<strong>ARC</strong> <strong>International</strong> Associates Inc.<br />

Architects Engineers Planners<br />

14 Sand Hill Road<br />

Sandy Hook, CT<br />

USA 06482-1624<br />

<strong>Airport</strong> <strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong> & <strong>Terminals</strong><br />

<strong>ARC</strong> <strong>International</strong> Associates Inc. - Douglas J. Tobin Architects Engineers Planners<br />

specialists in <strong>Airport</strong> Facility Project Development have been involved with over 40<br />

<strong>Airport</strong> <strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong> for <strong>Airport</strong> Passenger <strong>Terminals</strong>. We have<br />

performed the full scope of services required for the Master Planning, Design<br />

Development, Construction Documents and Construction Implementation Management<br />

of the <strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong> project works. The following provides an upper<br />

management outline of the project development process.<br />

<strong>ARC</strong> divides a <strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong> Project into the following Program<br />

Development categories:<br />

Part 1 - Master Planning, Concept Design, Numerical Analysis - Phase 1 Report<br />

Part 2 - <strong>Baggage</strong> <strong>Handling</strong> Design Development – CAD Concept Drawing Development<br />

Part 3 - Architectural Engineering Infrastructure Definitions for the <strong>Baggage</strong> <strong>Handling</strong><br />

<strong>Systems</strong><br />

Part 4 – <strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong> Engineering – CAD Specification Drawings<br />

Part 5 – <strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong> Specifications – Contract Documents<br />

Part 6 - Tender Evaluation, Contract Negotiation and Award<br />

Part 7 - Project Implementation Management<br />

Our expertise includes the following main components of <strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong><br />

Passenger Terminal development:<br />

! Project Program Development<br />

! Overall <strong>Baggage</strong> <strong>Handling</strong> System Site and Facility Master Planning<br />

! <strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong> Facility Planning, Cost & Numerical Analysis<br />

! <strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong> Design and Program Management<br />

! Structural, Mechanical, Electrical Engineering for the BHS<br />

! Fire Protection and Security <strong>Systems</strong> Engineering for the BHS<br />

! <strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong> Engineering Contract Documents<br />

! Security/Customs X-ray & Inspection <strong>Systems</strong> Design Development<br />

The following are some sample projects executed by <strong>ARC</strong>:<br />

Phone: 001-203-426-0146<br />

e-mail: arc-djt@att.net<br />

Fax: 001-203-426-3213 web: http://home.att.net/~arc-djt<br />

Page 1 of 5


<strong>ARC</strong> <strong>International</strong> Associates Inc.<br />

Sydney <strong>International</strong> <strong>Airport</strong><br />

Sydney, Australia<br />

<strong>Baggage</strong> <strong>Systems</strong> Consultant<br />

BHS Design Evaluation and<br />

Critique,<br />

BHS Numerical Analysis<br />

BHS Contract Review and<br />

Critique<br />

BHS Project Testing and<br />

Maintenance Program<br />

Project Value: $ 42,000,000<br />

Completion: 2002<br />

<strong>ARC</strong> was part of the overall<br />

Planning Program Management<br />

team with responsibilities for the<br />

review and critique of the <strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong> (BHS) design, functionality,<br />

performance, contract documents and specifications. We were specifically were<br />

retained to perform Contract Documents review with the objective of providing an<br />

overall BHS system analysis, with the development of debugging, testing and<br />

maintenance programs. As in any BHS project numerical analysis of the <strong>Airport</strong><br />

<strong>Baggage</strong> Projected flows and integration of these flows into comprehensive schematics<br />

are essential to baggage handling systems functionality; these processes were<br />

analyzed on <strong>ARC</strong> developed BHS processing software. The basic system design was<br />

specified to meet specific baggage handling rates and capacities, these rates were not<br />

being accomplished and the assistance <strong>ARC</strong> provided in debugging and testing of the<br />

baggage handling systems was invaluable in identifying solutions to improving system<br />

function, processing rates and overall system specification compliance. Programmable<br />

Logic Software review and critique identified specific problem areas within the BHS<br />

operations software that upon redesign provided improved system performance. <strong>ARC</strong><br />

also participated in the development and review of the maintenance manuals for the<br />

airport maintenance department. The critiques and debugging operations performed<br />

with the <strong>Airport</strong> Maintenance staff resulted in improved tilt-tray repair and debugging<br />

operations, parts stocking procedures and preventive maintenance scheduling<br />

programs.<br />

Sydney <strong>International</strong> <strong>Airport</strong>’s existing baggage handling system consists of standard<br />

check-in and transport of baggage conveyor belt system to the sortation systems.<br />

Terminal domestic baggage is sorted by a <strong>Baggage</strong> Belt - Pusher system to secondary<br />

baggage accumulation lines for the final manual sortation to aircraft gate loading<br />

positions. The <strong>International</strong> baggage is sorted by an upper and lower Tilt-Tray sortation<br />

system to secondary baggage accumulation flat plate conveyor loops.<br />

<strong>Baggage</strong> processing is one of the key components of any operational airport and today<br />

an essential part of overall airport security. The international baggage handling system<br />

had provisions for baggage x-ray screening that were implemented and provided hold<br />

baggage screening for any specified aircraft flight.<br />

Phone: 001-203-426-0146<br />

e-mail: arc-djt@worldnet.att.net<br />

Fax: 001-203-426-3213 web: http://home.att.net/~arc-djt<br />

Page 2 of 5


<strong>ARC</strong> <strong>International</strong> Associates Inc.<br />

San Francisco <strong>International</strong> <strong>Airport</strong><br />

<strong>International</strong> Terminal<br />

<strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong><br />

<strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong> Design<br />

Consultant<br />

BHS Numerical Analysis and <strong>Systems</strong><br />

Evaluation<br />

Control <strong>Systems</strong> Specifications and Design<br />

Consultant<br />

Project Value: $ 50,000,000<br />

Completion: 2000<br />

<strong>ARC</strong> was commissioned to develop and review the contract documents for the <strong>Baggage</strong><br />

<strong>Handling</strong> <strong>Systems</strong>, the addition of <strong>Baggage</strong> <strong>Handling</strong> X-Ray and Security <strong>Systems</strong> for<br />

100% Hold <strong>Baggage</strong> Screening, and Controls Specifications and PLC Computer Logic<br />

Designs. <strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong> review and critique included review of BHS<br />

system capacities and the execution of flow and rate numerical analysis of the overall<br />

BHS operation. <strong>ARC</strong> assisted Senior management in validating the BHS designs,<br />

specifications and planned operational requirements.<br />

New Athens <strong>International</strong> <strong>Airport</strong><br />

Spata, Greece<br />

<strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong> Consultant<br />

Team<br />

BHS System Design Evaluation Reports<br />

Numerical Analysis System Design<br />

Development<br />

Specification Critique and Tender Evaluation<br />

Automation and X-Ray Design Development<br />

Contract Document Development<br />

Project Value: $ 60,000,000<br />

Completion: 2000<br />

<strong>ARC</strong> was commissioned to develop and review the proposed contract documents for<br />

the <strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong>. Douglas J. Tobin was retained as the <strong>Baggage</strong><br />

<strong>Handling</strong> <strong>Systems</strong> expert to review and critique the <strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong><br />

Specifications and perform numerical analysis of the overall BHS operation and design<br />

reviews of the proposed <strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong>. Our reports documented<br />

expected system performance levels, and uncovered a number of critical planning<br />

design issues assisting in the overall terminal handling and operations troubleshooting.<br />

<strong>ARC</strong> was also responsible for the qualitative evaluation reports for the selection of the<br />

systems to be utilized for 100% hold baggage screening. Senior management<br />

presentation of these reviews of building and system integration of the proposed<br />

baggage screening X-ray systems received from Heimann <strong>Systems</strong>, Rapiscan Security<br />

Products, EG&G Astrophysics, Vivid Technologies and Radio Frequency tagging by<br />

Logan Fabricom allowed selection and contract award.<br />

Phone: 001-203-426-0146<br />

e-mail: arc-djt@worldnet.att.net<br />

Fax: 001-203-426-3213 web: http://home.att.net/~arc-djt<br />

Page 3 of 5


<strong>ARC</strong> <strong>International</strong> Associates Inc.<br />

New Seoul Korea Intl <strong>Airport</strong><br />

Incheon <strong>International</strong> <strong>Airport</strong><br />

JungGu, Incheon Korea<br />

<strong>Baggage</strong> <strong>Systems</strong> Consultant Team<br />

BHS Design Evaluation and Critique,<br />

BHS Value Engineering, Numerical Analysis<br />

Control <strong>Systems</strong> BHS Automation<br />

Electrical <strong>Systems</strong> Design Development<br />

Tneder Evaluation, Contract Negotiations,<br />

Project Mgm't<br />

Project Value: $ 130,000,000<br />

Completion: 2001<br />

<strong>ARC</strong> was part of the overall Planning Program Management team with responsibilities<br />

for the review and critique of the <strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong> design, functionality,<br />

performance, contract documents and specifications. As in any <strong>Baggage</strong> <strong>Handling</strong><br />

System project numerical analysis of the <strong>Airport</strong> <strong>Baggage</strong> Projected flows and<br />

integration of these flows into comprehensive schematics were part of our project<br />

responsibilities. Bids were received from qualified international contractors and<br />

responsibility for bid evaluation and comparison reports were part of <strong>ARC</strong>’s<br />

responsibilities. Aviation Board of Directors and Senior Management presentations of<br />

our recommendations and analysis were performed resulting in the selection of the best<br />

possible solution for the airport <strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong>. <strong>Systems</strong> designs<br />

incorporated the use of Tilt-Tray <strong>Baggage</strong> Sortation systems for main sort and transport<br />

of baggage and conventional <strong>Baggage</strong> Belt - Pusher systems for the secondary sort to<br />

aircraft gate loading positions.<br />

Greater Buffalo <strong>International</strong> <strong>Airport</strong><br />

DKI Engineering USA with <strong>ARC</strong> Associates<br />

Master Plan - <strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong><br />

<strong>Baggage</strong> <strong>Handling</strong> Schematic Design<br />

BHS Numerical Analysis<br />

<strong>Baggage</strong> <strong>Handling</strong> Design Development<br />

Buffalo, New York<br />

Project Value: $ 2,200,000<br />

Completion: 1995<br />

<strong>ARC</strong> was retained to work in the development<br />

of the Master Plan for the new terminal building at Greater Buffalo <strong>International</strong> <strong>Airport</strong>.<br />

Our project assignments were targeted at producing the overall <strong>Baggage</strong> <strong>Handling</strong><br />

<strong>Systems</strong> portion of the passenger terminal Master Plan. <strong>ARC</strong> performed the overall<br />

data acquisition, schematic design, concept development and analysis for the <strong>Baggage</strong><br />

<strong>Handling</strong> <strong>Systems</strong> Master Plan Report.<br />

Phone: 001-203-426-0146<br />

e-mail: arc-djt@worldnet.att.net<br />

Fax: 001-203-426-3213 web: http://home.att.net/~arc-djt<br />

Page 4 of 5


<strong>ARC</strong> <strong>International</strong> Associates Inc.<br />

Value Engineering (VE) Study for<br />

New York Port Authority<br />

<strong>International</strong> Arrivals<br />

Building Redevelopment (IAB)<br />

<strong>Baggage</strong> <strong>Systems</strong> Consultant Team<br />

Project Value: $ 29,500,000<br />

Project Completion: 1996<br />

Newark <strong>International</strong> <strong>Airport</strong><br />

Value Engineering study for the<br />

New York Port Authority<br />

New FIS Terminal<br />

Developed ten areas which PANY<br />

could save $ 600,000 on the<br />

<strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong>.<br />

Project Completion: 1994<br />

Please feel free to contact <strong>ARC</strong>:<br />

<strong>ARC</strong> <strong>International</strong> Associates Inc.<br />

Douglas J. Tobin P.E., R.A.<br />

Architects Engineers Planners<br />

14 Sand Hill Road<br />

Sandy Hook, CT 06482-1624<br />

203-426-0146<br />

203-426-3213 Fax.<br />

http://www.home.att.net/~arc-djt/<br />

E-mail : arc-djt@worldnet.att.net<br />

<strong>ARC</strong>-<strong>Baggage</strong> <strong>Handling</strong> <strong>Systems</strong>-100909.doc<br />

D:arc-base-web\<strong>ARC</strong>-Cargo-Documents<br />

Phone: 001-203-426-0146<br />

e-mail: arc-djt@worldnet.att.net<br />

Fax: 001-203-426-3213 web: http://home.att.net/~arc-djt<br />

Page 5 of 5