Grants Management Manual, Standard Operating Procedures
Grants Management Manual, Standard Operating Procedures
Grants Management Manual, Standard Operating Procedures
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
BOR administration has been made aware of, and endorses, the formal request for the grant. A copy of this<br />
document is then submitted to the Special Programs Office for the College’s record.<br />
4. BUDGET SUPPORT: A budget worksheet is attached for your convenience. Please work with the Special<br />
Programs Financial Analyst in the development of the budget to ensure that funding requests are compliant with<br />
both institutional and federal guidelines.<br />
5. OBTAIN Institutional Review Board (IRB) APPROVAL: Contact Edward Hummingbird, Institutional<br />
Effectiveness Specialist for any necessary IRB approvals or if you have questions as to whether your project<br />
will need IRB approval. (Please note that review by the Solicitor’s Office may still be required in some<br />
instances.)<br />
6. FORMAL SUBMISSION: Submit completed, approved project (including narrative, budget, and<br />
appendices) by the required deadline. If the proposal requires electronic submission (via <strong>Grants</strong>.gov, E-<strong>Grants</strong>,<br />
Fastlane, etc.), allow time prior to the due date to complete the process of online submission and<br />
confirmation. You must also allow time for the PI/PD to be set up on a grantor’s electronic reporting site such<br />
as Fastlane. Approval process as noted in the attached ‘Grant Proposal Checklist and Approval Form’ is the<br />
same for electronic submission.<br />
Receiving the Contract/Award<br />
When a grantor issues an award (or declination), official notification will be made via phone, letter, and/or<br />
email. Recipients typically include the President and/or Project Director. Additionally, the U.S. Senator’s Office<br />
or local Congressman’s Office may be notified. If awarded, SIPI and/or the BOR will receive an official Grant<br />
Award Notification (GAN) which must be fully executed by the SIPI President or the BOR Chair if a BOR<br />
grant. This contract will bind the institution to the terms outlined in the award notification.<br />
Contracts/Award Notices<br />
All fully executed award notifications will be kept on file in the Special Program Office or other designated<br />
office. It is the responsibility of the Project Director to forward a copy of the contract, budget (signed by the<br />
President or BOR Chair as appropriate), and award notification letter to the Special Programs Office. The<br />
Financial Analyst will then begin the process to establish a unique cost code/ account for each contract under<br />
the auspices of the College. The BOR Accountant will assign an appropriate job code for BOR contracts. The<br />
Project Director will be notified of the appropriate cost or job code(s) and will be expected to attend appropriate<br />
training sessions for efficient administration of the grant. The training will be a function of the Special<br />
Programs Office and will be provided to BOR staff as well.<br />
Continuing <strong>Grants</strong> and Contracts<br />
The President is SIPI’s signatory authority and serves as the project binding agent for all continuing contracts<br />
and grants, including amendments, renegotiated budgets, and annual budget requests that are awarded to the<br />
College. SIPI’s President will work in collaboration with the BOR Chair on all contracts and grants under the<br />
BOR. All fully executed documentation, including amended contracts, awards, annual reports, final reports, and<br />
close‐out documents should be sent to the Special Program Office for archival.<br />
Post-Award Process<br />
3