<strong>Allerdale</strong><br />
<strong>2011</strong>—20<strong>16</strong><br />
Local Development Framework<br />
Meeting the Five Year Housing<br />
Land Supply 10/11 - 15/<strong>16</strong><br />
July <strong>2011</strong>
Contents<br />
Summary<br />
4<br />
Methodology<br />
5<br />
The Five Year Supply 2010-2015<br />
8<br />
Major Sites<br />
10<br />
Appendix A: Planning Approvals<br />
22<br />
Appendix B: SHLAA Sites<br />
Appendix C: Existing Allocations<br />
25<br />
26
<strong>Allerdale</strong><br />
Local Development Framework<br />
LDF Evidence Base<br />
1 Summary<br />
Planning Policy Statement 3: Housing (PPS3)<br />
requires Local Planning Authorities to<br />
demonstrate five <strong>year</strong>s of deliverable housing<br />
land within their boundaries.<br />
applications are approved and existing<br />
approvals are implemented.<br />
This document has been produced in<br />
accordance with the guidelines published in<br />
PPS3. It shows <strong>Allerdale</strong>’s current <strong>supply</strong> of<br />
deliverable sites which the <strong>Council</strong> feels will<br />
be developed within the next 5 <strong>year</strong>s.<br />
The <strong>Council</strong>’s 5 <strong>year</strong> target has been<br />
established using the original ’Option 1 figure’<br />
from the Regional Spatial Strategy (RSS)<br />
annual target for <strong>Allerdale</strong> of 267 new houses<br />
per <strong>year</strong>. This means a total of 1,335 houses<br />
over 5 <strong>year</strong>s.<br />
This document demonstrates that <strong>Allerdale</strong><br />
currently has a <strong>supply</strong> of deliverable<br />
housing land to provide 1,186 new units,<br />
equating to a 4.4 <strong>year</strong> housing land <strong>supply</strong>,<br />
64% of which is on previously developed<br />
land. This means a shortfall of 149 new<br />
homes.<br />
The identification and monitoring of available<br />
housing land is an on going process, and the<br />
level of <strong>supply</strong> will be updated as new<br />
4 Meeting the 5 Year Housing Land Supply
LDF Evidence Base<br />
<strong>Allerdale</strong><br />
Local Development Framework<br />
2 Methodology<br />
This document puts forward a selection of<br />
deliverable and developable housing sites that<br />
the <strong>Council</strong> believes will be built within the<br />
next 5 <strong>year</strong>s.<br />
Establishing the 5 Year Housing Target<br />
For the purposes of this document, the<br />
<strong>Council</strong> considered four possible targets:<br />
• 2,375 - The RSS target covering the<br />
period 2003 to 2021, including residual<br />
shortfall since 2003, translating to 475<br />
dwellings per <strong>year</strong><br />
• 1,584 - The RSS target, including the<br />
residual shortfall since 2003, but<br />
extended to 2026 to better reflect the<br />
emerging development plan period,<br />
translating to 317 dwellings per <strong>year</strong><br />
• 1,335 - The original RSS annualised<br />
target, without the residual shortfall,<br />
translating to 267 dwellings per <strong>year</strong><br />
• 840 - The actual completion rate in<br />
<strong>Allerdale</strong> over the last five <strong>year</strong>s,<br />
translating to an average <strong>16</strong>8 dwellings<br />
per <strong>year</strong>.<br />
It was felt that the two options that include the<br />
residual shortfall in meeting the RSS annual<br />
housing target since 2003 presented an<br />
unrealistic and unsustainable completion rate<br />
when considered in light of the figure for<br />
actual completions over the last 5 <strong>year</strong>s.<br />
However, it was felt that to use the past<br />
completion rate figure would also prove to be<br />
unsustainable in that it did not allow for the<br />
aspirational levels of growth presented within<br />
the Energy Coast Masterplan and could lead<br />
to a stifling of economic development. In light<br />
of this, it was felt that the original RSS figure,<br />
based as it was on evidence that remains<br />
sound, was the most realistic target and would<br />
best reflect anticipated levels of growth until<br />
the <strong>Council</strong> was able to conduct its own study<br />
into producing a revised housing target.<br />
This document uses the original RSS<br />
target of 267 dwellings to calculate the<br />
<strong>Council</strong>’s five <strong>year</strong> housing target of 1,335<br />
new houses by 20<strong>16</strong>.<br />
Sources of Housing Land<br />
In accordance with guidance on the<br />
identification of a five <strong>year</strong> <strong>supply</strong> of housing<br />
land, four main sources of new housing were<br />
considered. These included:<br />
• Outstanding Planning Approvals<br />
These are sites that currently have planning<br />
permission, either full or outline, on which<br />
Meeting the 5 Year Housing Land Supply 5
<strong>Allerdale</strong><br />
Local Development Framework<br />
LDF Evidence Base<br />
construction may or may not have<br />
commenced. On larger sites of 3 or more<br />
dwellings where work had not commenced a<br />
<strong>year</strong> after the date of approval, applicants and<br />
agents were contacted to establish a continued<br />
interest in the site. Only those approvals where<br />
it was felt that work would commence within 5<br />
<strong>year</strong>s were included.<br />
• Existing Housing Allocations<br />
These are sites that have been identified in the<br />
Local Plan as being suitable for housing. They<br />
can be either green or brownfield. Allocations<br />
that were considered unlikely to come forward,<br />
perhaps due a lack of interest or a history of<br />
on-site refusal, were not included. Where it<br />
could be demonstrated that existing allocations<br />
have been subjected to renewed interest, then<br />
these sites have been brought back into<br />
consideration as part of the 5 <strong>year</strong> housing<br />
land <strong>supply</strong>.<br />
• Unallocated Brownfield Land<br />
Guidance on the 5 <strong>year</strong> housing land <strong>supply</strong><br />
does allow for the inclusion of sites on<br />
previously developed land (brownfield land)<br />
that, whilst not having a current planning<br />
approval, may have still made considerable<br />
progress through the planning process and are<br />
therefore considered likely to have realistic<br />
prospects of being implemented within the next<br />
5 <strong>year</strong>s. This may include brownfield sites<br />
which are awaiting the signing of Section 106<br />
agreements before full approval can be<br />
granted.<br />
• SHLAA Sites<br />
In some cases sites identified in the Strategic<br />
Housing Land Availability Assessment<br />
(SHLAA) as likely to come forward within the<br />
first 5 <strong>year</strong>s of the plan period were included<br />
within the study. Only SHLAA sites on which<br />
owners or developers had specifically<br />
expressed in interest in developing and which<br />
were within existing settlement limits were<br />
considered.<br />
Deliverability of Housing Land<br />
For each site identified, regardless of type, an<br />
assessment has been made pertaining to its<br />
deliverability. This is, in essence, an<br />
assessment of how likely it is that a particular<br />
site will come forward for development over<br />
the 5 <strong>year</strong> period.<br />
In order to be considered ’deliverable’ a site<br />
must be:<br />
• Available: The site is currently ready to<br />
be developed.<br />
6 Meeting the 5 Year Housing Land Supply
LDF Evidence Base<br />
<strong>Allerdale</strong><br />
Local Development Framework<br />
Methodology<br />
• Suitable: The site currently offers a<br />
developable location that would<br />
contribute to the creation of sustainable,<br />
mixed communities.<br />
• Achievable: The site should be<br />
economically viable.<br />
Meeting the 5 Year Housing Land Supply 7
<strong>Allerdale</strong><br />
Local Development Framework<br />
LDF Evidence Base<br />
3<br />
The Five Year Supply 2010 -<br />
2015<br />
<strong>Allerdale</strong> Housing Land Supply<br />
The council has identified 132 housing sites<br />
across the borough, which will provide 1,186<br />
houses between now and 20<strong>16</strong>. This equates<br />
to a 4.4 <strong>year</strong> housing land <strong>supply</strong> based on a<br />
target of 267 dwellings per <strong>year</strong>. This means<br />
the <strong>Council</strong> is 149 houses short of its 5 <strong>year</strong><br />
target of 1,335 new homes by 20<strong>16</strong>.<br />
Currently the <strong>Council</strong> has not broken down<br />
housing targets by settlement or locality areas.<br />
This will be done in the Core Strategy as part<br />
of the Local Development Framework process<br />
over the next 12 months. For now the housing<br />
land <strong>supply</strong> is presented as a borough wide<br />
figure measured against a borough wide<br />
target.<br />
Land has been identified as follows:<br />
Major Planning Approvals<br />
(10+ Houses): 736<br />
Minor Planning Approvals<br />
(Less than 10 Houses): 244<br />
Existing Allocations: 203<br />
SHLAA Sites: 7<br />
Further details on major sites of 10 or more<br />
dwellings, including existing allocations have<br />
been given on the following pages. A complete<br />
list of sites, including minor approvals, has<br />
been provided in Appendix A.<br />
Implications of Housing Land Supply<br />
It has been established that the <strong>Council</strong> cannot<br />
currently demonstrate a 5 <strong>year</strong> <strong>supply</strong>.<br />
Currently it falls short of the 5 <strong>year</strong> target by<br />
195 dwellings. In this instance PPS 3 states<br />
that Local Planning Authorities should look<br />
more favourably on new applications for<br />
housing development, with each new proposal<br />
being considered on its own merit.<br />
While this may allow for greater flexibility in<br />
determining planning applications, it does not<br />
mean that new housing applications will<br />
automatically be granted permission. Local<br />
Planning Authorities will still assess sites with<br />
regard to standard development management<br />
principles and relevant local and national<br />
policies. These include ensuring that<br />
development:<br />
• Is of a high quality<br />
• Achieves a good mix of housing reflecting<br />
the accommodation requirements of<br />
specific groups, in particular, families and<br />
older people<br />
8 Meeting the 5 Year Housing Land Supply
LDF Evidence Base<br />
<strong>Allerdale</strong><br />
Local Development Framework<br />
• Is in a suitable location and is<br />
environmentally sustainable<br />
• Uses land efficiently and effectively<br />
• Is in line with planning for housing<br />
objectives, reflecting the need and<br />
demand for housing in, and the spatial<br />
vision for, the area and does not<br />
undermine wider policy objectives e.g.<br />
addressing housing market renewal<br />
issues<br />
The <strong>Council</strong> will be closely monitoring its five<br />
<strong>year</strong> <strong>supply</strong>. Once it can be demonstrated that<br />
5 <strong>year</strong> targets can be met, then standard<br />
policies will once more apply.<br />
Meeting the 5 Year Housing Land Supply 9
<strong>Allerdale</strong><br />
Local Development Framework<br />
LDF Evidence Base<br />
4 Major<br />
Sites<br />
WK05 - Former Corus Offices<br />
Workington<br />
This brownfield site currently has full permission<br />
for 119 houses, granted in 2008.<br />
Discussions with the developer suggest<br />
that this is still considered to be an active<br />
site. A revised scheme is currently pending.<br />
CK09 - Sullart St Depot, Cockermouth<br />
This brownfield site, currently has full<br />
permission for 101 houses, granted in<br />
<strong>2011</strong>.<br />
10 Meeting the 5 Year Housing Land Supply
LDF Evidence Base<br />
<strong>Allerdale</strong><br />
Local Development Framework<br />
AASL03 - Fisons Factory, Silloth<br />
This brownfield site currently has outline<br />
permission for 250 new homes, granted<br />
in <strong>2011</strong>. It is proposed that 87 new<br />
dwellings shall be built within the first<br />
phase of development.<br />
RU68 - Church Meadows, Broughton<br />
This greenfield site currently has full permission<br />
for 58 new houses approved in<br />
<strong>2011</strong>. Awaiting signing of Section 106<br />
agreement.<br />
Meeting the 5 Year Housing Land Supply 11
<strong>Allerdale</strong><br />
Local Development Framework<br />
LDF Evidence Base<br />
WK06 - Former Workington Infirmary<br />
This brownfield site is currently under<br />
construction. Originally approved for 103<br />
homes there are a remaining 45 to build.<br />
RU18 - Rye Hill Farm, Flimby<br />
This greenfield site is currently under<br />
construction. Originally approved for 51<br />
homes there are a remaining 32 to build.<br />
12 Meeting the 5 Year Housing Land Supply
LDF Evidence Base<br />
<strong>Allerdale</strong><br />
Local Development Framework<br />
Major Sites<br />
MP01 - Strand Street, Maryport<br />
This brownfield site currently has full permission<br />
for 30 dwellings, granted in<br />
<strong>2011</strong>.<br />
MP02 - Ellenborough Place, Maryport<br />
This brownfield site currently has outline<br />
permission for 27 dwellings, renewed in<br />
2010. This recent renewal suggests continued<br />
interest in the site. This will be reviewed<br />
next <strong>year</strong>.<br />
Meeting the 5 Year Housing Land Supply 13
<strong>Allerdale</strong><br />
Local Development Framework<br />
LDF Evidence Base<br />
MP03 - Whitecroft, Maryport<br />
This brownfield site has outline approval<br />
for 26 dwellings. It was approved in<br />
2009. The site has been cleared and the<br />
recent approval suggests there is still interest<br />
in the site. This will be reviewed<br />
next <strong>year</strong>.<br />
WG01 - Kirkland Road, Wigton<br />
This greenfield site, and former Local<br />
Plan Allocation, currently has full permission<br />
for 59 houses, granted in 2010.<br />
Work has commenced on site and 20<br />
units remain to be constructed.<br />
14 Meeting the 5 Year Housing Land Supply
LDF Evidence Base<br />
<strong>Allerdale</strong><br />
Local Development Framework<br />
Major Sites<br />
WK07– The Cumbria Ballroom<br />
Workington<br />
This brownfield site currently has full permission<br />
for 18 flats, approved in 2009.<br />
Development is currently well underway.<br />
RU34 - West Lane, Kirkbride<br />
This brownfield site currently has full permission<br />
for 18 dwellings, approved in<br />
2010. Work has commenced on site.<br />
Meeting the 5 Year Housing Land Supply 15
<strong>Allerdale</strong><br />
Local Development Framework<br />
LDF Evidence Base<br />
WK21 - Former Opera House,<br />
Workington<br />
This brownfield site is currently has outline<br />
approval for 14 new units, granted in<br />
2010.<br />
MP05 - Ellenborough Place, Maryport<br />
This brownfield site currently has outline<br />
permission for 12 dwellings approved in<br />
2010.<br />
<strong>16</strong> Meeting the 5 Year Housing Land Supply
LDF Evidence Base<br />
<strong>Allerdale</strong><br />
Local Development Framework<br />
Major Sites<br />
RU29 - Ivydene, Kirkbride<br />
This brownfield site for 12 dwellings has<br />
full planning permission, approved in<br />
<strong>2011</strong>.<br />
RU33—Former Police HQ, Brigham<br />
This brownfield site currently has full permission<br />
for 12 houses, approved in<br />
<strong>2011</strong>.<br />
Meeting the 5 Year Housing Land Supply 17
<strong>Allerdale</strong><br />
Local Development Framework<br />
LDF Evidence Base<br />
RU05 - Croft Crescent, Dearham<br />
This brownfield site currently has full permission<br />
to demolish 26 dwellings and<br />
erect 38 in their place, meaning an additional<br />
12 new homes for the 5 <strong>year</strong> <strong>supply</strong>.<br />
Approved in 2010, construction is<br />
well underway.<br />
RU35 - Old Grass Dryer, Blencogo<br />
This brownfield site currently has full approval<br />
for 12 dwellings, approved in<br />
<strong>2011</strong>.<br />
18 Meeting the 5 Year Housing Land Supply
LDF Evidence Base<br />
<strong>Allerdale</strong><br />
Local Development Framework<br />
WK08—Millrigg Street, Workington<br />
This brownfield site currently has full permission<br />
for 11 dwellings, approved in<br />
2009. Construction is well underway.<br />
CK02 - Globe Hotel, Cockermouth<br />
This brownfield site currently has full permission<br />
for 10 units, approved in <strong>2011</strong>.<br />
Meeting the 5 Year Housing Land Supply 19
<strong>Allerdale</strong><br />
Local Development Framework<br />
LDF Evidence Base<br />
SL05– Acre Bank Close, Skinburness<br />
This brownfield site is currently under<br />
construction. One unit has been completed<br />
with a remaining 10 left to build.<br />
WKA2 - Barncroft Avenue, Seaton<br />
This greenfield site is an existing allocation<br />
in the current Local Plan. There was<br />
interest in this site before the Interim<br />
Housing Policy restricted development in<br />
Seaton. Now that the Interim Policy has<br />
been lifted it is anticipated that interest in<br />
the site will be renewed and development<br />
is likely within 5 <strong>year</strong>s. At 30 dwellings<br />
per hectare this site could provide<br />
92 new homes.<br />
20 Meeting the 5 Year Housing Land Supply
LDF Evidence Base<br />
<strong>Allerdale</strong><br />
Local Development Framework<br />
RUA2 - Brownside Rd, Dearham<br />
This brownfield site is an existing allocation<br />
in the current local plan. There has<br />
been recent developer interest around<br />
this site and its inclusion with the 5 Year<br />
Supply is warranted. This site could provide<br />
60 new dwellings.<br />
RUA1 - Moor Rd, Great Clifton<br />
This greenfield site is an existing allocation<br />
in the current local plan. There has<br />
been recent developer interest around<br />
this site and its inclusion with the 5 Year<br />
Supply is warranted. This site could provide<br />
51 new dwellings.<br />
Meeting the 5 Year Housing Land Supply 21
<strong>Allerdale</strong><br />
Local Development Framework<br />
LDF Evidence Base<br />
WG07– Scholars Green, Wigton<br />
This greenfield site currently has permission<br />
for 46 new dwellings, approved in<br />
August <strong>2011</strong>. Development has yet to<br />
commence.<br />
22 Meeting the 5 Year Housing Land Supply
LDF Evidence Base<br />
<strong>Allerdale</strong><br />
Local Development Framework<br />
Appendix A: Planning Approvals<br />
Ref Site Settlement Status Green/Brown Remaining Capcity<br />
WK05<br />
2/2008/0898<br />
Corus Offices Workington No commencement Brown 119<br />
2/<strong>2011</strong>/0151<br />
CK06 Sullart St Depot Cockermouth No commencement Brown 101<br />
2/2010/0037<br />
Former Fisons<br />
SL07 Site SIlloth No commencement Brown 87<br />
RU62<br />
2/<strong>2011</strong>/0<strong>16</strong>2<br />
Church Meadows<br />
Broughton No commencement Green 58<br />
2/<strong>2011</strong>/0143—<br />
WG07 Scholars Green Wigton No commencement Green 46<br />
2/2005/1300<br />
Workington<br />
WK06 Infirmary Site<br />
Development commenced Brown 45<br />
2/2006/1257<br />
Flimby<br />
RU18 Ryehill<br />
Development commenced Green 32<br />
2/2010/0529<br />
MP01 Strand Street Maryport No commencement Brown 30<br />
MP02 2/2010/0611 Maryport No commencement Brown 27<br />
MP03 2/2008/0777 Maryport No commencement Brown 26<br />
WG01<br />
2/2009/0524<br />
Kirkland Road Wigton Development commenced Green 20<br />
WK07 2/2008/0517 Workington Development commenced Brown 18<br />
RU34<br />
2/2010/0408<br />
Adjacent to Rodway<br />
Kirkbride Development commenced Brown 18<br />
WK21<br />
2/2010/0154<br />
Former Bingo<br />
Hall Workington No commencement Brown 14<br />
MP05 2/2010/0611 Maryport No commencement Brown 12<br />
RU29 2/2008/0937 Kirkbride No commencement Brown 12<br />
RU33<br />
2/2009/0872<br />
Former Police<br />
Station Brigham No commencement Brown 12<br />
RU05 2/2010/0272 Dearham Development commenced Brown 12<br />
RU35<br />
2/<strong>2011</strong>/0064<br />
Old Grass Dryer Blencogo No commencement Brown 12<br />
WK08 2/2009/0030 Workington Development commenced Green 11<br />
CK02<br />
2/2009/0781<br />
Globe Hotel Cockermouth No commencement Brown 10<br />
2/2006/0570 Skinburness<br />
SL05 Acre Bank Close<br />
Development commenced Green 10<br />
WK31 2/2010/0873 Workington No commencement Brown 9<br />
MP06 2/2009/0491 Maryport Development commenced Brown 9<br />
RU50 2/2010/0957 Great Clifton Development commenced Brown 8<br />
RU28 2/2009/0064 Hayton No commencement Green 8<br />
Meeting the 5 Year Housing Land Supply 23
<strong>Allerdale</strong><br />
Local Development Framework<br />
LDF Evidence Base<br />
WG02 2/2010/1060 Wigton Development commenced Green 8<br />
WK09 2/2010/0079 Workington Development commenced Brown 7<br />
WK10 2/2007/0456 Workington No commencement Brown 6<br />
RU19 2/2009/0746 Flimby No commencement Brown 6<br />
MP13 2/2010/0961 Maryport No commencement Green 6<br />
AS01 2/2008/0838 Aspatria Development commenced Brown 5<br />
WK12 2/2007/0619 Workington<br />
Stalled - no change in site in<br />
past 6months Brown 5<br />
WK11 2/2008/0962 Workington No commencement Brown 5<br />
WK13 2/2010/0020 Workington Development commenced Brown 5<br />
RU47 2/2010/0875<br />
Bolton Low<br />
Houses No commencement Green 5<br />
RU56 2/<strong>2011</strong>/0051 Kirkbampton No commencement Green 5<br />
WK29 2/<strong>2011</strong>/0270 Workington No commencement Green 5<br />
WG03 2/2008/0976 Wigton No commencement Brown 4<br />
MP07 2/2009/0427 Maryport Development commenced Brown 4<br />
WK14 2/2010/0039 Workington No commencement Brown 4<br />
AS05 2/2010/0919 Aspatria Brown 4<br />
RU07 2/2009/0518 Dearham No commencement Green 4<br />
WK23 2/2010/0663 Harrington Green 4<br />
WK01 2/2010/0863 Harrington No commencement Green 4<br />
AS03 2/2010/0503 Aspatria No commencement Brown 3<br />
WK15 2/2009/0040 Workington No commencement Brown 3<br />
MP08 2/2009/0618 Maryport No commencement Brown 3<br />
WK28 2/2010/0943 Workington Brown 3<br />
2/2002/1090<br />
Dearham<br />
RU06 Craika Close<br />
Development commenced Green 3<br />
RU44 2/2010/0787 Dearham Development commenced Green 3<br />
SL08 2/2010/0441 Silloth Green 3<br />
RU53 2/2010/1035 Torpenhow Green 3<br />
RU62 2/<strong>2011</strong>/0307 Gilcrux Green 3<br />
WK<strong>16</strong> 2/<strong>2011</strong>/0270 Workington No commencement Brown 2<br />
MP09 2/2009/0250 Maryport No commencement Brown 2<br />
CK03 2/2009/0823 Cockermouth Brown 2<br />
RU08 2/2007/0275 Dearham Development commenced Green 2<br />
RU37 2/2010/0625 Broughton Green 2<br />
WK27 2/2010/0751 Workington Green 2<br />
SL01 2/2010/0768 Blitterlees No commencement Green 2<br />
RU49 2/2010/0912 Oughterside Green 2<br />
MP12 2/2010/0942 Maryport Green 2<br />
RU52 2/2010/1008 Fletchertown Green 2<br />
WK30 2/<strong>2011</strong>/0281 Workington Green 2<br />
RU61 2/<strong>2011</strong>/0285 Tallentire Green 2<br />
RU<strong>16</strong> 2/2007/0688 Fletchertown No commencement Brown 1<br />
RU22 2/2007/0730 Flimby Development commenced Brown 1<br />
RU01 2/2007/0740 Broughton Moor Development commenced Brown 1<br />
WK17 2/2008/0909 Workington No commencement Brown 1<br />
RU14 2/2008/0956 Dearham No commencement Brown 1<br />
SL02 2/2009/0082 Silloth No commencement Brown 1<br />
RU10 2/2009/0232 Dearham No commencement Brown 1<br />
AS05 2/2009/0286 Aspatria No commencement Brown 1<br />
RU23 2/2009/0564 Flimby No commencement Brown 1<br />
CK01 2/2009/0633 Cockermouth No commencement Brown 1<br />
24 Meeting the 5 Year Housing Land Supply
LDF Evidence Base<br />
<strong>Allerdale</strong><br />
Local Development Framework<br />
RU11 2/2009/0650 Dearham Development commenced Brown 1<br />
RU12 2/2009/0657 Dearham No commencement Brown 1<br />
RU04 2/2009/0715 Deanscales No commencement Brown 1<br />
WK02 2/2009/0775 Harrington No commencement Brown 1<br />
RU17 2/2010/0057 Fletchertown No commencement Brown 1<br />
AS04 2/2010/0<strong>16</strong>5 Aspatria No commencement Brown 1<br />
RU15 2/2010/0214 Eaglesfield No commencement Brown 1<br />
WK19 2/2010/0257 Workington No commencement Brown 1<br />
RU03 2/2010/0282 Broughton Moor No commencement Brown 1<br />
RU39 2/2010/0677 Broughton Moor Brown 1<br />
RU55 2/<strong>2011</strong>/0044 Anthorn Brown 1<br />
RU59 2/<strong>2011</strong>/0177 Gilcrux Brown 1<br />
WK04 2/2007/0686 Harrington No commencement Green 1<br />
RU02 2/2008/0034 Broughton Moor Development commenced Green 1<br />
RU24 2/<strong>2011</strong>/0205 Flimby No commencement Green 1<br />
RU09 2/2008/0682 Dearham No commencement Green 1<br />
RU30 2/2008/0728 Newton Arlosh Development commenced Green 1<br />
RU25 2/2008/0732 Great Clifton No commencement Green 1<br />
WK18 2/2008/0888 Workington Development commenced Green 1<br />
SL04 2/2009/0210 Silloth No commencement Green 1<br />
RU27 2/2009/0391 Greysouthen Development commenced Green 1<br />
RU20 2/2009/0564 Flimby No commencement Green 1<br />
RU31 2/2009/0737 Oughterside No commencement Green 1<br />
SL06 2/2009/0799 Skinburness No commencement Green 1<br />
WG04 2/2009/0855 Wigton Development commenced Green 1<br />
RU26 2/2009/0859 Great Clifton No commencement Green 1<br />
RU13 2/2009/0895 Dearham No commencement Green 1<br />
WK03 2/2010/0013 Harrington No commencement Green 1<br />
MP10 2/2010/0604 Maryport Green 1<br />
WK22 2/2010/0620 Workington Green 1<br />
CK04 2/2010/0621 Cockermouth Green 1<br />
RU38 2/2010/0673 Broughton Green 1<br />
WK24 2/2010/0693 Seaton Green 1<br />
WK25 2/2010/0724 Harrington Green 1<br />
RU40 2/2010/0728 Broughton Moor Green 1<br />
WK26 2/2010/0731 Workington Green 1<br />
RU41 2/2010/0737 Flimby Green 1<br />
RU42 2/2010/0753 Dearham Green 1<br />
RU36 2/2010/0759 Broughton Green 1<br />
RU43 2/2010/0763 Greysouthen Green 1<br />
MP11 2/2010/0798 Maryport Green 1<br />
RU45 2/2010/0819 Dearham Green 1<br />
RU46 2/2010/0821 Dearham Green 1<br />
RU48 2/2010/0880 Dearham Green 1<br />
WG05 2/2010/09<strong>16</strong> Wigton Green 1<br />
CK05 2/2010/0964 Cockermouth Green 1<br />
RU51 2/2010/0984 Ullock Green 1<br />
RU32 2/2010/1002 Thursby No commencement Green 1<br />
RU54 2/2010/1036 Dean Green 1<br />
RU57 2/<strong>2011</strong>/0113 Broughton Green 1<br />
RU58 2/<strong>2011</strong>/0117 Hayton Green 1<br />
RU21 2/<strong>2011</strong>/0204 Flimby No commencement Green 1<br />
RU60 2/<strong>2011</strong>/0275 Dearham Green 1<br />
Total 976<br />
Meeting the 5 Year Housing Land Supply 25
<strong>Allerdale</strong><br />
Local Development Framework<br />
LDF Evidence Base<br />
Appendix B: SHLAA Sites<br />
Ref Site Settlement Status Type Capacity<br />
AARU123 Land at Manildra, Abbeytown Abbeytown SHLAA Green 7<br />
Total 7<br />
26 Meeting the 5 Year Housing Land Supply
LDF Evidence Base<br />
<strong>Allerdale</strong><br />
Local Development Framework<br />
Appendix C: Existing Allocations<br />
5 Year Reference<br />
Local Plan Ref Name Status Type<br />
5 Year Supply<br />
WKA2<br />
WKHS4<br />
Barncroft Avenue, Workington<br />
Local Plan Allocation Green 92<br />
RUA1 RHS5 Moor Road, Great Clifton Local Plan Allocation Green 51<br />
RUA2 RHS4 Browside Road, Dearham Local Plan Allocation Brown 60<br />
Total 203<br />
Meeting the 5 Year Housing Land Supply 27
<strong>Allerdale</strong><br />
Local Development Framework<br />
LDF Evidence Base<br />
28 Meeting the 5 Year Housing Land Supply