Standard Report for Planning Applications - Comhairle nan Eilean Siar

Standard Report for Planning Applications - Comhairle nan Eilean Siar

Standard Report for Planning Applications - Comhairle nan Eilean Siar

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4 Refuse bins must be taken to the verge of the A865 highway <strong>for</strong> collection at the<br />

agreed intervals.<br />

5 Technical Services would advise the <strong>for</strong>mation of a turning head at the end of<br />

the road to cater <strong>for</strong> possible future use i.e. bin wagon. The septic tank drainage<br />

should be taken through the road to discharge on west side.<br />

6 To comply with the Building (Scotland) Regulations 2004 the septic tank and<br />

outfall system must be a minimum of 5m from the site boundary and 10m from a<br />

water course or ditch.<br />

7 Surface water requires to be treated by use of a Sustainable Drainage system<br />

(SuDS). For further in<strong>for</strong>mation refer to <strong>Planning</strong> Advice Note 61 <strong>Planning</strong> And<br />

Sustainable Urban Drainage Systems on<br />

http://www.scotland.gov.uk/Topics/<strong>Planning</strong>/AdviceGuidance or visit the SEPA<br />

website www.sepa.org.uk or the local SEPA office (01851 706477).<br />

8 You are advised that due to the close proximity of Plot 4 to West<strong>for</strong>d Inn a high<br />

level of design will be required. A copy of the <strong>Comhairle</strong>s Design Guidance <strong>for</strong><br />

New Houses has been attached to the consent <strong>for</strong> your in<strong>for</strong>mation<br />

9 Any damaged caused to the existing access road during the construction of the<br />

development shall be repaired by the applicant/ developer.