28.12.2014 Views

System Hierarchy - Systems Modeling Simulation Lab. KAIST

System Hierarchy - Systems Modeling Simulation Lab. KAIST

System Hierarchy - Systems Modeling Simulation Lab. KAIST

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Work Breakdown Structure (WBS)<br />

<br />

<br />

<br />

A Work Breakdown <strong>System</strong> (WBS) is used for:<br />

• Task or work package planning and scheduling<br />

• Cost estimating or budget formulation<br />

• Product development documentation, e.g., documentation<br />

tree, systems engineering management plan (SEMP),<br />

drawings<br />

• Project status reporting and assessment<br />

The WBS should include:<br />

• All the work in the project life cycle, in-house and/or<br />

contracted<br />

• Hierarchical relationships of all work products<br />

• A companion dictionary to describe the content<br />

When should you have a WBS<br />

• Pre-phase A; conceptual design phase; early mission/project<br />

formulation<br />

Space <strong>System</strong>s Engineering: <strong>System</strong> <strong>Hierarchy</strong> Module 13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!