<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

Society of American Military Engineers Brief<br />

Proposed FY11 Work<br />

9 September 2010<br />

MAJ David Kaulfers, P.E.<br />

Assistant to the Chief, Programs<br />

and Project Management Division<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

(415) 503-6943<br />

David.A.Kaulfers@usace.army.mil<br />

U.S. Army Corps of Engineers<br />

BUILDING STRONG ®<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong>


Agenda<br />

• <strong>District</strong> Area of Responsibility<br />

• Core Work<br />

• Program Funding<br />

• Contracting Overview<br />

• Dredging Operations<br />

• Expected Awards Dredging<br />

• Expected Awards A/E Contracts<br />

• Expected Awards Construction<br />

• Points of Contact<br />

• Questions<br />

U.S. Army Corps of Engineers<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

BUILDING STRONG ®<br />

As of 6-Sep-10 2


<strong>District</strong> Area of Responsibility<br />

OREGON<br />

SPN MILCON requirements<br />

covered by:<br />

CALIFORNIA<br />

<strong>Sacramento</strong> <strong>District</strong><br />

Los Angeles <strong>District</strong><br />

18 Congressional <strong>District</strong>s<br />

902 Miles of Coastline<br />

Bay Area is Center of Gravity<br />

U.S. Army Corps of Engineers<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

BUILDING STRONG ®<br />

As of 6-Sep-10 3


Core Work<br />

• Dredging<br />

►<br />

Over 15 Projects<br />

• Regulatory<br />

►<br />

Permit Approval, Wetlands Delineations, Wetlands<br />

Bank Credits, Enforcement Actions<br />

• Dam and Recreation Operations<br />

►<br />

2 parks and <strong>San</strong> <strong>Francisco</strong> Bay Model<br />

• Debris Removal in <strong>San</strong> <strong>Francisco</strong> Bay<br />

►<br />

12,000 tons/year<br />

• Vertical Construction<br />

►<br />

►<br />

Veterans Affairs<br />

<strong>San</strong> Ramon Valley Recycled Water Pipeline<br />

• Emergency Management<br />

►<br />

Emergency Operations Office in Sausalito<br />

U.S. Army Corps of Engineers<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

BUILDING STRONG ®<br />

As of 6-Sep-10 4


Program Funding<br />

(million)<br />

Approp. FY07 FY08 FY09 FY 10<br />

FY11<br />

(Est.)**<br />

$300<br />

GI $5.7 $2.3 $5.0 $4.5 $4.0<br />

$250<br />

CG $66.3 $62.2 $47.8 $25.3 $48.8<br />

O&M $47.6 $58.8 $51.5 $56.1 ≈ $45.9<br />

FCCE $0.7 $0.6 $0.7 $0.5 $0.6<br />

Reg $3.7 $4.0 $4.1 $4.2 $4.0<br />

VA* $1.2 $11.0 $23.4 $46.9<br />

$200<br />

$150<br />

$100<br />

ARRA<br />

Const Mgmt<br />

VA<br />

Reg<br />

FCCE<br />

O&M<br />

CG<br />

GI<br />

Const<br />

Mgmt<br />

$4.0 $6.0 $41.3 $93.1 $0<br />

$50<br />

ARRA $78.2 $0.1 $0<br />

Total $128.0 $135.1 $239.6 $207.3 $150.2<br />

$0<br />

FY07 FY08 FY09 FY10 FY11<br />

* SPN oversees the program for Veterans Affairs’ Sierra Pacific Network area which<br />

includes SPK and POH. Total program (FY08-FY11)= $82.4M.<br />

** FY11 values are based on the President’s Budget or an estimate of historical data.<br />

U.S. Army Corps of Engineers<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

BUILDING STRONG ®<br />

As of 6-Sep-10 5


Contracting Overview<br />

Small Business<br />

Category<br />

FY09<br />

FY10 (as of 1 APR)<br />

Amount % Amount %<br />

Goal<br />

Total SPN Awards $96,377,146 $3,839,615<br />

Small Business $19,296,957 20.0% $2,894,184 86% 33%<br />

Women Owned SB $3,570,845 3.7% $377,496 57% 5.8%<br />

Small Disadvantaged Business $12,377,749 12.8% $1,862,044 47% 18%<br />

HUB Zone $5,138,937 5.3% $241,105 1.8% 10%<br />

Service Disabled Veterans $1,375,771 1.4% $729,738 7% 3%<br />

8(A) $8,742,392 9.1% $725,231 37% N/A<br />

Legend<br />

Exceeding USACE Goal<br />

< 5% below USACE Goal<br />

> 5% below USACE Goal<br />

U.S. Army Corps of Engineers<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

BUILDING STRONG ®<br />

As of 6-Sep-10 6


Dredging Operations<br />

U.S. Army Corps of Engineers<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

BUILDING STRONG ®<br />

As of 6-Sep-10 7


Expected Awards<br />

Dredging (O&M)- FY 11<br />

Project Range** Planned Award**<br />

Humboldt Harbor $4-7M 3 rd Qtr FY11<br />

Oakland $6-11M 3 rd Qtr FY11<br />

Redwood City $4-7M 3 rd Qtr FY11<br />

Richmond Harbor $7-10M 3 rd Qtr FY11<br />

<strong>San</strong> Pablo Bay (Pinole) $2-4M 3 rd Qtr FY11<br />

Suisan Bay $2-4M 3 rd Qtr FY11<br />

** Pending funding allocations<br />

U.S. Army Corps of Engineers<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

BUILDING STRONG ®<br />

As of 6-Sep-10 8


Expected Awards<br />

A/E Contracts – FY11<br />

Small Business<br />

Quantity<br />

Planning*<br />

IDIQ – Indefinite Delivery Indefinite Quantity (5yrs)<br />

Small Business<br />

Amount<br />

Other than Small<br />

Business Quantity<br />

Other than<br />

Small Business<br />

Total Amount<br />

1 each $10 Million 2 each $20 Million<br />

Civil Work Planning: Ecosystem restoration, flood damage<br />

reduction, navigation, watershed planning, infrastructure<br />

planning.<br />

Environmental Planning: Plan formulation, environmental<br />

planning such as feasibility studies, environmental impact<br />

statements/reports and environmental assessments.<br />

*<br />

Currently being negotiated<br />

U.S. Army Corps of Engineers<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

BUILDING STRONG ®<br />

As of 6-Sep-10 9


Expected Awards<br />

A/E Contracts – FY 11<br />

Small Business<br />

Quantity<br />

Geotechnical<br />

IDIQ – Indefinite Delivery Indefinite Quantity (5yrs)<br />

Small Business<br />

Amount<br />

Other than Small<br />

Business Quantity<br />

Other than<br />

Small Business<br />

Total Amount<br />

1 each $10 Million 1 each $10 Million<br />

Services: Geotechnical engineering design and/or subsurface<br />

soil-investigation, sampling, laboratory testing of soil<br />

characterization, and disposal of all drill cuttings, fluids and<br />

waste.<br />

Services are required for: Design of embankments and<br />

engineered slopes, retaining structure, shallow foundation, slope<br />

protection, geosynthetics, soil stabilization, and site drainage.<br />

U.S. Army Corps of Engineers<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

BUILDING STRONG ®<br />

As of 6-Sep-10 10


Small Business<br />

Quantity<br />

Expected Awards<br />

A/E Contracts - FY 11<br />

Hydrologic & Hydraulic<br />

IDIQ – Indefinite Delivery Indefinite Quantity (5yrs)<br />

Small Business<br />

Amount<br />

Other than Small<br />

Business Quantity<br />

Other than<br />

Small Business<br />

Total Amount<br />

1 each $10 Million 1 each $10 Million<br />

Services: Costal, hydrologic and hydraulic studies, geomorphic<br />

analysis, sediment engineering, flood plain analysis and<br />

hydraulic design.<br />

Services are required for: Flood risk mitigation, creek restoration,<br />

channel widening for navigation projects, sediment<br />

transportation studies, dredging, flood damage investigation and<br />

inspection and storm damage reduction.<br />

U.S. Army Corps of Engineers<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

BUILDING STRONG ®<br />

As of 6-Sep-10 11


Expected Awards<br />

Construction - FY 11<br />

Project Project Description Range Planned<br />

Award<br />

Napa River<br />

Salt Marsh<br />

restoration<br />

Restore 3 ponds to managed wetland<br />

Purpose: To provide wetland habitat for estuarine fish,<br />

endangered species and migratory fowl.<br />

Effects: The restoration will stop and reverse<br />

degradation of fish and wildlife loss of the historic<br />

Napa Salt Marsh<br />

$10-$12M<br />

4 th Qtr<br />

U.S. Army Corps of Engineers<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

BUILDING STRONG ®<br />

As of 6-Sep-10 12


Expected Awards<br />

Construction - FY 11<br />

Project Project Description Range Planned<br />

Award<br />

Sac River<br />

Deep<br />

Water Ship<br />

Channel<br />

Reevaluation study of <strong>Sacramento</strong> River Ship Channel<br />

Purpose: Determine if deepening from -30 feet to -35<br />

feet is economically and environmentally justified.<br />

Effects: Improve economic efficiency of waterborne<br />

commerce and navigation safety to the Port of West<br />

<strong>Sacramento</strong><br />

$15-$17M<br />

4 th Qtr<br />

U.S. Army Corps of Engineers<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

BUILDING STRONG ®<br />

As of 6-Sep-10 13


Expected Awards<br />

Construction - FY 11<br />

Project Project Description Range Planned<br />

Award<br />

<strong>San</strong><br />

<strong>Francisco</strong><br />

– Pier 35<br />

Maint and<br />

Repair<br />

Repair Pier 35 in <strong>San</strong> <strong>Francisco</strong><br />

Purpose: Repair Pier 35 in support of the Cruise Ship<br />

Terminal.<br />

Effects: Meets 30 year maintenance goal.<br />

$6-7M<br />

4 th Qtr<br />

U.S. Army Corps of Engineers<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

BUILDING STRONG ®<br />

As of 6-Sep-10 14


Expected Awards<br />

Construction - FY 11<br />

Project Project Description Range Planned<br />

Award<br />

<strong>San</strong><br />

<strong>Francisco</strong><br />

– Pier 36<br />

Removal<br />

Remove Pier 36 in <strong>San</strong> <strong>Francisco</strong><br />

Purpose: Remove Pier 36 in support of the Brannan<br />

Street Wharf Project.<br />

Effects: Provide site for future development<br />

$7-8M<br />

4 th Qtr<br />

U.S. Army Corps of Engineers<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

BUILDING STRONG ®<br />

As of 6-Sep-10 15


Expected Awards<br />

Construction - FY 11<br />

Project Project Description Range Planned<br />

Award<br />

Veterans<br />

Affairs<br />

<strong>San</strong><br />

<strong>Francisco</strong><br />

Med Ctr –<br />

Electrical<br />

Upgrades<br />

Upgrade campus-wide electrical service<br />

Purpose: To provide standard power supply<br />

Effects: More reliable power to the VA Med Center<br />

$23-25M<br />

1 st Qtr<br />

U.S. Army Corps of Engineers<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

BUILDING STRONG ®<br />

As of 6-Sep-10 16


Expected Awards<br />

Construction - FY 11<br />

Project Project Description Range Planned<br />

Award<br />

Veterans<br />

Affairs<br />

Menlo Park<br />

Gero-<br />

Psych<br />

Treatment<br />

Facility<br />

Construct Geriatric-Psychiatric Treatment Center<br />

Purpose: Construct single story 12,000 GSF clinical<br />

bldg in direct support of newly built 120-bed Gero-<br />

Psych Inpatient Facility<br />

Effects: Dental, Exam, Audio, Radiology, and OT/PT<br />

facilities<br />

$6-7M<br />

2 nd Qtr<br />

U.S. Army Corps of Engineers<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

BUILDING STRONG ®<br />

As of 6-Sep-10 17


Expected Awards<br />

Construction - FY 11<br />

Project Project Description Range Planned<br />

Award<br />

Veterans<br />

Affairs<br />

<strong>San</strong><br />

<strong>Francisco</strong><br />

Med Ctr –<br />

bldgs 9,10,<br />

13 &22<br />

Seismic Upgrade to buildings 9, 10 & 13 and new<br />

building 22<br />

Purpose: 1 new building & retrofit 3 buildings<br />

Effects: Earthquake-ready facilities & more hotel<br />

rooms<br />

$6-7M<br />

2 nd Qtr<br />

U.S. Army Corps of Engineers<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

BUILDING STRONG ®<br />

As of 6-Sep-10 18


Expected Awards<br />

Construction - FY 11<br />

Project Project Description Range Planned<br />

Award<br />

Veterans<br />

Affairs<br />

<strong>San</strong><br />

<strong>Francisco</strong><br />

Med Ctr –<br />

bldgs 5&7<br />

Seismic Upgrade Bldgs 5 & 7<br />

Purpose: Seismic retrofit and various improvements<br />

to 2 buildings<br />

Effects: Earthquake-ready facilities<br />

$6-8M<br />

2 nd Qtr<br />

U.S. Army Corps of Engineers<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

BUILDING STRONG ®<br />

As of 6-Sep-10 19


Expected Awards<br />

Construction - FY 11<br />

Project Project Description Range Planned<br />

Award<br />

Veterans<br />

Affairs<br />

Sausalito<br />

Center<br />

Demolish 40k square foot warehouse and replace with<br />

20k square foot facility<br />

Purpose: Provide seismically stable facility<br />

Effects: Provide office space for researchers<br />

$5-6M 3 rd Qtr<br />

Bay Model<br />

U.S. Army Corps of Engineers<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

BUILDING STRONG ®<br />

As of 6-Sep-10 20


Points of Contact<br />

• Ms. Linda Hales, Chief of Contracting<br />

Linda.F.Hales@usace.army.mil<br />

(415) 503-6990<br />

• Mr. Rick Vredenburg, Small Business Office<br />

Rick.F.Vredenburg@usace.army.mil<br />

(415) 503-6986<br />

• Mr. Joe Viola, A/E Contracting<br />

Joseph.J.Viola@usace.army.mil<br />

(415) 503-6883<br />

• Mr. Arijs Rakstins, Chief of Programs and<br />

Project Management<br />

Arijs.A.Rakstins@usace.army.mil<br />

(415) 503-6720<br />

U.S. Army Corps of Engineers<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

BUILDING STRONG ®<br />

As of 6-Sep-10 21


Questions ?<br />

U.S. Army Corps of Engineers<br />

<strong>San</strong> <strong>Francisco</strong> <strong>District</strong><br />

BUILDING STRONG ®<br />

As of 6-Sep-10 22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!