Step 12. Turn on Power and Check for Fore pressure__________________________________________<br />

Step 12. Turn on Power and Check for Fore<br />

pressure<br />

Turn on the GCQ main power breaker and check the fore pressure. Fix<br />

any leaks.<br />

Step 13. Attach Side and Top Panels<br />

When a good vacuum is obtained, put the side and top panels on. Press the service<br />

switch to Normal and place the top cover on the instrument. Reconfigure GCQ data<br />

system to reflect an installed turbo. This shortens the vent cycle.<br />

Step 14. Dispose of Old Diffusion <strong>Pump</strong><br />

Components<br />

Properly dispose of the old diffusion pump vacuum components. Follow disposal and<br />

safety practices according to local requirements. Do not return parts to the factory.<br />

The parts are not exchangeable.<br />

Note:<br />

<strong>Pump</strong>-down times are typically longer during the first few days with a new pump.<br />

After a few days at full vacuum, the time to pump-down shortens.<br />