Standard Report for Planning Applications - Comhairle nan Eilean Siar
Standard Report for Planning Applications - Comhairle nan Eilean Siar
Standard Report for Planning Applications - Comhairle nan Eilean Siar
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
4 Refuse bins must be taken to the verge of the A865 highway <strong>for</strong> collection at the<br />
agreed intervals.<br />
5 Technical Services would advise the <strong>for</strong>mation of a turning head at the end of<br />
the road to cater <strong>for</strong> possible future use i.e. bin wagon. The septic tank drainage<br />
should be taken through the road to discharge on west side.<br />
6 To comply with the Building (Scotland) Regulations 2004 the septic tank and<br />
outfall system must be a minimum of 5m from the site boundary and 10m from a<br />
water course or ditch.<br />
7 Surface water requires to be treated by use of a Sustainable Drainage system<br />
(SuDS). For further in<strong>for</strong>mation refer to <strong>Planning</strong> Advice Note 61 <strong>Planning</strong> And<br />
Sustainable Urban Drainage Systems on<br />
http://www.scotland.gov.uk/Topics/<strong>Planning</strong>/AdviceGuidance or visit the SEPA<br />
website www.sepa.org.uk or the local SEPA office (01851 706477).<br />
8 You are advised that due to the close proximity of Plot 4 to West<strong>for</strong>d Inn a high<br />
level of design will be required. A copy of the <strong>Comhairle</strong>s Design Guidance <strong>for</strong><br />
New Houses has been attached to the consent <strong>for</strong> your in<strong>for</strong>mation<br />
9 Any damaged caused to the existing access road during the construction of the<br />
development shall be repaired by the applicant/ developer.