18.11.2014 Views

DRAFT - 5 year supply 2011-16 - Allerdale Borough Council

DRAFT - 5 year supply 2011-16 - Allerdale Borough Council

DRAFT - 5 year supply 2011-16 - Allerdale Borough Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Allerdale</strong><br />

<strong>2011</strong>—20<strong>16</strong><br />

Local Development Framework<br />

Meeting the Five Year Housing<br />

Land Supply 10/11 - 15/<strong>16</strong><br />

July <strong>2011</strong>


Contents<br />

Summary<br />

4<br />

Methodology<br />

5<br />

The Five Year Supply 2010-2015<br />

8<br />

Major Sites<br />

10<br />

Appendix A: Planning Approvals<br />

22<br />

Appendix B: SHLAA Sites<br />

Appendix C: Existing Allocations<br />

25<br />

26


<strong>Allerdale</strong><br />

Local Development Framework<br />

LDF Evidence Base<br />

1 Summary<br />

Planning Policy Statement 3: Housing (PPS3)<br />

requires Local Planning Authorities to<br />

demonstrate five <strong>year</strong>s of deliverable housing<br />

land within their boundaries.<br />

applications are approved and existing<br />

approvals are implemented.<br />

This document has been produced in<br />

accordance with the guidelines published in<br />

PPS3. It shows <strong>Allerdale</strong>’s current <strong>supply</strong> of<br />

deliverable sites which the <strong>Council</strong> feels will<br />

be developed within the next 5 <strong>year</strong>s.<br />

The <strong>Council</strong>’s 5 <strong>year</strong> target has been<br />

established using the original ’Option 1 figure’<br />

from the Regional Spatial Strategy (RSS)<br />

annual target for <strong>Allerdale</strong> of 267 new houses<br />

per <strong>year</strong>. This means a total of 1,335 houses<br />

over 5 <strong>year</strong>s.<br />

This document demonstrates that <strong>Allerdale</strong><br />

currently has a <strong>supply</strong> of deliverable<br />

housing land to provide 1,186 new units,<br />

equating to a 4.4 <strong>year</strong> housing land <strong>supply</strong>,<br />

64% of which is on previously developed<br />

land. This means a shortfall of 149 new<br />

homes.<br />

The identification and monitoring of available<br />

housing land is an on going process, and the<br />

level of <strong>supply</strong> will be updated as new<br />

4 Meeting the 5 Year Housing Land Supply


LDF Evidence Base<br />

<strong>Allerdale</strong><br />

Local Development Framework<br />

2 Methodology<br />

This document puts forward a selection of<br />

deliverable and developable housing sites that<br />

the <strong>Council</strong> believes will be built within the<br />

next 5 <strong>year</strong>s.<br />

Establishing the 5 Year Housing Target<br />

For the purposes of this document, the<br />

<strong>Council</strong> considered four possible targets:<br />

• 2,375 - The RSS target covering the<br />

period 2003 to 2021, including residual<br />

shortfall since 2003, translating to 475<br />

dwellings per <strong>year</strong><br />

• 1,584 - The RSS target, including the<br />

residual shortfall since 2003, but<br />

extended to 2026 to better reflect the<br />

emerging development plan period,<br />

translating to 317 dwellings per <strong>year</strong><br />

• 1,335 - The original RSS annualised<br />

target, without the residual shortfall,<br />

translating to 267 dwellings per <strong>year</strong><br />

• 840 - The actual completion rate in<br />

<strong>Allerdale</strong> over the last five <strong>year</strong>s,<br />

translating to an average <strong>16</strong>8 dwellings<br />

per <strong>year</strong>.<br />

It was felt that the two options that include the<br />

residual shortfall in meeting the RSS annual<br />

housing target since 2003 presented an<br />

unrealistic and unsustainable completion rate<br />

when considered in light of the figure for<br />

actual completions over the last 5 <strong>year</strong>s.<br />

However, it was felt that to use the past<br />

completion rate figure would also prove to be<br />

unsustainable in that it did not allow for the<br />

aspirational levels of growth presented within<br />

the Energy Coast Masterplan and could lead<br />

to a stifling of economic development. In light<br />

of this, it was felt that the original RSS figure,<br />

based as it was on evidence that remains<br />

sound, was the most realistic target and would<br />

best reflect anticipated levels of growth until<br />

the <strong>Council</strong> was able to conduct its own study<br />

into producing a revised housing target.<br />

This document uses the original RSS<br />

target of 267 dwellings to calculate the<br />

<strong>Council</strong>’s five <strong>year</strong> housing target of 1,335<br />

new houses by 20<strong>16</strong>.<br />

Sources of Housing Land<br />

In accordance with guidance on the<br />

identification of a five <strong>year</strong> <strong>supply</strong> of housing<br />

land, four main sources of new housing were<br />

considered. These included:<br />

• Outstanding Planning Approvals<br />

These are sites that currently have planning<br />

permission, either full or outline, on which<br />

Meeting the 5 Year Housing Land Supply 5


<strong>Allerdale</strong><br />

Local Development Framework<br />

LDF Evidence Base<br />

construction may or may not have<br />

commenced. On larger sites of 3 or more<br />

dwellings where work had not commenced a<br />

<strong>year</strong> after the date of approval, applicants and<br />

agents were contacted to establish a continued<br />

interest in the site. Only those approvals where<br />

it was felt that work would commence within 5<br />

<strong>year</strong>s were included.<br />

• Existing Housing Allocations<br />

These are sites that have been identified in the<br />

Local Plan as being suitable for housing. They<br />

can be either green or brownfield. Allocations<br />

that were considered unlikely to come forward,<br />

perhaps due a lack of interest or a history of<br />

on-site refusal, were not included. Where it<br />

could be demonstrated that existing allocations<br />

have been subjected to renewed interest, then<br />

these sites have been brought back into<br />

consideration as part of the 5 <strong>year</strong> housing<br />

land <strong>supply</strong>.<br />

• Unallocated Brownfield Land<br />

Guidance on the 5 <strong>year</strong> housing land <strong>supply</strong><br />

does allow for the inclusion of sites on<br />

previously developed land (brownfield land)<br />

that, whilst not having a current planning<br />

approval, may have still made considerable<br />

progress through the planning process and are<br />

therefore considered likely to have realistic<br />

prospects of being implemented within the next<br />

5 <strong>year</strong>s. This may include brownfield sites<br />

which are awaiting the signing of Section 106<br />

agreements before full approval can be<br />

granted.<br />

• SHLAA Sites<br />

In some cases sites identified in the Strategic<br />

Housing Land Availability Assessment<br />

(SHLAA) as likely to come forward within the<br />

first 5 <strong>year</strong>s of the plan period were included<br />

within the study. Only SHLAA sites on which<br />

owners or developers had specifically<br />

expressed in interest in developing and which<br />

were within existing settlement limits were<br />

considered.<br />

Deliverability of Housing Land<br />

For each site identified, regardless of type, an<br />

assessment has been made pertaining to its<br />

deliverability. This is, in essence, an<br />

assessment of how likely it is that a particular<br />

site will come forward for development over<br />

the 5 <strong>year</strong> period.<br />

In order to be considered ’deliverable’ a site<br />

must be:<br />

• Available: The site is currently ready to<br />

be developed.<br />

6 Meeting the 5 Year Housing Land Supply


LDF Evidence Base<br />

<strong>Allerdale</strong><br />

Local Development Framework<br />

Methodology<br />

• Suitable: The site currently offers a<br />

developable location that would<br />

contribute to the creation of sustainable,<br />

mixed communities.<br />

• Achievable: The site should be<br />

economically viable.<br />

Meeting the 5 Year Housing Land Supply 7


<strong>Allerdale</strong><br />

Local Development Framework<br />

LDF Evidence Base<br />

3<br />

The Five Year Supply 2010 -<br />

2015<br />

<strong>Allerdale</strong> Housing Land Supply<br />

The council has identified 132 housing sites<br />

across the borough, which will provide 1,186<br />

houses between now and 20<strong>16</strong>. This equates<br />

to a 4.4 <strong>year</strong> housing land <strong>supply</strong> based on a<br />

target of 267 dwellings per <strong>year</strong>. This means<br />

the <strong>Council</strong> is 149 houses short of its 5 <strong>year</strong><br />

target of 1,335 new homes by 20<strong>16</strong>.<br />

Currently the <strong>Council</strong> has not broken down<br />

housing targets by settlement or locality areas.<br />

This will be done in the Core Strategy as part<br />

of the Local Development Framework process<br />

over the next 12 months. For now the housing<br />

land <strong>supply</strong> is presented as a borough wide<br />

figure measured against a borough wide<br />

target.<br />

Land has been identified as follows:<br />

Major Planning Approvals<br />

(10+ Houses): 736<br />

Minor Planning Approvals<br />

(Less than 10 Houses): 244<br />

Existing Allocations: 203<br />

SHLAA Sites: 7<br />

Further details on major sites of 10 or more<br />

dwellings, including existing allocations have<br />

been given on the following pages. A complete<br />

list of sites, including minor approvals, has<br />

been provided in Appendix A.<br />

Implications of Housing Land Supply<br />

It has been established that the <strong>Council</strong> cannot<br />

currently demonstrate a 5 <strong>year</strong> <strong>supply</strong>.<br />

Currently it falls short of the 5 <strong>year</strong> target by<br />

195 dwellings. In this instance PPS 3 states<br />

that Local Planning Authorities should look<br />

more favourably on new applications for<br />

housing development, with each new proposal<br />

being considered on its own merit.<br />

While this may allow for greater flexibility in<br />

determining planning applications, it does not<br />

mean that new housing applications will<br />

automatically be granted permission. Local<br />

Planning Authorities will still assess sites with<br />

regard to standard development management<br />

principles and relevant local and national<br />

policies. These include ensuring that<br />

development:<br />

• Is of a high quality<br />

• Achieves a good mix of housing reflecting<br />

the accommodation requirements of<br />

specific groups, in particular, families and<br />

older people<br />

8 Meeting the 5 Year Housing Land Supply


LDF Evidence Base<br />

<strong>Allerdale</strong><br />

Local Development Framework<br />

• Is in a suitable location and is<br />

environmentally sustainable<br />

• Uses land efficiently and effectively<br />

• Is in line with planning for housing<br />

objectives, reflecting the need and<br />

demand for housing in, and the spatial<br />

vision for, the area and does not<br />

undermine wider policy objectives e.g.<br />

addressing housing market renewal<br />

issues<br />

The <strong>Council</strong> will be closely monitoring its five<br />

<strong>year</strong> <strong>supply</strong>. Once it can be demonstrated that<br />

5 <strong>year</strong> targets can be met, then standard<br />

policies will once more apply.<br />

Meeting the 5 Year Housing Land Supply 9


<strong>Allerdale</strong><br />

Local Development Framework<br />

LDF Evidence Base<br />

4 Major<br />

Sites<br />

WK05 - Former Corus Offices<br />

Workington<br />

This brownfield site currently has full permission<br />

for 119 houses, granted in 2008.<br />

Discussions with the developer suggest<br />

that this is still considered to be an active<br />

site. A revised scheme is currently pending.<br />

CK09 - Sullart St Depot, Cockermouth<br />

This brownfield site, currently has full<br />

permission for 101 houses, granted in<br />

<strong>2011</strong>.<br />

10 Meeting the 5 Year Housing Land Supply


LDF Evidence Base<br />

<strong>Allerdale</strong><br />

Local Development Framework<br />

AASL03 - Fisons Factory, Silloth<br />

This brownfield site currently has outline<br />

permission for 250 new homes, granted<br />

in <strong>2011</strong>. It is proposed that 87 new<br />

dwellings shall be built within the first<br />

phase of development.<br />

RU68 - Church Meadows, Broughton<br />

This greenfield site currently has full permission<br />

for 58 new houses approved in<br />

<strong>2011</strong>. Awaiting signing of Section 106<br />

agreement.<br />

Meeting the 5 Year Housing Land Supply 11


<strong>Allerdale</strong><br />

Local Development Framework<br />

LDF Evidence Base<br />

WK06 - Former Workington Infirmary<br />

This brownfield site is currently under<br />

construction. Originally approved for 103<br />

homes there are a remaining 45 to build.<br />

RU18 - Rye Hill Farm, Flimby<br />

This greenfield site is currently under<br />

construction. Originally approved for 51<br />

homes there are a remaining 32 to build.<br />

12 Meeting the 5 Year Housing Land Supply


LDF Evidence Base<br />

<strong>Allerdale</strong><br />

Local Development Framework<br />

Major Sites<br />

MP01 - Strand Street, Maryport<br />

This brownfield site currently has full permission<br />

for 30 dwellings, granted in<br />

<strong>2011</strong>.<br />

MP02 - Ellenborough Place, Maryport<br />

This brownfield site currently has outline<br />

permission for 27 dwellings, renewed in<br />

2010. This recent renewal suggests continued<br />

interest in the site. This will be reviewed<br />

next <strong>year</strong>.<br />

Meeting the 5 Year Housing Land Supply 13


<strong>Allerdale</strong><br />

Local Development Framework<br />

LDF Evidence Base<br />

MP03 - Whitecroft, Maryport<br />

This brownfield site has outline approval<br />

for 26 dwellings. It was approved in<br />

2009. The site has been cleared and the<br />

recent approval suggests there is still interest<br />

in the site. This will be reviewed<br />

next <strong>year</strong>.<br />

WG01 - Kirkland Road, Wigton<br />

This greenfield site, and former Local<br />

Plan Allocation, currently has full permission<br />

for 59 houses, granted in 2010.<br />

Work has commenced on site and 20<br />

units remain to be constructed.<br />

14 Meeting the 5 Year Housing Land Supply


LDF Evidence Base<br />

<strong>Allerdale</strong><br />

Local Development Framework<br />

Major Sites<br />

WK07– The Cumbria Ballroom<br />

Workington<br />

This brownfield site currently has full permission<br />

for 18 flats, approved in 2009.<br />

Development is currently well underway.<br />

RU34 - West Lane, Kirkbride<br />

This brownfield site currently has full permission<br />

for 18 dwellings, approved in<br />

2010. Work has commenced on site.<br />

Meeting the 5 Year Housing Land Supply 15


<strong>Allerdale</strong><br />

Local Development Framework<br />

LDF Evidence Base<br />

WK21 - Former Opera House,<br />

Workington<br />

This brownfield site is currently has outline<br />

approval for 14 new units, granted in<br />

2010.<br />

MP05 - Ellenborough Place, Maryport<br />

This brownfield site currently has outline<br />

permission for 12 dwellings approved in<br />

2010.<br />

<strong>16</strong> Meeting the 5 Year Housing Land Supply


LDF Evidence Base<br />

<strong>Allerdale</strong><br />

Local Development Framework<br />

Major Sites<br />

RU29 - Ivydene, Kirkbride<br />

This brownfield site for 12 dwellings has<br />

full planning permission, approved in<br />

<strong>2011</strong>.<br />

RU33—Former Police HQ, Brigham<br />

This brownfield site currently has full permission<br />

for 12 houses, approved in<br />

<strong>2011</strong>.<br />

Meeting the 5 Year Housing Land Supply 17


<strong>Allerdale</strong><br />

Local Development Framework<br />

LDF Evidence Base<br />

RU05 - Croft Crescent, Dearham<br />

This brownfield site currently has full permission<br />

to demolish 26 dwellings and<br />

erect 38 in their place, meaning an additional<br />

12 new homes for the 5 <strong>year</strong> <strong>supply</strong>.<br />

Approved in 2010, construction is<br />

well underway.<br />

RU35 - Old Grass Dryer, Blencogo<br />

This brownfield site currently has full approval<br />

for 12 dwellings, approved in<br />

<strong>2011</strong>.<br />

18 Meeting the 5 Year Housing Land Supply


LDF Evidence Base<br />

<strong>Allerdale</strong><br />

Local Development Framework<br />

WK08—Millrigg Street, Workington<br />

This brownfield site currently has full permission<br />

for 11 dwellings, approved in<br />

2009. Construction is well underway.<br />

CK02 - Globe Hotel, Cockermouth<br />

This brownfield site currently has full permission<br />

for 10 units, approved in <strong>2011</strong>.<br />

Meeting the 5 Year Housing Land Supply 19


<strong>Allerdale</strong><br />

Local Development Framework<br />

LDF Evidence Base<br />

SL05– Acre Bank Close, Skinburness<br />

This brownfield site is currently under<br />

construction. One unit has been completed<br />

with a remaining 10 left to build.<br />

WKA2 - Barncroft Avenue, Seaton<br />

This greenfield site is an existing allocation<br />

in the current Local Plan. There was<br />

interest in this site before the Interim<br />

Housing Policy restricted development in<br />

Seaton. Now that the Interim Policy has<br />

been lifted it is anticipated that interest in<br />

the site will be renewed and development<br />

is likely within 5 <strong>year</strong>s. At 30 dwellings<br />

per hectare this site could provide<br />

92 new homes.<br />

20 Meeting the 5 Year Housing Land Supply


LDF Evidence Base<br />

<strong>Allerdale</strong><br />

Local Development Framework<br />

RUA2 - Brownside Rd, Dearham<br />

This brownfield site is an existing allocation<br />

in the current local plan. There has<br />

been recent developer interest around<br />

this site and its inclusion with the 5 Year<br />

Supply is warranted. This site could provide<br />

60 new dwellings.<br />

RUA1 - Moor Rd, Great Clifton<br />

This greenfield site is an existing allocation<br />

in the current local plan. There has<br />

been recent developer interest around<br />

this site and its inclusion with the 5 Year<br />

Supply is warranted. This site could provide<br />

51 new dwellings.<br />

Meeting the 5 Year Housing Land Supply 21


<strong>Allerdale</strong><br />

Local Development Framework<br />

LDF Evidence Base<br />

WG07– Scholars Green, Wigton<br />

This greenfield site currently has permission<br />

for 46 new dwellings, approved in<br />

August <strong>2011</strong>. Development has yet to<br />

commence.<br />

22 Meeting the 5 Year Housing Land Supply


LDF Evidence Base<br />

<strong>Allerdale</strong><br />

Local Development Framework<br />

Appendix A: Planning Approvals<br />

Ref Site Settlement Status Green/Brown Remaining Capcity<br />

WK05<br />

2/2008/0898<br />

Corus Offices Workington No commencement Brown 119<br />

2/<strong>2011</strong>/0151<br />

CK06 Sullart St Depot Cockermouth No commencement Brown 101<br />

2/2010/0037<br />

Former Fisons<br />

SL07 Site SIlloth No commencement Brown 87<br />

RU62<br />

2/<strong>2011</strong>/0<strong>16</strong>2<br />

Church Meadows<br />

Broughton No commencement Green 58<br />

2/<strong>2011</strong>/0143—<br />

WG07 Scholars Green Wigton No commencement Green 46<br />

2/2005/1300<br />

Workington<br />

WK06 Infirmary Site<br />

Development commenced Brown 45<br />

2/2006/1257<br />

Flimby<br />

RU18 Ryehill<br />

Development commenced Green 32<br />

2/2010/0529<br />

MP01 Strand Street Maryport No commencement Brown 30<br />

MP02 2/2010/0611 Maryport No commencement Brown 27<br />

MP03 2/2008/0777 Maryport No commencement Brown 26<br />

WG01<br />

2/2009/0524<br />

Kirkland Road Wigton Development commenced Green 20<br />

WK07 2/2008/0517 Workington Development commenced Brown 18<br />

RU34<br />

2/2010/0408<br />

Adjacent to Rodway<br />

Kirkbride Development commenced Brown 18<br />

WK21<br />

2/2010/0154<br />

Former Bingo<br />

Hall Workington No commencement Brown 14<br />

MP05 2/2010/0611 Maryport No commencement Brown 12<br />

RU29 2/2008/0937 Kirkbride No commencement Brown 12<br />

RU33<br />

2/2009/0872<br />

Former Police<br />

Station Brigham No commencement Brown 12<br />

RU05 2/2010/0272 Dearham Development commenced Brown 12<br />

RU35<br />

2/<strong>2011</strong>/0064<br />

Old Grass Dryer Blencogo No commencement Brown 12<br />

WK08 2/2009/0030 Workington Development commenced Green 11<br />

CK02<br />

2/2009/0781<br />

Globe Hotel Cockermouth No commencement Brown 10<br />

2/2006/0570 Skinburness<br />

SL05 Acre Bank Close<br />

Development commenced Green 10<br />

WK31 2/2010/0873 Workington No commencement Brown 9<br />

MP06 2/2009/0491 Maryport Development commenced Brown 9<br />

RU50 2/2010/0957 Great Clifton Development commenced Brown 8<br />

RU28 2/2009/0064 Hayton No commencement Green 8<br />

Meeting the 5 Year Housing Land Supply 23


<strong>Allerdale</strong><br />

Local Development Framework<br />

LDF Evidence Base<br />

WG02 2/2010/1060 Wigton Development commenced Green 8<br />

WK09 2/2010/0079 Workington Development commenced Brown 7<br />

WK10 2/2007/0456 Workington No commencement Brown 6<br />

RU19 2/2009/0746 Flimby No commencement Brown 6<br />

MP13 2/2010/0961 Maryport No commencement Green 6<br />

AS01 2/2008/0838 Aspatria Development commenced Brown 5<br />

WK12 2/2007/0619 Workington<br />

Stalled - no change in site in<br />

past 6months Brown 5<br />

WK11 2/2008/0962 Workington No commencement Brown 5<br />

WK13 2/2010/0020 Workington Development commenced Brown 5<br />

RU47 2/2010/0875<br />

Bolton Low<br />

Houses No commencement Green 5<br />

RU56 2/<strong>2011</strong>/0051 Kirkbampton No commencement Green 5<br />

WK29 2/<strong>2011</strong>/0270 Workington No commencement Green 5<br />

WG03 2/2008/0976 Wigton No commencement Brown 4<br />

MP07 2/2009/0427 Maryport Development commenced Brown 4<br />

WK14 2/2010/0039 Workington No commencement Brown 4<br />

AS05 2/2010/0919 Aspatria Brown 4<br />

RU07 2/2009/0518 Dearham No commencement Green 4<br />

WK23 2/2010/0663 Harrington Green 4<br />

WK01 2/2010/0863 Harrington No commencement Green 4<br />

AS03 2/2010/0503 Aspatria No commencement Brown 3<br />

WK15 2/2009/0040 Workington No commencement Brown 3<br />

MP08 2/2009/0618 Maryport No commencement Brown 3<br />

WK28 2/2010/0943 Workington Brown 3<br />

2/2002/1090<br />

Dearham<br />

RU06 Craika Close<br />

Development commenced Green 3<br />

RU44 2/2010/0787 Dearham Development commenced Green 3<br />

SL08 2/2010/0441 Silloth Green 3<br />

RU53 2/2010/1035 Torpenhow Green 3<br />

RU62 2/<strong>2011</strong>/0307 Gilcrux Green 3<br />

WK<strong>16</strong> 2/<strong>2011</strong>/0270 Workington No commencement Brown 2<br />

MP09 2/2009/0250 Maryport No commencement Brown 2<br />

CK03 2/2009/0823 Cockermouth Brown 2<br />

RU08 2/2007/0275 Dearham Development commenced Green 2<br />

RU37 2/2010/0625 Broughton Green 2<br />

WK27 2/2010/0751 Workington Green 2<br />

SL01 2/2010/0768 Blitterlees No commencement Green 2<br />

RU49 2/2010/0912 Oughterside Green 2<br />

MP12 2/2010/0942 Maryport Green 2<br />

RU52 2/2010/1008 Fletchertown Green 2<br />

WK30 2/<strong>2011</strong>/0281 Workington Green 2<br />

RU61 2/<strong>2011</strong>/0285 Tallentire Green 2<br />

RU<strong>16</strong> 2/2007/0688 Fletchertown No commencement Brown 1<br />

RU22 2/2007/0730 Flimby Development commenced Brown 1<br />

RU01 2/2007/0740 Broughton Moor Development commenced Brown 1<br />

WK17 2/2008/0909 Workington No commencement Brown 1<br />

RU14 2/2008/0956 Dearham No commencement Brown 1<br />

SL02 2/2009/0082 Silloth No commencement Brown 1<br />

RU10 2/2009/0232 Dearham No commencement Brown 1<br />

AS05 2/2009/0286 Aspatria No commencement Brown 1<br />

RU23 2/2009/0564 Flimby No commencement Brown 1<br />

CK01 2/2009/0633 Cockermouth No commencement Brown 1<br />

24 Meeting the 5 Year Housing Land Supply


LDF Evidence Base<br />

<strong>Allerdale</strong><br />

Local Development Framework<br />

RU11 2/2009/0650 Dearham Development commenced Brown 1<br />

RU12 2/2009/0657 Dearham No commencement Brown 1<br />

RU04 2/2009/0715 Deanscales No commencement Brown 1<br />

WK02 2/2009/0775 Harrington No commencement Brown 1<br />

RU17 2/2010/0057 Fletchertown No commencement Brown 1<br />

AS04 2/2010/0<strong>16</strong>5 Aspatria No commencement Brown 1<br />

RU15 2/2010/0214 Eaglesfield No commencement Brown 1<br />

WK19 2/2010/0257 Workington No commencement Brown 1<br />

RU03 2/2010/0282 Broughton Moor No commencement Brown 1<br />

RU39 2/2010/0677 Broughton Moor Brown 1<br />

RU55 2/<strong>2011</strong>/0044 Anthorn Brown 1<br />

RU59 2/<strong>2011</strong>/0177 Gilcrux Brown 1<br />

WK04 2/2007/0686 Harrington No commencement Green 1<br />

RU02 2/2008/0034 Broughton Moor Development commenced Green 1<br />

RU24 2/<strong>2011</strong>/0205 Flimby No commencement Green 1<br />

RU09 2/2008/0682 Dearham No commencement Green 1<br />

RU30 2/2008/0728 Newton Arlosh Development commenced Green 1<br />

RU25 2/2008/0732 Great Clifton No commencement Green 1<br />

WK18 2/2008/0888 Workington Development commenced Green 1<br />

SL04 2/2009/0210 Silloth No commencement Green 1<br />

RU27 2/2009/0391 Greysouthen Development commenced Green 1<br />

RU20 2/2009/0564 Flimby No commencement Green 1<br />

RU31 2/2009/0737 Oughterside No commencement Green 1<br />

SL06 2/2009/0799 Skinburness No commencement Green 1<br />

WG04 2/2009/0855 Wigton Development commenced Green 1<br />

RU26 2/2009/0859 Great Clifton No commencement Green 1<br />

RU13 2/2009/0895 Dearham No commencement Green 1<br />

WK03 2/2010/0013 Harrington No commencement Green 1<br />

MP10 2/2010/0604 Maryport Green 1<br />

WK22 2/2010/0620 Workington Green 1<br />

CK04 2/2010/0621 Cockermouth Green 1<br />

RU38 2/2010/0673 Broughton Green 1<br />

WK24 2/2010/0693 Seaton Green 1<br />

WK25 2/2010/0724 Harrington Green 1<br />

RU40 2/2010/0728 Broughton Moor Green 1<br />

WK26 2/2010/0731 Workington Green 1<br />

RU41 2/2010/0737 Flimby Green 1<br />

RU42 2/2010/0753 Dearham Green 1<br />

RU36 2/2010/0759 Broughton Green 1<br />

RU43 2/2010/0763 Greysouthen Green 1<br />

MP11 2/2010/0798 Maryport Green 1<br />

RU45 2/2010/0819 Dearham Green 1<br />

RU46 2/2010/0821 Dearham Green 1<br />

RU48 2/2010/0880 Dearham Green 1<br />

WG05 2/2010/09<strong>16</strong> Wigton Green 1<br />

CK05 2/2010/0964 Cockermouth Green 1<br />

RU51 2/2010/0984 Ullock Green 1<br />

RU32 2/2010/1002 Thursby No commencement Green 1<br />

RU54 2/2010/1036 Dean Green 1<br />

RU57 2/<strong>2011</strong>/0113 Broughton Green 1<br />

RU58 2/<strong>2011</strong>/0117 Hayton Green 1<br />

RU21 2/<strong>2011</strong>/0204 Flimby No commencement Green 1<br />

RU60 2/<strong>2011</strong>/0275 Dearham Green 1<br />

Total 976<br />

Meeting the 5 Year Housing Land Supply 25


<strong>Allerdale</strong><br />

Local Development Framework<br />

LDF Evidence Base<br />

Appendix B: SHLAA Sites<br />

Ref Site Settlement Status Type Capacity<br />

AARU123 Land at Manildra, Abbeytown Abbeytown SHLAA Green 7<br />

Total 7<br />

26 Meeting the 5 Year Housing Land Supply


LDF Evidence Base<br />

<strong>Allerdale</strong><br />

Local Development Framework<br />

Appendix C: Existing Allocations<br />

5 Year Reference<br />

Local Plan Ref Name Status Type<br />

5 Year Supply<br />

WKA2<br />

WKHS4<br />

Barncroft Avenue, Workington<br />

Local Plan Allocation Green 92<br />

RUA1 RHS5 Moor Road, Great Clifton Local Plan Allocation Green 51<br />

RUA2 RHS4 Browside Road, Dearham Local Plan Allocation Brown 60<br />

Total 203<br />

Meeting the 5 Year Housing Land Supply 27


<strong>Allerdale</strong><br />

Local Development Framework<br />

LDF Evidence Base<br />

28 Meeting the 5 Year Housing Land Supply

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!