27.11.2014 Views

Transient Voltage Surge Suppression

Transient Voltage Surge Suppression

Transient Voltage Surge Suppression

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Physical & electrical location.<br />

Location, Location, Location.<br />

It’s a familiar line but very true.<br />

Getting the location of an SPD<br />

right is paramount to success.<br />

It should be located as close<br />

as possible to Main Switch or<br />

metering point – within Main<br />

SWB if possible. The earthing<br />

point for the SPD (for Main<br />

SWBs) must be located within<br />

a short distance. The main<br />

earthing point is where you<br />

want the excess energy to end<br />

up being safely dissipated.<br />

Safety disconnectors.<br />

It is preferred to use HRC<br />

Gg/Gl fuses, not CBs. HRC<br />

fuses perform better than<br />

CB’s which are not designed<br />

for surge waveforms and fast<br />

rising transients. For medium<br />

& high-current services<br />

<br />

fuse as recommended by the<br />

manufacturer. For low-current<br />

services (

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!