Responding to Wal-Mart's RFID Mandate - ARC Advisory Group
Responding to Wal-Mart's RFID Mandate - ARC Advisory Group
Responding to Wal-Mart's RFID Mandate - ARC Advisory Group
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>ARC</strong> Strategies • December 2003<br />
process, will supply the replenishment data used <strong>to</strong> drive the allocation<br />
process. These processes may need <strong>to</strong> be adjusted. Replenishment order<br />
data will now need <strong>to</strong> be fed <strong>to</strong> the fac<strong>to</strong>ry’s Production<br />
Management system.<br />
• A key drawback <strong>to</strong> doing this in the fac<strong>to</strong>ry is that the <strong>RFID</strong> tagged<br />
cases will need <strong>to</strong> be segregated and handled differently from the other<br />
cases. This is a fundamentally different process in many fac<strong>to</strong>ries.<br />
• A key benefit, if tags are applied at the fac<strong>to</strong>ry, receiving and shipping<br />
processes can be au<strong>to</strong>mated in the DCs.<br />
Developing a Budget for <strong>RFID</strong> Pilots<br />
Conducting <strong>RFID</strong> pilots requires an investment in people, hardware, software,<br />
and consulting services. This section provides some “rules of thumb”<br />
for costing these fac<strong>to</strong>rs. A basic pilot test at a distribution center (one facility,<br />
one gateway with three readers, and several thousand tags) will likely<br />
cost in the neighborhood of $500,000 (not including internal employee costs<br />
devoted <strong>to</strong> this project). A pilot test at a fac<strong>to</strong>ry can be twice as expensive,<br />
considering the high cost of sortation systems.<br />
100%<br />
80%<br />
60%<br />
40%<br />
20%<br />
0%<br />
5%<br />
70%<br />
15%<br />
10%<br />
Training<br />
Consulting<br />
Software<br />
Hardware<br />
Avg. Pilot Costs<br />
$500K for<br />
DC Pilot<br />
$1M for<br />
Fac<strong>to</strong>ry Pilot<br />
Consulting Services Is Biggest Contribu<strong>to</strong>r <strong>to</strong> Cost<br />
Copyright © <strong>ARC</strong> <strong>Advisory</strong> <strong>Group</strong> • <strong>ARC</strong>web.com • 11