17.11.2014 Views

2012 Annual Report - Virginia Department of Transportation

2012 Annual Report - Virginia Department of Transportation

2012 Annual Report - Virginia Department of Transportation

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

% <strong>of</strong> Availability<br />

IT, Fleet Asset and Inventory Management<br />

Behind the scenes keeping it up and running.<br />

Key Accomplishments in <strong>2012</strong>:<br />

• The Inventory Management <strong>Department</strong> was able to<br />

surplus inventory at the Pine Chapel facility that<br />

resulted in a reduction <strong>of</strong> inventory from $43,919.07 to<br />

$13,008.27 in less than 4 months.<br />

• The Fleet Asset <strong>Department</strong> assisted the Richmond<br />

TOC by outfitting 22 trucks for their reinstated SSP<br />

program.<br />

• The Information Technology <strong>Department</strong> upgraded<br />

the campus network infrastructure which has been a<br />

key factor in assisting with the project to switch over<br />

camera video from analog to digital.<br />

The Inventory Management <strong>Department</strong> is<br />

responsible for the tracking <strong>of</strong> HRTOC assets and<br />

supplying members <strong>of</strong> HRTOC with the<br />

equipment needed to complete their tasks. In<br />

<strong>2012</strong>, Inventory supported multiple HRTOC<br />

projects through the entry <strong>of</strong> thousands pieces<br />

<strong>of</strong> equipment into the HRTOC asset database.<br />

One project that required entry <strong>of</strong> new assets<br />

into the database was the DMS Retr<strong>of</strong>it Project.<br />

This two phase project, that was ongoing during<br />

<strong>2012</strong>, involved the replacement <strong>of</strong> the internal<br />

components <strong>of</strong> over 70 overhead message signs.<br />

In addition to tracking the new equipment<br />

associated with this project, Inventory provided<br />

the storage solution at the Pine Chapel facility<br />

for the existing functional components that<br />

were removed from the signs. Inventory also<br />

maintained 100% accuracy in all state and<br />

federal audits during <strong>2012</strong>.<br />

<strong>2012</strong><br />

2011<br />

97.1%<br />

Average Vehicle Availability<br />

92.6%<br />

96.7% 96.7%<br />

92.4%<br />

100.0%<br />

The Fleet Asset <strong>Department</strong> is responsible for<br />

providing safe and reliable vehicles for the<br />

HRTOC SSP and maintenance departments as well<br />

as pool vehicles, that are used by a variety <strong>of</strong><br />

employees at the HRTOC to attend meetings or<br />

visit other local VDOT facilities. Due to the SSP<br />

expansion which began at the end <strong>of</strong> 2011 and<br />

continued throughout <strong>2012</strong>, the number <strong>of</strong> SSP<br />

vehicles in the fleet more than doubled between<br />

the end <strong>of</strong> 2011 and the end <strong>of</strong> <strong>2012</strong>. The<br />

addition <strong>of</strong> new vehicles allowed older, high<br />

mileage vehicles to be retired from the fleet.<br />

This aided in the increase <strong>of</strong> SSP average vehicle<br />

availability from 2011 to <strong>2012</strong>. Pool vehicle<br />

availability decreased from the previous year due<br />

to one vehicle being out <strong>of</strong> service for an<br />

extended period as a result <strong>of</strong> repairs that had to<br />

be completed outside <strong>of</strong> the HRTOC.<br />

The HRTOC fleet service technicians are able<br />

to perform preventive maintenance vehicle<br />

services and basic corrective maintenance.<br />

preventive maintenance vehicle services include<br />

oil changes, air and fuel filter changes and<br />

transmission fluid and filter changes. To support<br />

the increase in size <strong>of</strong> the SSP fleet a new service<br />

technician was hired for the Pine Chapel facility<br />

early in <strong>2012</strong>.<br />

SSP Maintenance Pool*<br />

*Pool vehicles are general use vehicles provided for<br />

local travel by HRTOC Management.<br />

5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!