21.11.2014 Views

Gary Mabrey.mdi - Indiana Logistics

Gary Mabrey.mdi - Indiana Logistics

Gary Mabrey.mdi - Indiana Logistics

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

9-25-2007<br />

Honda Manufacturing of <strong>Indiana</strong>, LLC<br />

<strong>Gary</strong> <strong>Mabrey</strong><br />

Purchasing Manager


Honda Supply Chain Innovation<br />

Honda Overview<br />

Honda in North America<br />

Honda in <strong>Indiana</strong><br />

Honda N.A. <strong>Logistics</strong><br />

Transportation Management<br />

Routing<br />

Supplier Evaluation<br />

Supplier Requirements<br />

Supplier Strategy


Honda Supply Chain Innovation<br />

Honda Overview<br />

Honda in North America<br />

Honda in <strong>Indiana</strong><br />

Honda N.A. <strong>Logistics</strong><br />

Transportation Management<br />

Routing<br />

Supplier Evaluation<br />

Supplier Requirements<br />

Supplier Strategy


Honda of America (OH)<br />

North American Production<br />

Honda Canada<br />

Honda Power<br />

Equipment (NC)<br />

Honda South<br />

Carolina<br />

Honda Mfg.<br />

<strong>Indiana</strong><br />

Honda de Mexico<br />

Honda Mfg. Alabama<br />

In Construction<br />

Honda of Canada Mfg. Engine Plant<br />

Honda Manufacturing of <strong>Indiana</strong>, LLC<br />

Honda Aircraft Company, Inc.


U.S. Car & Light Truck Sales<br />

1,509,358<br />

1,349,847<br />

1,394,398<br />

1,462,472<br />

Import<br />

Domestic<br />

940,386<br />

1,009,600<br />

1,076,893<br />

1,158,860<br />

1,247,834<br />

1,207,639<br />

77%<br />

79%<br />

79%<br />

78%<br />

854,879<br />

843,928<br />

783,102 803,367<br />

768,985<br />

768,845 788,230 794,579<br />

738,306<br />

716,546<br />

693,515<br />

75% 75% 75%<br />

78% 76%<br />

552,389<br />

508,420<br />

401,072<br />

34%<br />

26% 26%<br />

43%<br />

49% 50% 54% 60% 62%<br />

58%<br />

62%<br />

68%<br />

82% 73%<br />

13 Consecutive<br />

Years of Growth<br />

in Sales<br />

13%<br />

1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006


Suppliers in North America<br />

Number of Suppliers<br />

•• 600+ OEM Suppliers<br />

supplying our our N.A. Mfg Mfg<br />

facilities ($18 Bil) Bil)<br />

•• 5,000 MRO Suppliers<br />

for for N.A. OEM<br />

Locations of Suppliers<br />

•United States:<br />

Suppliers located in in 34 34<br />

States<br />

•Canada: Suppliers<br />

located in in 2 Provinces<br />

Honda OEM Suppliers


Purchasing & <strong>Logistics</strong> Scope<br />

Supply Base<br />

Tier 3 Tier 2 Tier 1<br />

Manufacture Ship Sell Service<br />

Design<br />

Engineering<br />

MRO<br />

Mass Merchants<br />

& Warehouse<br />

Clubs<br />

Parts<br />

Distribution<br />

OEM Parts<br />

Manufacture<br />

Ship<br />

OEM’s<br />

Service<br />

Center<br />

OEM Parts<br />

OEM<br />

Equipment/<br />

Facilities<br />

Raw<br />

Materials<br />

Items Directly Assy to Product<br />

Raw Materials<br />

Indirect<br />

Materials<br />

Quality<br />

Inventory<br />

Management<br />

Purchasing’s Responsibility for Q,C,D,D<br />

Cost<br />

Production<br />

Support Items or<br />

Services<br />

MRO<br />

Delivery<br />

Machines &<br />

Equipment<br />

Retail<br />

Dealers<br />

Construction<br />

Development<br />

Financing<br />

Insurance


Honda Supply Chain Innovation<br />

Honda Overview<br />

Honda in North America<br />

Honda in <strong>Indiana</strong><br />

Honda N.A. <strong>Logistics</strong><br />

Transportation Management<br />

Routing<br />

Supplier Evaluation<br />

Supplier Requirements<br />

Supplier Strategy


Groundbreaking Mar 19th ‘07<br />

Key Facts Announce<br />

3/19<br />

Company Name: Honda Manufacturing of <strong>Indiana</strong>, LLC<br />

Model: Civic sedan<br />

Company President: Yuzo Uenohara<br />

•Investment: $550 million<br />

•Mass-Production: Fall ’08<br />

•Employment: 2000 associates<br />

•Capacity: 200,000 units/year<br />

Construction on Schedule<br />

HAM HMIN = ~165 miles


<strong>Indiana</strong> Site Selection<br />

AEP<br />

MAP,ELP<br />

Greensburg<br />

100 miles<br />

200 miles<br />

300 miles


Central Location to N.A. Supply Base<br />

Greensburg, IN<br />

Central Location to our North American Supplier Network


Greensburg Site Layout<br />

Honda<br />

~1700 Acres of Land


Greensburg Site Layout<br />

AHM<br />

CBU<br />

Lot<br />

Welcome Center<br />

&<br />

Assoc Parking<br />

Consolidation<br />

Center (On-site)<br />

New Bridge for<br />

Truck Traffic<br />

CC On-Site Impact to Suppliers<br />

Less Inventory in System<br />

Shorter re-action time if<br />

mis-shipment occurs<br />

Shipment confirmation<br />

must be precise as parts<br />

leave supplier dock<br />

Delivery Status &<br />

Communications must be<br />

improved<br />

Rail


Greensburg Site Layout<br />

N<br />

STAMPING<br />

PLASTIC<br />

INJEC.<br />

PA<br />

MIX<br />

PA<br />

STORAGE<br />

WWT<br />

FAC.<br />

MECH.<br />

CC<br />

MAT’L<br />

SER-<br />

VICE<br />

WELD<br />

PAINT<br />

MAT’L<br />

SER-<br />

VICE<br />

ASSEMBLY<br />

VQ<br />

ADMIN/<br />

CAFE<br />

AF SUB<br />

TRAINASSY<br />

WELCOME<br />

CENTER<br />

TANK<br />

FARM


Groundbreaking Mar ‘07


Greensburg Site Layout<br />

Honda Supply Chain Innovation<br />

Honda Overview<br />

Honda in North America<br />

Honda in <strong>Indiana</strong><br />

Honda N.A. <strong>Logistics</strong><br />

Transportation Management<br />

Routing<br />

Supplier Evaluation<br />

Supplier Requirements<br />

Supplier Strategy


Supply Chain Innovation<br />

Challenge:<br />

Remove Waste from the Entire Value Stream<br />

Supplier<br />

Receiving<br />

Mfg Process<br />

Shipping<br />

Customer<br />

How: Improve Manufacturing Characteristics<br />

Quality Cost Delivery<br />

Development<br />

Supplier<br />

Management<br />

Approach<br />

Genba: Go to the spot


Transportation Management Control<br />

Route Control & Vanning Innovation<br />

Q<br />

C<br />

D<br />

D<br />

M<br />

Load Configuration<br />

Supply Chain Modeling<br />

Verifying the engineered load layout to<br />

confirm trailer optimization.<br />

Mapping of the supply chain<br />

model<br />

Network Optimization<br />

Routing<br />

Optimizing network assets<br />

(Supplier warehousing and cross-dock locations)<br />

Defining best routing options inside the<br />

established network.


Transportation Management Control<br />

Traditional Route Control and Vanning Process<br />

Q<br />

C<br />

D<br />

D<br />

M<br />

Variables<br />

Honda Control Process<br />

Production<br />

Changes<br />

Emergency<br />

Order<br />

Supplier<br />

Prod’n Delay<br />

Automated Manual<br />

Vanning<br />

Calculation<br />

Route<br />

Correlation<br />

Waste<br />

Supplier<br />

Supplier Load Process<br />

Receive<br />

Data<br />

Layout<br />

Load<br />

<strong>Logistics</strong> Supplier Company<br />

Route Change<br />

Receive<br />

Data<br />

Setup<br />

Routes<br />

Load<br />

Trailer<br />

Waste<br />

Execute<br />

Routes<br />

Waste<br />

OPEN<br />

SPACE<br />

Problems<br />

• manual process<br />

• extra steps<br />

• open space<br />

• high cost<br />

• no flexibility<br />

Process Innovation Objectives<br />

• Optimize Load Configuration<br />

• Increase efficiency of the Transportation Network<br />

• Allow Supply Chain Modeling<br />

• Improve Routing Flexibility


Honda Supply Chain Innovation<br />

Honda Overview<br />

Honda in North America<br />

Honda in <strong>Indiana</strong><br />

Honda N.A. <strong>Logistics</strong><br />

Transportation Management<br />

Routing<br />

Supplier Evaluation<br />

Supplier Requirements<br />

Supplier Strategy


Supplier Relationships<br />

When Honda Starts a Business Relationship With a New Supplier, the<br />

First Step Is to Explain Our Short and Long Term Expectations for<br />

Them in the Following Areas:<br />

QUALITY<br />

COST<br />

DELIVERY<br />

DEVELOPMENT<br />

MANAGEMENT<br />

Through Mutual Efforts We Establish and Enhance<br />

Mutual Trust, - the Basis of Our Relationship.<br />

Self-Reliant World Class Supply Base


Sourcing Philosophy<br />

Honda Philosophy is the cornerstone of our<br />

Purchasing Philosophy<br />

Honda Philosophy<br />

Honda Company Principle<br />

Respect for the Individual:<br />

• Initiative<br />

• Equality<br />

•Trust<br />

The Three Joys:<br />

• The Joy of Buying<br />

• The Joy of Selling<br />

• The Joy of Creating<br />

“Maintaining a global viewpoint, we are dedicated to<br />

supplying products of the highest quality yet at a<br />

reasonable price for worldwide customer satisfaction.”<br />

Soichiro Honda<br />

1954(modified in 1998)<br />

PURCHASING MISSION<br />

Quality parts,<br />

On-time, Right Quantity,<br />

at a Globally Competitive Price.<br />

Relationship with Suppliers<br />

1.Open Door Policy<br />

2.Fair & Clear Business Relationship<br />

3.Mutual Trust<br />

=Respect to Supplier’s Business


Management Expectations<br />

MANAGEMENT<br />

Honda’s expectation of suppliers extends beyond the<br />

typical quality, cost, delivery and development areas to<br />

also include a focus on corporate citizenship.


Honda Supply Chain Innovation<br />

Honda Overview<br />

Honda in North America<br />

Honda in <strong>Indiana</strong><br />

Honda N.A. <strong>Logistics</strong><br />

Transportation Management<br />

Routing<br />

Supplier Evaluation<br />

Supplier Requirements<br />

Supplier Strategy


•Performance Expectations<br />

•Delivery: 98% On time arrival…within 30 minute tolerance of scheduled window time<br />

•Quality: No Carrier initiated damages<br />

•Cost: Continuously provide best cost with ongoing reduction opportunities<br />

•Transportation Management Expectations<br />

•Reporting: Timely reporting of established lane events with Honda’s 3PL<br />

•Billing: Manage billing process within Honda’s 3PL Freight Bill Audit function<br />

•Equipment Specifications<br />

Carrier Requirements<br />

Carrier Requirements<br />

General<br />

•53 Foot Trailers…unless otherwise requested for specific requirements<br />

•E-Track equipped for proper security of freight within trailer


Carrier Requirements<br />

Regulatory<br />

•Insurances:<br />

•Carrier insurance coverage adequate to meet Department of Transportation<br />

requirements for the region in which freight is being transported<br />

•Proof of insurance provided to Honda listing Honda as additional insured<br />

•Company & Driver Qualifications (Cross Border Transport):<br />

•Carrier must be C-TPAT (Customs Trade Partnership Against Terrorism) certified<br />

to be awarded a transportation lane which crosses a North America border<br />

•Driver FAST (Free And Secure Trade) certified in order to be qualified to execute<br />

a Honda cross North America border transport


Honda Supply Chain Innovation<br />

Honda Overview<br />

Honda in North America<br />

Honda in <strong>Indiana</strong><br />

Honda N.A. <strong>Logistics</strong><br />

Transportation Management<br />

Routing<br />

Supplier Evaluation<br />

Supplier Requirements<br />

Supplier Strategy


Carrier Business Strategy<br />

Utilization of Diverse Carriers<br />

‘Local Carriers’ used as often as possible<br />

Regionalized Carriers used when lane is<br />

out of “Local Carriers’” scope<br />

National Carriers used when lane is out<br />

of “Local Carriers’” and “Regional<br />

Carriers’” scope<br />

National<br />

28.0%<br />

Honda of America<br />

All lanes are subject to open bid and<br />

carriers are invited to competitively bid<br />

on all areas. Bids awarded based on<br />

competitiveness.<br />

Business Distribution:<br />

Local<br />

24.3%<br />

National<br />

19.8%<br />

Honda Manufacturing of Alabama<br />

Local<br />

15.5%<br />

Regional<br />

47.7%<br />

Regional<br />

64.6%<br />

Honda <strong>Indiana</strong> Main Opportunity Expand Local Carriers to improve route efficiency


How to Become a Honda Supplier<br />

www.hondasupplyteam.com<br />

Link<br />

Submit Company Information to:<br />

Packaging and Transportation:<br />

Mindi Munz<br />

International Parts Supply<br />

25000 Honda Parkway<br />

Marysville, OH 43040<br />

937-642-5000 ext. 62833<br />

Include Company Brochure:<br />

-Describe available services<br />

-Contact Information


Thank You

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!