3.0 Scope <strong>of</strong> Work<br />
The ‘LTPR Assessment <strong>of</strong> <strong>Agricultural</strong> <strong>Enterprise</strong>s’ team will undertake the following tasks:<br />
• Conduct preparatory work involving: i) Consultation with <strong>USAID</strong>/<strong>Kenya</strong>, the ‘LTPR <strong>and</strong><br />
Conservation <strong>Enterprise</strong>s’ team <strong>and</strong> the locally-procured logistical coordinator (the East Africa<br />
Wildlife Society-EAWLS) to finalize logistics for field visits, including arrangements for all necessary<br />
meetings <strong>and</strong> interviews; ii) Review literature relevant to the case studies, including documents<br />
provided by <strong>USAID</strong>/<strong>Kenya</strong> <strong>and</strong> also sourced independently; iii) Finalize roles <strong>and</strong> responsibilities<br />
within the team, a methodology for conducting the field assessments, <strong>and</strong> procedures for<br />
communicating with the ‘LTPR Assessment <strong>of</strong> Conservation <strong>Enterprise</strong>’ team, <strong>USAID</strong>/Washington<br />
<strong>and</strong> <strong>USAID</strong>/<strong>Kenya</strong> as needed;<br />
• Travel to specific agricultural enterprise sites within <strong>Kenya</strong> as identified by <strong>USAID</strong>/<strong>Kenya</strong> <strong>and</strong> assist<br />
in conducting an assessment <strong>of</strong> the specific cases based on an agreed upon methodology guided by<br />
the issues noted in Component 1, above;<br />
• Develop an analytical framework for the findings <strong>and</strong> ‘lessons’ <strong>of</strong> Component 1, as related to<br />
property rights negotiation, establishment, governance, <strong>and</strong> transaction <strong>and</strong> the impacts on investors,<br />
managers, communities, benefit sharing <strong>and</strong> equity, l<strong>and</strong> <strong>and</strong> resource use. Work closely with the<br />
‘LTPR Assessment <strong>of</strong> Conservation <strong>Enterprise</strong>’ team <strong>and</strong> the ‘Desk Study <strong>and</strong> Programming<br />
Roundtable’ team in these efforts;<br />
• Inform the l<strong>and</strong> policy review, <strong>and</strong> identify important legal <strong>and</strong> policy changes that are needed to<br />
support the success <strong>of</strong> the agricultural enterprises;<br />
• Work with the ‘LTPR Assessment <strong>of</strong> Conservation <strong>Enterprise</strong>’ <strong>and</strong> the ‘Desk Study <strong>and</strong><br />
Programming Roundtable’ teams to develop a preliminary set <strong>of</strong> lessons learned that can be used to<br />
contribute to a <strong>USAID</strong>/<strong>Kenya</strong>-hosted workshop noted in Component 3, above;<br />
• Work with the ‘LTPR Assessment <strong>of</strong> Conservation <strong>Enterprise</strong>’ <strong>and</strong> the ‘Desk Study <strong>and</strong><br />
Programming Roundtable’ teams to present lessons learned at the <strong>USAID</strong>/<strong>Kenya</strong>-sponsored<br />
workshop; <strong>and</strong><br />
• Finalize a report based on comments received from <strong>USAID</strong>/<strong>Kenya</strong>, <strong>USAID</strong>/Washington <strong>and</strong><br />
participants in workshop. The report may be finalized upon return to the US.<br />
5.0 Deliverables<br />
1. A final report (not more than single spaced 30 pages) including an executive summary, introduction<br />
<strong>and</strong> background for the overall evaluation, detailed findings, conclusions, <strong>and</strong> recommendations. The<br />
report will incorporate comments from <strong>USAID</strong>/Washington <strong>and</strong> <strong>USAID</strong>/<strong>Kenya</strong>.<br />
2. Presentation <strong>and</strong> participation at the <strong>Kenya</strong> lessons learned workshop.<br />
The ‘overall project team leader’ will submit electronic copies <strong>of</strong> final report to <strong>USAID</strong>/Washington <strong>and</strong><br />
<strong>USAID</strong>/<strong>Kenya</strong>. A final report will be submitted no later than April 30, 2008.<br />
6.0 Schedule<br />
This assignment will begin with preparatory work in the US on or about 1 March 2008 with arrival in Nairobi<br />
o/a 3 March 2008 <strong>and</strong> end o/a 30 March 2008. The consultants will work six-day work weeks.<br />
7.0 Costs<br />
The costs for this component <strong>of</strong> the assessment are subject to the cost-plus-fixed fee rates applicable to the<br />
<strong>USAID</strong> PLACE IQC <strong>and</strong> the PRRG Task Order.<br />