20.11.2014 Views

MCset 4 Civil engineering - Schneider Electric

MCset 4 Civil engineering - Schneider Electric

MCset 4 Civil engineering - Schneider Electric

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Cable entry configuration<br />

<strong>Civil</strong> <strong>engineering</strong> execution and installation of MV cables must take account of<br />

several factors:<br />

- the cable bending radius,<br />

- the entry configuration,<br />

- the possibility of making it more or less easy to position or remove the cables.<br />

A number of recommendations are given below.<br />

Should there be any doubt on the configuration, please consult your nearest<br />

<strong>Schneider</strong> <strong>Electric</strong> representative.<br />

MV cable position for AD4/RD4 cubicle<br />

Entry from above<br />

Entry from below<br />

(1): rear of the cubicle.<br />

Internal arc version on 3 sides.<br />

Gas exhaust version.<br />

Internal arc version on 4 sides.<br />

MV cable position for cubicle DI4<br />

Internal arc version on 3 sides.<br />

Gas exhaust version.<br />

Internal arc version on 4 sides.<br />

16 - 07897546EN indice: D0<br />

<strong>Schneider</strong> <strong>Electric</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!