The contractor is to carry out <strong>and</strong> complete <strong>the</strong> works in a “proper <strong>and</strong> workmanlike<br />
manner” in accordance with <strong>the</strong> contract documents <strong>and</strong>:<br />
“shall complete <strong>the</strong> design for <strong>the</strong> Works including <strong>the</strong> selection of any<br />
specifications for <strong>the</strong> kinds <strong>and</strong> st<strong>and</strong>ards of <strong>the</strong> materials, goods <strong>and</strong><br />
workmanship to be used in <strong>the</strong> construction of <strong>the</strong> Works so far as not described<br />
or stated in <strong>the</strong> Employer’s Requirements or Contractor’s Proposals, <strong>and</strong> he shall<br />
give all notices required by <strong>the</strong> statutory requirements.” 8<br />
Clause 2.17.1 deals with design liability, <strong>and</strong> following <strong>the</strong> old <strong>JCT</strong> formulation states that<br />
<strong>the</strong> contractor’s liability to <strong>the</strong> employer in respect of design shall have such liability:<br />
“as would an architect or, as <strong>the</strong> case may be, o<strong>the</strong>r appropriate professional<br />
designer holding himself out as competent to take on work for such a design<br />
who, acting independently under a separate contract with <strong>the</strong> Employer, has<br />
supplied such design for or in connection with <strong>the</strong> works to be carried out <strong>and</strong><br />
completed by a building contractor who is not <strong>the</strong> supplier of <strong>the</strong> design.”<br />
The design liability of a contractor remains unresolved. It may be <strong>the</strong> case that <strong>the</strong> contractor<br />
might still owe a fitness for purpose obligation, even under <strong>the</strong> new regime. A fitness for<br />
purpose obligation has not been excluded, <strong>and</strong> simply stating that <strong>the</strong> contractor owes<br />
<strong>the</strong> same duty as a designer does not necessarily exclude a fitness for purpose obligation.<br />
Fur<strong>the</strong>r, <strong>the</strong> contractor is in many instances taking a partly completed design <strong>and</strong> <strong>the</strong>n<br />
developing it to completion. That obligation in itself requires <strong>the</strong> contractor to check <strong>the</strong><br />
existing design, toge<strong>the</strong>r with <strong>the</strong> assumptions upon which it is based in order <strong>the</strong>n to<br />
develop a completed design that will work in practice. 9<br />
The old <strong>JCT</strong> extension of time provisions has been replaced with provisions dealing<br />
with an “adjustment of completion date”. The contractor is required to give notice of<br />
delay in accordance with clause 2.24, identifying <strong>the</strong> causes of delay <strong>and</strong> identifying any<br />
events which are in his opinion, “Relevant Events”. An estimate of any expected delay in<br />
completion is also required. Fur<strong>the</strong>r, notices are required of any material change in <strong>the</strong><br />
estimate. The employer is <strong>the</strong>n required to give an extension of time “as he <strong>the</strong>n estimates<br />
to be fair <strong>and</strong> reasonable” in accordance with clause 2.25.<br />
8 Section 2, clause 2.1.1.<br />
9 See Co-Operative Insurance Society Limited<br />
–v- Henry Boot Scotl<strong>and</strong> Limited, [2003] CLJ Vol<br />
19 No 2 page 109, <strong>the</strong> decision of His Honour<br />
Judge Seymour QC stating that in his judgment,<br />
<strong>the</strong> obligation of Boot “was to complete <strong>the</strong><br />
design, that is to say, to develop <strong>the</strong> conceptual<br />
design [of Co-Op] into a completed design<br />
capable of being constructed. … assessing <strong>the</strong><br />
assumptions upon which it is based <strong>and</strong> forming<br />
an opinion whe<strong>the</strong>r those assumptions are<br />
appropriate. … <strong>the</strong> concept of “completion” of<br />
a design of necessity, in my judgment, involves<br />
a need to underst<strong>and</strong> <strong>the</strong> principles underlying<br />
<strong>the</strong> work done thus far <strong>and</strong> to form a view as to<br />
its sufficiency.”<br />
The relevant event provisions at clause 2.26 have certainly been rationalised. The usual<br />
requirements are <strong>the</strong>re, such as <strong>the</strong> adjustment to <strong>the</strong> completion date in respect of<br />
changes <strong>and</strong> instructions of <strong>the</strong> employer. A “catch all” approach has been adopted<br />
in order to try to avoid listing out numerous, <strong>and</strong> unnecessary, individual reasons for<br />
extending time. The catch all appears at clause 2.26 as follows:<br />
“any impediment, prevention or default, whe<strong>the</strong>r by act or omission by <strong>the</strong><br />
Employer or any of <strong>the</strong> Employer’s Persons except to <strong>the</strong> extent caused or<br />
contributed to by any default, whe<strong>the</strong>r by act or omission, of <strong>the</strong> Contractor or of<br />
any of <strong>the</strong> Contractor’s Persons;”<br />
A similar provision appears in respect of loss <strong>and</strong> expense. However, it is interesting to<br />
see that <strong>the</strong> catch all does not provide <strong>the</strong> employer with an opportunity to grant an<br />
extension of time where <strong>the</strong> contractor has caused any part of <strong>the</strong> delay or contributed<br />