29.11.2014 Views

Responding to Wal-Mart's RFID Mandate - ARC Advisory Group

Responding to Wal-Mart's RFID Mandate - ARC Advisory Group

Responding to Wal-Mart's RFID Mandate - ARC Advisory Group

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>ARC</strong> Strategies • December 2003<br />

process, will supply the replenishment data used <strong>to</strong> drive the allocation<br />

process. These processes may need <strong>to</strong> be adjusted. Replenishment order<br />

data will now need <strong>to</strong> be fed <strong>to</strong> the fac<strong>to</strong>ry’s Production<br />

Management system.<br />

• A key drawback <strong>to</strong> doing this in the fac<strong>to</strong>ry is that the <strong>RFID</strong> tagged<br />

cases will need <strong>to</strong> be segregated and handled differently from the other<br />

cases. This is a fundamentally different process in many fac<strong>to</strong>ries.<br />

• A key benefit, if tags are applied at the fac<strong>to</strong>ry, receiving and shipping<br />

processes can be au<strong>to</strong>mated in the DCs.<br />

Developing a Budget for <strong>RFID</strong> Pilots<br />

Conducting <strong>RFID</strong> pilots requires an investment in people, hardware, software,<br />

and consulting services. This section provides some “rules of thumb”<br />

for costing these fac<strong>to</strong>rs. A basic pilot test at a distribution center (one facility,<br />

one gateway with three readers, and several thousand tags) will likely<br />

cost in the neighborhood of $500,000 (not including internal employee costs<br />

devoted <strong>to</strong> this project). A pilot test at a fac<strong>to</strong>ry can be twice as expensive,<br />

considering the high cost of sortation systems.<br />

100%<br />

80%<br />

60%<br />

40%<br />

20%<br />

0%<br />

5%<br />

70%<br />

15%<br />

10%<br />

Training<br />

Consulting<br />

Software<br />

Hardware<br />

Avg. Pilot Costs<br />

$500K for<br />

DC Pilot<br />

$1M for<br />

Fac<strong>to</strong>ry Pilot<br />

Consulting Services Is Biggest Contribu<strong>to</strong>r <strong>to</strong> Cost<br />

Copyright © <strong>ARC</strong> <strong>Advisory</strong> <strong>Group</strong> • <strong>ARC</strong>web.com • 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!