In<strong>for</strong>mation meeting:<br />

<strong>Call</strong> <strong>for</strong> <strong>Proposals</strong> <strong>for</strong> <strong>Rogowski</strong> <strong>Coils</strong><br />

22/February/2012<br />

Barcelona


1. <strong>Call</strong> <strong>for</strong> <strong>Proposals</strong> – <strong>Rogowski</strong> <strong>Coils</strong><br />

F4E is preparing the launch of a <strong>Call</strong> <strong>for</strong> <strong>Proposals</strong> <strong>for</strong> <strong>Rogowski</strong> <strong>Coils</strong><br />

(RC) by end of quarter 1, 2012<br />

Scope:<br />

•From functional specifications, develop final designs of the RC up to a<br />

level where Build-To-Print (BTP) drawings can be produced and<br />

support BTP drawing production.<br />

•R&D/Design activities to include: Interface definition, Testing<br />

definition and execution, Production of the Design Description (DDD),<br />

Per<strong>for</strong>mance characteristics etc.<br />

Budget range:<br />

•Total estimated cost: 750.000 € -1.000.000 €<br />

•Estimated F4E contribution (40%): 300.000 € - 400.000 €


2. <strong>Rogowski</strong> <strong>Coils</strong> at ITER<br />

Primary Aim:<br />

•Measure the current flow through the blanket and<br />

divertor modules into the vacuum vessel<br />

•In<strong>for</strong>mation will be used to determine halo currents in the<br />

vacuum vessel via reconstruction procedure (not in<br />

scope)<br />

Location:<br />

•Around the blanket earth straps (Blanket RC)<br />

•Around divertor cassettes (Divertor RC)


3. Particular challenges <strong>for</strong> RC at ITER<br />

ITER stringent requirements:<br />

•Thermal survival range: 300 K – 625 K<br />

•Outgassing leaks<br />

•Exposure to large neutron fluxes<br />

•Potentially severe electro-magnetic loads from disruption<br />

events<br />

•No Remote-Handling <strong>for</strong>eseen -> High reliability<br />

Particular challenges <strong>for</strong> the RC:<br />

•Small dimensions, but high sensitivity<br />

•Tight bending radii<br />

•Large stray fields during disruptions


4. Management activities<br />

This grant involves not only technical work, but as well<br />

managerial activities as the Supplier shall:<br />

•Produce and manage the Project Schedule<br />

•Produce a Risk Plan and manage the Risk<br />

•Manage the resources, progress reporting, manage<br />

deviations etc.<br />

5. Indicative schedule<br />

<strong>Call</strong> <strong>for</strong> proposals launched: 1Q2012<br />

Kick-Off meeting / Start of the grant: 3Q2012<br />

Grant duration: Around 30 months from grant signature /<br />

dictated by ITER assembly schedule


If you want more in<strong>for</strong>mation or are<br />

interested in this <strong>Call</strong> <strong>for</strong> <strong>Proposals</strong>...<br />

Please join our in<strong>for</strong>mation meeting:<br />

22 th February 2012, Tuesday<br />

From 14:30 to 17:00<br />

F4E premises at Barcelona, Spain

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!