25.11.2014 Views

Progress report summarizing the reef fish sampling, PCB - Earthjustice

Progress report summarizing the reef fish sampling, PCB - Earthjustice

Progress report summarizing the reef fish sampling, PCB - Earthjustice

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

insulation to be left on board accounted for 97.6% (705.5 lbs) of <strong>the</strong> 722.6 lbs of total<br />

solid <strong>PCB</strong>s estimated to remain on <strong>the</strong> ex-Oriskany after environmental<br />

remediation. Fiberglass bulkhead insulation was identified as contributing 6.8 lbs<br />

to <strong>the</strong> <strong>PCB</strong> load remaining on board (.94%). Although paints had unregulated levels<br />

of <strong>PCB</strong>s, <strong>the</strong> remaining paint contributed an estimated 9.8 lbs of total <strong>PCB</strong>s<br />

remaining on board (1.36%). Rubber products and vent gaskets remaining on board<br />

contributed 0.4 lbs and 0.1 lbs of <strong>PCB</strong>s, respectively.<br />

Based on Pape’s (2004) analysis, of an estimated 832.2 lbs of solid <strong>PCB</strong>s on board<br />

<strong>the</strong> ex-Oriskany prior to environmental remediation (1,559 lbs, at 95% Upper<br />

Confidence Limit), that amount was reduced by an estimated 13.2% to 722.6 lbs of<br />

solid <strong>PCB</strong>s (1,342 lbs at <strong>the</strong> 95% Upper Confidence Limit) at <strong>the</strong> time <strong>the</strong> ship was<br />

ready for <strong>reef</strong>ing. This was based on <strong>the</strong> scenario of 5% paint removal, 10% cable<br />

removal, 72.6% bulkhead insulation removal, no rubber or vent gasket product<br />

removal and 100% lubricant<br />

removal.<br />

Additional ex-Oriskany<br />

environmental remediation<br />

included removal of <strong>the</strong> entire<br />

aircraft carrier flight deck down<br />

to clean bare metal. This was<br />

necessary to remove asphalt and<br />

underlying <strong>PCB</strong> contaminated<br />

wood and o<strong>the</strong>r materials (Jon<br />

Dodrill and Robert Turpin,<br />

personal observation).<br />

I(C) (7) Navy Sponsored Pre-Sink<br />

Monitoring<br />

Immediately prior to <strong>the</strong> <strong>reef</strong>ing<br />

of <strong>the</strong> ex-Oriskany, <strong>the</strong> Navy<br />

contracted with <strong>the</strong> University<br />

of West Florida to conduct<br />

trawling and hook-and-line<br />

<strong>sampling</strong> for <strong>fish</strong> to obtain presink<br />

baseline <strong>PCB</strong> data.<br />

Specimens for <strong>PCB</strong> analysis along with water and<br />

sediment samples were collected for <strong>PCB</strong> analysis from <strong>the</strong> immediate area of <strong>the</strong><br />

proposed sink site as well as several artificial <strong>reef</strong>s in <strong>the</strong> general area and some<br />

locations fur<strong>the</strong>r inshore (Figure 2) (Snyder et al., 2007).<br />

20 | P age<br />

Figure 2. Oriskany Reef Pre-sink trawl and hook<br />

and line <strong>sampling</strong> sites (from Snyder et al., 2007).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!