19.11.2014 Views

Grants Management Manual, Standard Operating Procedures

Grants Management Manual, Standard Operating Procedures

Grants Management Manual, Standard Operating Procedures

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

BOR administration has been made aware of, and endorses, the formal request for the grant. A copy of this<br />

document is then submitted to the Special Programs Office for the College’s record.<br />

4. BUDGET SUPPORT: A budget worksheet is attached for your convenience. Please work with the Special<br />

Programs Financial Analyst in the development of the budget to ensure that funding requests are compliant with<br />

both institutional and federal guidelines.<br />

5. OBTAIN Institutional Review Board (IRB) APPROVAL: Contact Edward Hummingbird, Institutional<br />

Effectiveness Specialist for any necessary IRB approvals or if you have questions as to whether your project<br />

will need IRB approval. (Please note that review by the Solicitor’s Office may still be required in some<br />

instances.)<br />

6. FORMAL SUBMISSION: Submit completed, approved project (including narrative, budget, and<br />

appendices) by the required deadline. If the proposal requires electronic submission (via <strong>Grants</strong>.gov, E-<strong>Grants</strong>,<br />

Fastlane, etc.), allow time prior to the due date to complete the process of online submission and<br />

confirmation. You must also allow time for the PI/PD to be set up on a grantor’s electronic reporting site such<br />

as Fastlane. Approval process as noted in the attached ‘Grant Proposal Checklist and Approval Form’ is the<br />

same for electronic submission.<br />

Receiving the Contract/Award<br />

When a grantor issues an award (or declination), official notification will be made via phone, letter, and/or<br />

email. Recipients typically include the President and/or Project Director. Additionally, the U.S. Senator’s Office<br />

or local Congressman’s Office may be notified. If awarded, SIPI and/or the BOR will receive an official Grant<br />

Award Notification (GAN) which must be fully executed by the SIPI President or the BOR Chair if a BOR<br />

grant. This contract will bind the institution to the terms outlined in the award notification.<br />

Contracts/Award Notices<br />

All fully executed award notifications will be kept on file in the Special Program Office or other designated<br />

office. It is the responsibility of the Project Director to forward a copy of the contract, budget (signed by the<br />

President or BOR Chair as appropriate), and award notification letter to the Special Programs Office. The<br />

Financial Analyst will then begin the process to establish a unique cost code/ account for each contract under<br />

the auspices of the College. The BOR Accountant will assign an appropriate job code for BOR contracts. The<br />

Project Director will be notified of the appropriate cost or job code(s) and will be expected to attend appropriate<br />

training sessions for efficient administration of the grant. The training will be a function of the Special<br />

Programs Office and will be provided to BOR staff as well.<br />

Continuing <strong>Grants</strong> and Contracts<br />

The President is SIPI’s signatory authority and serves as the project binding agent for all continuing contracts<br />

and grants, including amendments, renegotiated budgets, and annual budget requests that are awarded to the<br />

College. SIPI’s President will work in collaboration with the BOR Chair on all contracts and grants under the<br />

BOR. All fully executed documentation, including amended contracts, awards, annual reports, final reports, and<br />

close‐out documents should be sent to the Special Program Office for archival.<br />

Post-Award Process<br />

3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!