20.11.2014 Views

Spruce Grove Aerials Gymnastics Club - Agenda - The City of ...

Spruce Grove Aerials Gymnastics Club - Agenda - The City of ...

Spruce Grove Aerials Gymnastics Club - Agenda - The City of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Spruce</strong> <strong>Grove</strong> <strong>Aerials</strong> <strong>Gymnastics</strong> <strong>Club</strong><br />

Design Development Report January 2011<br />

5.3 MECHANICAL<br />

Mechanical systems for this facility will be selected in order to achieve a LEED<br />

silver rating. Air system will be located in the Mechanical Room and be ducted to<br />

displacement air grilles at low levels in all rooms. Air system will use 100% outside air<br />

with heat recovery. Plumbing systems will utilize low consumption fixtures c/w high<br />

efficiency water heater. Building heating system will utilize two medium efficient boilers<br />

and distribution pumps to heating radiant panels in the various spaces. Controls will be<br />

direct digital type.<br />

5.4 ELECTRICAL<br />

<strong>The</strong> electrical service and distribution for this building will include a utility fed<br />

transformer supplying a 120/208 volt, 3 phase, 4 wire secondary power service to a main<br />

distribution centre located in the Electrical Room. Branch circuit panelboards will be<br />

used to feed downstream devices such as mechanical loads, fluorescent lighting and<br />

duplex receptacles. A motor control center fed via the main distribution panel will be<br />

used to supply power to required mechanical loads. Duplex receptacles will be provided<br />

throughout the building for convenience, and as required by the identified building<br />

equipment. Lighting will be fluorescent throughout including high bay T5 fluorescent<br />

fixtures in the main gymnasium with T8 fluorescent fixtures throughout the remaining<br />

support spaces. Lighting controls will include microphonic/IR occupancy sensors in the<br />

main gymnasium and washroom/change room areas and occupancy sensors in the <strong>of</strong>fice<br />

and common areas. <strong>The</strong> gymnasium will have three level lighting and the remaining<br />

<strong>of</strong>fice, change room and common areas will be two level lighting. <strong>The</strong> main gymnasium<br />

will also have daylight sensors incorporated to account for additional daylight through<br />

the proposed windows. Emergency and exit lighting will be supplied in accordance with<br />

the requirements <strong>of</strong> the Alberta Building Standards, with the use <strong>of</strong> battery power as<br />

backup.<br />

Telephone service and distribution will include a utility feed to the main Telephone/<br />

Data backboard in the Electrical Room, from which point an empty conduit system will<br />

be provided throughout the building to serve outlets in <strong>of</strong>fice areas and other areas as<br />

required. <strong>The</strong> fire alarm and smoke detection system will be a class A system with battery<br />

backup and will include a main panel at the front entrance with initiating and signaling<br />

devices as required based on the code. <strong>The</strong> building and gymnasium sound systems<br />

will be provided for as directed by the <strong>City</strong> <strong>of</strong> <strong>Spruce</strong> <strong>Grove</strong>. Electrical systems will be<br />

designed in this building in order to achieve a LEED Silver rating.<br />

19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!