o<br />

If the permit is subject to biosolids regulation, the attachment <strong>for</strong> Biosolids In<strong>for</strong>mation<br />

Sheet found at www.pca.state.mn.us/publications/<strong>for</strong>ms/wq-wwprm7-16.doc.<br />

• This LSTS <strong>Guidance</strong> Document, including attachments (completed as appropriate)<br />

• Ground-Water Mounding Calculations<br />

• Hydrogeologic report (if applicable)<br />

• Engineering report (complete system design including design of the septic tanks, pretreatment<br />

unit, if applicable, and the sewer system)<br />

• Plans & Specifications<br />

• A draft Operation & Maintenance Manual, including a Nitrate Mitigation Plan<br />

• Additional in<strong>for</strong>mation as appropriate<br />

Send completed permit application <strong>for</strong>ms, attachments and fee to:<br />

Minnesota Pollution Control Agency<br />

Attn: Beckie Olson, Permit Document Coordinator<br />

520 Lafayette Road N.<br />

Saint Paul, MN 55155-4194<br />

15. Permit requirements / construction requirements<br />

After receiving a permit from the <strong>MPCA</strong> there are many requirements that need to be followed. These<br />

requirements are found in the permit and in the plans and specification approval letter. Be sure to read<br />

both documents to ensure compliance. Remember no construction can begin until the permit is issued<br />

and plans and specifications are approved.<br />

The following submittals are required:<br />

• notice to proceed with construction 14 days after its execution<br />

• change orders as described in the plan and specification approval letter<br />

• <strong>for</strong> systems using synthetic liners<br />

1) The Permittee must notify the <strong>MPCA</strong> in writing at least 14 days be<strong>for</strong>e the scheduled<br />

placement of the liner. Sub-grade soils tests and compaction test results will be needed <strong>for</strong><br />

this pre-liner inspection.<br />

2) The Permittee must notify the <strong>MPCA</strong> in writing at least 14 days be<strong>for</strong>e the scheduled prefill<br />

of the lined treatment unit. The <strong>MPCA</strong> may then complete a pre-fill inspection. "Prefill"<br />

means that the Permittee has accepted the work necessary to begin the water balance<br />

test in accordance with <strong>MPCA</strong> Pre-fill and Water Balance Criteria.<br />

Included with the above letter, if not previously submitted to the <strong>MPCA</strong>, must be the<br />

following:<br />

a. The contractor and liner manufacturer’s certifications that the liner was installed per<br />

the plans and specifications.<br />

b. The contractor and liner manufacturer’s certifications that the cover material was<br />

placed per the plans and specifications.<br />

c. The liner manufacturer’s certification that the installation was in con<strong>for</strong>mance with<br />

all warranty provisions and that no provisions of the warranty have been voided.<br />

d. A copy of all liner test results on seam strength, strength of liner material, mil<br />

thickness, etc.<br />

e. A copy of the liner warranty.<br />

<strong>Design</strong> <strong>Guidance</strong> <strong>for</strong> <strong>Large</strong> <strong>Subsurface</strong><br />

Minnesota Pollution Control Agency<br />

<strong>Wastewater</strong> Treatment Systems April 2010<br />

29