injury resulting<br />
from any default of CSL, the contractor shall indemnify and keep CSL indemnified against<br />
all such damages and compensation and against all claims, demands, proceedings, costs,<br />
charges and expenses whatsoever in respect thereof or in relation thereto.<br />
73 The contractor shall insure against such liability and shall continue such insurance during the<br />
whole of the time that any persons are employed by him on the works. Provided that, in<br />
respect of any persons employed by any sub-contractor, the contractor’s obligations to insure<br />
as aforesaid under this sub-clause shall be satisfied if the sub-contractor shall have insured<br />
against the liability in respect of such persons in such manner that CSL is indemnified under<br />
the policy, but the contractor shall require such sub-contractor to produce before CSL, such<br />
policy of insurance and the receipt for the payment of current premium.<br />
74 The contract involves an obligation of secrecy and the contractor, his agents, servants or subcontractor<br />
or their agents or servants shall observe and comply with the requirements of the<br />
<strong>India</strong>n Official Secrets Act 1923, and the rules there under or any statutory modifications or<br />
re-enactments thereof. Any breach of this clause shall constitute a breach of the contract.<br />
The contractor shall not disclose to anybody the details of drawings prepared for the work<br />
without the approval of CSL. No photographs of the CSL area shall be taken or permitted by<br />
the contractor to be taken by any of his employees without the approval of the competent<br />
authority and no such photographs shall be published, or otherwise circulated without the<br />
approval of CSL.<br />
Signature of Contractor
13<br />
75 The contractor shall not stop the work or abandon the site for whatsoever reason except force<br />
majeure conditions. The following shall amount to force majeure:-<br />
a) War, hostilities (whether war be declared or not), invasion, act of foreign enemies<br />
b) Rebellion, terrorism, revolution, insurrection, military or usurped power, or civil<br />
war,<br />
c) Riot, commotion, disorder, strike or lockout by persons other than the contractor’s<br />
personnel and other employees of the contractor,<br />
d) Munitions of war, explosive materials, ionizing radiation or contamination by<br />
radioactivity, except as may be attributable to the contractor’s use of such<br />
munitions, explosives, radiation or radio-activity, and Natural catastrophes such<br />
as earthquake, hurricane, typhoon or volcanic activity.<br />
e) Epidemic, famine;<br />
f) Strikes, Harthal or boycotts interrupting supplies and services to the site<br />
(excluding strikes or boycotts by employees, agents or representatives of<br />
contractor, or its subcontractors for any reason whatsoever);<br />
g) Fire caused otherwise than by any act or omission on the part of the contractor or<br />
its agents servants or employees or its subcontractor;<br />
h) Any event or circumstance of nature analogues to any of the above or an Act of<br />
God.<br />
76 If the contractor suffers delay in due execution of the contractual obligation due to delays<br />
caused by force majeure as defined above, the agreed time of completion of the job covered<br />
by this contract or the obligations of the contractor shall be extended by a period of time<br />
equal to period of delay, provided that on the occurrence of any such contingency, the<br />
contractor immediately should report in writing to CSL .A hindrance register shall be<br />
maintained by CSL in which the hindrances due to force majeure and hindrances attributable<br />
to CSL shall be recorded and signed by both parties. The hindrance so recorded will be<br />
regularized in accordance with the Contract provisions. The contractor shall resume<br />
performance of its obligations under this Contract as soon as possible after the Force Majeure<br />
Event no longer exists. During the period of Force Majeure CSL shall not be responsible for<br />
any cost resulting from a Force Majeure Event.<br />
77 Canvassing in connection with tender is strictly prohibited and tenders submitted by the<br />
contractors who resort to canvassing will be liable to rejection.<br />
Signature of Contractor
14<br />
78 For concrete works provisions of IS: 456 (2000) shall be followed as general guidance, along<br />
with all other relevant <strong>India</strong>n Standards, unless otherwise specifically mentioned. Contractor<br />
shall deploy mechanised system for production, transportation and placement of concrete.<br />
79 The tenderers shall have to sign in each page of the tender documents with official<br />
stamp as a token of his acceptance of the conditions stated therein.<br />
80 Any dispute(s) or differences arising out of or in connection with the Contract shall, to the<br />
extent possible, be settled amicably between CSL and the contractor. Any litigation in<br />
connection with contract shall be subjected to the exclusive jurisdiction of the Courts at<br />
Kochi, <strong>India</strong>.<br />
81 <strong>Tenders</strong> duly filled shall be deposited in the Tender Box kept in the office of the CGM<br />
(Tech), Cochin Shipyard Ltd. before the date and time as specified in the Tender Notice.<br />
Chief General Manager (Tech)<br />
Signature, Name &<br />
Address of contractor:<br />
Date:<br />
Signature of Contractor
15<br />
CIVIL ENGINEERING DEPARTMENT<br />
CONSTRUCTION OF NEW REST PLACE & SUPERVISOR CABIN AT MAINTENANCE SHOP<br />
TENDER SCHEDULE<br />
CIV/013/2012/AGM(CE)<br />
Sl. No. Description Qty Unit<br />
Rate (Rs)<br />
(Both in words & Figures)<br />
Amount(Rs)<br />
1<br />
2<br />
3<br />
Clearing of site including uprooting vegetation<br />
, small trees upto 300mm girth and cutting<br />
branches etc including disposal of debris<br />
within CSL premises etc. complete.<br />
Dismantling old aluminium sheets, 50 x 50x 6<br />
MS angle truss work ,125 NB pipe column<br />
and structurals of the existing vehicle parking<br />
shed including demolition of concrete below<br />
pipes, all labour, hire for tools and plants,<br />
other incidentals,and stacking the dismantled<br />
materials at the places pointed out by the<br />
Engineer-in-charge etc. complete. Mode of<br />
measurement: Length and Width of roofing<br />
Earthwork excavation in ordinary soil for lift<br />
upto 1.5m including shuttering, dewatering,<br />
leading water into drains, depositing the<br />
excavated earth within a lead of 50m, all<br />
labour, other incidentals, clearing of any<br />
material buried in the excavation area etc.<br />
complete for the successful completion of the<br />
work.<br />
125 m 2 m 2<br />
60 m 2 m 2<br />
35 m 3 m 3<br />
4<br />
Providing and laying plain cement concrete<br />
1:4:8 for foundation using 40mm I.S. hard<br />
granite broken stone including cost and<br />
conveyance of all materials, labour for mixing,
16<br />
Sl. No. Description<br />
conveyance of all materials, labour for mixing,<br />
Qty Unit<br />
laying, consolidating, curing, cost of form work<br />
etc. complete, excluding cost of cement.<br />
5 m 3 m 3<br />
Rate (Rs)<br />
(Both in words & Figures)<br />
Amount(Rs)<br />
5<br />
6<br />
Random rubble masonry in CM 1:5 including<br />
cost and conveyance of materials, labour,<br />
other incidentals etc.complete but excluding<br />
cost of cement .<br />
Backfilling inside the foundation trenches and<br />
filling inside basement with clean excavated<br />
earth in layers not exceeding 150mm thick<br />
each and consolidating well including all<br />
labour, other incidentals etc complete.<br />
35 m 3 m 3<br />
39 m 3 m 3<br />
7<br />
Filling inside the basement with departmental<br />
copper slag/clean excavated earth in layers<br />
not exceeding 150mm thick each and<br />
consolidating well including all labour, other<br />
incidentals etc complete.<br />
39 m 3 m 3<br />
8<br />
Providing and laying plain cement concrete<br />
1:2:4 for foundation using 20mm I.S. nominal<br />
size hard granite broken stone including cost<br />
and conveyance of all materials, labour for<br />
mixing, laying, consolidating, curing, cost of<br />
form work, all other incidentals etc. complete,<br />
excluding cost of cement.<br />
3 m 3 m 3<br />
9<br />
10<br />
Brick work in CM 1:5 using first class country<br />
burnt bricks including cost and conveyance of<br />
all materials, labour, other incidentals etc.<br />
complete, excluding cost of cement.<br />
Providing and laying Reinforced cement<br />
concrete 1:11/2:3 using 20mm I.S. nominal<br />
30 m 3 m 3
17<br />
Sl. No. Description<br />
concrete 1:11/2:3 using 20mm I.S. nominal<br />
Qty Unit<br />
size hard granite broken stone for lintel<br />
including cost and conveyance of all<br />
materials, labour for mixing, laying,<br />
consolidating, curing, cost of form work etc.<br />
complete, excluding cost of cement but<br />
including cost and fabrication charges of<br />
steel reinforcement.<br />
3 m 3 m 3<br />
Rate (Rs)<br />
(Both in words & Figures)<br />
Amount(Rs)<br />
11<br />
Providing and laying plain cement concrete<br />
1:4:8 for flooring using 40mm I.S. hard granite<br />
broken stone including cost and conveyance<br />
of all materials, labour for mixing, laying,<br />
consolidating, curing, cost of form work etc.<br />
complete, excluding cost of cement.<br />
15 m 3 m 3<br />
12<br />
13<br />
Supplying, fabricating and erecting in position<br />
following dia M.S. pipe medium type (class-B)<br />
as per approved drawing including cost and<br />
conveyance of all materials, cost of welding<br />
electrodes, cost of consumables, hire charges<br />
of welding equipment, all accessories, labour,<br />
other incidentals etc. complete including cost<br />
of bolts, nuts and washers and drilling holes<br />
etc complete<br />
(a) 65 NB 200 m m<br />
(b) 40 NB 232 m m<br />
(c) 25 NB 90 m m<br />
Supplying and fabricating structural steel work<br />
conforming to IS 226 / 2062 including cost<br />
and conveyance of all materials, all<br />
accessories, hire charges of tools & plants,<br />
welding or bolting, all labour, hire charges for<br />
welding equipment, cost of welding<br />
electrodes, other consumables, cost of bolts,<br />
nuts & washers, other incidentals etc.<br />
complete.
18<br />
Sl. No. Description Qty Unit<br />
complete.<br />
0.30 T T<br />
Rate (Rs)<br />
(Both in words & Figures)<br />
Amount(Rs)<br />
14<br />
15<br />
Fabricating and erecting in position in line and<br />
level 16mm dia anchor bolt as per approved<br />
drawing including cost and conveyance of all<br />
materials threading for bolts, nuts,<br />
washers,cost of welding electrodes, hire<br />
charges of welding equipment, labour, other<br />
incidentals etc. complete.<br />
Supplying and fixing Roofing with powder<br />
coated tile profile aluminium sheet of<br />
appropriate thickness of 0.50mm thk using<br />
approved size self tapping, self drilling screws<br />
with sealing washers to be fixed on crest of<br />
roofing sheets with minimum end overlaps of<br />
150mm and appropriate side laps including<br />
cost and conveyance of all materials, labour,<br />
all leads and lifts, other incidentals<br />
etc.complete.<br />
1.00 Qtl Qtl<br />
180 m 2 m 2<br />
16<br />
Providing and fixing in position to line and<br />
level PVC ceiling using PVC extruded<br />
sections 1.5mm or nearest available size at<br />
about 600mm spacing connected to<br />
suspended frames of powder coated G.I<br />
25mm T/L sections ,fixing panels by SS<br />
Screws of 19mm necessary cut out to<br />
electrical connections etc. including cost and<br />
conveyance of all materials, labour, other<br />
incidentals etc,complete.<br />
130 m 2 m 2<br />
17<br />
Supplying and fixing in position coloured<br />
aluminium sheet flashing/ ridge capping<br />
0.6mm thk or nearest available thickness to<br />
suit the shape and fixed to existing AC sheet
19<br />
Sl. No. Description<br />
suit the shape and fixed to existing AC sheet<br />
Qty Unit<br />
cladding by loosening the bolt fixing and insert<br />
the flashing through the gap of cladding sheet<br />
joint and tightened with 6mm dia<br />
noncorrosive Galvalume self threading screw<br />
and bitumen washers including cost and<br />
conveyance of all materials, labour, all leads<br />
and lifts, other incidentals etc complete.<br />
15 m 2 m 2<br />
Rate (Rs)<br />
(Both in words & Figures)<br />
Amount(Rs)<br />
18<br />
19<br />
20<br />
Supplying and fixing weld mesh for partition<br />
as per the approved drawing using weld mesh<br />
of size 50mmx50mmx10gx10g or nearest<br />
available size including cost and conveyancne<br />
of all materials, welding rods,hire charges for<br />
tools and plants, all labour, scaffolding, other<br />
incidentals etc complete.<br />
Plastering with CM 1:4, 12 thick in one coat<br />
floated hard and trowelled smooth including<br />
cost and conveyance of all materials, labour,<br />
other incidentals etc. complete excluding cost<br />
of cement.<br />
Supplying and laying best quality and<br />
coloured ceramic joint free glazed / mat<br />
finished tiles of Johnson /khajaria /Asian or<br />
equivalent of size 60cm x 60cm or nearest<br />
available size including skirting of 10cm<br />
height, set in CM 1:3, 20mm thick plastering<br />
and cement slurry to the back of the tiles for<br />
the proper binding of the tiles in line and level,<br />
pointing with coloured cement to the joints to<br />
match with the tiles, including cost and<br />
conveyance of all materials, labour, other<br />
incidentals, etc. complete, excluding cost of<br />
cement. (Skirting also shall be measured<br />
under this item)<br />
75 m 2 m 2<br />
300 m 2 m 2<br />
140 m 2 m 2
20<br />
Sl. No. Description Qty Unit<br />
Rate (Rs)<br />
(Both in words & Figures)<br />
Amount(Rs)<br />
21<br />
22<br />
Supplying and laying approved type best<br />
quality and coloured ceramic tiles for dadoing,<br />
set in CM 1:3, 12mm thick in line and level<br />
including pointing the joints with coloured<br />
cement to match with the tiles including cost<br />
and conveyance of all materials, labour, other<br />
incidentals, etc. complete, excluding cost of<br />
cement.<br />
Supplying and laying approved type best<br />
quality non-slippery flooring tiles (Eurocon or<br />
equivalent) on the steps and Entrance, set in<br />
CM 1:3, 15mm thick and cement slurry to the<br />
back of the tiles and pointing with coloured<br />
cement to the joints to match with the tiles<br />
including cost and conveyance of all<br />
materials, labour, other incidentals etc<br />
complete, excluding cost of cement.<br />
5 m 2 m 2<br />
12 m 2 m 2<br />
23<br />
24<br />
Supplying and fixing in position fully glazed<br />
aluminium single shutter openable door with<br />
outer frames 63.50x38.10mm alround<br />
horizontal and vertical members & shutter<br />
frames as bottom 100x44.50mm, top, divider,<br />
vertical of 50x44.50mm.The shutter to be<br />
panelled with 4mm thk.plain glass fixed with<br />
beading between glass and aluminium<br />
frames on all faces.The door is to be provided<br />
with 2nos aluminium handle,1No of lock,1No.<br />
door stopper, featherstrip, glazing clip, rubber<br />
beading etc.complete.<br />
Fabricating,supplying and fixing in position<br />
powder coated fully glazed aluminium double<br />
shutter openable sliding door with outer<br />
2.5 m 2 m 2
21<br />
Sl. No. Description Qty Unit<br />
frames 63.5x38.1mm ,door top 50X 44.5<br />
,door bottom 100 X 44.5 ,door vertical 50X<br />
44.5,door divider 50X 44.5,aluminium door<br />
gear,aluminium glazing clip,door gear TPI,etc<br />
as required with superior quality anodised<br />
aluminium sections, fully glazed with 4mm<br />
plain glass fixed with EDPM beading<br />
,aluminium frame on all faces,including all<br />
fixtures like hinges, locking arrangements,<br />
,handles, beadings etc, cost and conveyance<br />
of all materials, all labour, other incidentals<br />
etc. complete.<br />
5 m 2 m 2<br />
Rate (Rs)<br />
(Both in words & Figures)<br />
Amount(Rs)<br />
25<br />
26<br />
27<br />
Supplying and fixing in position fully glazed<br />
aluminium super sliding window (1500mm x<br />
1500 mm in two leaves) powder coated<br />
aluminium heavy section with sliding shutters<br />
using following sizes or nearest available size<br />
63.5x31.75mm for frames, 38.10x16mm for<br />
shutter interlock, vertical and horizontal and<br />
plain glass 4mm thick including all fixtures<br />
like hinges, locking arrangements, handles,<br />
beadings etc, cost and conveyance of all<br />
materials, all labour, other incidentals etc.<br />
complete.<br />
Painting on walls of new surface with two<br />
coats of interior emulsion paint of approved<br />
quality and colour over one coat of white<br />
cement wash after rubbing and cleaning the<br />
surface with wire brush, sand paper etc.,<br />
including cost and conveyance of all<br />
materials, labour, other incidentals etc.<br />
complete.<br />
Painting on new walls with two coats of water<br />
8 m 2 m 2<br />
145.00 m 2 m 2
22<br />
Sl. No. Description Qty Unit<br />
proof cement paint of approved quality and<br />
colour over one coat of white cement wash<br />
after rubbing and cleaning the surface using<br />
wire brush, sand paper etc. wherever required<br />
including cost and conveyance of all<br />
materials, labour, scaffolding other incidentals<br />
etc. complete.<br />
145.00 m 2 m 2<br />
Rate (Rs)<br />
(Both in words & Figures)<br />
Amount(Rs)<br />
28<br />
Painting on old surface with water proof<br />
cement paint of approved quality and colour in<br />
two coats on old surface after rubbing and<br />
cleaning the surface using wire brush, sand<br />
paper etc. including cost and conveyance of<br />
all materials, labour, other incidentals etc.<br />
complete.<br />
30 m 2 m 2<br />
29<br />
30<br />
Painting pipes & structurals with two coats of<br />
synthetic enamel paint of approved quality<br />
and colour over two coats of zinc chromite<br />
primer after rubbing and cleaning the surface<br />
using wire brush, sand paper etc. wherever<br />
required including cost and conveyance of all<br />
materials, labour,scaffolding other incidentals<br />
etc. complete.<br />
Fabricating and fixing in position 600mm wide<br />
x 8mm thick M.S. plate cover for drains to line<br />
and level, providing stiffness using 40x6mm<br />
M.S flats crosswise including cost and<br />
conveyance of all materials, labour, other<br />
incidentals painting two coats of coal tar<br />
epoxy paint over one coat of epoxy primer etc.<br />
complete. (provision for lift hook through holes<br />
shall be provided without any extra cost)<br />
110 m 2 m 2<br />
0.50 T T
23<br />
Sl. No. Description Qty Unit<br />
31<br />
Supplying and fixing in position Stainless steel<br />
wash hand basins 533x385mm or nearest<br />
available size ( Diamond or equivalent) with<br />
necessary M.S / C.I brackets, one central<br />
15mm C.P half way brass pillartap 1No.,<br />
15mm CP / NP stop cock, 32mm with C.P<br />
brass waste of standard patterns, 32mm PVC<br />
waste pipe (heavy), painting the brackets two<br />
coat of synthetic enamel paint over one coat<br />
iron primer including cost and conveyance of<br />
all materials, labour, other incidentals etc.<br />
complete.<br />
8 Nos. E<br />
Rate (Rs)<br />
(Both in words & Figures)<br />
Amount(Rs)<br />
32<br />
33<br />
34<br />
Supplying and fixing approved quality white<br />
glazed earthenware wash-hand basin<br />
550x400mm or nearest size (Cera or<br />
equivalent) with CI brackets, one central 20<br />
mm CP Bib cock, one central 15mm PVC<br />
connection, 1 no 15 mm CP stop cock , CP<br />
brass waste of standard patterns, 32mm PVC<br />
waste pipe, cutting and making good the<br />
walls, painting the brackets two coats<br />
including cost and conveyance of all<br />
materials, labour, other incidentals etc.<br />
complete. All accessories are to be heavy<br />
type.<br />
Supplying and fixing 15mm SDB<br />
brass/chromium plated tap long body<br />
(superior quality) including cost and<br />
conveyance of all materials, labour, other<br />
incidentals etc. complete.<br />
Supplying and fixing mirror with plain glass of<br />
40x60 cm or nearest available size with outer<br />
1 No E<br />
8 Nos. E
24<br />
Sl. No. Description Qty Unit<br />
frame made of moulded plastic and fixing the<br />
same in position with necessary plugs ,<br />
screws , etc. including cost and conveyance<br />
of all materials, labour, other incidentals etc.<br />
complete.<br />
9 Nos. E<br />
Rate (Rs)<br />
(Both in words & Figures)<br />
Amount(Rs)<br />
35<br />
Supplying, cutting, threading, laying and<br />
jointing rigid PVC pipes (Hycount or<br />
equivalent) including all specials such as tees,<br />
bends, elbows, checknuts, reducers, plugs<br />
etc. through walls/ concrete, making good the<br />
wall/ concrete after fixing using CM 1:3, taking<br />
connection from the existing water supply<br />
including cost and conveyance of all<br />
materials, labour, testing the line before<br />
embedding etc. complete.<br />
(i) 25mm dia 10 m m<br />
(ii) 32mm dia 30 m m<br />
36<br />
37<br />
Supplying and fixing in position to line and<br />
level PVC gutter supported on MS flat<br />
including cost and conveyance of all<br />
materials, all accessories, hire charges of<br />
tools & plants, welding or bolting, all labour,<br />
hire charges for welding equipment, cost of<br />
welding electrodes, other consumables, cost<br />
of bolts, nuts & washers, other incidentals etc.<br />
complete.( Rate is inclusive of providing<br />
necessary drops for connecting PVC down<br />
water pipes)<br />
Supplying and fixing 100mm dia PVC down<br />
water pipes connecting to the drain through<br />
walls of maintenance shopby clamping with<br />
necessary MS plates at sufficient intervals<br />
including cost and conveyance of all<br />
materials, all specials like bend, elbow etc,<br />
30 m m
25<br />
Sl. No. Description Qty Unit<br />
materials, all specials like bend, elbow etc,<br />
labour other incidentals etc.complete.<br />
20 m m<br />
Rate (Rs)<br />
(Both in words & Figures)<br />
Amount(Rs)<br />
38<br />
39<br />
40<br />
Providing and installing in position M.S.<br />
fabricated lockers to line and level as per<br />
approved drawing using M.S. plates, angles,<br />
flats etc. including straightening, cutting,<br />
bending, welding or bolting, cost of<br />
accessories, hire for tools and plants, cost<br />
and conveyance of all materials, hinges, locks<br />
and handles, labour, transporting, fixing,<br />
painting the units inside & outside with two<br />
coats of synthetic enamel paint over two coat<br />
of zinchromite iron primer after cleaning the<br />
surface sand paper, putty finish etc. complete.<br />
Dismantling the existing A.C sheet cladding<br />
and bottom runner and refixing A C sheet to<br />
line and level after modifying the length to suit<br />
the height and refixing the runner to suit the<br />
position including cost of bolts & nuts , GI<br />
washers, bitumen washers, all labour,<br />
scaffolding, hire charges of welding<br />
equipment, cost of electrodes ,other<br />
incidentals etc. complete.<br />
Suppying and stacking at site cement<br />
conforming to I.S. 8112/ 12269 (43/ 53grade) /<br />
1489 portland cement.<br />
GRAND TOTAL<br />
6 T T<br />
20 m 2 m 2<br />
14.5 T T<br />
Signature, Name & Address<br />
of the Tenderer :<br />