PH/CERN Structure beyond 2008 - Physics Department
PH/CERN Structure beyond 2008 - Physics Department
PH/CERN Structure beyond 2008 - Physics Department
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
• General <strong>CERN</strong> <strong>Structure</strong><br />
• Tour of the departments and DG services<br />
• Projects<br />
• More thoughts about <strong>PH</strong><br />
25/11/08<br />
Ph.B Senior Staff meeting
The new <strong>CERN</strong> structure<br />
Disclaimer<br />
– You are going to receive latest by Thursday a mail<br />
from the DG elect with the structure and mandate of<br />
all departments in 2009.<br />
– I haven’t seen the final slides: therefore some details<br />
in my presentation may be (slightly) incorrect due to<br />
last minute changes<br />
25/11/08<br />
Ph.B Senior Staff meeting
General <strong>CERN</strong> structure<br />
legal service ,<br />
council secretariat ,<br />
translation and minutes<br />
Director General<br />
Rolf-Dieter Heuer<br />
____________<br />
DG office<br />
external relations , 3 scientists<br />
internal audit, safety policy ,<br />
press office and visits , TT<br />
Director for Administration<br />
and General Infrastructure<br />
S. Lettow<br />
____________<br />
Resources Planning and controlling<br />
Director for Research<br />
and Scientific Computing<br />
S. Bertolucci<br />
____________<br />
Director for Accelerators<br />
and Technology<br />
S. Myers<br />
______________<br />
Accelerator Projects<br />
Human Resources<br />
E. Chiaveri<br />
<strong>Physics</strong><br />
Ph. .Bloch<br />
Beams<br />
P. Collier<br />
Finance and Procurement<br />
Th. .Lagrange<br />
Scientific Computing<br />
F. Hemmer<br />
Technology<br />
F. Bordry<br />
General Infrastructure<br />
25/11/08 Services<br />
Ph.B Senior Staff<br />
Th.<br />
meeting<br />
.Pettersson<br />
Engineering<br />
V. Vuillemin
Accelerator Sector : Beams <strong>Department</strong><br />
Beams<br />
Totals<br />
Combining<br />
present staff<br />
(2009 FTEs)<br />
Origin<br />
(present<br />
structure)<br />
Staff<br />
from<br />
AB<br />
Staff<br />
from<br />
TS<br />
Staff<br />
from<br />
AT<br />
Staff<br />
from<br />
IT<br />
Open<br />
Posts<br />
Accelerator and<br />
AB-ABP,<br />
59.2<br />
Beam <strong>Physics</strong><br />
TS-SU, +<br />
38.0 21.0 1.0 1.0<br />
Beam<br />
Instrumentation<br />
58.9 AB-BI 58.0 2.0<br />
Controls 52.7 AB-CO 51.0 1.0<br />
Operations 89.2 AB‐OP 85.0 5.0<br />
Radio Frequency 80.9 AB‐RF 80.0 3.0<br />
Administration,<br />
AB‐ADM,<br />
Safety and<br />
18.5<br />
20.0<br />
AB‐SU<br />
Resources<br />
Head Office 1.0 AB 1.0<br />
25/11/08<br />
Ph.B Senior Staff meeting<br />
Beams total 360.4 333.0 21.0 1.0 12.0
Accelerator Sector : Engineering <strong>Department</strong><br />
Engineering<br />
Totals Origin (present structure)<br />
Combining<br />
present staff<br />
(FTEs)<br />
Staff Staff<br />
from AB from TS<br />
Staff Staff<br />
from AT from IT<br />
Manufacturing 76 TS-MME 0 76 0 0<br />
Cooling & Ventilation 50 TS-CV 0 50 0 0<br />
Transport 29 TS-HE 0 29 0 0<br />
Electrical Engineering 58 TS-EL 0 60 0 0<br />
Tech Coord [Accelerators and<br />
Experimental Facilities]<br />
59 AB-ATB-SBA +TS-LEA +AB-<br />
ABP-RTL +TS-ICC<br />
Targets, collimators & dumps 33 AB-ATB-EET / IF / LPE /<br />
TCD + TS-LEA<br />
Controls and electronics 45 AB-CO-IS + AB-CO-MA +<br />
IT-CO + TS-DEM<br />
26 32 0 0<br />
31 2 0 0<br />
14 15 0 16<br />
TOTAL 350 71 264 0 16<br />
Admin and Head Office 22 TS-AS3 + TS-HDO 22<br />
Total 25/11/08 with Admin and Head<br />
Office Ph.B Senior Staff meeting<br />
372 71 286 0 16
Accelerator Sector : Technology <strong>Department</strong><br />
Technology<br />
<strong>Department</strong><br />
Totals<br />
Combining<br />
present staff<br />
(FTEs)<br />
Origin (present structure)<br />
Staff<br />
from AB<br />
Staff<br />
from AT<br />
Staff<br />
from<br />
TS<br />
Not<br />
from<br />
section<br />
Superconductors/HTS -<br />
SC Magnet design -<br />
Magnetic Mesurements<br />
Magnet integration and<br />
repairs- Warm Magnets<br />
Machine Protection &<br />
ELQA & Quench<br />
protection<br />
51.9<br />
40.6<br />
24.0<br />
Cryogenics 67.1<br />
AT-MCS-ML + AT-MCS-MDE +<br />
AT-MCS-SC + AT-MEI-SD + AT-<br />
MEI-MM ++AT-MEI-FP<br />
0.0 49.9 0.0 2.0<br />
AT-MCS-CI + AT-MCS-MF+AT-<br />
MCS-MNC 0.0 41.6 0.0 -1.0<br />
AT-MEI-TF+AT-MEI-PE+AB-CO-<br />
MI 7.0 15.0 0.0 2.0<br />
AT-CRG<br />
0.0 67.1 0.0 0.0<br />
Vacuum+CCS 69.5 AT-VAC and TS-MME-CCS 0.0 48.5 21.0 0.0<br />
Injection/Extraction and<br />
AB-BT<br />
49.4<br />
49.4 0.0 0.0 0.0<br />
Beam transfer<br />
Power Converters 65.0 AB-PO 63.0 0.0 2.0 0.0<br />
Total 367.5 119.4 222.1 23.0 3.0<br />
ADM 13.3 AT-ADM 2.0 11.3<br />
TE DH and DHO 3.0 1.0 2.0 0.0<br />
25/11/08<br />
Total with Admin and<br />
Ph.B Head Senior OfficeStaff meeting<br />
383.8 122.4 235.4 23.0 3.0
Accelerator sector<br />
• Changes to be noted<br />
– TS/SU (survey) →Beam-ABP<br />
– TS/LEA-EAM (LHC expt A.M.)<br />
– AB-ABT-SBA (Efthymiopoulos et al)<br />
The group ENG-TC is responsible for planning, coordinating all maintenance and<br />
installation activities in the <strong>CERN</strong> Accelerator complex, providing support to the<br />
experiments using the <strong>CERN</strong> accelerators during their preparation, integration,<br />
installation and operation, and for the design installation and maintenance of the<br />
secondary beam zones.<br />
– IT/CO & TS-DEM → EN-ICE<br />
→ EN - TC<br />
• It has been agreed that a memorandum will be written to<br />
specify the expectations of the Research Sector for the<br />
Accelerator Sector support (and vice-versa).<br />
25/11/08<br />
Ph.B Senior Staff meeting
Administration and General Infrastructure: Finance<br />
• Finance and Procurements (~ 60 staffs) includes<br />
2 groups:<br />
– Finance and accounting<br />
• Includes TT financial accounting<br />
– Procurement and Industrial Services<br />
25/11/08<br />
Ph.B Senior Staff meeting
Administration and General Infrastructure: HR<br />
Human Resources<br />
– Very few changes.<br />
– Pension fund directly under Administration Director<br />
25/11/08<br />
Ph.B Senior Staff meeting
Administration and General Infrastructure: GS<br />
General Services<br />
New department. Includes:<br />
• Facility Management (FM)<br />
• Civil engineering<br />
• Access, Safety, Engineering tools<br />
• Logistics<br />
• Administrative Information Services<br />
• Scientific Information (Library)<br />
• Fire Brigade<br />
• Medical Service<br />
• Visits, exhibitions, outreach <br />
The site committee will be resurrected.<br />
was TS/FM<br />
was TS/CE<br />
was TS-ASE<br />
was FI-LS<br />
was IT-AIS<br />
was DSU-SI<br />
was in SC<br />
was in SC<br />
was in DSU-CO-PO<br />
25/11/08<br />
Ph.B Senior Staff meeting
DG services (~ 90 staffs)<br />
– Internal audit<br />
– Corporate Communication<br />
– Administrative Support<br />
– VIP service<br />
– External Relations :F.Pauss<br />
– Technology Transfer (core business) C.Parinello<br />
Partnerships, Knowledge and Technology Transfer (PKT)<br />
– Translation & minutes<br />
– Legal service<br />
– Council secretariat<br />
– Education : yet to defined.<br />
Directly under Adm. Director <br />
25/11/08<br />
Ph.B Senior Staff meeting
The 3 DG scientific advisors<br />
• 3 scientific advisors will be asked to explore<br />
topical problems of interest (make reports,<br />
proposals for changes).<br />
• The first topics are:<br />
– E.Tsesmelis : Crisis management including the<br />
question of spare material<br />
– I. Bejar-Alonso : Internal Charging, Safety<br />
– E. Rondio : non LHC program <br />
25/11/08<br />
Ph.B Senior Staff meeting
25/11/08<br />
Ph.B Senior Staff meeting<br />
External relations
Safety Commission<br />
• A special meeting took place on Wednesday<br />
19 th where the current Safety Organization (and<br />
its difficulties) was presented to the DG elect.<br />
• It has already been decided to keep RP as a<br />
single group inside SC and to empower again<br />
SAPOCO.<br />
25/11/08<br />
Ph.B Senior Staff meeting
Communication<br />
• The DG elect has expressed his strong wish to<br />
strongly improve internal communication<br />
• HR is working on “code of conduct”<br />
– Will include conditions of use for <strong>CERN</strong> image and<br />
blogs<br />
25/11/08<br />
Ph.B Senior Staff meeting
Research Sector: Scientific Computing<br />
• No changes compared to IT, with 2 exceptions<br />
– IT/CO (industrial controls) → EN/TC<br />
– AIS (EDH etc..) → GS<br />
25/11/08<br />
Ph.B Senior Staff meeting
Research Sector : <strong>PH</strong> <strong>Department</strong><br />
• Essentially no change in the structure (we had our<br />
restructuration during last 15 months !)<br />
• Only two deputies<br />
• One for EP unit<br />
• One for TH unit<br />
– The third deputy attributions will be spread on a number of <strong>PH</strong><br />
staff members (devoting a fraction of their time for the Dep t<br />
administration)<br />
• Computing (on & off) matters (including recruitment)<br />
• Technology Transfer Officer<br />
• Cat 1 matters (research fellows, LD recruitment)<br />
• CLIC/ILC project<br />
• [non-LHC program]<br />
– A “management board” meeting regularly will include the DH,<br />
DDH and DPO and the responsible of the above “projects” (part<br />
or full attendance)<br />
25/11/08<br />
Ph.B Senior Staff meeting
<strong>PH</strong> organization chart<br />
Team Team Team Team<br />
25/11/08<br />
Ph.B Senior Staff meeting
Projects<br />
• Two projects will be defined across sectors, and<br />
therefore in <strong>PH</strong><br />
– SLHC<br />
– CLIC/ILC<br />
• While the short term aim of the CLIC/ILC in <strong>PH</strong> is rather<br />
clear to me (The CLIC project foresees a Conceptual Design<br />
Report by about 2010. This will include a CLIC detector concept with<br />
a demonstration of its physics performance), the organization of<br />
an SLHC project across <strong>PH</strong> (<strong>beyond</strong> the present WP<br />
R&D) remains to be understood.<br />
• The good point is that it has been agreed that both<br />
projects should be included in the future MTP.<br />
• New non-LHC initiatives should also be included.<br />
25/11/08<br />
Ph.B Senior Staff meeting
Budget<br />
• 2009 is not going to be an easy year<br />
– Large LHC debt reimbursement<br />
– New facts<br />
• LHC repair (20 MCHF)<br />
• CVI (3.68%) will probably be only partially granted<br />
• Help of collaboration funds may be useful to<br />
“bridge” and maximize our recruitment<br />
possibilities<br />
25/11/08<br />
Ph.B Senior Staff meeting
<strong>PH</strong> : additional thoughts<br />
• I intend to visit in the coming months the various<br />
groups and try to understand their most<br />
important concerns, in particular in terms of<br />
resources<br />
• There are a number of domains I’d like to revisit<br />
to see with you whether we can bring<br />
improvement<br />
– Seminars and their (poor) attendance<br />
– Internal <strong>PH</strong> communication (Web site, Newsletters,<br />
faculty meetings)<br />
Would like that we all feel part of the same “ensemble”<br />
25/11/08<br />
Ph.B Senior Staff meeting