20.11.2014 Views

DOD AP/1 - Davis-Monthan Air Force Base

DOD AP/1 - Davis-Monthan Air Force Base

DOD AP/1 - Davis-Monthan Air Force Base

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Overview<br />

• DM Ops<br />

• Wyle Study Update<br />

• Operation Snowbird<br />

• Flight Operation Concerns CY10<br />

• FY09 Economic Impact<br />

• DM Vicinity Map<br />

– AICUZ/JLUS


The Mission<br />

355th Fighter Wing<br />

309th Aerospace Maintenance<br />

and Regeneration Group<br />

12th <strong>Air</strong> <strong>Force</strong>/AF SOUTH<br />

214th Reconnaissance Group<br />

563rd Rescue Group<br />

162nd Arizona <strong>Air</strong> National Guard<br />

943rd Rescue Group<br />

US Customs Service & Border Patrol<br />

55th Electronic Combat Group<br />

25th Operational Weather Squadron


<strong>Davis</strong>-<strong>Monthan</strong> AFB<br />

One of the most important combat air bases in DoD<br />

Over 9000 <strong>Air</strong>men…800-1000 deployed<br />

85 A-10 aircraft<br />

12 th <strong>Air</strong> <strong>Force</strong> HQ<br />

14 EC-130 aircraft<br />

6 HC-130 aircraft<br />

14 HH-60 helicopters<br />

4 Alert F-16s - Operation Noble Eagle<br />

Operation Snowbird<br />

Predator operations across SW Asia<br />

309th Aerospace Maintenance and Regeneration Group<br />

Regional Weather Forecasting<br />

10,600+ acres<br />

~$1,007,000,000 economic impact (2009)<br />

76,000 annual volunteer hours


Wyle OSB Study<br />

Current Projected Timeline<br />

Wyle Study on hold pending Higher<br />

Headquarters coordination of the draft<br />

Preliminary Study


Pending Operation Snowbird<br />

Schedule<br />

• 6 May – 15 Jul, UK Army w/ 6 AH-64s<br />

• 9 Jul – 17 Jul, MD ANG w/ 4 A-10s<br />

• 2 Aug – 2 Sep, USAF Tyndall, w/ 8 F-22s


OSB Days<br />

200<br />

190<br />

180<br />

170<br />

160<br />

194<br />

190<br />

192<br />

150<br />

140<br />

130<br />

120<br />

110<br />

100<br />

FY08<br />

FY09<br />

FY10 Days reflects currently scheduled<br />

aircraft<br />

FY10


OSB Sorties<br />

1600<br />

Projected: 1,536<br />

1400<br />

1200<br />

1000<br />

~819<br />

800<br />

600<br />

1233<br />

1190<br />

400<br />

200<br />

717<br />

0<br />

FY08<br />

FY10 Sorties estimated base on<br />

current averages.<br />

FY09<br />

FY10


200<br />

180<br />

160<br />

140<br />

120<br />

100<br />

80<br />

60<br />

40<br />

20<br />

0<br />

Monthly Flight Operations Concerns<br />

March:<br />

Total: 184<br />

Callers: 88<br />

Callers w/ > 5: 4<br />

Account for: 78/42.39%<br />

Frequent caller: 46/25.00%<br />

Year to Date:<br />

Total: 475<br />

Callers: 176<br />

Callers w/ > 5: 10<br />

Account for: 244/51.37%<br />

Frequent caller: 91/19.16%<br />

April:<br />

Total: 103<br />

Callers: 31<br />

Callers w/ > 5: 4<br />

Account for: 66/64.08%<br />

Frequent caller: 38/36.89%<br />

Jan Feb Mar Apr<br />

2009 2010<br />

May Jun Jul<br />

Aug<br />

Sep<br />

Oct<br />

Nov<br />

Dec


DM Transient Restrictions<br />

• Restricted via <strong>DOD</strong> Enroute Supplement:<br />

Transient aircraft are allowed 1 approach to a full stop between 1430Z and<br />

offl SS, or if <strong>Davis</strong> <strong>Monthan</strong> is not the final destination, may execute 1<br />

approach and depart the pattern. For multiple approaches or approaches<br />

outside these hr 355 OG/CC approval required.<br />

• <strong>Base</strong> Instruction 11-250:<br />

1.4.1.5. Overhead approaches will not be conducted prior to 0900L on<br />

weekends and holidays. Transient aircraft are limited to one straight-in<br />

approach to a full stop prior to 0900L on weekends and holidays.<br />

Transient aircraft are not allowed to fly overhead approaches at night.<br />

• <strong>DOD</strong> <strong>AP</strong>/1<br />

<strong>Davis</strong>-<strong>Monthan</strong> AFB - Avoid overflight of Tucson to maximum extent possible;<br />

To minimize noise over the city of Tucson, aircraft departing on Rwy 12 or 30<br />

should climb using safe procedures consistent with the aircraft flight manual<br />

until reaching 6000’ MSL, then accelerate to required airspeed; Expect rapid<br />

descents and climbs from surface to 3500’; Only single approach and full stop<br />

landing authorized for transient aircraft;


<strong>Davis</strong>-<strong>Monthan</strong> AFB

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!