26. Clause No. 2.4 <str<strong>on</strong>g>of</str<strong>on</strong>g> Chapter II: should be read as<br />
“In all cases, a copy <str<strong>on</strong>g>of</str<strong>on</strong>g> solvency certificate issued by the tenderers Bankers in case <str<strong>on</strong>g>of</str<strong>on</strong>g> Indian<br />
tenderer and suitable certificate in case <str<strong>on</strong>g>of</str<strong>on</strong>g> Foreign tenderer is to be submitted.”<br />
27. Clause No. 3.1 <str<strong>on</strong>g>of</str<strong>on</strong>g> Chapter VI:<br />
Bank Guarantee for EMD: The term ” SEALED with the Comm<strong>on</strong> Seal <str<strong>on</strong>g>of</str<strong>on</strong>g> the said Bank this<br />
______ day <str<strong>on</strong>g>of</str<strong>on</strong>g> _______ 20_______” may be read as ” SEALED with the Seal <str<strong>on</strong>g>of</str<strong>on</strong>g> the said<br />
Bank this ______ day <str<strong>on</strong>g>of</str<strong>on</strong>g> _______ 20_______”<br />
28. Clause No. 5.1.2 <str<strong>on</strong>g>of</str<strong>on</strong>g> Chapter V: should be read as<br />
“As standard sinking procedure, no. <str<strong>on</strong>g>of</str<strong>on</strong>g> plumb lines shall be provided by the C<strong>on</strong>tractor and he<br />
shall set out these al<strong>on</strong>g the periphery <str<strong>on</strong>g>of</str<strong>on</strong>g> the shaft at required positi<strong>on</strong>s. All measurements for<br />
excavati<strong>on</strong> and c<strong>on</strong>crete lining shall be with reference to these lines. The finished shaft radius<br />
will have maximum tolerance <str<strong>on</strong>g>of</str<strong>on</strong>g> +20 mm at any place with reference to design shaft<br />
radius, the C<strong>on</strong>tractor shall maintain the shaft strictly vertical.”<br />
29. Clause No. 5.7 <str<strong>on</strong>g>of</str<strong>on</strong>g> Chapter V: should be read as<br />
The shaft is to be designed to have three hoisting arrangement. The cage–counter weight<br />
system for lowering & hoisting <str<strong>on</strong>g>of</str<strong>on</strong>g> men and materials, Twin skip system for ore hoisting and<br />
skip–counter weight system for hoisting <str<strong>on</strong>g>of</str<strong>on</strong>g> waste rock. The proposed shaft plan showing the<br />
each item is shown in the Drawing. No. CMPDI/HQ/UMD/201111. The shaft plan is<br />
tentative and it can be optimised by the bidder without reducing the cage size and<br />
capacity <str<strong>on</strong>g>of</str<strong>on</strong>g> the skips. However all such Design/drawings shall be approved by MOIL.<br />
30. Clause No. 5.16.1 (t) <str<strong>on</strong>g>of</str<strong>on</strong>g> Chapter V should be read as<br />
t) Specificati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Diesel Generator<br />
Suitable Diesel Generator set (11 KV out put) shall be supplied and installed by the C<strong>on</strong>tractor<br />
at the surface to supply power for emergency operati<strong>on</strong> (e.g. ventilati<strong>on</strong>, man winding,<br />
pumping, surface lighting, communicati<strong>on</strong>) in case <str<strong>on</strong>g>of</str<strong>on</strong>g> power failure. A suitable<br />
electrical……………………..<br />
31. Clause No. 2.26 – Escalati<strong>on</strong>, <str<strong>on</strong>g>of</str<strong>on</strong>g> Chapter III (C<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>tract) should be read as<br />
Escalati<strong>on</strong> will be given during the scheduled completi<strong>on</strong> period. Escalati<strong>on</strong> shall also be<br />
c<strong>on</strong>sidered bey<strong>on</strong>d scheduled completi<strong>on</strong> period if delay is occurred due the fault <strong>on</strong> part<br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> the Company.<br />
However, no escalati<strong>on</strong> shall be c<strong>on</strong>sidered bey<strong>on</strong>d the scheduled completi<strong>on</strong> period if<br />
there is fault <strong>on</strong> the part <str<strong>on</strong>g>of</str<strong>on</strong>g> the c<strong>on</strong>tractor .<br />
The provisi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> escalati<strong>on</strong>s will be as under:<br />
(a) Escalati<strong>on</strong> for design & engineering cost:<br />
----------------------------------<br />
There shall be a ceiling <strong>on</strong> price variati<strong>on</strong> due to escalati<strong>on</strong> covered under clauses menti<strong>on</strong>ed<br />
hereinbefore, limited to 10% <str<strong>on</strong>g>of</str<strong>on</strong>g> the “total ordered price <str<strong>on</strong>g>of</str<strong>on</strong>g> the heads <strong>on</strong> which escalati<strong>on</strong> is<br />
allowed” <strong>on</strong>ly.