25.12.2014 Views

PH/CERN Structure beyond 2008 - Physics Department

PH/CERN Structure beyond 2008 - Physics Department

PH/CERN Structure beyond 2008 - Physics Department

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• General <strong>CERN</strong> <strong>Structure</strong><br />

• Tour of the departments and DG services<br />

• Projects<br />

• More thoughts about <strong>PH</strong><br />

25/11/08<br />

Ph.B Senior Staff meeting


The new <strong>CERN</strong> structure<br />

Disclaimer<br />

– You are going to receive latest by Thursday a mail<br />

from the DG elect with the structure and mandate of<br />

all departments in 2009.<br />

– I haven’t seen the final slides: therefore some details<br />

in my presentation may be (slightly) incorrect due to<br />

last minute changes<br />

25/11/08<br />

Ph.B Senior Staff meeting


General <strong>CERN</strong> structure<br />

legal service ,<br />

council secretariat ,<br />

translation and minutes<br />

Director General<br />

Rolf-Dieter Heuer<br />

____________<br />

DG office<br />

external relations , 3 scientists<br />

internal audit, safety policy ,<br />

press office and visits , TT<br />

Director for Administration<br />

and General Infrastructure<br />

S. Lettow<br />

____________<br />

Resources Planning and controlling<br />

Director for Research<br />

and Scientific Computing<br />

S. Bertolucci<br />

____________<br />

Director for Accelerators<br />

and Technology<br />

S. Myers<br />

______________<br />

Accelerator Projects<br />

Human Resources<br />

E. Chiaveri<br />

<strong>Physics</strong><br />

Ph. .Bloch<br />

Beams<br />

P. Collier<br />

Finance and Procurement<br />

Th. .Lagrange<br />

Scientific Computing<br />

F. Hemmer<br />

Technology<br />

F. Bordry<br />

General Infrastructure<br />

25/11/08 Services<br />

Ph.B Senior Staff<br />

Th.<br />

meeting<br />

.Pettersson<br />

Engineering<br />

V. Vuillemin


Accelerator Sector : Beams <strong>Department</strong><br />

Beams<br />

Totals<br />

Combining<br />

present staff<br />

(2009 FTEs)<br />

Origin<br />

(present<br />

structure)<br />

Staff<br />

from<br />

AB<br />

Staff<br />

from<br />

TS<br />

Staff<br />

from<br />

AT<br />

Staff<br />

from<br />

IT<br />

Open<br />

Posts<br />

Accelerator and<br />

AB-ABP,<br />

59.2<br />

Beam <strong>Physics</strong><br />

TS-SU, +<br />

38.0 21.0 1.0 1.0<br />

Beam<br />

Instrumentation<br />

58.9 AB-BI 58.0 2.0<br />

Controls 52.7 AB-CO 51.0 1.0<br />

Operations 89.2 AB‐OP 85.0 5.0<br />

Radio Frequency 80.9 AB‐RF 80.0 3.0<br />

Administration,<br />

AB‐ADM,<br />

Safety and<br />

18.5<br />

20.0<br />

AB‐SU<br />

Resources<br />

Head Office 1.0 AB 1.0<br />

25/11/08<br />

Ph.B Senior Staff meeting<br />

Beams total 360.4 333.0 21.0 1.0 12.0


Accelerator Sector : Engineering <strong>Department</strong><br />

Engineering<br />

Totals Origin (present structure)<br />

Combining<br />

present staff<br />

(FTEs)<br />

Staff Staff<br />

from AB from TS<br />

Staff Staff<br />

from AT from IT<br />

Manufacturing 76 TS-MME 0 76 0 0<br />

Cooling & Ventilation 50 TS-CV 0 50 0 0<br />

Transport 29 TS-HE 0 29 0 0<br />

Electrical Engineering 58 TS-EL 0 60 0 0<br />

Tech Coord [Accelerators and<br />

Experimental Facilities]<br />

59 AB-ATB-SBA +TS-LEA +AB-<br />

ABP-RTL +TS-ICC<br />

Targets, collimators & dumps 33 AB-ATB-EET / IF / LPE /<br />

TCD + TS-LEA<br />

Controls and electronics 45 AB-CO-IS + AB-CO-MA +<br />

IT-CO + TS-DEM<br />

26 32 0 0<br />

31 2 0 0<br />

14 15 0 16<br />

TOTAL 350 71 264 0 16<br />

Admin and Head Office 22 TS-AS3 + TS-HDO 22<br />

Total 25/11/08 with Admin and Head<br />

Office Ph.B Senior Staff meeting<br />

372 71 286 0 16


Accelerator Sector : Technology <strong>Department</strong><br />

Technology<br />

<strong>Department</strong><br />

Totals<br />

Combining<br />

present staff<br />

(FTEs)<br />

Origin (present structure)<br />

Staff<br />

from AB<br />

Staff<br />

from AT<br />

Staff<br />

from<br />

TS<br />

Not<br />

from<br />

section<br />

Superconductors/HTS -<br />

SC Magnet design -<br />

Magnetic Mesurements<br />

Magnet integration and<br />

repairs- Warm Magnets<br />

Machine Protection &<br />

ELQA & Quench<br />

protection<br />

51.9<br />

40.6<br />

24.0<br />

Cryogenics 67.1<br />

AT-MCS-ML + AT-MCS-MDE +<br />

AT-MCS-SC + AT-MEI-SD + AT-<br />

MEI-MM ++AT-MEI-FP<br />

0.0 49.9 0.0 2.0<br />

AT-MCS-CI + AT-MCS-MF+AT-<br />

MCS-MNC 0.0 41.6 0.0 -1.0<br />

AT-MEI-TF+AT-MEI-PE+AB-CO-<br />

MI 7.0 15.0 0.0 2.0<br />

AT-CRG<br />

0.0 67.1 0.0 0.0<br />

Vacuum+CCS 69.5 AT-VAC and TS-MME-CCS 0.0 48.5 21.0 0.0<br />

Injection/Extraction and<br />

AB-BT<br />

49.4<br />

49.4 0.0 0.0 0.0<br />

Beam transfer<br />

Power Converters 65.0 AB-PO 63.0 0.0 2.0 0.0<br />

Total 367.5 119.4 222.1 23.0 3.0<br />

ADM 13.3 AT-ADM 2.0 11.3<br />

TE DH and DHO 3.0 1.0 2.0 0.0<br />

25/11/08<br />

Total with Admin and<br />

Ph.B Head Senior OfficeStaff meeting<br />

383.8 122.4 235.4 23.0 3.0


Accelerator sector<br />

• Changes to be noted<br />

– TS/SU (survey) →Beam-ABP<br />

– TS/LEA-EAM (LHC expt A.M.)<br />

– AB-ABT-SBA (Efthymiopoulos et al)<br />

The group ENG-TC is responsible for planning, coordinating all maintenance and<br />

installation activities in the <strong>CERN</strong> Accelerator complex, providing support to the<br />

experiments using the <strong>CERN</strong> accelerators during their preparation, integration,<br />

installation and operation, and for the design installation and maintenance of the<br />

secondary beam zones.<br />

– IT/CO & TS-DEM → EN-ICE<br />

→ EN - TC<br />

• It has been agreed that a memorandum will be written to<br />

specify the expectations of the Research Sector for the<br />

Accelerator Sector support (and vice-versa).<br />

25/11/08<br />

Ph.B Senior Staff meeting


Administration and General Infrastructure: Finance<br />

• Finance and Procurements (~ 60 staffs) includes<br />

2 groups:<br />

– Finance and accounting<br />

• Includes TT financial accounting<br />

– Procurement and Industrial Services<br />

25/11/08<br />

Ph.B Senior Staff meeting


Administration and General Infrastructure: HR<br />

Human Resources<br />

– Very few changes.<br />

– Pension fund directly under Administration Director<br />

25/11/08<br />

Ph.B Senior Staff meeting


Administration and General Infrastructure: GS<br />

General Services<br />

New department. Includes:<br />

• Facility Management (FM)<br />

• Civil engineering<br />

• Access, Safety, Engineering tools<br />

• Logistics<br />

• Administrative Information Services<br />

• Scientific Information (Library)<br />

• Fire Brigade<br />

• Medical Service<br />

• Visits, exhibitions, outreach <br />

The site committee will be resurrected.<br />

was TS/FM<br />

was TS/CE<br />

was TS-ASE<br />

was FI-LS<br />

was IT-AIS<br />

was DSU-SI<br />

was in SC<br />

was in SC<br />

was in DSU-CO-PO<br />

25/11/08<br />

Ph.B Senior Staff meeting


DG services (~ 90 staffs)<br />

– Internal audit<br />

– Corporate Communication<br />

– Administrative Support<br />

– VIP service<br />

– External Relations :F.Pauss<br />

– Technology Transfer (core business) C.Parinello<br />

Partnerships, Knowledge and Technology Transfer (PKT)<br />

– Translation & minutes<br />

– Legal service<br />

– Council secretariat<br />

– Education : yet to defined.<br />

Directly under Adm. Director <br />

25/11/08<br />

Ph.B Senior Staff meeting


The 3 DG scientific advisors<br />

• 3 scientific advisors will be asked to explore<br />

topical problems of interest (make reports,<br />

proposals for changes).<br />

• The first topics are:<br />

– E.Tsesmelis : Crisis management including the<br />

question of spare material<br />

– I. Bejar-Alonso : Internal Charging, Safety<br />

– E. Rondio : non LHC program <br />

25/11/08<br />

Ph.B Senior Staff meeting


25/11/08<br />

Ph.B Senior Staff meeting<br />

External relations


Safety Commission<br />

• A special meeting took place on Wednesday<br />

19 th where the current Safety Organization (and<br />

its difficulties) was presented to the DG elect.<br />

• It has already been decided to keep RP as a<br />

single group inside SC and to empower again<br />

SAPOCO.<br />

25/11/08<br />

Ph.B Senior Staff meeting


Communication<br />

• The DG elect has expressed his strong wish to<br />

strongly improve internal communication<br />

• HR is working on “code of conduct”<br />

– Will include conditions of use for <strong>CERN</strong> image and<br />

blogs<br />

25/11/08<br />

Ph.B Senior Staff meeting


Research Sector: Scientific Computing<br />

• No changes compared to IT, with 2 exceptions<br />

– IT/CO (industrial controls) → EN/TC<br />

– AIS (EDH etc..) → GS<br />

25/11/08<br />

Ph.B Senior Staff meeting


Research Sector : <strong>PH</strong> <strong>Department</strong><br />

• Essentially no change in the structure (we had our<br />

restructuration during last 15 months !)<br />

• Only two deputies<br />

• One for EP unit<br />

• One for TH unit<br />

– The third deputy attributions will be spread on a number of <strong>PH</strong><br />

staff members (devoting a fraction of their time for the Dep t<br />

administration)<br />

• Computing (on & off) matters (including recruitment)<br />

• Technology Transfer Officer<br />

• Cat 1 matters (research fellows, LD recruitment)<br />

• CLIC/ILC project<br />

• [non-LHC program]<br />

– A “management board” meeting regularly will include the DH,<br />

DDH and DPO and the responsible of the above “projects” (part<br />

or full attendance)<br />

25/11/08<br />

Ph.B Senior Staff meeting


<strong>PH</strong> organization chart<br />

Team Team Team Team<br />

25/11/08<br />

Ph.B Senior Staff meeting


Projects<br />

• Two projects will be defined across sectors, and<br />

therefore in <strong>PH</strong><br />

– SLHC<br />

– CLIC/ILC<br />

• While the short term aim of the CLIC/ILC in <strong>PH</strong> is rather<br />

clear to me (The CLIC project foresees a Conceptual Design<br />

Report by about 2010. This will include a CLIC detector concept with<br />

a demonstration of its physics performance), the organization of<br />

an SLHC project across <strong>PH</strong> (<strong>beyond</strong> the present WP<br />

R&D) remains to be understood.<br />

• The good point is that it has been agreed that both<br />

projects should be included in the future MTP.<br />

• New non-LHC initiatives should also be included.<br />

25/11/08<br />

Ph.B Senior Staff meeting


Budget<br />

• 2009 is not going to be an easy year<br />

– Large LHC debt reimbursement<br />

– New facts<br />

• LHC repair (20 MCHF)<br />

• CVI (3.68%) will probably be only partially granted<br />

• Help of collaboration funds may be useful to<br />

“bridge” and maximize our recruitment<br />

possibilities<br />

25/11/08<br />

Ph.B Senior Staff meeting


<strong>PH</strong> : additional thoughts<br />

• I intend to visit in the coming months the various<br />

groups and try to understand their most<br />

important concerns, in particular in terms of<br />

resources<br />

• There are a number of domains I’d like to revisit<br />

to see with you whether we can bring<br />

improvement<br />

– Seminars and their (poor) attendance<br />

– Internal <strong>PH</strong> communication (Web site, Newsletters,<br />

faculty meetings)<br />

Would like that we all feel part of the same “ensemble”<br />

25/11/08<br />

Ph.B Senior Staff meeting

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!