2 STRATEGY strategy<br />

EFQM Excellence Award 2010 20<br />

Delivery of strategic priorities (StP) is measured using the associated<br />

CSF indicators aligned to key processes. These indicators are<br />

included in the Balanced Scorecard (BSC).<br />

Managing Risk<br />

In <strong>Olabide</strong>, SWOT analysis and strategic reflection exercises are<br />

used to understand and anticipate future scenarios and to manage<br />

strategic risk. For example, SP’s are updated on the basis of<br />

SWOT analysis, this technique was also used in 2008 to analyse<br />

the potential impact of a change to the school timetable, and as<br />

a result of SWOT analysis and MT reflection, a specific protocol<br />

has been drawn up to counteract the effects of heavy snowfall on<br />

the school transport service and class timetabling. A contingency<br />

protocol is also in place to minimise the risk of catching swine<br />

flu. With regard to financial risk, the only contingency we have<br />

against late payment of government subsidies is the availability<br />

of credit, though we very rarely use this. If government subsidies<br />

to the school were one day drastically reduced, the only options<br />

open to us would be to increase fees or to reduce the services we<br />

offer. Finally, on an academic level, the potential risk of not being<br />

able to deliver minimum pupil performance levels is addressed<br />

by deploying complementary resources such as support classes,<br />

splitting one class into two for more focused attention and customised<br />

help.<br />

Monitoring of the Strategy Plan<br />

The delivery of strategic priorities is monitored quarterly by the<br />

MT to prevent possible deviation from planned targets. To do so,<br />

the MT uses the BSC with its 54 indicators to measure delivery<br />

of the CSF listed in D1. An extract from this is shown in Fig.<br />

2c.4. Monthly monitoring provides us with sufficient time and<br />

space to bolster the activities required to deliver strategic priorities.<br />

At the end of the academic year, the MT closes the BP by<br />

analysing all relevant indicators to check whether targets have<br />

been delivered and proposing any corrective actions which may<br />

need to be taken.<br />

2005-06 2006-07 2007-08 2008-09<br />

Associated CSF indicators Actual Target Actual Target Actual Target Actual Target<br />

1.1. Overall degree of parent satisfaction<br />

with <strong>Olabide</strong> 7.40 7.60 7.40 7.65 7.50 7.70 7.53 7.70<br />

1.3. Degree of pupil satisfaction with the<br />

teaching in <strong>Olabide</strong> 6.96 6.70 6.84 6.75 7.03 6.80 7.22 7.12<br />

Fig. 2c.4: Extract from Balanced Scorecard<br />

Drawing up and budgeting of the Annual School Plan (ASP)<br />

At the beginning of the 3rd school term, the MT begins to plan<br />

the organisational needs of all stakeholders for the next academic<br />

year. Meetings are held to discuss and put forward proposals on<br />

operational needs, covering a wide range of areas such as staff,<br />

curricular programming, school calendar and timetabling for the<br />

different education stages, teacher timetabling, organisation of<br />

transport, canteen and child-minding services, sports and cultural<br />

activities, etc.<br />

The activities of the BP, which forms part of the ASP, are funded<br />

through the annual budget. For example, actions included in the<br />

BP to deliver the StP ‘Deeper focus on the EFQM Excellence<br />

Model’ required considerable funding, such as the services of an<br />

external consultancy and training for our people in the model.<br />

The actions required are first identified, an estimation of their<br />

cost is made and, if acceptable, the actions are included in the<br />

annual budget.<br />

Measurement, learning, refinement and improvement<br />

As explained above, delivery of the SP is measured through the<br />

different CSF indicators included in the BSC and presented in<br />

this document in the results criteria. Some of the most significant<br />

actions taken as a result of measurement and learning in this area<br />

of <strong>Olabide</strong> management include:<br />

YEAR<br />

2004-<br />

05<br />

2005-<br />

06<br />

REVIEW AND<br />

LEARNING<br />

Self- assessment<br />

Irizar EQA sub.<br />

doc.<br />

External<br />

assessment<br />

IMPROVEMENT ACTION<br />

Process system becomes an integral<br />

tool for strategic reflection, clarifying<br />

the contribution of each process to<br />

strategy.<br />

Use of matrix to improve identification<br />

of key processes.<br />

More detailed use of SWOT analysis<br />

to cover and balance <strong>Olabide</strong> needs<br />

and the needs of all stakeholders.<br />

Involvement of all <strong>Olabide</strong> people in<br />

providing input to for BP content.<br />

YEAR<br />

2006-<br />

07<br />

2007-<br />

08<br />

2008-<br />

09<br />

REVIEW AND<br />

LEARNING<br />

External<br />

assessment<br />

Self-assessment<br />

Reflection by<br />

MT<br />

Formulation of<br />

new Strategy<br />

Plan 2009-12<br />

IMPROVEMENT ACTION<br />

Explicit reference to social and<br />

environmental sustainability<br />

included in Mission and integrated<br />

into teaching syllabus and pupil<br />

values.<br />

Explicit identification of the need for<br />

the support of partners in delivering<br />

the Strategic Priorities of the BP<br />

Design of a new process to monitor<br />

former pupils, covering their<br />

integration into wider Society and<br />

their satisfaction with the values and<br />

general education received.<br />

Updating of basic documents,<br />

new Strategic Objectives derived<br />

from newly formulated Vision (see<br />

Qualification File, Dec. 2009) and<br />

drawing up of BP 2009-10.<br />

2d. Strategy and supporting policies are communicated,<br />

implemented and monitored<br />

Approach and deployment<br />

In <strong>Olabide</strong>, performance targets for the forthcoming academic<br />

year are proposed by each process owner and agreed to on a consensus<br />

basis between the process owners themselves and the QCT<br />

(comprised of the MT and the PS owners). These decisions are<br />

taken on the basis of results from previous years and, where available,<br />

comparative data on the performance of other schools.<br />

<strong>Olabide</strong> has defined a system for communicating and deploying<br />

our Strategy to those stakeholders we consider need to be informed.<br />

Given the importance of keeping stakeholders informed<br />

of the school’s strategy, we have developed a series of processes<br />

which define what needs to be communicated, to whom, how and<br />

when. Once approved, the content of the BP and other important

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!