3GPP TSG SA WG2 #93 æè°å ±å - 網路éè¨åéæ¨æºåæååè ...
3GPP TSG SA WG2 #93 æè°å ±å - 網路éè¨åéæ¨æºåæååè ...
3GPP TSG SA WG2 #93 æè°å ±å - 網路éè¨åéæ¨æºåæååè ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Gi<br />
L-GW<br />
Gn<br />
Sxx<br />
Se<br />
GW<br />
Gn<br />
Iurh<br />
HNB<br />
Iuh<br />
HNB<br />
GW<br />
Iu<br />
SGSN<br />
Uu<br />
UE<br />
Figure 5.4.3.x-3: SIPTO@LN architecture (UMTS diagram)<br />
The following open points need to be resolved:<br />
- whether Sxx contains a Control plane component;<br />
- how to establish the secure tunnel transporting the S5 interface between the L-GW and the SGW;<br />
- L-GW selection and addressing;<br />
- discovery of the SIPTO@LN mobility area;<br />
- deactivation of the PDN connection established in SIPTO@LN mode.<br />
‣Others<br />
Others S2-123829 S2-123830 TR<br />
23.859 Figure A.3.3 Figure A.3.4 <br />
commenter ZTE ZTE <br />
<br />
<br />
•New working items<br />
1. UPCON (User plan congestion management requirements)<br />
Stage 1 FS_UPCON user data RAN user plan<br />
35