<strong>Regional</strong><br />

<strong>Transportation</strong><br />

Commission of<br />

Southern<br />

Nevada<br />

<strong>Transportation</strong> Improvement Program<br />

2009 - 2012


TRANSPORTATION IMPROVEMENT PROGRAM<br />

FISCAL YEARS 2009-2012<br />

NARRATIVE, ANALYSIS<br />

AND PROJECT SUMMARIES<br />

Draft Final November, 2008<br />

REGIONAL TRANSPORTATION COMMISSION<br />

OF SOUTHERN NEVADA<br />

600 SO. GRAND CENTRAL PARKWAY<br />

LAS VEGAS, NEVADA 89106-4512<br />

(702) 676-1500<br />

The preparation of this document was financed, in part, by a grant from the United States<br />

Department of <strong>Transportation</strong>, Federal Transit Administration under Section 8 of the Urban<br />

Mass <strong>Transportation</strong> Act of 1964, as amended, and the Federal Highway Administration<br />

under Title 23, Section 134 of the United States Code.


Acknowledgments<br />

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA<br />

City of Boulder City Councilman Roger Tobler<br />

City of Henderson Councilman Andy Hafen<br />

City of Las Vegas Councilman Larry Brown, Chairman<br />

City of Las Vegas Mayor Oscar Goodman<br />

City of Mesquite Councilman David Bennett<br />

City of North Las Vegas Councilman Robert L. Eliason<br />

Clark County Commissioner Chip Maxfield, Vice Chairman<br />

Clark County Commissioner Bruce L. Woodbury<br />

State of Nevada Director, NDOT Susan Martinovich, (Ex-Officio)<br />

EXECUTIVE ADVISORY COMMITTEE<br />

TRANSPORTATION ACCESS ADVISORY COMMITTEE<br />

City of Boulder City Brok Armantrout Joseph Bifano, Vice Chairman James Speed<br />

City of Boulder City Scott Hansen, Chairman Karen Bishop Ralph Steele<br />

City of Henderson Stephanie Garcia-Vause Janie Brown Mary Ann Hantout<br />

City of Henderson Robert Murnane, P.E. Corie Craig Mary Ann Wainwright<br />

City of Las Vegas Jorge Cervantes Alfreda Ferrell Gerry Petuya<br />

City of Las Vegas Margo Wheeler Jessie Harris Jerry Sim<br />

City of Mesquite J. Allen Bell, P.E. Gary Shade Jean Peyton, Chairwoman<br />

City of Mesquite<br />

Cathrine Lorbeer<br />

City of North Las Vegas Frank Fiori<br />

City of North Las Vegas Qiong Liu, P.E.,<br />

Clark County Denis Cederburg, P.E. Vice<br />

Chairman<br />

Clark County<br />

Barbara Ginoulias<br />

NDOT<br />

Rudy Malfabon<br />

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA STAFF<br />

General Manager<br />

Deputy General Manager<br />

Assistant General Manager, Administrative Services<br />

Assistant General Manager, MPO<br />

Assistant General Manager, Transit<br />

Assistant General Manager, HR/Safety & Security<br />

Assistant General Manager Governmental Affairs<br />

Director of Planning Services<br />

Director of Engineering Services<br />

Director of FAST<br />

Manager Planning<br />

Manager Planning<br />

Manager Planning<br />

Manager Engineering<br />

Manager of Public Information<br />

Principal <strong>Transportation</strong> Planner<br />

Principal <strong>Transportation</strong> Planner<br />

Senior <strong>Transportation</strong> Planner<br />

Senior <strong>Transportation</strong> Planner<br />

Senior <strong>Transportation</strong> Planner<br />

Senior <strong>Transportation</strong> Planner<br />

<strong>Transportation</strong> Planner<br />

Jacob L. Snow<br />

Tina Quigley<br />

M.J. Maynard<br />

Fred A. Ohene<br />

Mark Wells<br />

Jerry Keating<br />

Tracy Bower<br />

Bruce Turner<br />

Mike Hand<br />

Glenn Grayson<br />

Martyn James<br />

Jerry Duke<br />

Beth Xie<br />

Mike Hand<br />

Jackie Dennis<br />

Paulette Carolin<br />

Mohammad Farhan<br />

Philip Banea<br />

Maria G. Rodriguez<br />

Lijuan Su<br />

Hui Shen<br />

David A. Boocher<br />

TRANSPORTATION IMPROVEMENT PROGRAM 2009-2012<br />

DRAFT FINAL NOVEMBER 2008


Table of Contents<br />

1 Introduction...................................................................................................1<br />

2 The <strong>Regional</strong> <strong>Transportation</strong> Commission ..................................................2<br />

3 SAFETEA-LU Planning Factors......................................................................3<br />

4 <strong>Transportation</strong> Improvement Program Development and Amendment<br />

Process..........................................................................................................5<br />

5 Project Selection Process ............................................................................7<br />

6 Public Participation.......................................................................................8<br />

7 Financial Plan................................................................................................9<br />

Fund Sourcce Balance Sheets...................................................................................... 10<br />

8 Project List ................................................................................................. 14<br />

Table 1: List of Projects by Sponsoring Agency............................................................ 15<br />

Table 2: List of Projects by Fund Source ...................................................................... 51<br />

MAPS<br />

Map 1: Street and Highway Projects............................................................................. 45<br />

Map 2: <strong>Intelligent</strong> <strong>Transportation</strong> <strong>System</strong>s (ITS) Projects and Operational<br />

Improvements................................................................................................................ 46<br />

Map 3: Alternate Mode (Bicycle and Pedestrian) and Environmental Projects .......... 47<br />

Map 4: Transit and Park-and-Ride Projects.................................................................. 48<br />

Map 5: Projects outside the Las Vegas Valley – Boulder City, Laughlin and Mesquite<br />

........................................................................................................................................ 49<br />

Map 6: Downtown Las Vegas – Street and Highway, Alternate Mode and<br />

Environmental Projects....................................................................................................50<br />

APPENDIX<br />

I: Administrative Modification and Amendment Process<br />

TRANSPORTATION IMPROVEMENT PROGRAM 2009-2012<br />

DRAFT FINAL NOVEMBER 2008


1: Introduction<br />

The <strong>Transportation</strong> Improvement Program is a<br />

document that identifies transportation projects that<br />

are expected to receive federal funding over the next<br />

four years. Approval of the program by the federal<br />

agencies provides authorization for state and local<br />

agencies to request federal funding.<br />

This <strong>Transportation</strong> Improvement Program for<br />

Federal Fiscal Years 2009-2012 (TIP) is prepared by<br />

the <strong>Regional</strong> <strong>Transportation</strong> Commission of<br />

Southern Nevada in compliance with the<br />

Metropolitan Planning Rules and Regulations issued<br />

under 23CFR Part 450 and 49CFR Part 613.<br />

The technical assumptions and analyses which<br />

support the RTP and TIP are set out in detail in the<br />

RTP appendices. These include:<br />

The regional travel demand model parameters<br />

and methods;<br />

The regional estimates and projections of<br />

population and employment and the related<br />

planning variables used as inputs to the model;<br />

The projection of funding that is reasonably<br />

expected to be available to support the plan;<br />

The Air Quality Conformity Analysis; and<br />

The projected sources of funding.<br />

The TIP identifies all transportation projects in the<br />

Las Vegas region that are expected to be funded<br />

during the years 2009-2012 wholly or in part<br />

through Federal Highway Administration (FHWA) or<br />

Federal Transit Administration (FTA) programs, all<br />

“<strong>Regional</strong>ly Significant” projects regardless of fund<br />

source, as well as any other projects expected to<br />

involve Federal action.<br />

The Las Vegas region comprises the whole of Clark<br />

County, Nevada. Much of the county is designated<br />

as an air quality non-attainment area by the U.S.<br />

Environmental Protection Agency, and all<br />

transportation plans and programs are required to<br />

be in conformity with State and Federal Regulations<br />

for Air Quality.<br />

The projects identified in this TIP are either taken<br />

from, or are consistent with, the <strong>Regional</strong><br />

<strong>Transportation</strong> Plan for 2009-2030 (RTP). The draft<br />

of the TIP, the RTP and the related air quality<br />

Conformity Finding were made available for public<br />

review and comment for a 45-day period starting on<br />

September 2, 2008, and running through October<br />

16, 2008. This TIP includes corrections and<br />

modifications made in response to comments<br />

received. Documentation of comments and a<br />

summary of how the RTC responded are set out in<br />

Appendix 2 to the RTP.<br />

1<br />

TRANSPORTATION IMPROVEMENT PROGRAM 2009-2012<br />

DRAFT FINAL, NOVEMBER 2008


2: The <strong>Regional</strong> <strong>Transportation</strong><br />

Commission<br />

The <strong>Regional</strong> <strong>Transportation</strong> Commission of<br />

Southern Nevada (RTC) is a regional government<br />

organization comprised of elected officials appointed<br />

from each of the local governments within Clark<br />

County, Nevada. The RTC, as the designated<br />

Metropolitan Planning Organization (MPO) for<br />

Southern Nevada, performs the following functions:<br />

• Oversees the federally mandated transportation<br />

planning process for the region;<br />

• Directs the expenditure of funds generated from<br />

the Federal Transit Administration, the Federal<br />

Highway Trust Fund, the County Option Motor<br />

Vehicle Fuel Tax for regional street and highway<br />

construction, and the County Sales Tax designated<br />

for transportation;<br />

• Ensures that transportation plans and programs<br />

conform to approved air quality standards;<br />

• Provides public mass transportation within<br />

Southern Nevada, which is presently supported by<br />

a sales tax;<br />

• Administers the region’s trip reduction program,<br />

Club Ride Commuter Services; and<br />

• Designs, develops, and manages<br />

traffic<br />

management systems including signal timing and<br />

coordination, ramp metering and dynamic<br />

messaging.<br />

As the MPO, the RTC is responsible to the State and<br />

federal governments for maintaining a continuing,<br />

cooperative and comprehensive transportation<br />

planning process. Under the Nevada Revised<br />

Statues, the Metropolitan Planning Area comprises<br />

the whole of Clark County and includes both the Las<br />

Vegas Urbanized Area and the various outlying<br />

communities and rural portions of the County. The<br />

geographic area of Clark County is often referred to<br />

as “Southern Nevada” except when discussing the<br />

specific functions or attributes of the county as a<br />

unit of government.<br />

Membership on the RTC is set by state<br />

law and consists of two members from<br />

the Board of Clark County<br />

Commissioners, two members from the<br />

city council of the largest incorporated<br />

city (presently, the City of Las Vegas), and<br />

one member from the city council of every<br />

other incorporated city in the county. The<br />

Director of the Nevada Department of<br />

<strong>Transportation</strong> participates in a nonvoting<br />

capacity<br />

2<br />

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA


3: Planning Factors<br />

The 2006 Safe, Accountable, Flexible, Efficient<br />

<strong>Transportation</strong> Equity Act – A Legacy for Users<br />

(SAFETEA-LU) established a number of factors to be<br />

taken into account by MPOs in developing their<br />

regional transportation plans and programs. There<br />

follows a brief summary of these factors and their<br />

relation to the draft TIP. A fuller discussion of the<br />

transportation issues and challenges facing the<br />

region is to be found in Chapter 3 of the 2009-2030<br />

<strong>Regional</strong> <strong>Transportation</strong> Plan.<br />

<strong>Support</strong> the economic vitality of the metropolitan<br />

area, especially by enabling global competitiveness,<br />

productivity, and efficiency.<br />

Both short and long range planning process and<br />

projects support the economic vitality of the RTC’s<br />

region by improving transportation infrastructure.<br />

For example, the TIP includes projects like North 5 th<br />

Street in North Las Vegas, which integrate land-use<br />

and transportation in a major developing corridor.<br />

Capacity improvement projects sponsored by the<br />

Nevada Department of <strong>Transportation</strong> such as US<br />

95 North, I-15 North Design Build, I-15 Express<br />

Lanes, and Lake Mead Pkwy in Henderson will<br />

enhance the connectivity and mobility in the<br />

metropolitan area as well as through the<br />

metropolitan region. The CC.215 Bruce Woodbury<br />

Beltway and Airport Connector interchange at I-215<br />

are other locally funded regionally significant<br />

projects that will enhance system connectivity and<br />

efficiency. These projects are the building blocks to<br />

support economic vitality in the Las Vegas Valley and<br />

make it competitive both regionally and globally.<br />

A new airport at Ivanpah has been proposed to meet<br />

the long-term growth in air travel to and from the<br />

region. This proposal is currently undergoing<br />

environmental study, and highway network<br />

improvements are identified in the TIP to support<br />

this proposed airport.<br />

Increase the safety of the transportation system for<br />

motorized and non-motorized users<br />

Safety and security of the transportation system is<br />

one of the high priorities in the RTC region. The RTC<br />

has devised a congestion management system<br />

process to identify transportation improvement<br />

locations. The process considers factors, such as the<br />

impact of safety, accessibility, and mobility. Bus<br />

turn-out and dedicated lanes for bus and bicycle<br />

projects increase the safety of the transportation<br />

system in the region. Street improvement projects<br />

funded under RTC programs take into account the<br />

need for proper cross sections which include curb<br />

and gutters and sidewalks.<br />

<strong>Intelligent</strong> <strong>Transportation</strong> <strong>System</strong> (ITS) projects<br />

further improve the operation and performance of<br />

the transportation network providing increased<br />

safety as well as efficiency. Freeway Service Patrol<br />

funding is programmed to continue the operation to<br />

help the stranded motorists.<br />

Blue Diamond Road (SR 160) will be improved to<br />

increase the traveler’s safety in this corridor. The<br />

Nevada Department of <strong>Transportation</strong> (NDOT) has<br />

developed the Nevada Strategic Highway Safety Plan<br />

(SHSP) to address safety issues in Nevada. This TIP<br />

has identified safety funds for the projects to be<br />

selected based on the strategies identified in SHSP.<br />

RTC will be partnering with NDOT and other area<br />

agencies to enhance safety of the transportation<br />

system in the region.<br />

Increase the Security of the transportation system<br />

for motorized and non-motorized users<br />

Recent training of the RTC staff to the course titled<br />

as the “Terrorist Activity Recognition and Reaction”<br />

is one the important step to enhance security of the<br />

transportation system in the metropolitan region.<br />

The Freeway and Arterial <strong>System</strong> of <strong>Transportation</strong><br />

(FAST) in the Las Vegas Valley has the state of the<br />

art technology to monitor the metropolitan region’s<br />

highway system. The monitoring system provides<br />

enhanced security to the highway network and an<br />

opportunity for quick response for incident<br />

management.<br />

Increase the accessibility and mobility options<br />

available to people and freight.<br />

Street and intersection improvements in the TIP will<br />

increase the accessibility and mobility for both<br />

individuals and commercial cargo carriers in the<br />

MPO area. ITS deployment enhances the movement<br />

of freight and people as well as quality of life.<br />

Installation of bus shelters, construction and<br />

implementation of the downtown connector will<br />

provide enhanced mobility options for people.<br />

NDOT’s I-15 Express lane project, allied to the<br />

improvements to I-15 North now under construction,<br />

3<br />

TRANSPORTATION IMPROVEMENT PROGRAM 2009-2012<br />

DRAFT FINAL, NOVEMBER 2008


will enhance the truck freight movement through the<br />

region.<br />

The South Strip Bus Transfer Terminal offers long<br />

term parking and ride to the airport for the travelers<br />

departing from McCarran International Airport.<br />

Other Park and Ride projects identified in the TIP will<br />

further enhance the mobility options for the<br />

metropolitan community.<br />

The proposed privately funded extension of the Las<br />

Vegas Monorail to McCarran Airport will enable the<br />

citizens and visitors to utilize mobility options.<br />

Protect and enhance the environment, promote<br />

energy conservation, and improve quality of life.<br />

Projects such as Bicycle Lanes and Bus Turn-Out<br />

Improvements are part of RTC’s commitment to<br />

enhance the environment and conserve energy by<br />

alleviating congestion which in turn improves quality<br />

of life. The Bicycle and Pedestrian plan will provide<br />

the tools to identify strategies and projects to<br />

promote and implement this SAFETEA-LU planning<br />

factor. Local Gas Tax funds are allocated for Bus<br />

turn projects.<br />

The NDOT Master Landscape Plan considers the use<br />

of landscaping elements that are native to the region<br />

keeping the regional environmental characteristics.<br />

The RTC transit fleet uses alternative fuel technology<br />

to improve air quality. Park and ride projects in the<br />

TIP are complemented by the RTC’s Club Ride<br />

program as a coordinated effort to promote<br />

carpooling and transit use, thus improving air quality<br />

and promoting energy conservation.<br />

improve the operation on the I-15 South and US 95<br />

North. Unified Planning Work Program (UPWP)<br />

contains studies, such as “Analysis of Alternatives<br />

for Accommodating Trucks on Southern Nevada<br />

Urban Freeways”, Las Vegas Blvd. North Land-use,<br />

Transit, and pedestrian studies are looking into on<br />

how to efficiently manage and operate system.<br />

Other studies in the UPWP are the “Planning Process<br />

for Evaluation and Optimization of Ramp Metering”<br />

and Las Vegas Valley Arterial Development Study’” to<br />

identify the tools and data to promote and<br />

implement efficient system management and<br />

operation. This TIP contains Intersection<br />

improvement projects, ITS, I-15 Express lanes, I-15<br />

North Design Build and US 95 Project which will<br />

enhance system efficiency and operation.<br />

Emphasize the preservation of the existing<br />

transportation system.<br />

Local funds are allocated to rehabilitate the roadway<br />

network and system. Interstate maintenance funds<br />

are identified in the TIP to maintain the existing<br />

highway network system. NDOT allows for the costs<br />

of maintaining the state highway system in deciding<br />

the level of state resources that can be committed to<br />

the capital improvement program. Some State and<br />

RTC Gas Tax funds are dispersed directly to the local<br />

jurisdictions, and may be used for local system<br />

maintenance.<br />

Enhance the integration and connectivity of the<br />

transportation system, across and between modes,<br />

for people and freight.<br />

Implementation of the park and ride projects and<br />

High Occupancy Vehicle (HOV) lanes will enhance<br />

the integration and connectivity of the transportation<br />

system. ADA accessible ramps, bus station and turn<br />

out improvement (Bus Bays) project in the TIP and<br />

CIP will enhance integration and connectivity for the<br />

non-motorized users.<br />

Promote efficient system management and<br />

operation.<br />

This TIP contains intersection improvement projects<br />

which will enhance management and operation of<br />

the arterial system. NDOT’s HOV lane projects will<br />

4<br />

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA


4: The <strong>Transportation</strong> Improvement<br />

Program Development and<br />

Amendment Process<br />

In compliance with the federal regulations, the TIP is<br />

updated at least every four years. These updates<br />

are developed by the RTC in coordination with the<br />

local and state transportation agencies. After<br />

adoption by the RTC, the TIP is incorporated into the<br />

Nevada’s Statewide <strong>Transportation</strong> Improvement<br />

Program (STIP) which is then submitted to the<br />

federal agencies for their approval.<br />

The <strong>Regional</strong> <strong>Transportation</strong> Plan (RTP) is also<br />

required to be updated every four years, and it is the<br />

normal practice of the RTC to update both<br />

documents through a single process. This process<br />

also includes the required air quality conformity<br />

finding. As a practical matter, the rate of<br />

development in the region is such that the RTC has<br />

typically updated the RTP and TIP every two years.<br />

This TIP for 2009-2012 has thus been prepared in<br />

parallel with the development of the 2009-2030<br />

RTP. Drafts of both documents were being made<br />

available for public review and comment at the same<br />

time, and it is expected they will move jointly through<br />

the local and federal approval process.<br />

One consequence of this is that the projects in this<br />

TIP are for the most part taken directly from the<br />

projects identified for funding in the first four<br />

program years of the RTP. In some cases the RTP<br />

identifies general types of activities, and as these<br />

are moved forward into the TIP, the latter identifies<br />

the specific projects to be undertaken in the first<br />

and second years of the program. In other cases,<br />

the TIP may provide more detail of project phasing.<br />

An important restriction is that all projects requiring<br />

air quality analysis must be identified in the RTP and<br />

made part of the conformity analysis before they can<br />

be moved into the TIP.<br />

First, there are times when projects slip back in the<br />

program or, alternatively, need to be advanced. This<br />

may be due to funding issues, to unexpected<br />

problems with implementation, or may be the result<br />

of opportunities to accelerate the implementation of<br />

needed projects.<br />

Second, as projects in the TIP and STIP move closer<br />

to implementation, they frequently require changes<br />

to costs and funding sources.<br />

Federal regulations for revising the STIP are set out<br />

in 40CFR Part 23 §450.326, “TIP Revision and<br />

Relationship to STIP”, In accordance with these<br />

regulations, NDOT has developed an Administrative<br />

Modification and Amendment Process that governs<br />

the procedures that need to be followed before<br />

changes to the STIP may be approved.<br />

Modification and Amendment Process<br />

This process is in two parts, reflecting two levels of<br />

changes recognized in federal regulation.<br />

Minor changes to the STIP are considered to be<br />

“administrative modifications”, which require<br />

minimal review prior to incorporation into the<br />

approved STIP.<br />

More substantive changes are termed<br />

“amendments”.<br />

NDOT has defined the conditions that must be<br />

satisfied for a change to be considered an<br />

administrative modification (see box on the next<br />

page).<br />

Projects are selected for inclusion in the RTP on the<br />

basis of the established procedures of the RTC and<br />

the Nevada Department of <strong>Transportation</strong>. These<br />

procedures also govern the prioritization of projects<br />

for funding.<br />

TIP Amendments<br />

The TIP requires periodic amendment for two<br />

reasons.<br />

5<br />

TRANSPORTATION IMPROVEMENT PROGRAM 2009-2012<br />

DRAFT FINAL, NOVEMBER 2008


Administrative Modification Process<br />

The Administrative Modification process applies when:<br />

1. There is a change in a public funding category<br />

with no change in the priority of a project in the<br />

STIP/RTIP.<br />

2. A project is moved from the third or fourth to the<br />

first or second year or a project is moved from the<br />

second to the first year of the STIP/RTIP. (Project<br />

to be completed sooner/Project is moved forward)<br />

3. A project is moved from the first to the second,<br />

third or fourth year of the STIP/RTIP or is moved<br />

from the second or third year to the fourth year.<br />

(i.e the project is completed later or moved back<br />

in the program.)<br />

4. A positive cost estimate change of less than $5<br />

Million is requested or anticipated.<br />

5. A positive cost estimate change is<br />

requested/anticipated that is greater than $5<br />

Million, but less than 20 percent of the estimated<br />

dollar amount of the project.<br />

6. A positive or negative change in the unprogrammed<br />

balance forward is received.<br />

7. A positive or negative change in the anticipated<br />

fund allocation is received.<br />

8. A project is added to use Federal Funds for<br />

repayment of previously authorized work and all<br />

repayments will come from unallocated funds.<br />

9. A new planning study is identified.<br />

10. A project is Advance Constructed.<br />

RTC normally concurs in administrative<br />

modifications, since these are matters that by<br />

definition do not affect the RTP or the air quality<br />

conformity analysis, are unlikely to materially affect<br />

the funding assumptions in the RTP, and do not<br />

normally involve any other issues that would be of<br />

concern to the RTC.<br />

Amendment Process<br />

The Amendment process applies when:<br />

1. There is a significant change in the design or<br />

scope of any project identified in the STIP/RTIP.<br />

2. A regionally significant project is added or deleted.<br />

3. There are significant changes in the funding<br />

category that alter the overall financial<br />

reasonableness of the STIP/RTIP, or when a<br />

privately funded project is changed to public<br />

funding.<br />

4. There is a positive change in cost over $5 million<br />

and greater than 20 percent of the estimated<br />

dollar amount of the project is<br />

requested/anticipated<br />

The RTC has adopted procedures relating to<br />

amendments that reflect the NDOT process from the<br />

standpoint of the MPO responsible for developing<br />

and maintaining the TIP. Appendix I shows the<br />

“<strong>Transportation</strong> Improvement Program and<br />

Statewide <strong>Transportation</strong> Improvement Program<br />

Administrative Modification and Amendment<br />

Process” document approved by the RTC.<br />

These RTC procedures recognize several levels of<br />

amendment, depending on four criteria:<br />

1. consistency with the RTP;<br />

2. whether the project has “exempt” or “nonexempt”<br />

status under the procedures governing<br />

air quality analysis;<br />

3. consistency with the fiscal assumptions upon<br />

which the RTP was based; and<br />

4. whether there are other issues requiring<br />

elevation to the RTC Board.<br />

The aim is to allow for adequate consideration of<br />

issues that affect the MPO, without imposing<br />

unnecessary delay on the process.<br />

Any proposed action beyond these conditions will<br />

trigger the following amendment process, as defined<br />

in the following box:<br />

6<br />

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA


5: The Project Selection Process<br />

The RTC employs the following process to prioritize<br />

the projects included in the TIP. To be considered for<br />

evaluation, projects must be:<br />

1. on the federal functional classification road<br />

system, and<br />

2 in the <strong>Regional</strong> <strong>Transportation</strong> Plan (RTP).<br />

The draft <strong>Regional</strong> <strong>Transportation</strong> Plan for 2009-<br />

2030 forms the basis for the four-year program of<br />

projects identified in the draft TIP. The projects<br />

listed in the TIP are consistent with the finding of air<br />

quality conformity on the draft RTP and are also<br />

fiscally constrained within the resources expected to<br />

be available as documented in the draft RTP and<br />

summarized in Section 7 below.<br />

Chapter 4 of the RTP sets out the goals and<br />

objectives of the RTC and describes how they form<br />

the framework for selecting the projects for inclusion<br />

in the Plan.<br />

Selecting projects for the TIP<br />

In the context of the goals of the agency, four<br />

concerns in particular guide the selection of projects<br />

to be advanced from the RTP into the TIP:<br />

1. maintenance of the existing system;<br />

2. safety<br />

3. mitigating congestion; and<br />

3. the need to keep up with growth.<br />

These factors influence different programs in<br />

different ways.<br />

Priorities for the RTC High-Speed Lane Mile program<br />

were established at a time when growth issues<br />

predominated. Other Q.10 programs address a<br />

wider range of factors including ITS development,<br />

bus turnouts and bike lanes.<br />

Priorities for NDOT projects include safety (SR.160),<br />

reconstruction of deteriorated roadways (I-15 North),<br />

development of ITS infrastructure and the promotion<br />

of carpooling and transit though the construction of<br />

carpool lanes (US.95 North). AB 595 funding has to<br />

be spent on projects in the US-95/I-15 corridor. The<br />

first phase of the I-15 South project will focus on<br />

ramp reconfiguration and operational improvements<br />

such as collector-distributor lanes, but will allow for<br />

long-term addition of carpool lanes in later phases.<br />

RTC has prioritized the STP (Urban) program mainly<br />

as a complement to the Q.10 programs, while<br />

projects under the CMAQ were selected based on<br />

cost-effectiveness in reducing emissions.<br />

RTC Transit projects focus on the development of<br />

innovative services to provide attractive alternatives<br />

to auto travel while not neglecting the need to<br />

maintain the existing transit system<br />

Congestion Management<br />

Federal regulations require that RTC uses a process<br />

to address congestion management in a way that<br />

“provides for safe and effective integrated<br />

management and operation of the multimodal<br />

transportation system”. The regulations identify<br />

specific congestion management strategies for<br />

consideration, including:<br />

Travel demand management,<br />

Traffic operational improvements,<br />

Public transportation improvements,<br />

ITS technologies, and, where necessary,<br />

Additional system capacity.<br />

These factors are taken into account in existing RTC<br />

and NDOT procedures, and are reflected in the<br />

prioritization of projects in this TIP.<br />

RTC and the local entities are working to improve<br />

existing project prioritization procedures that reflect<br />

this integrated multimodal congestion management<br />

process. To fully address congestion and maintain<br />

mobility in the core of the region is going to require<br />

exactly the sort of mix of multi-modal and<br />

operational strategies envisaged under the federal<br />

congestion management process. It is expected that<br />

these improved procedures will guide the selection<br />

of projects in the next TIP, for 2010-2013.<br />

Public procedures<br />

Projects proposed for inclusion in the TIP may be<br />

further refined through the public participation<br />

process discussed in Section 6. The RTC Advisory<br />

Committees reviews all projects for their local and<br />

regional benefits prior to recommending the TIP for<br />

adoption by the RTC Board.<br />

7<br />

TRANSPORTATION IMPROVEMENT PROGRAM 2009-2012<br />

DRAFT FINAL, NOVEMBER 2008


6: Public Participation<br />

The RTC is committed to educating and informing<br />

the public on local transportation issues. The RTC<br />

plans and conducts public meetings and hearings to<br />

provide citizens with the opportunity to give input<br />

and receive information on transportation projects<br />

and policies. At least one formal public hearing is<br />

held prior to adoption of a new RTP, TIP or Public<br />

participation Plan update and, as appropriate, for<br />

the major plan or TIP amendments. These hearings<br />

are supplemented by informal public meetings<br />

during consultation on the draft documents.<br />

The primary public participation activities currently<br />

used by the RTC include:<br />

• Board of Commissioners,<br />

• Advisory Committees and Subcommittees,<br />

• Public Meetings/Hearings,<br />

• Website,<br />

• Public Comment and Response to<br />

Comments and<br />

• Project Advisory Committees<br />

On-gong public information activities include:<br />

• The RTC website,<br />

• <strong>Transportation</strong> Fairs,<br />

• Neighborhood Planning Meetings,<br />

• On the Move Television Show,<br />

• On the Move Newsletter,<br />

• Community & Public Meetings,<br />

• Media Relations and<br />

• Special events<br />

The projects included in the TIP for 2009-12 are all<br />

taken from the <strong>Regional</strong> <strong>Transportation</strong> Plan for<br />

2009-2030, which has been developed through a<br />

process of inter-agency coordination and public<br />

review and comment.<br />

The TIP for 2009-12 was made available for public<br />

review and comment. In accordance with federal<br />

law and the RTC's adopted public participation<br />

policy, a 45-day public comment period opened at<br />

on Tuesday, September 2, 2008. The public was<br />

encouraged to submit comments to the RTC in<br />

writing or by e-mail through Thursday, October 16,<br />

2008. The TIP, RTP and Appendices were available<br />

in both hard copy and CD format and were posted on<br />

the RTC’s website. Many individuals and interested<br />

parties were notified of the availability of the draft<br />

documents. During the consultation period a<br />

number of public meetings were held, as well as a<br />

public hearing in the RTP building.<br />

Details of the public outreach activities on the Plan,<br />

the comments received and the disposition of those<br />

comments are set out in Appendix 2 to the RTP and<br />

are presented to the RTC Board for consideration<br />

prior to approval of the RTP and TIP.<br />

The TIP and RTP, as modified in response to<br />

comments received, are available from the RTC on<br />

request and may be viewed online at the RTC’s<br />

website (http://www.rtcsouthernnevada.com/).<br />

All RTC Committee meetings are open to the public<br />

and notice is provided in accordance with the State<br />

of Nevada Open Meeting Law (NRS Chapter 241).<br />

Committee agendas and agenda backup materials,<br />

as well as technical and other reports documenting<br />

the development, refinement and update of the<br />

plan, TIP and other planning studies, are made<br />

available upon request. Public comment on<br />

products of the planning process is accepted in<br />

either written or oral format at all committee<br />

meetings.<br />

8<br />

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA


7: The Financial Plan<br />

Under SAFETEA-LU, the cost of projects included in<br />

the TIP must be consistent with the funds that can<br />

reasonably be expected to be available over the fouryear<br />

program period and reflect year of expenditure<br />

cost estimates. In agreement with NDOT and the<br />

federal agencies, a 3.4 percent inflation rate is used<br />

to determine year of expenditure cost estimates.<br />

A full explanation of the assumptions underlying the<br />

Financial Plan is set out in the RTP, which<br />

demonstrates the consistency of proposed<br />

transportation investments with already available<br />

and projected revenue sources between 2009 and<br />

2030, while showing that existing and proposed<br />

revenues also cover all forecast operation and<br />

maintenance costs.<br />

In developing the TIP, allowance was made for<br />

revised project costs and revenue projections in<br />

each program area to ensure that the TIP preserves<br />

consistency between programmed project costs and<br />

projected revenues. The selection of projects<br />

included for funding under federal programs<br />

administered by NDOT was made jointly by RTC and<br />

NDOT in accord with the procedures discussed in<br />

Section 5. The selection of projects under federal<br />

programs allocated to Southern Nevada are<br />

constrained by projected allocations to the Las<br />

Vegas non-attainment area under each program.<br />

As noted in the RTP, NDOT has made extensive use<br />

of Assembly Bill 595 Bond funding to advance the<br />

implementation of projects. Governor Gibbons<br />

signed AB 595 in June 2007 to provide funds for<br />

critically needed transportation projects. The<br />

principal on past bond issues is now being repaid<br />

out of current program revenues under the NHS and<br />

STP (Statewide) programs, considerably reducing the<br />

funding available for current projects. In addition,<br />

allowance has to be made for projects elsewhere in<br />

the state. Similar considerations apply to revenues<br />

from the State Gas Tax, which are needed to cover<br />

Bond debt service costs as well as current projects.<br />

The selection of projects for inclusion in the TIP<br />

takes account of current projections of revenues, the<br />

schedule of bond prepayments and debt service,<br />

and state-wide needs.<br />

The Fund Source Balance Sheets set out on the<br />

following pages show that the scheduled costs of<br />

projects funded in 2009-2012 are consistent with<br />

anticipated federal, state, and local resources.<br />

As discussed in the RTP, the locally funded regionally<br />

significant projects identified in the RTP and TIP are<br />

only part of a large program of projects funded under<br />

RTC Gas Tax and “Question 10” revenues. The<br />

projects identified for RTC local funding in the TIP for<br />

2009-2012 are selected from the financially<br />

constrained RTC Capital Improvement Program and<br />

are consistent with the planning assumptions made<br />

in the RTP.<br />

Other Local<br />

2%<br />

TIP Funding Sources<br />

Private<br />

13%<br />

RTC<br />

50%<br />

Federal<br />

19%<br />

Bonded against<br />

Federal<br />

0%<br />

State<br />

16%<br />

9<br />

TRANSPORTATION IMPROVEMENT PROGRAM 2009-2012<br />

DRAFT FINAL, NOVEMBER 2008


TIP Fund Source Balance Sheets<br />

Fund Source Balance Sheet<br />

2009 2010 2011 2012 Total<br />

Federal Highway Program Funds allocated to the State of Nevada<br />

National Highway <strong>System</strong> (NHS)<br />

Balance forward $100,000 $108,000 $798,000 $2,488,000 $100,000<br />

Anticipated allocation $68,518,000 $60,500,000 $60,500,000 $60,500,000 $250,018,000<br />

Contingency $14,000,000 $5,000,000 $5,000,000 $5,000,000 $29,000,000<br />

Bond repayment $45,000,000 $47,000,000 $50,000,000 $48,000,000 $190,000,000<br />

Available for programming $9,618,000 $8,608,000 $6,298,000 $9,988,000 $31,118,000<br />

Scheduled elsewhere in Nevada $810,000 $810,000 $810,000 $810,000 $3,240,000<br />

Scheduled in TIP $8,700,000 $7,000,000 $3,000,000 $3,000,000 $21,700,000<br />

Balance available $108,000 $798,000 $2,488,000 $6,178,000 $6,178,000<br />

Interstate Maintenance Program - for information only; individual projects are not scheduled in the TIP<br />

Anticipated statewide allocation $43,475,000 $35,000,000 $35,000,000 $35,000,000 $148,475,000<br />

Bridge Program - for information only; individual projects are not scheduled in the TIP<br />

Anticipated statewide allocation $10,950,000 $10,950,000 $11,000,000 $11,000,000 $43,900,000<br />

Safety Program - for information only; individual projects are not scheduled in the TIP<br />

Anticipated statewide allocation $10,500,000 $11,000,000 $11,000,000 $11,000,000 $43,500,000<br />

Surface <strong>Transportation</strong> Program - Statewide (STP-NV)<br />

Balance Forward $0 $2,038,000 $1,538,000 $8,038,000 $0<br />

Anticipated allocation $21,438,000 $18,500,000 $18,500,000 $18,500,000 $76,938,000<br />

Contingency $6,000,000 $5,000,000 $5,000,000 $5,000,000 $21,000,000<br />

Bond repayment $12,500,000 $7,000,000 $7,000,000 $7,000,000 $33,500,000<br />

Available for programming $2,938,000 $8,538,000 $8,038,000 $14,538,000 $22,438,000<br />

Scheduled elsewhere in Nevada $0 $0 $0 $0 $0<br />

Scheduled in TIP $900,000 $7,000,000 $0 $0 $7,900,000<br />

Balance available $2,038,000 $1,538,000 $8,038,000 $14,538,000 $14,538,000<br />

Surface <strong>Transportation</strong> Enhancement Program (STP-E)<br />

Scheduled in TIP $3,605,750 $0 $0 $0 $3,605,750<br />

Federal Highway Program Funds allocated to Southern Nevada<br />

Includes funds allocated to the Las Vegas <strong>Transportation</strong> Management Area, to Urbanized Areas in<br />

Clark County, to the Las Vegas Non-Attainment Area, or earmarked for projects in Southern Nevada.<br />

Surface <strong>Transportation</strong> Program - Urban (STP-Clark County)<br />

Balance Forward $0 $501,818 $3,262,618 $2,872,218 $0<br />

Anticipated allocation $23,501,000 $20,000,000 $20,400,000 $20,808,000 $84,709,000<br />

Contingency $1,800,000 $2,000,000 $2,040,000 $2,080,800 $7,920,800<br />

Available for programming $21,701,000 $18,501,818 $21,622,618 $21,599,418 $76,788,200<br />

Scheduled in TIP $21,199,182 $15,239,200 $18,750,400 $20,861,600 $76,050,382<br />

Balance available $501,818 $3,262,618 $2,872,218 $737,818 $737,818<br />

Congestion Mitigation and Air Quality Program (CMAQ)<br />

Balance Forward $7,500,000 $2,380,000 $3,267,800 $3,715,800 $7,500,000<br />

Anticipated allocation $16,237,000 $15,500,000 $15,500,000 $15,500,000 $62,737,000<br />

Contingency $4,000,000 $1,550,000 $1,550,000 $1,550,000 $8,650,000<br />

Available for programming $19,737,000 $16,330,000 $17,217,800 $17,665,800 $61,587,000<br />

Scheduled in TIP $17,357,000 $13,062,200 $13,502,000 $17,158,000 $61,079,200<br />

Balance available $2,380,000 $3,267,800 $3,715,800 $507,800 $507,800<br />

10<br />

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA


Fund Source Balance Sheet (contd) 2009 2010 2011 2012 Total<br />

Federal Highway Discretionary Program Funds allocated to projects in Southern Nevada<br />

Public, Federal and Forest Lands Highways Programs<br />

Balance forward $0 $1,960,000 $0 $0 $0<br />

Public Lands Highways $31,921,000 $0 $0 $0 $31,921,000<br />

Federal Lands Highways $3,100,000 $26,900,000 $610,000 $12,600,000 $43,210,000<br />

Forest Highways $0 $0 $0 $0 $0<br />

Available for programming $35,021,000 $28,860,000 $610,000 $12,600,000 $75,131,000<br />

Scheduled in TIP $33,061,000 $28,860,000 $610,000 $12,600,000 $75,131,000<br />

Balance available $1,960,000 $0 $0 $0 $0<br />

Other FHWA Discretionary Programs<br />

Balance forward $0 $0 $0 $0 $0<br />

Interstate Maintenance Discretionary $1,351,300 $0 $0 $0 $1,351,300<br />

<strong>Transportation</strong>, Community and <strong>System</strong><br />

Preservation Program $980,000 $0 $0 $0 $980,000<br />

Available for programming $2,331,300 $0 $0 $0 $2,331,300<br />

Scheduled in TIP $2,331,300 $0 $0 $0 $2,331,300<br />

Balance available $0 $0 $0 $0 $0<br />

Federal Funds earmarked for highway and transit projects in Southern Nevada<br />

FFY2002 Appropriations $500,000 $0 $0 $0 $500,000<br />

FFY2004 Appropriations $7,700,000 $0 $0 $0 $7,700,000<br />

SAFETEA-LU High Priority Projects $90,193,372 $0 $0 $0 $90,193,372<br />

SAFETEA-LU <strong>Transportation</strong> Improvements $44,263,975 $0 $0 $0 $44,263,975<br />

FFY2006 Appropriations $148,500 $0 $0 $0 $148,500<br />

FFY2008 Appropriations $1,176,000 $0 $0 $0 $1,176,000<br />

Anticipated Appropriations $980,000 $0 $0 $0 $980,000<br />

Available $144,961,847 $0 $0 $0 $144,961,847<br />

Scheduled highway projects $132,340,704 $11,121,143 $0 $0 $143,461,847<br />

Scheduled transit projects $1,500,000 $0 $0 $0 $1,500,000<br />

Scheduled in TIP $133,840,704 $11,121,143 $0 $0 $144,961,847<br />

Balance available $11,121,143 $0 $0 $0 $0<br />

Federal Transit Administration Funds allocated to Southern Nevada<br />

S.5307 Urbanized Area Formula Program<br />

Balance Forward $0 $527,155 $89,364 $70,769 $0<br />

Anticipated allocation $25,097,852 $25,599,809 $26,111,805 $26,634,041 $103,443,508<br />

Transfers in $3,182,400 $3,182,400<br />

Contingency<br />

Available for programming $28,280,252 $26,126,964 $26,201,169 $26,704,811 $106,625,908<br />

Enhancement projects $480,000 $776,000 $304,000 $312,000 $1,872,000<br />

Security-related projects $288,000 $296,000 $304,000 $312,000 $1,200,000<br />

General formula projects $26,985,097 $24,965,600 $25,522,400 $25,692,000 $103,165,097<br />

Scheduled in TIP $27,753,097 $26,037,600 $26,130,400 $26,316,000 $106,237,097<br />

Balance available $527,155 $89,364 $70,769 $388,811 $388,811<br />

S.5309 Bus and Bus-Related Discretionary Program<br />

Balance Forward $8,453,613 $0 $0 $0 $8,453,613<br />

Anticipated allocation $0 $0 $0 $0 $0<br />

Available for programming $8,453,613 $0 $0 $0 $8,453,613<br />

Scheduled in TIP $8,453,613 $0 $0 $0 $8,453,613<br />

Balance $0 $0 $0 $0<br />

$0<br />

S.5309 New Starts Program<br />

Balance Forward $992,000 $0 $0 $0 $992,000<br />

Anticipated allocation $0 $0 $0 $0 $0<br />

Available for programming $992,000 $0 $0 $0 $992,000<br />

Scheduled in TIP $992,000 $0 $0 $0 $992,000<br />

Balance $0 $0 $0 $0<br />

$0<br />

11<br />

TRANSPORTATION IMPROVEMENT PROGRAM 2009-2012<br />

DRAFT FINAL, NOVEMBER 2008


Fund Source Balance Sheet (contd) 2009 2010 2011 2012 Total<br />

Federal Transit Administration Funds allocated to Southern Nevada (contd)<br />

S.5316, S.5317 Job Access and Reverse Commute and New Freedom Programs<br />

Balance Forward $0 $0 $0 $0 $0<br />

S.5316 anticipated allocation $755,823 $786,056 $817,498 $850,198 $3,209,575<br />

S.5317 anticipated allocation $487,675 $507,182 $527,469 $548,568 $2,070,894<br />

Available for programming $1,243,498 $1,293,238 $1,344,967 $1,398,766 $5,280,469<br />

S.5316 $755,823 $786,056 $817,498 $850,198 $3,209,575<br />

S.5317 $487,675 $507,182 $527,469 $548,568 $2,070,894<br />

Scheduled in TIP $1,243,498 $1,293,238 $1,344,967 $1,398,766 $5,280,469<br />

Balance available $0 $0 $0 $0 $0<br />

Federal Transit Program Funds allocated to the State of Nevada<br />

S.5311 Small Urban and Rural Public <strong>Transportation</strong> Program<br />

Balance forward $7,548,792 $8,084,160 $8,331,746 $8,252,532 $7,548,792<br />

Anticipated allocation $4,875,981 $5,022,260 $5,172,928 $5,328,116 $20,399,285<br />

Available for programming $12,424,773 $13,106,420 $13,504,674 $13,580,648 $27,948,077<br />

Scheduled elsewhere in Nevada $2,965,737 $3,262,310 $3,588,542 $3,947,396 $13,763,985<br />

Scheduled in TIP $1,374,876 $1,512,364 $1,663,600 $1,829,960 $6,380,800<br />

Balance available $8,084,160 $8,331,746 $8,252,532 $7,803,292 $7,803,292<br />

Federal Railroad Administration Funds<br />

FRA Funding<br />

Scheduled in TIP $0 $3,000,000 $0 $0 $3,000,000<br />

State Funds allocated to projects in Southern Nevada<br />

Bonded Funds<br />

Anticipated bond proceeds $112,945,000 $112,945,000<br />

Scheduled elsewhere in Nevada $102,945,000 $102,945,000<br />

Scheduled in TIP $10,000,000 $10,000,000<br />

Balance $0 $0<br />

NDOT State Gas Tax<br />

Financing Costs $60,000,000 $60,000,000 $55,000,000 $52,000,000 $227,000,000<br />

Scheduled elsewhere in Nevada $28,950,000 $750,000 $750,000 $750,000 $31,200,000<br />

Scheduled in TIP $46,500,000 $12,000,000 $0 $0 $58,500,000<br />

AB 595 Funds<br />

Balance Forward $3,600,000 $8,920,412 $26,513,060 $23,952,425 $3,600,000<br />

Car rental tax supplement $3,690,000 $3,782,250 $3,876,806 $3,973,726 $15,322,783<br />

Ad Valorem Property Tax $9,130,412 $14,380,399 $20,132,558 $26,423,983 $70,067,351<br />

Program revenues $12,820,412 $18,162,649 $24,009,364 $30,397,709 $85,390,134<br />

Bond Proceeds $7,500,000 $0 $126,500,000 $0 $134,000,000<br />

LVCVA Bond Proceeds $272,000,000 $0 $0 $0 $272,000,000<br />

Financing Proceeds $279,500,000 $0 $126,500,000 $0 $406,000,000<br />

Total for Capital Program $295,920,412 $27,083,060 $177,022,425 $54,350,134 $494,990,134<br />

Financing Costs $0 $570,000 $570,000 $10,184,000 $11,324,000<br />

Available for programming $295,920,412 $26,513,060 $176,452,425 $44,166,134 $483,666,134<br />

Scheduled in TIP $287,000,000 $0 $152,500,000 $4,000,000 $443,500,000<br />

Balance $8,920,412 $26,513,060 $23,952,425 $40,166,134 $40,166,134<br />

Nevada State General Fund<br />

Scheduled in TIP $0 $0 $16,000,000 $0 $16,000,000<br />

12<br />

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA


RTC Funds<br />

RTC Gas Tax Program<br />

Balance Forward $30,252,634 $250,783 $254,679 $254,361 $30,252,634<br />

Fuel Tax Revenues $71,955,268 $72,674,821 $73,401,569 $74,135,585 $292,167,244<br />

Other revenues $8,705,053 $8,005,016 $8,005,094 $6,755,087 $31,470,249<br />

Program revenues $80,660,321 $80,679,837 $81,406,663 $80,890,672 $323,637,493<br />

Financing Proceeds $154,650,000 $214,940,000 $1,280,000 $4,650,000 $375,520,000<br />

Total for Capital Program $235,310,321 $295,619,837 $82,686,663 $85,540,672 $699,157,493<br />

Financing Costs $40,412,172 $217,433,441 $34,387,856 $45,091,897 $337,325,366<br />

Program overheads $19,900,000 $20,582,500 $21,299,125 $22,051,581 $83,833,206<br />

Available for programming $205,250,783 $57,854,679 $27,254,361 $18,651,555 $308,251,555<br />

Scheduled in TIP $67,586,000 $16,565,000 $2,927,000 $0 $87,078,000<br />

Other non-regionally significant projects $134,564,794 $41,063,000 $19,039,000 $18,476,000 $213,142,794<br />

Balance $3,099,989 $226,679 $5,288,361 $175,555 $8,030,761<br />

Q.10 Programs<br />

Balance Forward $15,385,626 $135,331 $11,623,241 $1,190,586 $15,385,626<br />

Sales Tax Revenues $43,625,000 $44,933,750 $46,281,763 $47,670,215 $182,510,728<br />

Other revenues $21,489,856 $22,134,452 $22,798,412 $23,482,309 $89,905,029<br />

Revenues $65,114,856 $67,068,202 $69,080,175 $71,152,524 $272,415,757<br />

Financing Proceeds $97,126,757 $56,552,252 $49,348,265 $231,684,054 $434,711,328<br />

Total for Capital Program $162,241,613 $123,620,454 $118,428,440 $302,836,578 $707,127,085<br />

Financing Costs $14,920,699 $12,063,135 $14,013,893 $196,455,175 $237,452,901<br />

Operating costs of Q.10 Programs $13,924,965 $14,886,408 $15,879,202 $16,981,401 $61,671,976<br />

Available for programming $148,781,576 $96,806,241 $100,158,586 $90,590,589 $423,387,834<br />

Scheduled in TIP $88,338,130 $68,176,000 $82,102,000 $55,063,000 $293,679,130<br />

Other non-regionally significant projects $60,308,115 $17,007,000 $16,866,000 $16,729,776 $110,910,891<br />

Balance $135,331 $11,623,241 $1,190,586 $18,797,813 $18,797,813<br />

RTC Transit Program<br />

Balance Forward $99,645,146 $59,023,937 $1,772,520 $12,281 $99,645,146<br />

Sales Tax Revenues $130,875,000 $136,764,375 $142,918,772 $149,350,117 $559,908,263<br />

Bus and Rapid Transit farebox revenues $52,075,000 $60,700,000 $71,868,000 $77,592,942 $262,235,942<br />

Paratransit recvenues $775,000 $800,000 $825,000 $850,000 $3,250,000<br />

Other revenues $3,750,000 $5,039,341 $5,845,910 $6,562,109 $21,197,360<br />

Revenues $187,475,000 $203,303,716 $221,457,682 $234,355,168 $846,591,566<br />

Financing Proceeds $0 $0 $0 $0 $0<br />

Total for Transit <strong>System</strong> $287,120,146 $262,327,654 $223,230,202 $234,367,449 $946,236,712<br />

Bus system operations $97,388,248 $102,257,660 $102,257,660 $105,325,390 $407,228,959<br />

Paratransit system operations $30,134,299 $31,490,342 $32,907,408 $34,388,241 $128,920,291<br />

Fuel $30,000,000 $30,900,000 $31,827,000 $32,781,810 $125,508,810<br />

Other operating costs $17,477,453 $18,001,777 $18,541,830 $19,098,085 $73,119,144<br />

Administartive overhead $25,320,121 $29,211,154 $30,963,823 $32,821,652 $118,316,751<br />

Transit system costs $200,320,121 $211,860,933 $216,497,721 $224,415,179 $853,093,955<br />

Financing Costs $0 $0 $0 $0 $0<br />

Available for capital program $86,800,024 $50,466,720 $6,732,481 $9,952,270 $93,142,757<br />

Scheduled in TIP $27,776,087 $48,694,200 $6,720,200 $6,769,400 $89,959,887<br />

Balance $59,023,937 $1,772,520 $12,281 $3,182,870 $3,182,870<br />

Other local funds<br />

Clark County Beltway Program<br />

Scheduled in TIP $512,459,000 $287,474,000 $324,340,000 $32,600,000 $1,156,873,000<br />

Other local public funds<br />

Clark County Department of Avaiation / FAA $1,500,000 $25,200,000 $4,000,000 $15,300,000 $46,000,000<br />

Other local funds $9,069,498 $912,852 $949,365 $10,987,340 $21,919,055<br />

Scheduled in TIP $10,569,498 $26,112,852 $4,949,365 $26,287,340 $67,919,055<br />

Private development funds<br />

Las Vegas Monorail Corporation funding<br />

Las Vegas Monorail Corp $150,000,000 $75,000,000 $75,000,000 $50,000,000 $350,000,000<br />

TIFIA loan proceeds (for LVMC) $0 $25,000,000 $25,000,000 $50,000,000 $100,000,000<br />

Scheduled in TIP $150,000,000 $100,000,000 $100,000,000 $100,000,000 $450,000,000<br />

Other private development funds<br />

Scheduled in TIP $0 $0 $92,500,000 $0 $92,500,000<br />

Total Scheduled in TIP $1,461,040,735 $673,147,797 $847,039,932 $307,884,066 $3,289,112,530<br />

13<br />

TRANSPORTATION IMPROVEMENT PROGRAM 2009-2012<br />

DRAFT FINAL, NOVEMBER 2008


8: The <strong>Transportation</strong> Improvement<br />

Program 2009-2012: Project lists<br />

and Maps<br />

A list of the projects included in the TIP for FY 2009-<br />

2012, begins on page 15.<br />

The TIP includes all regionally significant projects<br />

scheduled for funding in the four fiscal years, 2009<br />

to 2012, regardless of funding source (see box).<br />

<strong>Regional</strong>ly Significant Projects<br />

The term <strong>Regional</strong>ly Significant Project is<br />

defined in Federal Regulation to mean a project<br />

that is on a facility which serves regional<br />

transportation needs, including, at a minimum,<br />

all principal arterial highways and all fixed<br />

guideway transit facilities that offer a<br />

significant alternative to regional highway<br />

travel.<br />

The TIP is also required to include all projects<br />

that are proposed for federal funding or may<br />

involve other federal action. (“Federal” in this<br />

case means funding or actions by the Federal<br />

Highway and Federal Transit Administrations).<br />

appear when incorporated into the Nevada<br />

Statewide <strong>Transportation</strong> Improvement Program.<br />

Project implementation<br />

The TIP identifies projects for funding. For<br />

construction projects, it shows if the funding is for<br />

construction or just for the earlier stages, such as<br />

preliminary engineering or the acquisition of rightof-way.<br />

Typically, projects are built within a year or<br />

so of being funded, and the anticipated completion<br />

date of each project is shown for information in the<br />

tables.<br />

Larger projects may be built over a long time frame,<br />

and project schedules are liable to change. Anyone<br />

requiring information about the implementation or<br />

construction schedule for specific projects should<br />

contact the sponsoring agency.<br />

In Table 1, TIP projects are listed by sponsoring<br />

jurisdiction. Projects having multiple fund sources<br />

are grouped together under each project.<br />

The location of projects included in the TIP is<br />

illustrated on a set of maps that follow the project<br />

listing:<br />

Street and Highway Projects<br />

<strong>Intelligent</strong> <strong>Transportation</strong> <strong>System</strong> (ITS) Projects<br />

and other operational improvements<br />

Alternate Mode (Bicycle and Pedestrian)<br />

Projects and environmental improvements<br />

Transit Projects<br />

TIP projects outside of the Las Vegas Valley<br />

Downtown Las Vegas Detail<br />

Area-wide projects are noted on the maps.<br />

For convenience, the TIP projects are also listed in<br />

Table 2 by funding source in the order that they will<br />

14<br />

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA


<strong>Regional</strong> <strong>Transportation</strong> Commission of Southern Nevada<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Clark County<br />

Table 1: Projects by Sponsoring Entity<br />

Project # 108 Location: Cactus Ave. at I-15 From: Dean Martin Dr. To: Las Vegas Blvd.<br />

Description: Construct an interchange<br />

FYComplete: 2013 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$50,133,080<br />

CL200516<br />

FY04 Appropriations Act, S.115 $200,000 $0<br />

$0 $0<br />

Interstate Maintenance Discretionary $861,300 $0<br />

$0 $0<br />

Q10 High Speed Lane Miles Program $2,799,000 $0<br />

$5,157,000 $7,272,000<br />

SAFETEA-LU High Priority Projects $6,843,780 $0<br />

$0 $0<br />

STP Clark County $0 $0<br />

$9,000,000 $18,000,000<br />

Project # 506 Location: CC-215 Northern Beltway From: Tenaya Way To: Decatur Blvd.<br />

Description: Upgrade to 6-lane freeway with interchanges at Jones Blvd. and Decatur Blvd. and an overpass at Bradley Rd FYComplete: 2010 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $150,360,000<br />

Clark County Beltway Program $150,360,000 $0<br />

$0 $0<br />

Project # 507 Location: CC-215 Northern Beltway From: Decatur Blvd. To: North Fifth St.<br />

Description: Upgrade to 6-lane freeway with interchanges at Revere St and North 5th St.<br />

FYComplete: 2011 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $115,599,000<br />

Clark County Beltway Program $115,599,000 $0<br />

$0 $0<br />

Project # 508 Location: CC-215 Northern Beltway From: North Fifth St. To: Range Rd.<br />

Description: Upgrade to 6-lane freeway with interchanges at Losee Rd., Pecos Rd., Lamb Blvd., and Range Rd.<br />

FYComplete: 2011 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $118,700,000<br />

Clark County Beltway Program $118,700,000 $0<br />

$0 $0<br />

Project # 509 Location: CC-215 Northern Beltway From: @ I-15 To:<br />

Description: Upgrade to system-to-system interchange and widen to 6 lanes<br />

FYComplete: 2013<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$118,721,143<br />

CL200835<br />

Clark County Beltway Program $0 $0<br />

$107,600,000 $0<br />

SAFETEA-LU High Priority Projects $0 $11,121,143 $0 $0<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 15


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Clark County<br />

Table 1: Projects by Sponsoring Entity<br />

Project # 926 Location: CC-215 Northern Beltway @ US.95 From: Hualapai Way To: Tenaya Way<br />

Description: Upgrade to system-to-systsem interchange and widen to 6 lanes<br />

FYComplete: 2013 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$228,009,643<br />

CL200704<br />

Clark County Beltway Program $0 $0<br />

$216,740,000 $0<br />

FY06 Appropriations Act, S.112 $148,500 $0<br />

$0 $0<br />

SAFETEA-LU High Priority Projects $11,121,143 $0<br />

$0 $0<br />

Project # 504 Location: CC-215 Western Beltway From: Alta Dr To: north of Summerlin Pkwy<br />

Description: Construct interchanges at Far Hills Ave and Summerlin Pkwy and widen to 6 lanes from Charleston Blvd to Summerlin<br />

Pkwy.<br />

FYComplete: 2010 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $127,800,000<br />

Clark County Beltway Program $127,800,000 $0<br />

$0 $0<br />

Project # 510 Location: CC-215 Western Beltway From: Craig Rd. To: Hualapai Way (North)<br />

Description: Upgrade to 6-lane freeway with interchanges at Lone Mountain Rd and Ann Rd and an overpass at Centennial Pkwy. FYComplete: 2012 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $134,300,000<br />

Clark County Beltway Program $0 $134,300,000 $0 $0<br />

Project # 2709 Location: Durango Dr. From: CC-215 Southern Beltway To: Desert Inn Rd.<br />

Description: Signal interconnects and timing infrastructure<br />

FYComplete: 2011 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$1,365,000<br />

CL200834<br />

CMAQ $700,000 $665,000 $0 $0<br />

Project # 2746 Location: Eastern Ave From: Serene Ave To: Flamingo Rd<br />

Description: ITS and signal infrastructure improvements<br />

FYComplete: 2010 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $4,958,000<br />

Q10 Traffic Signals & ITS Programs $4,958,000 $0<br />

$0 $0<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 16


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Clark County<br />

Table 1: Projects by Sponsoring Entity<br />

Project # 221 Location: I-215 Southern Beltway From: @ Airport Connector To:<br />

Description: Upgrade Interchange, expand mainline from I-15 to Windmill Ln.<br />

FYComplete: 2012<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$181,477,930<br />

CL200483<br />

CCDOA $0 $23,000,000 $0 $0<br />

Clark County Beltway Program $0 $153,174,000 $0 $0<br />

SAFETEA-LU High Priority Projects $5,303,930 $0<br />

$0 $0<br />

Project # 228 Location: I-215 Southern Beltway From: Eastern Ave. To: Windmill Ln.<br />

Description: Widen from 6 to 8 lanes<br />

FYComplete: 2013 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $32,600,000<br />

Clark County Beltway Program $0 $0<br />

$0 $32,600,000<br />

Project # 1584 Location: I-215 Southern Beltway From: at Eastern Ave To:<br />

Description: Interchange landscaping<br />

FYComplete: 2009<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $498,750<br />

STP Enhancements $498,750 $0<br />

$0 $0<br />

Project # 3002 Location: Laughlin From: Needles Hwy. To: Bullhead City, AZ<br />

Description: Construct new Colorado River bridge and related road works<br />

FYComplete: 2013 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$56,398,505<br />

CL2006108<br />

Public Lands Highways $1,000,000 $0<br />

$0 $0<br />

Q10 High Speed Lane Miles Program $0 $0<br />

$5,000,000 $25,000,000<br />

SAFETEA-LU <strong>Transportation</strong> Improvements $15,398,505 $0<br />

$0 $0<br />

Western AZ Council of Governments $0 $0<br />

$0 $10,000,000<br />

Project # 1573 Location: Ozone Non-Attainment Area - Clark County From: To:<br />

Description: Various measures to reduce Ozone emissions, to be determined in the Ozone SIP<br />

FYComplete: 2013<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$5,300,000<br />

CL2006110<br />

CMAQ $0 $0<br />

$2,600,000 $2,700,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 17


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Clark County<br />

Table 1: Projects by Sponsoring Entity<br />

Project # 551 Location: Rainbow Blvd. From: CC-215 Southern Beltway To: Tropicana Ave.<br />

Description: Widen from 4 to 6 lanes<br />

FYComplete: 2011 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$3,640,000<br />

CL200666<br />

Q10 High Speed Lane Miles Program $500,000 $2,095,000 $1,045,000 $0<br />

Project # 2702 Location: Silverado Ranch Blvd. From: @ Dean Martin Dr To:<br />

Description: Develop a park-and-ride lot and related facilities to serve the I-15 South corridor<br />

FYComplete: 2009<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$1,000,000<br />

CL200667<br />

STP Clark County $1,000,000 $0<br />

$0 $0<br />

Project # 112 Location: SR 604 Las Vegas Blvd. South From: SR 146 St.Rose Pkwy To: Serene Ave.<br />

Description: Widen to 6 Lanes<br />

FYComplete: 2010 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$3,500,000<br />

CL200613<br />

STP Clark County $3,500,000 $0<br />

$0 $0<br />

Project # 113 Location: SR 604 Las Vegas Blvd. South From: Serene Ave. To: Sunset Rd.<br />

Description: Widen to 6 Lanes<br />

FYComplete: 2010 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$2,552,182<br />

CL200517<br />

STP Clark County $2,552,182 $0<br />

$0 $0<br />

Project # 2733 Location: Tropicana Ave From: Rainbow Blvd To: Wynn Rd<br />

Description: ITS and signal infrastructure improvements<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $169,000<br />

Q10 Traffic Signals & ITS Programs $169,000 $0<br />

$0 $0<br />

Total for Clark County $570,013,090 $324,355,143 $347,142,000 $95,572,000 Total Scheduled: $1,337,082,233<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 18


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Clark County Dept of Air Quality and Environmental Management<br />

Table 1: Projects by Sponsoring Entity<br />

Project # 2707 Location: Off-road diesel engine retrofit program From: To:<br />

Description: Off-road diesel engine retrofits<br />

FYComplete: 2020<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$726,200<br />

CL200836<br />

CMAQ $365,000 $361,200 $0 $0<br />

Project # 1572 Location: Truck stops - various locations From: To:<br />

Description: Truck stop electrification to reduce emissions from trucks parked at various facilities<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$1,280,000<br />

CL2006113<br />

CMAQ $640,000 $640,000 $0 $0<br />

Total for Clark County Dept of Air Quality and En $1,005,000 $1,001,200 $0 $0<br />

Total Scheduled: $2,006,200<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 19


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Clark County Dept of Aviation<br />

Table 1: Projects by Sponsoring Entity<br />

Project # 4202 Location: I-15 From: @ MP 3 To:<br />

Description: Construct Ivanpah interchange on I-15 to access the airport<br />

FYComplete: 2011<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $9,100,000<br />

CCDOA and FAA Combination $0 $0<br />

$1,300,000 $7,800,000<br />

Project # 4266 Location: Ivanpah Expwy From: Proposed Ivanpah Valley Airport To: I-15 near MP 22<br />

Description: PE and RoW for new expressway from Ivanpah Airport to I-15 south of Sloan Rd, including interchange with I-15 FYComplete: 2012 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $9,000,000<br />

CCDOA and FAA Combination $1,500,000 $2,000,000 $2,500,000 $3,000,000<br />

Project # 4203 Location: SR. 604 Las Vegas Blvd South From: Proposed Ivanpah Valley Airport To: Jean<br />

Description: Construct Las Vegas Blvd. South as 2-lane arterial roadway from Ivanpah Airport to Jean<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $4,900,000<br />

CCDOA $0 $200,000 $200,000 $4,500,000<br />

Total for Clark County Dept of Aviation $1,500,000 $2,200,000 $4,000,000 $15,300,000 Total Scheduled: $23,000,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 20


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

City of Henderson<br />

Table 1: Projects by Sponsoring Entity<br />

Project # 4232 Location: Eastern Ave. From: Serene To: Sunridge<br />

Description: Signal and intersection improvements<br />

FYComplete: 2009<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $280,000<br />

Q10 Traffic Signals & ITS Programs $280,000 $0<br />

$0 $0<br />

Project # 4025 Location: I-15 From: @ Starr Av. To:<br />

Description: PE and RW for new Interchange<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$7,333,780<br />

CL200901<br />

Interstate Maintenance Discretionary $490,000 $0<br />

$0 $0<br />

SAFETEA-LU High Priority Projects $6,843,780 $0<br />

$0 $0<br />

Project # 134 Location: I-515 From: @ Galleria Dr. To:<br />

Description: Construct interchange and construct Galleria Dr. 4 lanes between Stephanie and Boulder Hwy.<br />

FYComplete: 2011<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$61,926,000<br />

CL200435<br />

Q10 High Speed Lane Miles Program $40,009,000 $11,531,000 $0 $0<br />

RTC Gas Tax - Area-Wide Program $10,386,000 $0<br />

$0 $0<br />

Project # 843 Location: SR 564 Lake Mead Pkwy. From: Boulder Highway To: Lake Mead National Recreation<br />

Area<br />

Description: Widen to 6 lanes<br />

FYComplete: 2012 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$41,072,080<br />

CL200521<br />

FY08 Appropriations Act, S.129 $196,000 $0<br />

$0 $0<br />

Public Lands Highways $14,000,000 $0<br />

$0 $0<br />

SAFETEA-LU High Priority Projects $3,764,080 $0<br />

$0 $0<br />

STP Clark County $0 $14,500,000 $8,000,000 $0<br />

STP Enhancements $612,000 $0<br />

$0 $0<br />

Project # 1585 Location: Sunset Rd From: at I-515 To:<br />

Description: Interchange landscaping<br />

FYComplete: 2009<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $650,000<br />

STP Enhancements $650,000 $0<br />

$0 $0<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 21


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

City of Henderson<br />

Table 1: Projects by Sponsoring Entity<br />

Total for City of Henderson $77,230,860 $26,031,000 $8,000,000 $0<br />

Total Scheduled: $111,261,860<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 22


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

City of Las Vegas<br />

Table 1: Projects by Sponsoring Entity<br />

Project # 740 Location: Bonneville Ave. / Clark Ave. Couplet From: Main St. To: Charleston Blvd.<br />

Description: Convert to one-way couplet, 3 lanes in each direction; add landscaping between Casino Center Dr and Las Vegas Blvd FYComplete: 2010 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $13,114,000<br />

RTC Gas Tax $6,900,000 $5,564,000 $0 $0<br />

STP Enhancements $650,000 $0<br />

$0 $0<br />

Project # 1561 Location: City of Las Vegas From: Union Park To: Main St<br />

Description: Construct pedestrian overbridge across UPRR<br />

FYComplete: 2009<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$3,500,000<br />

CL2006105<br />

FY04 Appropriations Act, S.115 $500,000 $0<br />

$0 $0<br />

Local Funds $3,000,000 $0<br />

$0 $0<br />

Project # 2747 Location: Craig Rd From: Tenaya Way To: Decatur Blvd<br />

Description: ITS and signal infrastructure improvements<br />

FYComplete: 2010 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $511,000<br />

Q10 Traffic Signals & ITS Programs $511,000 $0<br />

$0 $0<br />

Project # 129 Location: Horse Dr. @ US-95 From: Grand Canyon Dr. To: Fort Apache Rd.<br />

Description: Construct 6-lane overpass with an interchange at US.95<br />

FYComplete: 2011 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$42,345,268<br />

CL200476<br />

Q10 High Speed Lane Miles Program $4,280,000 $15,000,000 $0 $0<br />

RTC Gas Tax - Area-Wide Program $16,043,000 $2,916,000 $0 $0<br />

SAFETEA-LU High Priority Projects $4,106,268 $0<br />

$0 $0<br />

Project # 4267 Location: Kyle Canyon Rd. From: at US.95 To:<br />

Description: PE and RoW for interchange at Kyle Canyon Rd and US95<br />

FYComplete: 2012<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $6,854,000<br />

RTC Gas Tax $1,000,000 $2,927,000 $2,927,000 $0<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 23


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

City of Las Vegas<br />

Table 1: Projects by Sponsoring Entity<br />

Project # 1578 Location: Rainbow Blvd. From: Desert Inn Rd. To: US-95<br />

Description: Intersection improvements at Desert Inn Rd, Oakey Blvd, Charleston Blvd and Alta Dr.<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$7,350,000<br />

CL200669<br />

CMAQ $2,600,000 $900,000 $0 $0<br />

Q10 Bus Turnout Program $1,500,000 $0<br />

$0 $0<br />

Q10 High Speed Lane Miles Program $200,000 $2,150,000 $0 $0<br />

Project # 1579 Location: Rainbow Blvd. From: at Sahara Ave To:<br />

Description: Intersection improvements<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$5,300,000<br />

CL200902<br />

CMAQ $0 $3,100,000 $0 $0<br />

Q10 High Speed Lane Miles Program $0 $800,000 $1,400,000 $0<br />

Project # 2708 Location: Rancho Dr. From: Sahara Ave. To: Rainbow Blvd.<br />

Description: Signal interconnects and timing infrastructure<br />

FYComplete: 2010 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$5,480,000<br />

CL200837<br />

CMAQ $5,480,000 $0<br />

$0 $0<br />

Project # 4263 Location: Sheep Mountain Pkwy. From: @ US-95 & CC-215 Western Beltway To:<br />

Description: PE and right-of-way for the construction of interchanges<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $14,999,000<br />

RTC Gas Tax - Area-Wide Program $14,999,000 $0<br />

$0 $0<br />

Project # 4271 Location: Sheep Mountain Pkwy. From: CC-215 Western Beltway near Ann Rd To: I-15 North<br />

Description: Reserve Right-of-Way for future roadway<br />

FYComplete: 2011<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $0<br />

City of Las Vegas (BLM Reservation) $0 $0<br />

$0 $0<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 24


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

City of Las Vegas<br />

Table 1: Projects by Sponsoring Entity<br />

Project # 4027 Location: Sheep Mountian Pkwy. From: CC-215 Western Beltway near Ann Rd To: I-15<br />

Description: PE and NEPA process/environmental assessment for new roadway<br />

FYComplete: 2009<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$9,356,000<br />

CL20090151<br />

FY08 Appropriations Act, S.129 $735,000 $0<br />

$0 $0<br />

Q10 High Speed Lane Miles Program $5,353,000 $600,000 $0 $0<br />

RTC Gas Tax $2,668,000 $0<br />

$0 $0<br />

Project # 4089 Location: Stewart Ave From: Main St. To: Maryland Parkway<br />

Description: Landscaping and roadway rehabilitation<br />

FYComplete: 2009 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $3,424,000<br />

RTC Gas Tax $924,000 $1,900,000 $0 $0<br />

STP Enhancements $600,000 $0<br />

$0 $0<br />

Project # 894 Location: Summerlin Pkwy. From: CC-215 Western Beltway To: US-95<br />

Description: Widen to 8 lanes<br />

FYComplete: 2015<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$3,560,000<br />

CL200668<br />

Q10 High Speed Lane Miles Program $560,000 $0<br />

$0 $3,000,000<br />

Total for City of Las Vegas $72,609,268 $35,857,000 $4,327,000 $3,000,000 Total Scheduled: $115,793,268<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 25


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Las Vegas Monorail Company<br />

Table 1: Projects by Sponsoring Entity<br />

Project # 4200 Location: Las Vegas Monorail From: McCarren International Airport To: MGM Hotel Monorail Station<br />

Description: Design/permit/construct dual quideway monorail from the existing Las Vegas Monorail Station<br />

FYComplete: 2012 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $450,000,000<br />

LVMC funding $150,000,000 $75,000,000 $75,000,000 $50,000,000<br />

TIFIA $0 $25,000,000 $25,000,000 $50,000,000<br />

Total for Las Vegas Monorail Company $150,000,000 $100,000,000 $100,000,000 $100,000,000 Total Scheduled: $450,000,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 26


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

City of Mesquite<br />

Table 1: Projects by Sponsoring Entity<br />

Project # 961 Location: I-15 From: @ Mile Post 108 To:<br />

Description: Construct new interchange to serve Mesquite Airport<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$6,843,780<br />

CL200603<br />

SAFETEA-LU High Priority Projects $6,843,780 $0<br />

$0 $0<br />

Project # 4140 Location: I-15 From: @ Mile Post 118 Pioneer Blvd.<br />

To:<br />

Extension<br />

Description: Construct new interchange (PE)<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$4,684,378<br />

CL200801<br />

Local Funds $4,000,000 $0<br />

$0 $0<br />

SAFETEA-LU High Priority Projects $684,378 $0<br />

$0 $0<br />

Total for City of Mesquite $11,528,158 $0 $0 $0<br />

Total Scheduled: $11,528,158<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 27


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Nevada Department of <strong>Transportation</strong><br />

Table 1: Projects by Sponsoring Entity<br />

Project # 4158 Location: CC 215 Interchanges From: I-215 from the Airport Connector To: I-15 North<br />

Description: PE for the construction of four regional beltway interchanges<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$1,078,000<br />

CL200923<br />

Public Lands Highways $1,078,000 $0<br />

$0 $0<br />

Project # 163 Location: FAST Freeway Management <strong>System</strong> From: To:<br />

Description: Institution and operation of a Freeway & Arterial Management <strong>System</strong> of <strong>Transportation</strong> (FAST) (PE, RW, Const.) FYComplete: 2012<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$39,000,000<br />

CL2000104<br />

National Highway <strong>System</strong> $1,500,000 $1,500,000 $1,500,000 $1,500,000<br />

NDOT State Gas Tax $32,000,000 $0<br />

$0 $0<br />

SAFETEA-LU High Priority Projects $1,000,000 $0<br />

$0 $0<br />

Project # 235 Location: Freeway Service Patrol From: To:<br />

Description: Operation of a motorist assistance program on I-15 from the Jean Interchange to the Apex Interchange and on US 95/I-<br />

515 from Railroad Pass to SR.157<br />

FYComplete: 2030<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$6,000,000<br />

CL2003128<br />

National Highway <strong>System</strong> $1,500,000 $1,500,000 $1,500,000 $1,500,000<br />

Project # 166 Location: I-15 From: I-515/US-95 Interchange (Spaghetti To: SR.573 Craig Rd.<br />

Bowl)<br />

Description: Widen from 6 to 10 lanes from US 95/I-515 to Lake Mead Blvd.; Widen from 4 to 8 Lanes from Lake Mead Blvd. to SR<br />

573 Craig Road.<br />

FYComplete: 2011 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$7,000,000<br />

CL200473<br />

Public Lands Highways $7,000,000 $0<br />

$0 $0<br />

Project # 4023 Location: I-15 From: Las Vegas Valley To:<br />

Description: PE and Right-of-Way for various widening and interchange improvements<br />

FYComplete: 2012<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$6,843,780<br />

CL200804<br />

SAFETEA-LU High Priority Projects $6,843,780 $0<br />

$0 $0<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 28


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Nevada Department of <strong>Transportation</strong><br />

Table 1: Projects by Sponsoring Entity<br />

Project # 4138 Location: I-15 From: Sahara Ave. To: I-515/US 95 Interchange (Spaghetti<br />

Bowl)<br />

Description: PE and Right-of-Way for widening to 10 lanes, to include HOV lanes, plus auxiliary lanes and collector/distributer roads FYComplete: 2010 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$5,000,000<br />

CL200365<br />

National Highway <strong>System</strong> $5,000,000 $0<br />

$0 $0<br />

Project # 4142 Location: I-15 From: Russell Rd. To: Sahara Ave.<br />

Description: Widen from 8 to 10 lanes including 2 express lanes each way and 3 general purpose lanes each way<br />

FYComplete: 2010 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $3,000,000<br />

Public Lands Highways $3,000,000 $0<br />

$0 $0<br />

Project # 4159 Location: I-15 From: at US 93 (North) To:<br />

Description: PE for construction of an interchange<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$686,000<br />

CL200922<br />

Public Lands Highways $686,000 $0<br />

$0 $0<br />

Project # 4270 Location: I-15 From: SR.573 Craig Rd To: Speedway Blvd<br />

Description: PE for widening to 6 lanes<br />

FYComplete: 2011 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$980,000<br />

CL200916<br />

<strong>Transportation</strong>, Community & <strong>System</strong> Preservation $980,000 $0<br />

$0 $0<br />

Project # 4151 Location: I-15 / US 95 From: I-15 south of Oakey Blvd To: US 95 east of Rancho Dr<br />

Description: Project Neon Phase 1: PE for the construction of system-to-system direct connect HOV ramps, including add/drop<br />

lanes at Oakey/Wyoming<br />

FYComplete: 2010 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$15,000,000<br />

CL201203<br />

AB 595 Bonded $15,000,000 $0<br />

$0 $0<br />

Project # 4157 Location: I-15 Corridor Study From: CA stateline To: Mesquite<br />

Description: Corridor Study, NV<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$245,000<br />

CL200924<br />

Public Lands Highways $245,000 $0<br />

$0 $0<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 29


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Nevada Department of <strong>Transportation</strong><br />

Table 1: Projects by Sponsoring Entity<br />

Project # 246 Location: I-15 South Design Build From: SR 160 Blue Diamond Rd. To: Tropicana Ave.<br />

Description: Phase 1: Widen from 6 to 8 lanes, to include HOV lanes and auxiliary lanes<br />

FYComplete: 2012 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$272,980,000<br />

CL200917<br />

Anticipated appropriations $980,000 $0<br />

$0 $0<br />

LVCVA Bonded $272,000,000 $0<br />

$0 $0<br />

Project # 4253 Location: I-215/ SR 564 (Lake Mead Pkwy.) From: I-215 @ Green Valley Pkwy. To: SR.564 @ Boulder Hwy<br />

Description: Develop and integrate ITS infrastructure<br />

FYComplete: 2010 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$4,887,000<br />

CL20110006<br />

CMAQ $4,887,000 $0<br />

$0 $0<br />

Project # 203 Location: I-515 From: Foothills Grade Separation To: I-15 / US 95 Interchange (Spaghetti<br />

Bowl)<br />

Description: Conduct NEPA process and preliminary engineering<br />

FYComplete: 2009 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$4,000,000<br />

CL200354<br />

National Highway <strong>System</strong> $0 $4,000,000 $0 $0<br />

Project # 4155 Location: I-515 From: I-215 To: SR 159 Charleston Blvd.<br />

Description: FAST package B1: ITS infrastructure<br />

FYComplete: 2011 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$12,000,000<br />

CL201004<br />

CMAQ $0 $7,000,000 $5,000,000 $0<br />

Project # 4156 Location: I-515 From: I-215 To: SR 159 Charleston Blvd.<br />

Description: FAST package B2: ITS infrastructure<br />

FYComplete: 2012 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$10,000,000<br />

CL200925<br />

CMAQ $0 $0<br />

$2,000,000 $8,000,000<br />

Project # 2904 Location: Inter-city passenger rail From: Los Angeles To: Las Vegas<br />

Description: Acquisition of conventional passenger rail equipment<br />

FYComplete: 2012 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$3,000,000<br />

CL20100115<br />

Federal Railroad Administration $0 $3,000,000 $0 $0<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 30


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Nevada Department of <strong>Transportation</strong><br />

Table 1: Projects by Sponsoring Entity<br />

Project # 4244 Location: Kyle Canyon Rd. From: To:<br />

Description: Replace Bridge<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$3,100,000<br />

CL20090150<br />

Federal Lands Highways $2,300,000 $800,000 $0 $0<br />

Project # 4246 Location: Lake Mead NRA; PRA LAME 1 (10) From: Northshore Rd. To:<br />

Description: Rehabiltate<br />

FYComplete: 2011<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$12,610,000<br />

CL201104<br />

Federal Lands Highways $0 $0<br />

$10,000 $12,600,000<br />

Project # 4245 Location: Lake Mead NRA; PRA LAME 1 (9) & 11 (1) From: Northshore and Echo Bay Access Rds. To:<br />

Description: Rehabiltate<br />

FYComplete: 2012<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$13,300,000<br />

CL201005<br />

Federal Lands Highways $0 $12,700,000 $600,000 $0<br />

Project # 4147 Location: Martin Luther King Blvd. / Industrial Rd. Connector Proje From: Industrial Rd. south of Wyoming Ave To: M.L.King Blvd. at Palomino Ln.<br />

Description: Preliminary Engineering and Right-of-Way for a 6-lane overpass across I-15 with grade separation at Oakey/Wyoming FYComplete: 2011 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$14,343,780<br />

CL200002<br />

AB 595 Bonded $0 $0<br />

$7,500,000 $0<br />

SAFETEA-LU High Priority Projects $6,843,780 $0<br />

$0 $0<br />

Project # 4243 Location: Northshore Rd. (Lake Mead NRA) From: Northshore Road and Various Routes To:<br />

Description: Rehabilitate Mile 26-40 (Construction Engineering)<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$1,200,000<br />

CL200480<br />

Federal Lands Highways $800,000 $400,000 $0 $0<br />

Project # 4028 Location: SR 160 Blue Diamond Rd. From: Durango Dr. To: SR.159 Red Rock Canyon Road<br />

Description: Widen from 2 to 4 lanes with a raised median island<br />

FYComplete: 2012 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$12,500,000<br />

CL200745<br />

NDOT State Gas Tax $12,500,000 $0<br />

$0 $0<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 31


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Nevada Department of <strong>Transportation</strong><br />

Table 1: Projects by Sponsoring Entity<br />

Project # 4238 Location: SR 160 Blue Diamond Rd. From: Rainbow Blvd. To: Durango Dr.<br />

Description: Widen from 2 to 4 lanes<br />

FYComplete: 2011 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $3,500,000<br />

Private Developers $0 $0<br />

$3,500,000 $0<br />

Project # 4018 Location: SR 160 Pahrump Valley Rd. From: SR.159 Red Rock Canyon Road To: Mountain Springs<br />

Description: Widen from 2 to 4 Lanes<br />

FYComplete: 2013 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$108,370,000<br />

CL200749<br />

Nevada State General Funds $0 $0<br />

$16,000,000 $0<br />

Private Developers $0 $0<br />

$89,000,000 $0<br />

Public Lands Highways $1,470,000 $0<br />

$0 $0<br />

STP Clark County $1,000,000 $0<br />

$0 $0<br />

STP Statewide $900,000 $0<br />

$0 $0<br />

Project # 179 Location: US 93 Boulder City Corridor From: 0.5 mi east of Lake Shore Dr. To: Foothills Grade Separation<br />

Description: Preliminary Engineering and right-of-way for a 4-lane freeway<br />

FYComplete: 2007 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$27,758,801<br />

CL200802<br />

FY08 Appropriations Act, S.129 $245,000 $0<br />

$0 $0<br />

SAFETEA-LU High Priority Projects $4,843,780 $0<br />

$0 $0<br />

SAFETEA-LU <strong>Transportation</strong> Improvements $22,670,021 $0<br />

$0 $0<br />

Project # 252 Location: US 93 Hoover Dam Bypass (Mike O' Callaghan - Pat Till From: 1.8 mile east of Colorado River (AZ) To: 2.1 mile west of Colorado River (<br />

NV)<br />

Description: Surfacing, signing & guardrails<br />

FYComplete: 2011 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$14,960,000<br />

CL200650<br />

Federal Lands Highways $0 $13,000,000 $0 $0<br />

Public Lands Highways $0 $1,960,000 $0 $0<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 32


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Nevada Department of <strong>Transportation</strong><br />

Table 1: Projects by Sponsoring Entity<br />

Project # 4139 Location: US 93/95 From: US 93/95 Jct. To: Foothills Grade Separation<br />

Description: Boulder City Corridor Phase 1: PE and right-of-way for the construction of a new freeway<br />

FYComplete: 2010 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$6,992,000<br />

CL200802<br />

FY04 Appropriations Act, S.115 $6,000,000 $0<br />

$0 $0<br />

Public Lands Highways $992,000 $0<br />

$0 $0<br />

Project # 4019 Location: US 95 North From: Martin Luther King Boulevard To: Rainbow Interchange<br />

Description: Landscaping<br />

FYComplete: 2009 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$10,000,000<br />

CL2007103<br />

NDOT Bonded Funds $10,000,000 $0<br />

$0 $0<br />

Project # 4030 Location: US 95 Sierra Club Lawsuit Settlement Agreement From: To:<br />

Description: Nationwide MSAT Study (PE)<br />

FYComplete: 2009<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$700,000<br />

CL2007105<br />

National Highway <strong>System</strong> $700,000 $0<br />

$0 $0<br />

Project # 201 Location: US 95 South From: CA State Line To: SR 163 Laughlin Hwy.<br />

Description: Widen to a 4-lane divided highway<br />

FYComplete: 2011 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$5,000,000<br />

CL201001<br />

NDOT State Gas Tax $0 $5,000,000 $0 $0<br />

Project # 256 Location: US-95 North From: SR 578 Washington Av. To: Ann Rd.<br />

Description: US-95 North Package 1: Widen from 6 to 8 lanes, to include HOV lanes add auxiliary lanes. Braid both the northbound<br />

and southbound ramps at the Rancho/Ann Rd. interchange. (PE, RW, Const.)<br />

FYComplete: 2013<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$156,463,332<br />

CL200661<br />

AB 595 Bonded $0 $0<br />

$145,000,000 $0<br />

SAFETEA-LU High Priority Projects $11,463,332 $0<br />

$0 $0<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 33


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Nevada Department of <strong>Transportation</strong><br />

Table 1: Projects by Sponsoring Entity<br />

Project # 257 Location: US-95 North From: Ann Rd. To: SR.157 Kyle Canyon Rd.<br />

Description: US-95 North Package 2: Ann to Centennial: Widen from 6 to 8 lanes. Add auxiliary lanes. Centennial to Durango:<br />

Widen from 4 to 8 lanes. Durango to Kyle Canyon: Widen from 4 to 6 lanes. (PE.)<br />

FYComplete: 2011 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$4,000,000<br />

CL201101<br />

AB 595 Bonded $0 $0<br />

$0 $4,000,000<br />

Project # 239 Location: Warm Springs Rd. From: Dean Martin Drive To: SR.604 Las Vegas Blvd. South<br />

Description: SR-160 Phase 3: Construct a new 6-lane roadway with sidewalk and bicycle facilities and a grade separation over I-15 FYComplete: 2009 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$14,000,000<br />

CL200503<br />

NDOT State Gas Tax $0 $7,000,000 $0 $0<br />

STP Statewide $0 $7,000,000 $0 $0<br />

Total for Nevada Department of <strong>Transportation</strong> $436,427,693 $64,860,000 $271,610,000 $27,600,000 Total Scheduled: $800,497,693<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 34


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

City of North Las Vegas<br />

Table 1: Projects by Sponsoring Entity<br />

Project # 1581 Location: Cheyenne Ave. From: at Commerce St. To:<br />

Description: Traffic Signal Modifications<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$300,000<br />

CL200670<br />

STP Clark County $300,000 $0<br />

$0 $0<br />

Project # 4145 Location: Cheyenne Ave. From: US 95 To: Nellis Blvd.<br />

Description: Restripe to 6 lanes, where possible<br />

FYComplete: 2010 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$13,000,000<br />

CL200362<br />

NDOT State Gas Tax $2,000,000 $0<br />

$0 $0<br />

STP Clark County $11,000,000 $0<br />

$0 $0<br />

Project # 140 Location: City of North Las Vegas - various locations From: To:<br />

Description: Modify traffic signals and lane configuration to construct dual lefts at Las Vegas Blvd./Civic Center Dr., Las Vegas<br />

Blvd./Carey Ave. & Civic Center Dr./Carey Ave.<br />

FYComplete: 2009<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$1,115,000<br />

CL200518<br />

STP Clark County $1,115,000 $0<br />

$0 $0<br />

Project # 1582 Location: Craig Rd From: Revere St. To: North 5th St.<br />

Description: Median landscaping<br />

FYComplete: 2009 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $595,000<br />

STP Enhancements $595,000 $0<br />

$0 $0<br />

Project # 4035 Location: North 5th St. From: Owens Ave. To: Cheyenne Ave.<br />

Description: Construct 8-lane roadway with overpass at I-15 and new interchange at Cheyenne Ave, including transit lanes, gradeseparated<br />

pedestrian crossings and multi-use trails; Reconfigure Main St./Owens Ave./Las Vegas Blvd. intersections.<br />

FYComplete: 2012 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $105,368,130<br />

Q10 High Speed Lane Miles Program $24,319,130 $20,000,000 $40,000,000 $18,291,000<br />

RTC Gas Tax $0 $2,758,000 $0 $0<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 35


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

City of North Las Vegas<br />

Table 1: Projects by Sponsoring Entity<br />

Project # 143 Location: SR 573 Craig Rd @ I-15 From: Berg St. To: Pecos Rd.<br />

Description: Widen from 4 to 6 lanes with a Railroad Grade Separation and Interchange Improvements<br />

FYComplete: 2009 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$21,851,449<br />

CL199710<br />

Public Lands Highways $490,000 $0<br />

$0 $0<br />

RTC Gas Tax $5,500,000 $500,000 $0 $0<br />

RTC Gas Tax - Area-Wide Program $9,166,000 $0<br />

$0 $0<br />

SAFETEA-LU <strong>Transportation</strong> Improvements $6,195,449 $0<br />

$0 $0<br />

Total for City of North Las Vegas $60,680,579 $23,258,000 $40,000,000 $18,291,000 Total Scheduled: $142,229,579<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 36


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

<strong>Regional</strong> <strong>Transportation</strong> Commission<br />

Table 1: Projects by Sponsoring Entity<br />

Project # 2020 Location: Boulder Hwy: Bus Rapid Transit From: College Dr To: Downtown Las Vegas<br />

Description: Roadway reconstruction and intersection improvements to accommodate Rapid Transit operations in the Boulder Hwy<br />

corridor<br />

FYComplete: 2012 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $66,125,000<br />

FTA S.5307 Formula $0 $18,500,000 $0 $0<br />

Q10 RTC Projects $500,000 $14,500,000 $28,000,000 $0<br />

RTC Sales Tax $0 $4,625,000 $0 $0<br />

Project # 2022 Location: Boulder Hwy: Bus Rapid Transit From: College Dr To: Downtown Las Vegas<br />

Description: Construct shelters and ancillary equipment for Rapid Transit operations in the Boulder Hwy corridor<br />

FYComplete: 2012 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $5,564,300<br />

FTA S.5307 Formula $0 $0<br />

$4,000,000 $0<br />

FTA S.5309 Bus Discretionary $451,440 $0<br />

$0 $0<br />

RTC Sales Tax $112,860 $0<br />

$1,000,000 $0<br />

Project # 1508 Location: BPE On-Street Bike Projects: 2009-12 From: To:<br />

Description: Installation of Bicycle Lanes & Routes in Various Locations<br />

FYComplete: 2009<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $6,900,000<br />

Q10 Bicycle Lane Program $2,400,000 $1,500,000 $1,500,000 $1,500,000<br />

Project # 1569 Location: Bus fleet From: To:<br />

Description: Install triple bike racks on fixed-route transit vehicles<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$150,000<br />

CL2006114<br />

CMAQ $150,000 $0<br />

$0 $0<br />

Project # 2048 Location: Bus fleet replacement program From: To:<br />

Description: Acquire 78 buses for the fixed-route bus replacement program<br />

FYComplete: 2012<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $47,351,000<br />

FTA S.5307 Formula $11,667,200 $0<br />

$10,240,000 $15,973,600<br />

RTC Sales Tax $2,916,800 $0<br />

$2,560,000 $3,993,400<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 37


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

<strong>Regional</strong> <strong>Transportation</strong> Commission<br />

Table 1: Projects by Sponsoring Entity<br />

Project # 2006 Location: Bus Rapid Transit - fleet expansion From: To:<br />

Description: Acquire 50 vehicles for the expansion of the Ace Rapid Transit fleet<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $60,000,000<br />

RTC Sales Tax $18,000,000 $42,000,000 $0 $0<br />

Project # 2010 Location: Central City Intermodal <strong>Transportation</strong> Terminal From: To:<br />

Description: Development of a new intermodal transportation center to serve downtown Las Vegas<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $6,417,521<br />

FTA S.5307 Formula $2,682,697 $0<br />

$0 $0<br />

FTA S.5309 Bus Discretionary $2,451,320 $0<br />

$0 $0<br />

RTC Sales Tax $1,283,504 $0<br />

$0 $0<br />

Project # 2807 Location: Clark County From: To:<br />

Description: Development and operation of a same day paratransit service<br />

FYComplete: 2012<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $351,350<br />

FTA S.5317 "New Freedom" $175,675 $0<br />

$0 $0<br />

Local Funds $175,675 $0<br />

$0 $0<br />

Project # 2703 Location: Durango Dr. From: @ Westcillf Dr. To:<br />

Description: Develop a park-and-ride lot, including transit passenger facilities, to serve the Summerlin Pkwy corridor<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$3,978,000<br />

CL200664<br />

FTA S.5307 Formula $3,182,400 $0<br />

$0 $0<br />

RTC Sales Tax $795,600 $0<br />

$0 $0<br />

Project # 2744 Location: Las Vegas Area From: To:<br />

Description: <strong>Regional</strong> Intersection Traffic Flow Improvements<br />

FYComplete: 2030<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$3,150,000<br />

CL20110006<br />

CMAQ $0 $0<br />

$500,000 $550,000<br />

STP Clark County $0 $0<br />

$1,000,000 $1,100,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 38


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

<strong>Regional</strong> <strong>Transportation</strong> Commission<br />

Table 1: Projects by Sponsoring Entity<br />

Project # 2745 Location: Las Vegas Area From: To:<br />

Description: <strong>Regional</strong> Pedestrian Realm Enhancements<br />

FYComplete: 2030<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$2,100,000<br />

CL20120003<br />

CMAQ $0 $0<br />

$0 $1,100,000<br />

STP Clark County $0 $0<br />

$0 $1,000,000<br />

Project # 2748 Location: Las Vegas Area From: To:<br />

Description: Electric Bike Pilot Project in downtown Las Vegas<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$100,000<br />

CL20090156<br />

CMAQ $100,000 $0<br />

$0 $0<br />

Project # 2801 Location: Las Vegas Area From: To:<br />

Description: Projects to be selected under the RTC Coordinated Public Transit - Human Services <strong>Transportation</strong> Plan<br />

FYComplete: 2012<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $4,907,504<br />

FTA S.5316 Job Access and Reverse Commute $0 $786,056 $817,498 $850,198<br />

Local Funds $0 $786,056 $817,498 $850,198<br />

Project # 2802 Location: Las Vegas Area From: To:<br />

Description: Projects to be selected under the RTC Coordinated Public Transit - Human Services <strong>Transportation</strong> Plan<br />

FYComplete: 2012<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $1,979,024<br />

FTA S.5317 "New Freedom" $0 $507,182 $527,469 $548,568<br />

Local Funds $0 $126,796 $131,867 $137,142<br />

Project # 2805 Location: Las Vegas Area From: To:<br />

Description: Institute regular paratransit service for disabled workers<br />

FYComplete: 2012<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $1,511,646<br />

FTA S.5316 Job Access and Reverse Commute $755,823 $0<br />

$0 $0<br />

Local Funds $755,823 $0<br />

$0 $0<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 39


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

<strong>Regional</strong> <strong>Transportation</strong> Commission<br />

Table 1: Projects by Sponsoring Entity<br />

Project # 2806 Location: Las Vegas Area From: To:<br />

Description: Development and operation of a centralized information and referral service for human services transportation clients. FYComplete: 2012<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $390,000<br />

FTA S.5317 "New Freedom" $312,000 $0<br />

$0 $0<br />

Local Funds $78,000 $0<br />

$0 $0<br />

Project # 2603 Location: Las Vegas Blvd From: Sunset Rd To: Downtown Las Vegas<br />

Description: Upgrade transit shelters, TVMs and security systems at selected transit stops on the Las Vegas Strip<br />

FYComplete: 2010 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $600,000<br />

FTA S.5307 Formula Enhancements $480,000 $0<br />

$0 $0<br />

RTC Sales Tax $120,000 $0<br />

$0 $0<br />

Project # 3001 Location: Laughlin From: Needles Hwy. To: Bullhead City, AZ<br />

Description: Planning and NEPA process for new Colorado River crossing<br />

FYComplete: 2010 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$2,566,418<br />

CL2006108<br />

SAFETEA-LU High Priority Projects $2,566,418 $0<br />

$0 $0<br />

Project # 2905 Location: Laughlin / Mesquite From: To:<br />

Description: Acquire two senior transportation vehicles for SNTC operations<br />

FYComplete: 0<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $122,500<br />

FTA S.5309 Bus Discretionary $98,000 $0<br />

$0 $0<br />

RTC Sales Tax $24,500 $0<br />

$0 $0<br />

Project # 2033 Location: Paratransit fleet expansion From: To:<br />

Description: Acquire 22 vehicles for the expansion of paratransit operations.<br />

FYComplete: 2009<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $2,004,000<br />

FTA S.5307 Formula $1,603,200 $0<br />

$0 $0<br />

RTC Sales Tax $400,800 $0<br />

$0 $0<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 40


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

<strong>Regional</strong> <strong>Transportation</strong> Commission<br />

Table 1: Projects by Sponsoring Entity<br />

Project # 2055 Location: Paratransit fleet expansion From: To:<br />

Description: Acquire 60 vehicles for the expansion of paratransit operations.<br />

FYComplete: 2012<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $5,370,000<br />

FTA S.5307 Formula $980,800 $545,600 $1,361,600 $1,408,000<br />

RTC Sales Tax $245,200 $136,400 $340,400 $352,000<br />

Project # 2052 Location: Paratransit fleet replacement From: To:<br />

Description: Acquire 257 vehicles for the paratransit fleet replacement program<br />

FYComplete: 2012<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $26,775,000<br />

FTA S.5307 Formula $3,668,800 $3,520,000 $8,320,800 $5,910,400<br />

RTC Sales Tax $917,200 $880,000 $2,080,200 $1,477,600<br />

Project # 2706 Location: Park-and-Ride lots - various locations From: To:<br />

Description: Development of park-and-ride lots<br />

FYComplete: 2015<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$6,000,000<br />

CL200903<br />

FTA S.5307 Formula $0 $2,400,000 $0 $2,400,000<br />

RTC Sales Tax $0 $600,000 $0 $600,000<br />

Project # 2051 Location: <strong>Regional</strong> express transit system development From: various locations To:<br />

Description: Operating support for freeway express transit routes<br />

FYComplete: 2017<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$400,000<br />

CL20120004<br />

CMAQ $0 $0<br />

$0 $400,000<br />

Project # 2046 Location: <strong>Regional</strong> transit bus stop and shelter program From: To:<br />

Description: Enhancements to transit shelters including TVMs, signage, passenger amenities, landscaping and related sidewalk<br />

improvements<br />

FYComplete: 2012<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $1,140,000<br />

FTA S.5307 Formula Enhancements $0 $296,000 $304,000 $312,000<br />

RTC Sales Tax $0 $74,000 $76,000 $78,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 41


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

<strong>Regional</strong> <strong>Transportation</strong> Commission<br />

Table 1: Projects by Sponsoring Entity<br />

Project # 2602 Location: <strong>Regional</strong> transit system facilities From: various locations To:<br />

Description: Upgrade and replacement of security systems at RTC facilities<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $360,000<br />

FTA S.5307 Formula Security $288,000 $0<br />

$0 $0<br />

RTC Sales Tax $72,000 $0<br />

$0 $0<br />

Project # 2601 Location: <strong>Regional</strong> transit system security systems From: various locations To:<br />

Description: Security systems for the regional transit system<br />

FYComplete: 2030<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $1,140,000<br />

FTA S.5307 Formula Security $0 $296,000 $304,000 $312,000<br />

RTC Sales Tax $0 $74,000 $76,000 $78,000<br />

Project # 4265 Location: Southern Nevada FAST <strong>System</strong> From: To:<br />

Description: ITS and signal timing coordination on regional freeway and arterial roadways<br />

FYComplete: 2030<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$6,000,000<br />

CL20110007<br />

CMAQ $0 $0<br />

$3,000,000 $3,000,000<br />

Project # 2019 Location: Summerlin Center From: To:<br />

Description: Installation of transit shelters and ancillary equipment at the Summerlin Transit Center<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $600,000<br />

FTA S.5307 Formula Enhancements $0 $480,000 $0 $0<br />

RTC Sales Tax $0 $120,000 $0 $0<br />

Project # 2012 Location: Sunset Rd. From: east of Decatur Blvd. To:<br />

Description: Development of the Sunset Transit Maintenance Facility<br />

FYComplete: 2009<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $9,749,476<br />

FTA S.5309 Bus Discretionary $5,352,853 $0<br />

$0 $0<br />

FTA S.5309 New Starts $992,000 $0<br />

$0 $0<br />

FY02 Appropriations Act, S.330 $500,000 $0<br />

$0 $0<br />

FY04 Appropriations Act, S.115 $1,000,000 $0<br />

$0 $0<br />

RTC Sales Tax $1,904,623 $0<br />

$0 $0<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 42


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

<strong>Regional</strong> <strong>Transportation</strong> Commission<br />

Table 1: Projects by Sponsoring Entity<br />

Project # 210 Location: TDM Program From: To:<br />

Description: <strong>Transportation</strong> Demand Management products and services that promote the reduction of Single Occupant Vehicles on<br />

the region's roads in order to improve traffic congestion and air quality<br />

FYComplete:<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$5,320,000<br />

CL200308-L<br />

CMAQ $385,000 $396,000 $402,000 $408,000<br />

RTC Sales Tax $183,000 $184,800 $187,600 $190,400<br />

STP Clark County $732,000 $739,200 $750,400 $761,600<br />

Project # 2742 Location: University of Nevada Las Vegas From: To:<br />

Description: Bike Locker Program<br />

FYComplete: 2012<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$100,000<br />

CL20090157<br />

CMAQ $100,000 $0<br />

$0 $0<br />

Project # 2803 Location: University of Nevada Las Vegas From: To:<br />

Description: Construct a bus transfer center to serve the main UNLV campus<br />

FYComplete: 2013<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $2,000,000<br />

FTA S.5307 Formula $0 $0<br />

$1,600,000 $0<br />

RTC Sales Tax $0 $0<br />

$400,000 $0<br />

Project # 2701 Location: US 95 From: @ Durango Dr To:<br />

Description: Develop of a park-and-ride lot, including transit passenger facilities, to serve the US.95 corridor.<br />

FYComplete: 2010<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$4,000,000<br />

CL200610<br />

FTA S.5307 Formula $3,200,000 $0<br />

$0 $0<br />

RTC Sales Tax $800,000 $0<br />

$0 $0<br />

Project # 2005 Location: US 95: Express transit service From: Durango Dr To: Downtown Las Vegas<br />

Description: Operating support for freeway express transit routes<br />

FYComplete: 2013 PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012<br />

Total Scheduled:<br />

$2,950,000<br />

CL2008104<br />

CMAQ $1,950,000 $0<br />

$0 $1,000,000<br />

Total for <strong>Regional</strong> <strong>Transportation</strong> Commission $77,511,211 $94,073,090 $70,297,332 $46,291,106 Total Scheduled: $288,172,739<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 43


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Southern Nevada Transit Coalition<br />

Table 1: Projects by Sponsoring Entity<br />

Project # 2809 Location: Clark and Nye Counties From: To:<br />

Description: Operating and administrative support for transit operations between Pahrump and Las Vegas<br />

FYComplete: 2012<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $1,663,223<br />

FTA S.5311 Non-Urbanized Area Formula $358,376 $394,214 $433,635 $476,998<br />

Project # 2903 Location: Laughlin From: To:<br />

Description: Development and construction of building for Southern Nevada Transit Coalition public transit operations<br />

FYComplete: 2009<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $1,160,000<br />

Colorado River Commission $1,000,000 $0<br />

$0 $0<br />

FTA S.5309 Bus Discretionary $100,000 $0<br />

$0 $0<br />

Local Funds $60,000 $0<br />

$0 $0<br />

Project # 2808 Location: Laughlin / Mesquite From: To:<br />

Description: Operating and administrative support for transit operations in Mesquite and Laughlin<br />

FYComplete: 2012<br />

PE ROW CON<br />

Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $4,717,577<br />

FTA S.5311 Non-Urbanized Area Formula $1,016,500 $1,118,150 $1,229,965 $1,352,962<br />

Total for Southern Nevada Transit Coalition $2,534,876 $1,512,364 $1,663,600 $1,829,960 Total Scheduled: $7,540,800<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 44


FUND SOURCE ORDER LISTED IN TABLE-2<br />

Surface <strong>Transportation</strong> Program (STP) Clark County<br />

Congestion Mitigation and Air Quality (CMAQ)<br />

AB 595 Bonded<br />

Clark County Department of Aviation (CCDOA)<br />

Clark County Department of Aviation and FAA Combination<br />

Clark County Beltway Program<br />

Colorado River Commission<br />

FTA 5307 Formula<br />

FTA 5307 Formula Enhancements<br />

FTA 5307 Formula Security<br />

FTA 5309 Bus Discretionary<br />

FTA 5309 New Starts<br />

FTA 5316 Job Access and Reverse Commute Program<br />

FTA 5317 New Freedom<br />

Local Funds<br />

LVCVA Bonded<br />

Private Developers<br />

Q10 Bicycle Lane Program<br />

Q10 High Speed Lane Miles Program<br />

Q10 Traffic Signals and ITS Programs<br />

Q10 RTC Projects<br />

RTC Gas Tax<br />

RTC Gas Tax Area-Wide Program<br />

RTC Sales Tax<br />

TIFIA<br />

Western AZ Council of Governments<br />

National Highway <strong>System</strong> (NHS)<br />

STP Statewide<br />

SAFETEA-LU High Priority Projects<br />

SAFETEA-LU <strong>Transportation</strong> Improvements<br />

NDOT Bonded Projects<br />

Federal Lands Highways<br />

Public Lands Highways<br />

Interstate Maintenance Discretionary<br />

Nevada State General Fund<br />

<strong>Transportation</strong>, Community & <strong>System</strong> Preservation<br />

NDOT State Gas Tax<br />

FY 02 Appropriations Act, Section 330<br />

FY 04 Appropriations Act, Section 115 Funding<br />

FY 06 Appropriations Act, Section 112 Funding<br />

FY 08 Appropriations Act, Section 129<br />

Anticipated Appropriations<br />

FTA 5311 Non-Urbanized Area Formula<br />

TRANSPORTATION IMPROVEMENT PROGRAM FOR FY 2009-2012


Federal Railroad Administration<br />

LVMC Funding<br />

STP Enhancements<br />

Q10 Bus Turnout Program<br />

City of Las Vegas (BLM Reservation)<br />

TRANSPORTATION IMPROVEMENT PROGRAM FOR FY 2009-2012


<strong>Regional</strong> <strong>Transportation</strong> Commission of Southern Nevada<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

STP Clark County<br />

Project # :108 Location: Cactus Ave. at I-15<br />

From: Dean Martin Dr.<br />

To: Las Vegas Blvd.<br />

Description: Construct an interchange<br />

Project # :1581 Location: Cheyenne Ave.<br />

From: at Commerce St.<br />

To:<br />

Description: Traffic Signal Modifications<br />

Project # :4145 Location: Cheyenne Ave.<br />

From: US 95<br />

To: Nellis Blvd.<br />

Description: Restripe to 6 lanes, where possible<br />

Project # :140 Location: City of North Las Vegas - various locations<br />

From:<br />

To:<br />

Description: Modify traffic signals and lane configuration to construct dual lefts at Las<br />

Vegas Blvd./Civic Center Dr., Las Vegas Blvd./Carey Ave. & Civic Center<br />

Dr./Carey Ave.<br />

Project # :2744 Location: Las Vegas Area<br />

From:<br />

To:<br />

Description: <strong>Regional</strong> Intersection Traffic Flow Improvements<br />

Project # :2745 Location: Las Vegas Area<br />

From:<br />

To:<br />

Description: <strong>Regional</strong> Pedestrian Realm Enhancements<br />

Project Sponsor: Clark County NDOTID: CL200516 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$9,000,000<br />

FY 2012<br />

$18,000,000<br />

Total Scheduled<br />

$27,000,000<br />

Project Sponsor: North Las Vegas NDOTID: CL200670 PE RoW CONST.<br />

FY 2009<br />

$300,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$300,000<br />

Project Sponsor: North Las Vegas NDOTID: CL200362 PE RoW CONST.<br />

FY 2009<br />

$11,000,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$11,000,000<br />

Project Sponsor: North Las Vegas NDOTID: CL200518 PE RoW CONST.<br />

FY 2009<br />

$1,115,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$1,115,000<br />

Project Sponsor: RTC NDOTID: CL20110006 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$1,000,000<br />

FY 2012<br />

$1,100,000<br />

Total Scheduled<br />

$2,100,000<br />

Project Sponsor: RTC NDOTID: CL20120003 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$1,000,000<br />

Total Scheduled<br />

$1,000,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 51


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :2702 Location: Silverado Ranch Blvd.<br />

From: @ Dean Martin Dr<br />

To:<br />

Description: Develop a park-and-ride lot and related facilities to serve the I-15 South<br />

corridor<br />

Project # :4018 Location: SR 160 Pahrump Valley Rd.<br />

From: SR.159 Red Rock Canyon Road<br />

To: Mountain Springs<br />

Description: Widen from 2 to 4 Lanes<br />

Project # :843 Location: SR 564 Lake Mead Pkwy.<br />

From: Boulder Highway<br />

To: Lake Mead National Recreation Area<br />

Description: Widen to 6 lanes<br />

Project # :112 Location: SR 604 Las Vegas Blvd. South<br />

From: SR 146 St.Rose Pkwy<br />

To: Serene Ave.<br />

Description: Widen to 6 Lanes<br />

Project # :113 Location: SR 604 Las Vegas Blvd. South<br />

From: Serene Ave.<br />

To: Sunset Rd.<br />

Description: Widen to 6 Lanes<br />

Project # :210 Location: TDM Program<br />

From:<br />

To:<br />

Description: <strong>Transportation</strong> Demand Management products and services that promote the<br />

reduction of Single Occupant Vehicles on the region's roads in order to<br />

improve traffic congestion and air quality<br />

Project Sponsor: Clark County NDOTID: CL200667 PE RoW CONST.<br />

FY 2009<br />

$1,000,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$1,000,000<br />

Project Sponsor: NDOT NDOTID: CL200749 PE RoW CONST.<br />

FY 2009<br />

$1,000,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$1,000,000<br />

Project Sponsor: Henderson NDOTID: CL200521 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$14,500,000<br />

FY 2011<br />

$8,000,000<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$22,500,000<br />

Project Sponsor: Clark County NDOTID: CL200613 PE RoW CONST.<br />

FY 2009<br />

$3,500,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$3,500,000<br />

Project Sponsor: Clark County NDOTID: CL200517 PE RoW CONST.<br />

FY 2009<br />

$2,552,182<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$2,552,182<br />

Project Sponsor: RTC NDOTID: CL200308-L PE RoW CONST.<br />

FY 2009<br />

$732,000<br />

FY 2010<br />

$739,200<br />

FY 2011<br />

$750,400<br />

FY 2012<br />

$761,600<br />

Total Scheduled<br />

$2,983,200<br />

Total for STP Clark County $21,199,182 $15,239,200 $18,750,400 $20,861,600<br />

$76,050,382<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 52


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

CMAQ<br />

Project # :1569 Location: Bus fleet<br />

From:<br />

To:<br />

Description: Install triple bike racks on fixed-route transit vehicles<br />

Project # :2709 Location: Durango Dr.<br />

From: CC-215 Southern Beltway<br />

To: Desert Inn Rd.<br />

Description: Signal interconnects and timing infrastructure<br />

Project # :4253 Location: I-215/ SR 564 (Lake Mead Pkwy.)<br />

From: I-215 @ Green Valley Pkwy.<br />

To: SR.564 @ Boulder Hwy<br />

Description: Develop and integrate ITS infrastructure<br />

Project # :4155 Location: I-515<br />

From: I-215<br />

To: SR 159 Charleston Blvd.<br />

Description: FAST package B1: ITS infrastructure<br />

Project # :4156 Location: I-515<br />

From: I-215<br />

To: SR 159 Charleston Blvd.<br />

Description: FAST package B2: ITS infrastructure<br />

Project # :2744 Location: Las Vegas Area<br />

From:<br />

To:<br />

Description: <strong>Regional</strong> Intersection Traffic Flow Improvements<br />

Project # :2745 Location: Las Vegas Area<br />

From:<br />

To:<br />

Description: <strong>Regional</strong> Pedestrian Realm Enhancements<br />

Project Sponsor: RTC NDOTID: CL2006114 PE RoW CONST.<br />

FY 2009<br />

$150,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$150,000<br />

Project Sponsor: Clark County NDOTID: CL200834 PE RoW CONST.<br />

FY 2009<br />

$700,000<br />

FY 2010<br />

$665,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$1,365,000<br />

Project Sponsor: NDOT NDOTID: CL20110006 PE RoW CONST.<br />

FY 2009<br />

$4,887,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$4,887,000<br />

Project Sponsor: NDOT NDOTID: CL201004 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$7,000,000<br />

FY 2011<br />

$5,000,000<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$12,000,000<br />

Project Sponsor: NDOT NDOTID: CL200925 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$2,000,000<br />

FY 2012<br />

$8,000,000<br />

Total Scheduled<br />

$10,000,000<br />

Project Sponsor: RTC NDOTID: CL20110006 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$500,000<br />

FY 2012<br />

$550,000<br />

Total Scheduled<br />

$1,050,000<br />

Project Sponsor: RTC NDOTID: CL20120003 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$1,100,000<br />

Total Scheduled<br />

$1,100,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 53


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :2748 Location: Las Vegas Area<br />

From:<br />

To:<br />

Description: Electric Bike Pilot Project in downtown Las Vegas<br />

Project # :2707 Location: Off-road diesel engine retrofit program<br />

From:<br />

To:<br />

Description: Off-road diesel engine retrofits<br />

Project # :1573 Location: Ozone Non-Attainment Area - Clark County<br />

From:<br />

To:<br />

Description: Various measures to reduce Ozone emissions, to be determined in the Ozone<br />

SIP<br />

Project # :1578 Location: Rainbow Blvd.<br />

From: Desert Inn Rd.<br />

To: US-95<br />

Description: Intersection improvements at Desert Inn Rd, Oakey Blvd, Charleston Blvd and<br />

Alta Dr.<br />

Project # :1579 Location: Rainbow Blvd.<br />

From: at Sahara Ave<br />

To:<br />

Description: Intersection improvements<br />

Project # :2708 Location: Rancho Dr.<br />

From: Sahara Ave.<br />

To: Rainbow Blvd.<br />

Description: Signal interconnects and timing infrastructure<br />

Project # :2051 Location: <strong>Regional</strong> express transit system development<br />

From: various locations<br />

To:<br />

Description: Operating support for freeway express transit routes<br />

Project Sponsor: RTC NDOTID: CL20090156 PE RoW CONST.<br />

FY 2009<br />

$100,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$100,000<br />

Project Sponsor: DAQEM NDOTID: CL200836 PE RoW CONST.<br />

FY 2009<br />

$365,000<br />

FY 2010<br />

$361,200<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$726,200<br />

Project Sponsor: Clark County NDOTID: CL2006110 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$2,600,000<br />

FY 2012<br />

$2,700,000<br />

Total Scheduled<br />

$5,300,000<br />

Project Sponsor: Las Vegas NDOTID: CL200669 PE RoW CONST.<br />

FY 2009<br />

$2,600,000<br />

FY 2010<br />

$900,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$3,500,000<br />

Project Sponsor: Las Vegas NDOTID: CL200902 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$3,100,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$3,100,000<br />

Project Sponsor: Las Vegas NDOTID: CL200837 PE RoW CONST.<br />

FY 2009<br />

$5,480,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$5,480,000<br />

Project Sponsor: RTC NDOTID: CL20120004 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$400,000<br />

Total Scheduled<br />

$400,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 54


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :4265 Location: Southern Nevada FAST <strong>System</strong><br />

From:<br />

To:<br />

Description: ITS and signal timing coordination on regional freeway and arterial roadways<br />

Project # :210 Location: TDM Program<br />

From:<br />

To:<br />

Description: <strong>Transportation</strong> Demand Management products and services that promote the<br />

reduction of Single Occupant Vehicles on the region's roads in order to<br />

improve traffic congestion and air quality<br />

Project # :1572 Location: Truck stops - various locations<br />

From:<br />

To:<br />

Description: Truck stop electrification to reduce emissions from trucks parked at various<br />

facilities<br />

Project # :2742 Location: University of Nevada Las Vegas<br />

From:<br />

To:<br />

Description: Bike Locker Program<br />

Project # :2005 Location: US 95: Express transit service<br />

From: Durango Dr<br />

To: Downtown Las Vegas<br />

Description: Operating support for freeway express transit routes<br />

Project Sponsor: RTC NDOTID: CL20110007 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$3,000,000<br />

FY 2012<br />

$3,000,000<br />

Total Scheduled<br />

$6,000,000<br />

Project Sponsor: RTC NDOTID: CL200308-L PE RoW CONST.<br />

FY 2009<br />

$385,000<br />

FY 2010<br />

$396,000<br />

FY 2011<br />

$402,000<br />

FY 2012<br />

$408,000<br />

Total Scheduled<br />

$1,591,000<br />

Project Sponsor: DAQEM NDOTID: CL2006113 PE RoW CONST.<br />

FY 2009<br />

$640,000<br />

FY 2010<br />

$640,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$1,280,000<br />

Project Sponsor: RTC NDOTID: CL20090157 PE RoW CONST.<br />

FY 2009<br />

$100,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$100,000<br />

Project Sponsor: RTC NDOTID: CL2008104 PE RoW CONST.<br />

FY 2009<br />

$1,950,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$1,000,000<br />

Total Scheduled<br />

$2,950,000<br />

Total for CMAQ $17,357,000 $13,062,200 $13,502,000 $17,158,000<br />

$61,079,200<br />

AB 595 Bonded<br />

Project # :4151 Location: I-15 / US 95<br />

From: I-15 south of Oakey Blvd<br />

To: US 95 east of Rancho Dr<br />

Description: Project Neon Phase 1: PE for the construction of system-to-system direct<br />

connect HOV ramps, including add/drop lanes at Oakey/Wyoming<br />

Project Sponsor: NDOT NDOTID: CL201203 PE RoW CONST.<br />

FY 2009<br />

$15,000,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$15,000,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 55


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :4147 Location: Martin Luther King Blvd. / Industrial Rd. Connector<br />

Project Neon Phase 2<br />

From: Industrial Rd. south of Wyoming Ave<br />

To: M.L.King Blvd. at Palomino Ln.<br />

Description: Preliminary Engineering and Right-of-Way for a 6-lane overpass across I-15<br />

with grade separation at Oakey/Wyoming<br />

Project # :256 Location: US-95 North<br />

From: SR 578 Washington Av.<br />

To: Ann Rd.<br />

Description: US-95 North Package 1: Widen from 6 to 8 lanes, to include HOV lanes add<br />

auxiliary lanes. Braid both the northbound and southbound ramps at the<br />

Rancho/Ann Rd. interchange. (PE, RW, Const.)<br />

Project # :257 Location: US-95 North<br />

From: Ann Rd.<br />

To: SR.157 Kyle Canyon Rd.<br />

Description: US-95 North Package 2: Ann to Centennial: Widen from 6 to 8 lanes. Add<br />

auxiliary lanes. Centennial to Durango: Widen from 4 to 8 lanes. Durango to<br />

Kyle Canyon: Widen from 4 to 6 lanes. (PE.)<br />

Project Sponsor: NDOT NDOTID: CL200002 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$7,500,000<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$7,500,000<br />

Project Sponsor: NDOT NDOTID: CL200661 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$145,000,000<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$145,000,000<br />

Project Sponsor: NDOT NDOTID: CL201101 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$4,000,000<br />

Total Scheduled<br />

$4,000,000<br />

Total for AB 595 Bonded $15,000,000 $0 $152,500,000 $4,000,000<br />

$171,500,000<br />

CCDOA<br />

Project # :221 Location: I-215 Southern Beltway<br />

From: @ Airport Connector<br />

To:<br />

Description: Upgrade Interchange, expand mainline from I-15 to Windmill Ln.<br />

Project # :4203 Location: SR. 604 Las Vegas Blvd South<br />

From: Proposed Ivanpah Valley Airport<br />

To: Jean<br />

Description: Construct Las Vegas Blvd. South as 2-lane arterial roadway from Ivanpah<br />

Airport to Jean<br />

Project Sponsor: Clark County NDOTID: CL200483 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$23,000,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$23,000,000<br />

Project Sponsor: DoA NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$200,000<br />

FY 2011<br />

$200,000<br />

FY 2012<br />

$4,500,000<br />

Total Scheduled<br />

$4,900,000<br />

Total for CCDOA $0 $23,200,000 $200,000 $4,500,000<br />

$27,900,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 56


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

CCDOA and FAA Combination<br />

Project # :4202 Location: I-15<br />

From: @ MP 3<br />

To:<br />

Description: Construct Ivanpah interchange on I-15 to access the airport<br />

Project # :4266 Location: Ivanpah Expwy<br />

From: Proposed Ivanpah Valley Airport<br />

To: I-15 near MP 22<br />

Description: PE and RoW for new expressway from Ivanpah Airport to I-15 south of Sloan<br />

Rd, including interchange with I-15<br />

Project Sponsor: DoA NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$1,300,000<br />

FY 2012<br />

$7,800,000<br />

Total Scheduled<br />

$9,100,000<br />

Project Sponsor: DoA NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$1,500,000<br />

FY 2010<br />

$2,000,000<br />

FY 2011<br />

$2,500,000<br />

FY 2012<br />

$3,000,000<br />

Total Scheduled<br />

$9,000,000<br />

Total for CCDOA and FAA Combination $1,500,000 $2,000,000 $3,800,000 $10,800,000<br />

$18,100,000<br />

Clark County Beltway Program<br />

Project # :506 Location: CC-215 Northern Beltway<br />

From: Tenaya Way<br />

To: Decatur Blvd.<br />

Description: Upgrade to 6-lane freeway with interchanges at Jones Blvd. and Decatur Blvd.<br />

and an overpass at Bradley Rd<br />

Project # :507 Location: CC-215 Northern Beltway<br />

From: Decatur Blvd.<br />

To: North Fifth St.<br />

Description: Upgrade to 6-lane freeway with interchanges at Revere St and North 5th St.<br />

Project # :508 Location: CC-215 Northern Beltway<br />

From: North Fifth St.<br />

To: Range Rd.<br />

Description: Upgrade to 6-lane freeway with interchanges at Losee Rd., Pecos Rd., Lamb<br />

Blvd., and Range Rd.<br />

Project # :509 Location: CC-215 Northern Beltway<br />

From: @ I-15<br />

To:<br />

Description: Upgrade to system-to-system interchange and widen to 6 lanes<br />

Project Sponsor: Clark County NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$150,360,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$150,360,000<br />

Project Sponsor: Clark County NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$115,599,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$115,599,000<br />

Project Sponsor: Clark County NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$118,700,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$118,700,000<br />

Project Sponsor: Clark County NDOTID: CL200835 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$107,600,000<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$107,600,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 57


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :926 Location: CC-215 Northern Beltway @ US.95<br />

From: Hualapai Way<br />

To: Tenaya Way<br />

Description: Upgrade to system-to-systsem interchange and widen to 6 lanes<br />

Project # :504 Location: CC-215 Western Beltway<br />

From: Alta Dr<br />

To: north of Summerlin Pkwy<br />

Description: Construct interchanges at Far Hills Ave and Summerlin Pkwy and widen to 6<br />

lanes from Charleston Blvd to Summerlin Pkwy.<br />

Project # :510 Location: CC-215 Western Beltway<br />

From: Craig Rd.<br />

To: Hualapai Way (North)<br />

Description: Upgrade to 6-lane freeway with interchanges at Lone Mountain Rd and Ann Rd<br />

and an overpass at Centennial Pkwy.<br />

Project # :221 Location: I-215 Southern Beltway<br />

From: @ Airport Connector<br />

To:<br />

Description: Upgrade Interchange, expand mainline from I-15 to Windmill Ln.<br />

Project # :228 Location: I-215 Southern Beltway<br />

From: Eastern Ave.<br />

To: Windmill Ln.<br />

Description: Widen from 6 to 8 lanes<br />

Project Sponsor: Clark County NDOTID: CL200704 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$216,740,000<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$216,740,000<br />

Project Sponsor: Clark County NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$127,800,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$127,800,000<br />

Project Sponsor: Clark County NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$134,300,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$134,300,000<br />

Project Sponsor: Clark County NDOTID: CL200483 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$153,174,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$153,174,000<br />

Project Sponsor: Clark County NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$32,600,000<br />

Total Scheduled<br />

$32,600,000<br />

Total for Clark County Beltway Program $512,459,000 $287,474,000 $324,340,000 $32,600,000<br />

$1,156,873,000<br />

Colorado River Commission<br />

Project # :2903 Location: Laughlin<br />

From:<br />

To:<br />

Description: Development and construction of building for Southern Nevada Transit<br />

Coalition public transit operations<br />

Project Sponsor: SNTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$1,000,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$1,000,000<br />

Total for Colorado River Commission $1,000,000 $0 $0<br />

$0<br />

$1,000,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 58


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

FTA S.5307 Formula<br />

Project # :2020 Location: Boulder Hwy: Bus Rapid Transit<br />

From: College Dr<br />

To: Downtown Las Vegas<br />

Description: Roadway reconstruction and intersection improvements to accommodate<br />

Rapid Transit operations in the Boulder Hwy corridor<br />

Project # :2022 Location: Boulder Hwy: Bus Rapid Transit<br />

From: College Dr<br />

To: Downtown Las Vegas<br />

Description: Construct shelters and ancillary equipment for Rapid Transit operations in the<br />

Boulder Hwy corridor<br />

Project # :2048 Location: Bus fleet replacement program<br />

From:<br />

To:<br />

Description: Acquire 78 buses for the fixed-route bus replacement program<br />

Project # :2010 Location: Central City Intermodal <strong>Transportation</strong> Terminal<br />

From:<br />

To:<br />

Description: Development of a new intermodal transportation center to serve downtown Las<br />

Vegas<br />

Project # :2703 Location: Durango Dr.<br />

From: @ Westcillf Dr.<br />

To:<br />

Description: Develop a park-and-ride lot, including transit passenger facilities, to serve the<br />

Summerlin Pkwy corridor<br />

Project # :2033 Location: Paratransit fleet expansion<br />

From:<br />

To:<br />

Description: Acquire 22 vehicles for the expansion of paratransit operations.<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$18,500,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$18,500,000<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$4,000,000<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$4,000,000<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$11,667,200<br />

FY 2010<br />

$0<br />

FY 2011<br />

$10,240,000<br />

FY 2012<br />

$15,973,600<br />

Total Scheduled<br />

$37,880,800<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$2,682,697<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$2,682,697<br />

Project Sponsor: RTC NDOTID: CL200664 PE RoW CONST.<br />

FY 2009<br />

$3,182,400<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$3,182,400<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$1,603,200<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$1,603,200<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 59


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :2055 Location: Paratransit fleet expansion<br />

From:<br />

To:<br />

Description: Acquire 60 vehicles for the expansion of paratransit operations.<br />

Project # :2052 Location: Paratransit fleet replacement<br />

From:<br />

To:<br />

Description: Acquire 257 vehicles for the paratransit fleet replacement program<br />

Project # :2706 Location: Park-and-Ride lots - various locations<br />

From:<br />

To:<br />

Description: Development of park-and-ride lots<br />

Project # :2803 Location: University of Nevada Las Vegas<br />

From:<br />

To:<br />

Description: Construct a bus transfer center to serve the main UNLV campus<br />

Project # :2701 Location: US 95<br />

From: @ Durango Dr<br />

To:<br />

Description: Develop of a park-and-ride lot, including transit passenger facilities, to serve<br />

the US.95 corridor.<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$980,800<br />

FY 2010<br />

$545,600<br />

FY 2011<br />

$1,361,600<br />

FY 2012<br />

$1,408,000<br />

Total Scheduled<br />

$4,296,000<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$3,668,800<br />

FY 2010<br />

$3,520,000<br />

FY 2011<br />

$8,320,800<br />

FY 2012<br />

$5,910,400<br />

Total Scheduled<br />

$21,420,000<br />

Project Sponsor: RTC NDOTID: CL200903 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$2,400,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$2,400,000<br />

Total Scheduled<br />

$4,800,000<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$1,600,000<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$1,600,000<br />

Project Sponsor: RTC NDOTID: CL200610 PE RoW CONST.<br />

FY 2009<br />

$3,200,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$3,200,000<br />

Total for FTA S.5307 Formula $26,985,097 $24,965,600 $25,522,400 $25,692,000<br />

$103,165,097<br />

FTA S.5307 Formula Enhancements<br />

Project # :2603 Location: Las Vegas Blvd<br />

From: Sunset Rd<br />

To: Downtown Las Vegas<br />

Description: Upgrade transit shelters, TVMs and security systems at selected transit stops<br />

on the Las Vegas Strip<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$480,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$480,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 60


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :2046 Location: <strong>Regional</strong> transit bus stop and shelter program<br />

From:<br />

To:<br />

Description: Enhancements to transit shelters including TVMs, signage, passenger<br />

amenities, landscaping and related sidewalk improvements<br />

Project # :2019 Location: Summerlin Center<br />

From:<br />

To:<br />

Description: Installation of transit shelters and ancillary equipment at the Summerlin Transit<br />

Center<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$296,000<br />

FY 2011<br />

$304,000<br />

FY 2012<br />

$312,000<br />

Total Scheduled<br />

$912,000<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$480,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$480,000<br />

Total for FTA S.5307 Formula Enhancements $480,000 $776,000 $304,000 $312,000<br />

$1,872,000<br />

FTA S.5307 Formula Security<br />

Project # :2602 Location: <strong>Regional</strong> transit system facilities<br />

From: various locations<br />

To:<br />

Description: Upgrade and replacement of security systems at RTC facilities<br />

Project # :2601 Location: <strong>Regional</strong> transit system security systems<br />

From: various locations<br />

To:<br />

Description: Security systems for the regional transit system<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$288,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$288,000<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$296,000<br />

FY 2011<br />

$304,000<br />

FY 2012<br />

$312,000<br />

Total Scheduled<br />

$912,000<br />

Total for FTA S.5307 Formula Security $288,000 $296,000 $304,000 $312,000<br />

$1,200,000<br />

FTA S.5309 Bus Discretionary<br />

Project # :2022 Location: Boulder Hwy: Bus Rapid Transit<br />

From: College Dr<br />

To: Downtown Las Vegas<br />

Description: Construct shelters and ancillary equipment for Rapid Transit operations in the<br />

Boulder Hwy corridor<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$451,440<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$451,440<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 61


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :2010 Location: Central City Intermodal <strong>Transportation</strong> Terminal<br />

From:<br />

To:<br />

Description: Development of a new intermodal transportation center to serve downtown Las<br />

Vegas<br />

Project # :2903 Location: Laughlin<br />

From:<br />

To:<br />

Description: Development and construction of building for Southern Nevada Transit<br />

Coalition public transit operations<br />

Project # :2905 Location: Laughlin / Mesquite<br />

From:<br />

To:<br />

Description: Acquire two senior transportation vehicles for SNTC operations<br />

Project # :2012 Location: Sunset Rd.<br />

From: east of Decatur Blvd.<br />

To:<br />

Description: Development of the Sunset Transit Maintenance Facility<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$2,451,320<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$2,451,320<br />

Project Sponsor: SNTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$100,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$100,000<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$98,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$98,000<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$5,352,853<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$5,352,853<br />

Total for FTA S.5309 Bus Discretionary $8,453,613 $0 $0<br />

$0<br />

$8,453,613<br />

FTA S.5309 New Starts<br />

Project # :2012 Location: Sunset Rd.<br />

From: east of Decatur Blvd.<br />

To:<br />

Description: Development of the Sunset Transit Maintenance Facility<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$992,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$992,000<br />

Total for FTA S.5309 New Starts $992,000 $0 $0<br />

$0<br />

$992,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 62


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

FTA S.5316 Job Access and Reverse Commute<br />

Project # :2801 Location: Las Vegas Area<br />

From:<br />

To:<br />

Description: Projects to be selected under the RTC Coordinated Public Transit - Human<br />

Services <strong>Transportation</strong> Plan<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$786,056<br />

FY 2011<br />

$817,498<br />

FY 2012<br />

$850,198<br />

Total Scheduled<br />

$2,453,752<br />

Project # :2805 Location: Las Vegas Area<br />

From:<br />

To:<br />

Description: Institute regular paratransit service for disabled workers<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$755,823<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$755,823<br />

Total for FTA S.5316 Job Access and Reverse Commute $755,823 $786,056 $817,498 $850,198<br />

$3,209,575<br />

FTA S.5317 "New Freedom"<br />

Project # :2807 Location: Clark County<br />

From:<br />

To:<br />

Description: Development and operation of a same day paratransit service<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$175,675<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$175,675<br />

Project # :2802 Location: Las Vegas Area<br />

From:<br />

To:<br />

Description: Projects to be selected under the RTC Coordinated Public Transit - Human<br />

Services <strong>Transportation</strong> Plan<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$507,182<br />

FY 2011<br />

$527,469<br />

FY 2012<br />

$548,568<br />

Total Scheduled<br />

$1,583,219<br />

Project # :2806 Location: Las Vegas Area<br />

From:<br />

To:<br />

Description: Development and operation of a centralized information and referral service for<br />

human services transportation clients.<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$312,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$312,000<br />

Total for FTA S.5317 "New Freedom" $487,675 $507,182 $527,469 $548,568<br />

$2,070,894<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 63


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Local Funds<br />

Project # :1561 Location: City of Las Vegas<br />

From: Union Park<br />

To: Main St<br />

Description: Construct pedestrian overbridge across UPRR<br />

Project # :2807 Location: Clark County<br />

From:<br />

To:<br />

Description: Development and operation of a same day paratransit service<br />

Project # :4140 Location: I-15<br />

From: @ Mile Post 118 Pioneer Blvd. Extension<br />

To:<br />

Description: Construct new interchange (PE)<br />

Project # :2801 Location: Las Vegas Area<br />

From:<br />

To:<br />

Description: Projects to be selected under the RTC Coordinated Public Transit - Human<br />

Services <strong>Transportation</strong> Plan<br />

Project # :2802 Location: Las Vegas Area<br />

From:<br />

To:<br />

Description: Projects to be selected under the RTC Coordinated Public Transit - Human<br />

Services <strong>Transportation</strong> Plan<br />

Project # :2805 Location: Las Vegas Area<br />

From:<br />

To:<br />

Description: Institute regular paratransit service for disabled workers<br />

Project # :2806 Location: Las Vegas Area<br />

From:<br />

To:<br />

Description: Development and operation of a centralized information and referral service for<br />

human services transportation clients.<br />

Project Sponsor: Las Vegas NDOTID: CL2006105 PE RoW CONST.<br />

FY 2009<br />

$3,000,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$3,000,000<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$175,675<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$175,675<br />

Project Sponsor: Mesquite NDOTID: CL200801 PE RoW CONST.<br />

FY 2009<br />

$4,000,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$4,000,000<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$786,056<br />

FY 2011<br />

$817,498<br />

FY 2012<br />

$850,198<br />

Total Scheduled<br />

$2,453,752<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$126,796<br />

FY 2011<br />

$131,867<br />

FY 2012<br />

$137,142<br />

Total Scheduled<br />

$395,805<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$755,823<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$755,823<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$78,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$78,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 64


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :2903 Location: Laughlin<br />

From:<br />

To:<br />

Description: Development and construction of building for Southern Nevada Transit<br />

Coalition public transit operations<br />

Project Sponsor: SNTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$60,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$60,000<br />

Total for Local Funds $8,069,498 $912,852 $949,365 $987,340<br />

$10,919,055<br />

LVCVA Bonded<br />

Project # :246 Location: I-15 South Design Build<br />

From: SR 160 Blue Diamond Rd.<br />

To: Tropicana Ave.<br />

Description: Phase 1: Widen from 6 to 8 lanes, to include HOV lanes and auxiliary lanes<br />

Project Sponsor: NDOT NDOTID: CL200917 PE RoW CONST.<br />

FY 2009<br />

$272,000,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$272,000,000<br />

Total for LVCVA Bonded $272,000,000 $0 $0<br />

$0<br />

$272,000,000<br />

Private Developers<br />

Project # :4238 Location: SR 160 Blue Diamond Rd.<br />

From: Rainbow Blvd.<br />

To: Durango Dr.<br />

Description: Widen from 2 to 4 lanes<br />

Project # :4018 Location: SR 160 Pahrump Valley Rd.<br />

From: SR.159 Red Rock Canyon Road<br />

To: Mountain Springs<br />

Description: Widen from 2 to 4 Lanes<br />

Project Sponsor: NDOT NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$3,500,000<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$3,500,000<br />

Project Sponsor: NDOT NDOTID: CL200749 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$89,000,000<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$89,000,000<br />

Total for Private Developers $0 $0 $92,500,000<br />

$0<br />

$92,500,000<br />

Q10 Bicycle Lane Program<br />

Project # :1508 Location: BPE On-Street Bike Projects: 2009-12<br />

From:<br />

To:<br />

Description: Installation of Bicycle Lanes & Routes in Various Locations<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$2,400,000<br />

FY 2010<br />

$1,500,000<br />

FY 2011<br />

$1,500,000<br />

FY 2012<br />

$1,500,000<br />

Total Scheduled<br />

$6,900,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 65


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Total for Q10 Bicycle Lane Program $2,400,000 $1,500,000 $1,500,000 $1,500,000<br />

$6,900,000<br />

Q10 High Speed Lane Miles Program<br />

Project # :108 Location: Cactus Ave. at I-15<br />

From: Dean Martin Dr.<br />

To: Las Vegas Blvd.<br />

Description: Construct an interchange<br />

Project # :129 Location: Horse Dr. @ US-95<br />

From: Grand Canyon Dr.<br />

To: Fort Apache Rd.<br />

Description: Construct 6-lane overpass with an interchange at US.95<br />

Project # :134 Location: I-515<br />

From: @ Galleria Dr.<br />

To:<br />

Description: Construct interchange and construct Galleria Dr. 4 lanes between Stephanie<br />

and Boulder Hwy.<br />

Project # :3002 Location: Laughlin<br />

From: Needles Hwy.<br />

To: Bullhead City, AZ<br />

Description: Construct new Colorado River bridge and related road works<br />

Project # :4035 Location: North 5th St.<br />

From: Owens Ave.<br />

To: Cheyenne Ave.<br />

Description: Construct 8-lane roadway with overpass at I-15 and new interchange at<br />

Cheyenne Ave, including transit lanes, grade-separated pedestrian crossings<br />

and multi-use trails; Reconfigure Main St./Owens Ave./Las Vegas Blvd.<br />

intersections.<br />

Project # :551 Location: Rainbow Blvd.<br />

From: CC-215 Southern Beltway<br />

To: Tropicana Ave.<br />

Description: Widen from 4 to 6 lanes<br />

Project Sponsor: Clark County NDOTID: CL200516 PE RoW CONST.<br />

FY 2009<br />

$2,799,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$5,157,000<br />

FY 2012<br />

$7,272,000<br />

Total Scheduled<br />

$15,228,000<br />

Project Sponsor: Las Vegas NDOTID: CL200476 PE RoW CONST.<br />

FY 2009<br />

$4,280,000<br />

FY 2010<br />

$15,000,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$19,280,000<br />

Project Sponsor: Henderson NDOTID: CL200435 PE RoW CONST.<br />

FY 2009<br />

$40,009,000<br />

FY 2010<br />

$11,531,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$51,540,000<br />

Project Sponsor: Clark County NDOTID: CL2006108 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$5,000,000<br />

FY 2012<br />

$25,000,000<br />

Total Scheduled<br />

$30,000,000<br />

Project Sponsor: North Las Vegas NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$24,319,130<br />

FY 2010<br />

$20,000,000<br />

FY 2011<br />

$40,000,000<br />

FY 2012<br />

$18,291,000<br />

Total Scheduled<br />

$102,610,130<br />

Project Sponsor: Clark County NDOTID: CL200666 PE RoW CONST.<br />

FY 2009<br />

$500,000<br />

FY 2010<br />

$2,095,000<br />

FY 2011<br />

$1,045,000<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$3,640,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 66


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :1578 Location: Rainbow Blvd.<br />

From: Desert Inn Rd.<br />

To: US-95<br />

Description: Intersection improvements at Desert Inn Rd, Oakey Blvd, Charleston Blvd and<br />

Alta Dr.<br />

Project # :1579 Location: Rainbow Blvd.<br />

From: at Sahara Ave<br />

To:<br />

Description: Intersection improvements<br />

Project # :4027 Location: Sheep Mountian Pkwy.<br />

From: CC-215 Western Beltway near Ann Rd<br />

To: I-15<br />

Description: PE and NEPA process/environmental assessment for new roadway<br />

Project # :894 Location: Summerlin Pkwy.<br />

From: CC-215 Western Beltway<br />

To: US-95<br />

Description: Widen to 8 lanes<br />

Project Sponsor: Las Vegas NDOTID: CL200669 PE RoW CONST.<br />

FY 2009<br />

$200,000<br />

FY 2010<br />

$2,150,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$2,350,000<br />

Project Sponsor: Las Vegas NDOTID: CL200902 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$800,000<br />

FY 2011<br />

$1,400,000<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$2,200,000<br />

Project Sponsor: Las Vegas NDOTID: CL20090151 PE RoW CONST.<br />

FY 2009<br />

$5,353,000<br />

FY 2010<br />

$600,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$5,953,000<br />

Project Sponsor: Las Vegas NDOTID: CL200668 PE RoW CONST.<br />

FY 2009<br />

$560,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$3,000,000<br />

Total Scheduled<br />

$3,560,000<br />

Total for Q10 High Speed Lane Miles Program $78,020,130 $52,176,000 $52,602,000 $53,563,000<br />

$236,361,130<br />

Q10 Traffic Signals & ITS Programs<br />

Project # :2747 Location: Craig Rd<br />

From: Tenaya Way<br />

To: Decatur Blvd<br />

Description: ITS and signal infrastructure improvements<br />

Project # :2746 Location: Eastern Ave<br />

From: Serene Ave<br />

To: Flamingo Rd<br />

Description: ITS and signal infrastructure improvements<br />

Project Sponsor: Las Vegas NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$511,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$511,000<br />

Project Sponsor: Clark County NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$4,958,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$4,958,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 67


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :4232 Location: Eastern Ave.<br />

From: Serene<br />

To: Sunridge<br />

Description: Signal and intersection improvements<br />

Project # :2733 Location: Tropicana Ave<br />

From: Rainbow Blvd<br />

To: Wynn Rd<br />

Description: ITS and signal infrastructure improvements<br />

Project Sponsor: Henderson NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$280,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$280,000<br />

Project Sponsor: Clark County NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$169,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$169,000<br />

Total for Q10 Traffic Signals & ITS Programs $5,918,000 $0 $0<br />

$0<br />

$5,918,000<br />

Q10 RTC Projects<br />

Project # :2020 Location: Boulder Hwy: Bus Rapid Transit<br />

From: College Dr<br />

To: Downtown Las Vegas<br />

Description: Roadway reconstruction and intersection improvements to accommodate<br />

Rapid Transit operations in the Boulder Hwy corridor<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$500,000<br />

FY 2010<br />

$14,500,000<br />

FY 2011<br />

$28,000,000<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$43,000,000<br />

Total for Q10 RTC Projects $500,000 $14,500,000 $28,000,000<br />

$0<br />

$43,000,000<br />

RTC Gas Tax<br />

Project # :740 Location: Bonneville Ave. / Clark Ave. Couplet<br />

From: Main St.<br />

To: Charleston Blvd.<br />

Description: Convert to one-way couplet, 3 lanes in each direction; add landscaping<br />

between Casino Center Dr and Las Vegas Blvd<br />

Project # :4267 Location: Kyle Canyon Rd.<br />

From: at US.95<br />

To:<br />

Description: PE and RoW for interchange at Kyle Canyon Rd and US95<br />

Project Sponsor: Las Vegas NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$6,900,000<br />

FY 2010<br />

$5,564,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$12,464,000<br />

Project Sponsor: Las Vegas NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$1,000,000<br />

FY 2010<br />

$2,927,000<br />

FY 2011<br />

$2,927,000<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$6,854,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 68


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :4035 Location: North 5th St.<br />

From: Owens Ave.<br />

To: Cheyenne Ave.<br />

Description: Construct 8-lane roadway with overpass at I-15 and new interchange at<br />

Cheyenne Ave, including transit lanes, grade-separated pedestrian crossings<br />

and multi-use trails; Reconfigure Main St./Owens Ave./Las Vegas Blvd.<br />

intersections.<br />

Project # :4027 Location: Sheep Mountian Pkwy.<br />

From: CC-215 Western Beltway near Ann Rd<br />

To: I-15<br />

Description: PE and NEPA process/environmental assessment for new roadway<br />

Project # :143 Location: SR 573 Craig Rd @ I-15<br />

From: Berg St.<br />

To: Pecos Rd.<br />

Description: Widen from 4 to 6 lanes with a Railroad Grade Separation and Interchange<br />

Improvements<br />

Project # :4089 Location: Stewart Ave<br />

From: Main St.<br />

To: Maryland Parkway<br />

Description: Landscaping and roadway rehabilitation<br />

Project Sponsor: North Las Vegas NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$2,758,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$2,758,000<br />

Project Sponsor: Las Vegas NDOTID: CL20090151 PE RoW CONST.<br />

FY 2009<br />

$2,668,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$2,668,000<br />

Project Sponsor: North Las Vegas NDOTID: CL199710 PE RoW CONST.<br />

FY 2009<br />

$5,500,000<br />

FY 2010<br />

$500,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$6,000,000<br />

Project Sponsor: Las Vegas NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$924,000<br />

FY 2010<br />

$1,900,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$2,824,000<br />

Total for RTC Gas Tax $16,992,000 $13,649,000 $2,927,000<br />

$0<br />

$33,568,000<br />

RTC Gas Tax - Area-Wide Program<br />

Project # :129 Location: Horse Dr. @ US-95<br />

From: Grand Canyon Dr.<br />

To: Fort Apache Rd.<br />

Description: Construct 6-lane overpass with an interchange at US.95<br />

Project # :134 Location: I-515<br />

From: @ Galleria Dr.<br />

To:<br />

Description: Construct interchange and construct Galleria Dr. 4 lanes between Stephanie<br />

and Boulder Hwy.<br />

Project Sponsor: Las Vegas NDOTID: CL200476 PE RoW CONST.<br />

FY 2009<br />

$16,043,000<br />

FY 2010<br />

$2,916,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$18,959,000<br />

Project Sponsor: Henderson NDOTID: CL200435 PE RoW CONST.<br />

FY 2009<br />

$10,386,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$10,386,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 69


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :4263 Location: Sheep Mountain Pkwy.<br />

From: @ US-95 & CC-215 Western Beltway<br />

To:<br />

Description: PE and right-of-way for the construction of interchanges<br />

Project # :143 Location: SR 573 Craig Rd @ I-15<br />

From: Berg St.<br />

To: Pecos Rd.<br />

Description: Widen from 4 to 6 lanes with a Railroad Grade Separation and Interchange<br />

Improvements<br />

Project Sponsor: Las Vegas NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$14,999,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$14,999,000<br />

Project Sponsor: North Las Vegas NDOTID: CL199710 PE RoW CONST.<br />

FY 2009<br />

$9,166,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$9,166,000<br />

Total for RTC Gas Tax - Area-Wide Program $50,594,000 $2,916,000 $0<br />

$0<br />

$53,510,000<br />

RTC Sales Tax<br />

Project # :2020 Location: Boulder Hwy: Bus Rapid Transit<br />

From: College Dr<br />

To: Downtown Las Vegas<br />

Description: Roadway reconstruction and intersection improvements to accommodate<br />

Rapid Transit operations in the Boulder Hwy corridor<br />

Project # :2022 Location: Boulder Hwy: Bus Rapid Transit<br />

From: College Dr<br />

To: Downtown Las Vegas<br />

Description: Construct shelters and ancillary equipment for Rapid Transit operations in the<br />

Boulder Hwy corridor<br />

Project # :2048 Location: Bus fleet replacement program<br />

From:<br />

To:<br />

Description: Acquire 78 buses for the fixed-route bus replacement program<br />

Project # :2006 Location: Bus Rapid Transit - fleet expansion<br />

From:<br />

To:<br />

Description: Acquire 50 vehicles for the expansion of the Ace Rapid Transit fleet<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$4,625,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$4,625,000<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$112,860<br />

FY 2010<br />

$0<br />

FY 2011<br />

$1,000,000<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$1,112,860<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$2,916,800<br />

FY 2010<br />

$0<br />

FY 2011<br />

$2,560,000<br />

FY 2012<br />

$3,993,400<br />

Total Scheduled<br />

$9,470,200<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$18,000,000<br />

FY 2010<br />

$42,000,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$60,000,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 70


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :2010 Location: Central City Intermodal <strong>Transportation</strong> Terminal<br />

From:<br />

To:<br />

Description: Development of a new intermodal transportation center to serve downtown Las<br />

Vegas<br />

Project # :2703 Location: Durango Dr.<br />

From: @ Westcillf Dr.<br />

To:<br />

Description: Develop a park-and-ride lot, including transit passenger facilities, to serve the<br />

Summerlin Pkwy corridor<br />

Project # :2603 Location: Las Vegas Blvd<br />

From: Sunset Rd<br />

To: Downtown Las Vegas<br />

Description: Upgrade transit shelters, TVMs and security systems at selected transit stops<br />

on the Las Vegas Strip<br />

Project # :2905 Location: Laughlin / Mesquite<br />

From:<br />

To:<br />

Description: Acquire two senior transportation vehicles for SNTC operations<br />

Project # :2033 Location: Paratransit fleet expansion<br />

From:<br />

To:<br />

Description: Acquire 22 vehicles for the expansion of paratransit operations.<br />

Project # :2055 Location: Paratransit fleet expansion<br />

From:<br />

To:<br />

Description: Acquire 60 vehicles for the expansion of paratransit operations.<br />

Project # :2052 Location: Paratransit fleet replacement<br />

From:<br />

To:<br />

Description: Acquire 257 vehicles for the paratransit fleet replacement program<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$1,283,504<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$1,283,504<br />

Project Sponsor: RTC NDOTID: CL200664 PE RoW CONST.<br />

FY 2009<br />

$795,600<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$795,600<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$120,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$120,000<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$24,500<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$24,500<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$400,800<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$400,800<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$245,200<br />

FY 2010<br />

$136,400<br />

FY 2011<br />

$340,400<br />

FY 2012<br />

$352,000<br />

Total Scheduled<br />

$1,074,000<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$917,200<br />

FY 2010<br />

$880,000<br />

FY 2011<br />

$2,080,200<br />

FY 2012<br />

$1,477,600<br />

Total Scheduled<br />

$5,355,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 71


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :2706 Location: Park-and-Ride lots - various locations<br />

From:<br />

To:<br />

Description: Development of park-and-ride lots<br />

Project # :2046 Location: <strong>Regional</strong> transit bus stop and shelter program<br />

From:<br />

To:<br />

Description: Enhancements to transit shelters including TVMs, signage, passenger<br />

amenities, landscaping and related sidewalk improvements<br />

Project # :2602 Location: <strong>Regional</strong> transit system facilities<br />

From: various locations<br />

To:<br />

Description: Upgrade and replacement of security systems at RTC facilities<br />

Project # :2601 Location: <strong>Regional</strong> transit system security systems<br />

From: various locations<br />

To:<br />

Description: Security systems for the regional transit system<br />

Project # :2019 Location: Summerlin Center<br />

From:<br />

To:<br />

Description: Installation of transit shelters and ancillary equipment at the Summerlin Transit<br />

Center<br />

Project # :2012 Location: Sunset Rd.<br />

From: east of Decatur Blvd.<br />

To:<br />

Description: Development of the Sunset Transit Maintenance Facility<br />

Project # :210 Location: TDM Program<br />

From:<br />

To:<br />

Description: <strong>Transportation</strong> Demand Management products and services that promote the<br />

reduction of Single Occupant Vehicles on the region's roads in order to<br />

improve traffic congestion and air quality<br />

Project Sponsor: RTC NDOTID: CL200903 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$600,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$600,000<br />

Total Scheduled<br />

$1,200,000<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$74,000<br />

FY 2011<br />

$76,000<br />

FY 2012<br />

$78,000<br />

Total Scheduled<br />

$228,000<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$72,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$72,000<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$74,000<br />

FY 2011<br />

$76,000<br />

FY 2012<br />

$78,000<br />

Total Scheduled<br />

$228,000<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$120,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$120,000<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$1,904,623<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$1,904,623<br />

Project Sponsor: RTC NDOTID: CL200308-L PE RoW CONST.<br />

FY 2009<br />

$183,000<br />

FY 2010<br />

$184,800<br />

FY 2011<br />

$187,600<br />

FY 2012<br />

$190,400<br />

Total Scheduled<br />

$745,800<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 72


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :2803 Location: University of Nevada Las Vegas<br />

From:<br />

To:<br />

Description: Construct a bus transfer center to serve the main UNLV campus<br />

Project # :2701 Location: US 95<br />

From: @ Durango Dr<br />

To:<br />

Description: Develop of a park-and-ride lot, including transit passenger facilities, to serve<br />

the US.95 corridor.<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$400,000<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$400,000<br />

Project Sponsor: RTC NDOTID: CL200610 PE RoW CONST.<br />

FY 2009<br />

$800,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$800,000<br />

Total for RTC Sales Tax $27,776,087 $48,694,200 $6,720,200 $6,769,400<br />

$89,959,887<br />

TIFIA<br />

Project # :4200 Location: Las Vegas Monorail<br />

From: McCarren International Airport<br />

To: MGM Hotel Monorail Station<br />

Description: Design/permit/construct dual quideway monorail from the existing Las Vegas<br />

Monorail Station<br />

Project Sponsor: LVMC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$25,000,000<br />

FY 2011<br />

$25,000,000<br />

FY 2012<br />

$50,000,000<br />

Total Scheduled<br />

$100,000,000<br />

Total for TIFIA $0 $25,000,000 $25,000,000 $50,000,000<br />

$100,000,000<br />

Western AZ Council of Governments<br />

Project # :3002 Location: Laughlin<br />

From: Needles Hwy.<br />

To: Bullhead City, AZ<br />

Description: Construct new Colorado River bridge and related road works<br />

Project Sponsor: Clark County NDOTID: CL2006108 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$10,000,000<br />

Total Scheduled<br />

$10,000,000<br />

Total for Western AZ Council of Governments $0 $0 $0<br />

$10,000,000<br />

$10,000,000<br />

National Highway <strong>System</strong><br />

Project # :163 Location: FAST Freeway Management <strong>System</strong><br />

From:<br />

To:<br />

Description: Institution and operation of a Freeway & Arterial Management <strong>System</strong> of<br />

<strong>Transportation</strong> (FAST) (PE, RW, Const.)<br />

Project Sponsor: NDOT NDOTID: CL2000104 PE RoW CONST.<br />

FY 2009<br />

$1,500,000<br />

FY 2010<br />

$1,500,000<br />

FY 2011<br />

$1,500,000<br />

FY 2012<br />

$1,500,000<br />

Total Scheduled<br />

$6,000,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 73


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :235 Location: Freeway Service Patrol<br />

From:<br />

To:<br />

Description: Operation of a motorist assistance program on I-15 from the Jean Interchange<br />

to the Apex Interchange and on US 95/I-515 from Railroad Pass to SR.157<br />

Project # :4138 Location: I-15<br />

From: Sahara Ave.<br />

To: I-515/US 95 Interchange (Spaghetti Bowl)<br />

Description: PE and Right-of-Way for widening to 10 lanes, to include HOV lanes, plus<br />

auxiliary lanes and collector/distributer roads<br />

Project # :203 Location: I-515<br />

From: Foothills Grade Separation<br />

To: I-15 / US 95 Interchange (Spaghetti Bowl)<br />

Description: Conduct NEPA process and preliminary engineering<br />

Project # :4030 Location: US 95 Sierra Club Lawsuit Settlement Agreement<br />

From:<br />

To:<br />

Description: Nationwide MSAT Study (PE)<br />

Project Sponsor: NDOT NDOTID: CL2003128 PE RoW CONST.<br />

FY 2009<br />

$1,500,000<br />

FY 2010<br />

$1,500,000<br />

FY 2011<br />

$1,500,000<br />

FY 2012<br />

$1,500,000<br />

Total Scheduled<br />

$6,000,000<br />

Project Sponsor: NDOT NDOTID: CL200365 PE RoW CONST.<br />

FY 2009<br />

$5,000,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$5,000,000<br />

Project Sponsor: NDOT NDOTID: CL200354 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$4,000,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$4,000,000<br />

Project Sponsor: NDOT NDOTID: CL2007105 PE RoW CONST.<br />

FY 2009<br />

$700,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$700,000<br />

Total for National Highway <strong>System</strong> $8,700,000 $7,000,000 $3,000,000 $3,000,000<br />

$21,700,000<br />

STP Statewide<br />

Project # :4018 Location: SR 160 Pahrump Valley Rd.<br />

From: SR.159 Red Rock Canyon Road<br />

To: Mountain Springs<br />

Description: Widen from 2 to 4 Lanes<br />

Project # :239 Location: Warm Springs Rd.<br />

From: Dean Martin Drive<br />

To: SR.604 Las Vegas Blvd. South<br />

Description: SR-160 Phase 3: Construct a new 6-lane roadway with sidewalk and bicycle<br />

facilities and a grade separation over I-15<br />

Project Sponsor: NDOT NDOTID: CL200749 PE RoW CONST.<br />

FY 2009<br />

$900,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$900,000<br />

Project Sponsor: NDOT NDOTID: CL200503 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$7,000,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$7,000,000<br />

Total for STP Statewide $900,000 $7,000,000 $0<br />

$0<br />

$7,900,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 74


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

SAFETEA-LU High Priority Projects<br />

Project # :108 Location: Cactus Ave. at I-15<br />

From: Dean Martin Dr.<br />

To: Las Vegas Blvd.<br />

Description: Construct an interchange<br />

Project # :509 Location: CC-215 Northern Beltway<br />

From: @ I-15<br />

To:<br />

Description: Upgrade to system-to-system interchange and widen to 6 lanes<br />

Project # :926 Location: CC-215 Northern Beltway @ US.95<br />

From: Hualapai Way<br />

To: Tenaya Way<br />

Description: Upgrade to system-to-systsem interchange and widen to 6 lanes<br />

Project # :163 Location: FAST Freeway Management <strong>System</strong><br />

From:<br />

To:<br />

Description: Institution and operation of a Freeway & Arterial Management <strong>System</strong> of<br />

<strong>Transportation</strong> (FAST) (PE, RW, Const.)<br />

Project # :129 Location: Horse Dr. @ US-95<br />

From: Grand Canyon Dr.<br />

To: Fort Apache Rd.<br />

Description: Construct 6-lane overpass with an interchange at US.95<br />

Project # :961 Location: I-15<br />

From: @ Mile Post 108<br />

To:<br />

Description: Construct new interchange to serve Mesquite Airport<br />

Project # :4023 Location: I-15<br />

From: Las Vegas Valley<br />

To:<br />

Description: PE and Right-of-Way for various widening and interchange improvements<br />

Project Sponsor: Clark County NDOTID: CL200516 PE RoW CONST.<br />

FY 2009<br />

$6,843,780<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$6,843,780<br />

Project Sponsor: Clark County NDOTID: CL200835 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$11,121,143<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$11,121,143<br />

Project Sponsor: Clark County NDOTID: CL200704 PE RoW CONST.<br />

FY 2009<br />

$11,121,143<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$11,121,143<br />

Project Sponsor: NDOT NDOTID: CL2000104 PE RoW CONST.<br />

FY 2009<br />

$1,000,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$1,000,000<br />

Project Sponsor: Las Vegas NDOTID: CL200476 PE RoW CONST.<br />

FY 2009<br />

$4,106,268<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$4,106,268<br />

Project Sponsor: Mesquite NDOTID: CL200603 PE RoW CONST.<br />

FY 2009<br />

$6,843,780<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$6,843,780<br />

Project Sponsor: NDOT NDOTID: CL200804 PE RoW CONST.<br />

FY 2009<br />

$6,843,780<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$6,843,780<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 75


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :4025 Location: I-15<br />

From: @ Starr Av.<br />

To:<br />

Description: PE and RW for new Interchange<br />

Project # :4140 Location: I-15<br />

From: @ Mile Post 118 Pioneer Blvd. Extension<br />

To:<br />

Description: Construct new interchange (PE)<br />

Project # :221 Location: I-215 Southern Beltway<br />

From: @ Airport Connector<br />

To:<br />

Description: Upgrade Interchange, expand mainline from I-15 to Windmill Ln.<br />

Project # :3001 Location: Laughlin<br />

From: Needles Hwy.<br />

To: Bullhead City, AZ<br />

Description: Planning and NEPA process for new Colorado River crossing<br />

Project # :4147 Location: Martin Luther King Blvd. / Industrial Rd. Connector<br />

Project Neon Phase 2<br />

From: Industrial Rd. south of Wyoming Ave<br />

To: M.L.King Blvd. at Palomino Ln.<br />

Description: Preliminary Engineering and Right-of-Way for a 6-lane overpass across I-15<br />

with grade separation at Oakey/Wyoming<br />

Project # :843 Location: SR 564 Lake Mead Pkwy.<br />

From: Boulder Highway<br />

To: Lake Mead National Recreation Area<br />

Description: Widen to 6 lanes<br />

Project # :179 Location: US 93 Boulder City Corridor<br />

From: 0.5 mi east of Lake Shore Dr.<br />

To: Foothills Grade Separation<br />

Description: Preliminary Engineering and right-of-way for a 4-lane freeway<br />

Project Sponsor: Henderson NDOTID: CL200901 PE RoW CONST.<br />

FY 2009<br />

$6,843,780<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$6,843,780<br />

Project Sponsor: Mesquite NDOTID: CL200801 PE RoW CONST.<br />

FY 2009<br />

$684,378<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$684,378<br />

Project Sponsor: Clark County NDOTID: CL200483 PE RoW CONST.<br />

FY 2009<br />

$5,303,930<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$5,303,930<br />

Project Sponsor: RTC NDOTID: CL2006108 PE RoW CONST.<br />

FY 2009<br />

$2,566,418<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$2,566,418<br />

Project Sponsor: NDOT NDOTID: CL200002 PE RoW CONST.<br />

FY 2009<br />

$6,843,780<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$6,843,780<br />

Project Sponsor: Henderson NDOTID: CL200521 PE RoW CONST.<br />

FY 2009<br />

$3,764,080<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$3,764,080<br />

Project Sponsor: NDOT NDOTID: CL200802 PE RoW CONST.<br />

FY 2009<br />

$4,843,780<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$4,843,780<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 76


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :256 Location: US-95 North<br />

From: SR 578 Washington Av.<br />

To: Ann Rd.<br />

Description: US-95 North Package 1: Widen from 6 to 8 lanes, to include HOV lanes add<br />

auxiliary lanes. Braid both the northbound and southbound ramps at the<br />

Rancho/Ann Rd. interchange. (PE, RW, Const.)<br />

Project Sponsor: NDOT NDOTID: CL200661 PE RoW CONST.<br />

FY 2009<br />

$11,463,332<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$11,463,332<br />

Total for SAFETEA-LU High Priority Projects $79,072,229 $11,121,143 $0<br />

$0<br />

$90,193,372<br />

SAFETEA-LU <strong>Transportation</strong> Improvements<br />

Project # :3002 Location: Laughlin<br />

From: Needles Hwy.<br />

To: Bullhead City, AZ<br />

Description: Construct new Colorado River bridge and related road works<br />

Project # :143 Location: SR 573 Craig Rd @ I-15<br />

From: Berg St.<br />

To: Pecos Rd.<br />

Description: Widen from 4 to 6 lanes with a Railroad Grade Separation and Interchange<br />

Improvements<br />

Project # :179 Location: US 93 Boulder City Corridor<br />

From: 0.5 mi east of Lake Shore Dr.<br />

To: Foothills Grade Separation<br />

Description: Preliminary Engineering and right-of-way for a 4-lane freeway<br />

Project Sponsor: Clark County NDOTID: CL2006108 PE RoW CONST.<br />

FY 2009<br />

$15,398,505<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$15,398,505<br />

Project Sponsor: North Las Vegas NDOTID: CL199710 PE RoW CONST.<br />

FY 2009<br />

$6,195,449<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$6,195,449<br />

Project Sponsor: NDOT NDOTID: CL200802 PE RoW CONST.<br />

FY 2009<br />

$22,670,021<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$22,670,021<br />

Total for SAFETEA-LU <strong>Transportation</strong> Improvements $44,263,975 $0 $0<br />

$0<br />

$44,263,975<br />

NDOT Bonded Funds<br />

Project # :4019 Location: US 95 North<br />

From: Martin Luther King Boulevard<br />

To: Rainbow Interchange<br />

Description: Landscaping<br />

Project Sponsor: NDOT NDOTID: CL2007103 PE RoW CONST.<br />

FY 2009<br />

$10,000,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$10,000,000<br />

Total for NDOT Bonded Funds $10,000,000 $0 $0<br />

$0<br />

$10,000,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 77


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Federal Lands Highways<br />

Project # :4244 Location: Kyle Canyon Rd.<br />

From:<br />

To:<br />

Description: Replace Bridge<br />

Project Sponsor: NDOT NDOTID: CL20090150 PE RoW CONST.<br />

FY 2009<br />

$2,300,000<br />

FY 2010<br />

$800,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$3,100,000<br />

Project # :4246 Location:<br />

From: Northshore Rd.<br />

To:<br />

Description: Rehabiltate<br />

Lake Mead NRA; PRA LAME 1 (10)<br />

Project Sponsor: NDOT NDOTID: CL201104 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$10,000<br />

FY 2012<br />

$12,600,000<br />

Total Scheduled<br />

$12,610,000<br />

Project # :4245 Location: Lake Mead NRA; PRA LAME 1 (9) & 11 (1)<br />

From: Northshore and Echo Bay Access Rds.<br />

To:<br />

Description: Rehabiltate<br />

Project # :4243 Location: Northshore Rd. (Lake Mead NRA)<br />

From: Northshore Road and Various Routes<br />

To:<br />

Description: Rehabilitate Mile 26-40 (Construction Engineering)<br />

Project # :252 Location: US 93 Hoover Dam Bypass (Mike O' Callaghan - Pat<br />

Tillman Memorial Bridge)<br />

From: 1.8 mile east of Colorado River (AZ)<br />

To: 2.1 mile west of Colorado River ( NV)<br />

Description: Surfacing, signing & guardrails<br />

Project Sponsor: NDOT NDOTID: CL201005 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$12,700,000<br />

FY 2011<br />

$600,000<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$13,300,000<br />

Project Sponsor: NDOT NDOTID: CL200480 PE RoW CONST.<br />

FY 2009<br />

$800,000<br />

FY 2010<br />

$400,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$1,200,000<br />

Project Sponsor: NDOT NDOTID: CL200650 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$13,000,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$13,000,000<br />

Total for Federal Lands Highways $3,100,000 $26,900,000 $610,000 $12,600,000<br />

$43,210,000<br />

Public Lands Highways<br />

Project # :4158 Location: CC 215 Interchanges<br />

From: I-215 from the Airport Connector<br />

To: I-15 North<br />

Description: PE for the construction of four regional beltway interchanges<br />

Project Sponsor: NDOT NDOTID: CL200923 PE RoW CONST.<br />

FY 2009<br />

$1,078,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$1,078,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 78


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :166 Location: I-15<br />

From: I-515/US-95 Interchange (Spaghetti Bowl)<br />

To: SR.573 Craig Rd.<br />

Description: Widen from 6 to 10 lanes from US 95/I-515 to Lake Mead Blvd.; Widen from 4<br />

to 8 Lanes from Lake Mead Blvd. to SR 573 Craig Road.<br />

Project # :4142 Location: I-15<br />

From: Russell Rd.<br />

To: Sahara Ave.<br />

Description: Widen from 8 to 10 lanes including 2 express lanes each way and 3 general<br />

purpose lanes each way<br />

Project # :4159 Location: I-15<br />

From: at US 93 (North)<br />

To:<br />

Description: PE for construction of an interchange<br />

Project # :4157 Location: I-15 Corridor Study<br />

From: CA stateline<br />

To: Mesquite<br />

Description: Corridor Study, NV<br />

Project # :3002 Location: Laughlin<br />

From: Needles Hwy.<br />

To: Bullhead City, AZ<br />

Description: Construct new Colorado River bridge and related road works<br />

Project # :4018 Location: SR 160 Pahrump Valley Rd.<br />

From: SR.159 Red Rock Canyon Road<br />

To: Mountain Springs<br />

Description: Widen from 2 to 4 Lanes<br />

Project # :843 Location: SR 564 Lake Mead Pkwy.<br />

From: Boulder Highway<br />

To: Lake Mead National Recreation Area<br />

Description: Widen to 6 lanes<br />

Project Sponsor: NDOT NDOTID: CL200473 PE RoW CONST.<br />

FY 2009<br />

$7,000,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$7,000,000<br />

Project Sponsor: NDOT NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$3,000,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$3,000,000<br />

Project Sponsor: NDOT NDOTID: CL200922 PE RoW CONST.<br />

FY 2009<br />

$686,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$686,000<br />

Project Sponsor: NDOT NDOTID: CL200924 PE RoW CONST.<br />

FY 2009<br />

$245,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$245,000<br />

Project Sponsor: Clark County NDOTID: CL2006108 PE RoW CONST.<br />

FY 2009<br />

$1,000,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$1,000,000<br />

Project Sponsor: NDOT NDOTID: CL200749 PE RoW CONST.<br />

FY 2009<br />

$1,470,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$1,470,000<br />

Project Sponsor: Henderson NDOTID: CL200521 PE RoW CONST.<br />

FY 2009<br />

$14,000,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$14,000,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 79


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :143 Location: SR 573 Craig Rd @ I-15<br />

From: Berg St.<br />

To: Pecos Rd.<br />

Description: Widen from 4 to 6 lanes with a Railroad Grade Separation and Interchange<br />

Improvements<br />

Project # :252 Location: US 93 Hoover Dam Bypass (Mike O' Callaghan - Pat<br />

Tillman Memorial Bridge)<br />

From: 1.8 mile east of Colorado River (AZ)<br />

To: 2.1 mile west of Colorado River ( NV)<br />

Description: Surfacing, signing & guardrails<br />

Project # :4139 Location: US 93/95<br />

From: US 93/95 Jct.<br />

To: Foothills Grade Separation<br />

Description: Boulder City Corridor Phase 1: PE and right-of-way for the construction of a<br />

new freeway<br />

Project Sponsor: North Las Vegas NDOTID: CL199710 PE RoW CONST.<br />

FY 2009<br />

$490,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$490,000<br />

Project Sponsor: NDOT NDOTID: CL200650 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$1,960,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$1,960,000<br />

Project Sponsor: NDOT NDOTID: CL200802 PE RoW CONST.<br />

FY 2009<br />

$992,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$992,000<br />

Total for Public Lands Highways $29,961,000 $1,960,000 $0<br />

$0<br />

$31,921,000<br />

Interstate Maintenance Discretionary<br />

Project # :108 Location: Cactus Ave. at I-15<br />

From: Dean Martin Dr.<br />

To: Las Vegas Blvd.<br />

Description: Construct an interchange<br />

Project # :4025 Location: I-15<br />

From: @ Starr Av.<br />

To:<br />

Description: PE and RW for new Interchange<br />

Project Sponsor: Clark County NDOTID: CL200516 PE RoW CONST.<br />

FY 2009<br />

$861,300<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$861,300<br />

Project Sponsor: Henderson NDOTID: CL200901 PE RoW CONST.<br />

FY 2009<br />

$490,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$490,000<br />

Total for Interstate Maintenance Discretionary $1,351,300 $0 $0<br />

$0<br />

$1,351,300<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 80


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Nevada State General Funds<br />

Project # :4018 Location: SR 160 Pahrump Valley Rd.<br />

From: SR.159 Red Rock Canyon Road<br />

To: Mountain Springs<br />

Description: Widen from 2 to 4 Lanes<br />

Project Sponsor: NDOT NDOTID: CL200749 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$16,000,000<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$16,000,000<br />

Total for Nevada State General Funds $0 $0 $16,000,000<br />

$0<br />

$16,000,000<br />

<strong>Transportation</strong>, Community & <strong>System</strong> Preservation<br />

Project # :4270 Location: I-15<br />

From: SR.573 Craig Rd<br />

To: Speedway Blvd<br />

Description: PE for widening to 6 lanes<br />

Project Sponsor: NDOT NDOTID: CL200916 PE RoW CONST.<br />

FY 2009<br />

$980,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$980,000<br />

Total for <strong>Transportation</strong>, Community & <strong>System</strong> Preservation $980,000 $0 $0<br />

$0<br />

$980,000<br />

NDOT State Gas Tax<br />

Project # :4145 Location: Cheyenne Ave.<br />

From: US 95<br />

To: Nellis Blvd.<br />

Description: Restripe to 6 lanes, where possible<br />

Project # :163 Location: FAST Freeway Management <strong>System</strong><br />

From:<br />

To:<br />

Description: Institution and operation of a Freeway & Arterial Management <strong>System</strong> of<br />

<strong>Transportation</strong> (FAST) (PE, RW, Const.)<br />

Project # :4028 Location: SR 160 Blue Diamond Rd.<br />

From: Durango Dr.<br />

To: SR.159 Red Rock Canyon Road<br />

Description: Widen from 2 to 4 lanes with a raised median island<br />

Project Sponsor: North Las Vegas NDOTID: CL200362 PE RoW CONST.<br />

FY 2009<br />

$2,000,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$2,000,000<br />

Project Sponsor: NDOT NDOTID: CL2000104 PE RoW CONST.<br />

FY 2009<br />

$32,000,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$32,000,000<br />

Project Sponsor: NDOT NDOTID: CL200745 PE RoW CONST.<br />

FY 2009<br />

$12,500,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$12,500,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 81


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :201 Location: US 95 South<br />

From: CA State Line<br />

To: SR 163 Laughlin Hwy.<br />

Description: Widen to a 4-lane divided highway<br />

Project # :239 Location: Warm Springs Rd.<br />

From: Dean Martin Drive<br />

To: SR.604 Las Vegas Blvd. South<br />

Description: SR-160 Phase 3: Construct a new 6-lane roadway with sidewalk and bicycle<br />

facilities and a grade separation over I-15<br />

Project Sponsor: NDOT NDOTID: CL201001 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$5,000,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$5,000,000<br />

Project Sponsor: NDOT NDOTID: CL200503 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$7,000,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$7,000,000<br />

Total for NDOT State Gas Tax $46,500,000 $12,000,000 $0<br />

$0<br />

$58,500,000<br />

FY02 Appropriations Act, S.330<br />

Project # :2012 Location: Sunset Rd.<br />

From: east of Decatur Blvd.<br />

To:<br />

Description: Development of the Sunset Transit Maintenance Facility<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$500,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$500,000<br />

Total for FY02 Appropriations Act, S.330 $500,000 $0 $0<br />

$0<br />

$500,000<br />

FY04 Appropriations Act, S.115<br />

Project # :108 Location: Cactus Ave. at I-15<br />

From: Dean Martin Dr.<br />

To: Las Vegas Blvd.<br />

Description: Construct an interchange<br />

Project # :1561 Location: City of Las Vegas<br />

From: Union Park<br />

To: Main St<br />

Description: Construct pedestrian overbridge across UPRR<br />

Project # :2012 Location: Sunset Rd.<br />

From: east of Decatur Blvd.<br />

To:<br />

Description: Development of the Sunset Transit Maintenance Facility<br />

Project Sponsor: Clark County NDOTID: CL200516 PE RoW CONST.<br />

FY 2009<br />

$200,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$200,000<br />

Project Sponsor: Las Vegas NDOTID: CL2006105 PE RoW CONST.<br />

FY 2009<br />

$500,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$500,000<br />

Project Sponsor: RTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$1,000,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$1,000,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 82


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :4139 Location: US 93/95<br />

From: US 93/95 Jct.<br />

To: Foothills Grade Separation<br />

Description: Boulder City Corridor Phase 1: PE and right-of-way for the construction of a<br />

new freeway<br />

Project Sponsor: NDOT NDOTID: CL200802 PE RoW CONST.<br />

FY 2009<br />

$6,000,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$6,000,000<br />

Total for FY04 Appropriations Act, S.115 $7,700,000 $0 $0<br />

$0<br />

$7,700,000<br />

FY06 Appropriations Act, S.112<br />

Project # :926 Location: CC-215 Northern Beltway @ US.95<br />

From: Hualapai Way<br />

To: Tenaya Way<br />

Description: Upgrade to system-to-systsem interchange and widen to 6 lanes<br />

Project Sponsor: Clark County NDOTID: CL200704 PE RoW CONST.<br />

FY 2009<br />

$148,500<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$148,500<br />

Total for FY06 Appropriations Act, S.112 $148,500 $0 $0<br />

$0<br />

$148,500<br />

FY08 Appropriations Act, S.129<br />

Project # :4027 Location: Sheep Mountian Pkwy.<br />

From: CC-215 Western Beltway near Ann Rd<br />

To: I-15<br />

Description: PE and NEPA process/environmental assessment for new roadway<br />

Project # :843 Location: SR 564 Lake Mead Pkwy.<br />

From: Boulder Highway<br />

To: Lake Mead National Recreation Area<br />

Description: Widen to 6 lanes<br />

Project # :179 Location: US 93 Boulder City Corridor<br />

From: 0.5 mi east of Lake Shore Dr.<br />

To: Foothills Grade Separation<br />

Description: Preliminary Engineering and right-of-way for a 4-lane freeway<br />

Project Sponsor: Las Vegas NDOTID: CL20090151 PE RoW CONST.<br />

FY 2009<br />

$735,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$735,000<br />

Project Sponsor: Henderson NDOTID: CL200521 PE RoW CONST.<br />

FY 2009<br />

$196,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$196,000<br />

Project Sponsor: NDOT NDOTID: CL200802 PE RoW CONST.<br />

FY 2009<br />

$245,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$245,000<br />

Total for FY08 Appropriations Act, S.129 $1,176,000 $0 $0<br />

$0<br />

$1,176,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 83


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Anticipated appropriations<br />

Project # :246 Location: I-15 South Design Build<br />

From: SR 160 Blue Diamond Rd.<br />

To: Tropicana Ave.<br />

Description: Phase 1: Widen from 6 to 8 lanes, to include HOV lanes and auxiliary lanes<br />

Project Sponsor: NDOT NDOTID: CL200917 PE RoW CONST.<br />

FY 2009<br />

$980,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$980,000<br />

Total for Anticipated appropriations $980,000 $0 $0<br />

$0<br />

$980,000<br />

FTA S.5311 Non-Urbanized Area Formula<br />

Project # :2809 Location: Clark and Nye Counties<br />

From:<br />

To:<br />

Description: Operating and administrative support for transit operations between Pahrump<br />

and Las Vegas<br />

Project # :2808 Location: Laughlin / Mesquite<br />

From:<br />

To:<br />

Description: Operating and administrative support for transit operations in Mesquite and<br />

Laughlin<br />

Project Sponsor: SNTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$358,376<br />

FY 2010<br />

$394,214<br />

FY 2011<br />

$433,635<br />

FY 2012<br />

$476,998<br />

Total Scheduled<br />

$1,663,223<br />

Project Sponsor: SNTC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$1,016,500<br />

FY 2010<br />

$1,118,150<br />

FY 2011<br />

$1,229,965<br />

FY 2012<br />

$1,352,962<br />

Total Scheduled<br />

$4,717,577<br />

Total for FTA S.5311 Non-Urbanized Area Formula $1,374,876 $1,512,364 $1,663,600 $1,829,960<br />

$6,380,800<br />

Federal Railroad Administration<br />

Project # :2904 Location: Inter-city passenger rail<br />

From: Los Angeles<br />

To: Las Vegas<br />

Description: Acquisition of conventional passenger rail equipment<br />

Project Sponsor: NDOT NDOTID: CL20100115 PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$3,000,000<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$3,000,000<br />

Total for Federal Railroad Administration $0 $3,000,000 $0<br />

$0<br />

$3,000,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 84


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

LVMC funding<br />

Project # :4200 Location: Las Vegas Monorail<br />

From: McCarren International Airport<br />

To: MGM Hotel Monorail Station<br />

Description: Design/permit/construct dual quideway monorail from the existing Las Vegas<br />

Monorail Station<br />

Project Sponsor: LVMC NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$150,000,000<br />

FY 2010<br />

$75,000,000<br />

FY 2011<br />

$75,000,000<br />

FY 2012<br />

$50,000,000<br />

Total Scheduled<br />

$350,000,000<br />

Total for LVMC funding $150,000,000 $75,000,000 $75,000,000 $50,000,000<br />

$350,000,000<br />

STP Enhancements<br />

Project # :740 Location: Bonneville Ave. / Clark Ave. Couplet<br />

From: Main St.<br />

To: Charleston Blvd.<br />

Description: Convert to one-way couplet, 3 lanes in each direction; add landscaping<br />

between Casino Center Dr and Las Vegas Blvd<br />

Project # :1582 Location: Craig Rd<br />

From: Revere St.<br />

To: North 5th St.<br />

Description: Median landscaping<br />

Project # :1584 Location: I-215 Southern Beltway<br />

From: at Eastern Ave<br />

To:<br />

Description: Interchange landscaping<br />

Project # :843 Location: SR 564 Lake Mead Pkwy.<br />

From: Boulder Highway<br />

To: Lake Mead National Recreation Area<br />

Description: Widen to 6 lanes<br />

Project # :4089 Location: Stewart Ave<br />

From: Main St.<br />

To: Maryland Parkway<br />

Description: Landscaping and roadway rehabilitation<br />

Project Sponsor: Las Vegas NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$650,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$650,000<br />

Project Sponsor: North Las Vegas NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$595,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$595,000<br />

Project Sponsor: Clark County NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$498,750<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$498,750<br />

Project Sponsor: Henderson NDOTID: CL200521 PE RoW CONST.<br />

FY 2009<br />

$612,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$612,000<br />

Project Sponsor: Las Vegas NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$600,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$600,000<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 85


<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />

Table 2: Projects by Fund Source<br />

Project # :1585 Location: Sunset Rd<br />

From: at I-515<br />

To:<br />

Description: Interchange landscaping<br />

Project Sponsor: Henderson NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$650,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$650,000<br />

Total for STP Enhancements $3,605,750 $0 $0<br />

$0<br />

$3,605,750<br />

Q10 Bus Turnout Program<br />

Project # :1578 Location: Rainbow Blvd.<br />

From: Desert Inn Rd.<br />

To: US-95<br />

Description: Intersection improvements at Desert Inn Rd, Oakey Blvd, Charleston Blvd and<br />

Alta Dr.<br />

Project Sponsor: Las Vegas NDOTID: CL200669 PE RoW CONST.<br />

FY 2009<br />

$1,500,000<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$1,500,000<br />

Total for Q10 Bus Turnout Program $1,500,000 $0 $0<br />

$0<br />

$1,500,000<br />

City of Las Vegas (BLM Reservation)<br />

Project # :4271 Location: Sheep Mountain Pkwy.<br />

From: CC-215 Western Beltway near Ann Rd<br />

To: I-15 North<br />

Description: Reserve Right-of-Way for future roadway<br />

Project Sponsor: Las Vegas NDOTID:<br />

PE RoW CONST.<br />

FY 2009<br />

$0<br />

FY 2010<br />

$0<br />

FY 2011<br />

$0<br />

FY 2012<br />

$0<br />

Total Scheduled<br />

$0<br />

Total for City of Las Vegas (BLM Reservation) $0 $0 $0<br />

$0<br />

$0<br />

Fiscal Year (FY):<br />

Total Funds Scheduled in the <strong>Transportation</strong> Improvement Program for FY 2009 - 2012<br />

2009 2010 2011 2012 Total Scheduled<br />

Total scheduled $1,461,040,735 $673,147,797 $847,039,932 $307,884,066 $3,289,112,530<br />

<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 86


<strong>Regional</strong> <strong>Transportation</strong> Commission of Southern Nevada<br />

APPENDIX-I


<strong>Transportation</strong> Improvement Program (TIP) and Statewide <strong>Transportation</strong><br />

Improvement Program (STIP) Administrative Modification and Amendment<br />

Process<br />

November 14, 2007


Table of Contents Page Number<br />

Background---------------------------------------------------------------------------------------------------------------------------------------- 2<br />

NDOT Administrative Modification Process As Per NDOT Statewide <strong>Transportation</strong> <strong>System</strong> Projects (TSP) --------------------- 3<br />

NDOT Amendment Process As Per NDOT Statewide <strong>Transportation</strong> <strong>System</strong> Projects (TSP) --------------------------------------- 6<br />

List of Figures<br />

NDOT and RTC Administrative Modification and Amendment Process Hierarchy – Figure A--------------------------------------- 2<br />

NDOT TIP/STIP Administrative Modification Procedures Initiated by NDOT – Figure B--------------------------------------------- 4<br />

RTC TIP/STIP Administrative Modification Procedures Initiated by RTC – Figure C -------------------------------------------------- 5<br />

RTC - TIP/STIP Administrative Amendment Procedures for Exempt Activities– Figure D ------------------------------------------- 7<br />

RTC - TIP/STIP Amendment Procedures Requiring Conformity Statement – Figure E ----------------------------------------------- 8<br />

RTC - TIP/STIP Amendment Procedures Requiring Conformity– Figure F ------------------------------------------------------------- 9<br />

Acronyms --------------------------------------------------------------------------------------------------------------------------------- 10<br />

1


Background<br />

The Las Vegas Metropolitan Area <strong>Transportation</strong> Improvement Program (TIP) is updated at least every four years in coordination<br />

with the area agencies and incorporated into the Nevada’s Statewide <strong>Transportation</strong> Improvement Program (STIP). As the projects in<br />

the TIP and STIP move close to implementation stage, they require changes on a regular basis. The following are the internal<br />

procedures of the Nevada Department of <strong>Transportation</strong> (NDOT) and the <strong>Regional</strong> <strong>Transportation</strong> Commission of Southern Nevada<br />

(RTC) to modify and amend the TIP and STIP to reflect changing regional needs and to streamline the project delivery system.<br />

NDOT has adopted two processes for administrative modifications and amendments, as set out in Figures 2 and 4 of the Statewide<br />

<strong>Transportation</strong> <strong>System</strong> Projects (TSP) For Fiscal Years 2008-2017, October 2007. The RTC accepts the process outlined in the TSP.<br />

However, this process needs to be expanded to define and meet the RTC internal procedures as the designated Metropolitan Planning<br />

Organization for the Clark County.<br />

NDOT and RTC Administrative Modification and Amendment Process Hierarchy – Figure A<br />

“Exempt Actions”<br />

Follow Figure – D<br />

Actions within the scope of<br />

the administrative<br />

modification process<br />

No RTC Action – Modify<br />

TIP – Follow Figure -<br />

B or C<br />

RTC staff adjust TIP and<br />

concur – Follow Figure –<br />

B or C<br />

Actions within the scope of<br />

the amendment process<br />

Amendments requiring<br />

Conformity Statement -<br />

Follow Figure - E<br />

Amendments requiring<br />

Conformity Analysis –<br />

Follow Figure - F<br />

2


NDOT Administrative Modification Process As Per NDOT Statewide <strong>Transportation</strong> <strong>System</strong> Projects (TSP)<br />

Applies:<br />

1. When there is a change in a public funding category with no change in the priority of a project in the STIP/RTIP.<br />

2. When a project is moved from the third or fourth to the first or second year or a project is moved from the second to the first of<br />

the STIP/RTIP. (Project to be completed sooner/Project is moved forward)<br />

3. When moving a project from the first to the second, third or fourth year of the STIP/RTIP or moving a project from the second<br />

or third year to the fourth year. (Project is completed later/Project is moved back.)<br />

4. When a positive cost estimate change is less than $5 Million is requested/anticipated.<br />

5. When a positive cost estimate change is requested/anticipated that is greater than $5 Million, but less than 20 percent of the<br />

estimated dollar amount of the project.<br />

6. When a positive or negative change in the un-programmed balance forward is received.<br />

7. When a positive or negative change in the anticipated fund allocation is received.<br />

8. When a project is added to use Federal Funds for repayment of previously authorized work and all repayments will come from<br />

unallocated funds.<br />

9. When a new planning study is identified.<br />

10. When a project is Advance Constructed.<br />

The following procedures are followed by the RTC in response to the administrative modification process initiated by NDOT.<br />

1. Minor TIP/STIP Administrative Modifications<br />

These are defined by items 5-8 and 10 of the NDOT administrative modification process as set out above (See Figure B):<br />

RTC staff will adjust the TIP upon receipt of NODT notification, and will notify the RTC Board of the adjustment.<br />

i) RTC staff adjust the TIP upon receipt of NDOT notification.<br />

ii) Executive Advisory Committee (EAC) notified of administrative modification on consent agenda.<br />

iii) No formal RTC Board action required.<br />

2. Unified Planning Work Program (UPWP) Amendment<br />

These are defined by item 9 of the NDOT administrative modification process.<br />

i) New NDOT planning studies are included in the UPWP and follow the established UPWP approval/amendment process.<br />

3


3. TIP/STIP Administrative Modifications<br />

These are defined by items 1-4 of the NDOT administrative modification process as set out on Page 3 (See Figure B):<br />

i) RTC staff (Assistant Planning Manager) issue a memo of concurrence unless circumstances require elevation.<br />

ii) EAC notified of concurrence on consent agenda.<br />

iii) No formal RTC Board action required<br />

NDOT TIP/STIP Administrative Modification Procedures Initiated by NDOT – Figure B<br />

Minor TIP/STIP Administrative<br />

Modifications Items 5-8 & 10<br />

NDOT<br />

notifies RTC<br />

No RTC Board<br />

action<br />

required<br />

Minor TIP/STIP Administrative<br />

Modifications Item 9<br />

NDOT<br />

notifies RTC<br />

Amend UPWP<br />

EAC notified<br />

by Non-<br />

Consent<br />

RTC notified<br />

by Consent<br />

TIP/STIP Administrative Modification<br />

Item 1-4<br />

NDOT<br />

notifies RTC<br />

RTC staff<br />

concurs<br />

EAC notified<br />

by Consent<br />

RTC notified<br />

by Consent<br />

TIP and STIP administrative modifications do not require RTC Board action. The RTC authorizes the General Manager or his<br />

designee to approve administrative modifications requested by NDOT and sponsoring agencies. However, the RTC will be informed<br />

of the TIP adjustments by consent agenda.<br />

The following procedures are followed by the RTC staff when the administrative modification process is initiated by RTC.<br />

4. Minor TIP/STIP Administrative Modifications<br />

These are defined by items 5-8 and 10 of the NDOT administrative modification process as set out on Page 3 (See Figure C):<br />

i) RTC staff (Assistant Planning Manager) adjust the TIP and request NDOT to make corresponding administrative modification<br />

to the STIP.<br />

ii) EAC notified on consent agenda.<br />

iii) No formal RTC Board action required<br />

4


5. Unified Planning Work Program (UPWP) Amendment<br />

These are defined by item 9 of the NDOT administrative modification process as set out on Page 3:<br />

i) New RTC planning studies are included in the UPWP and follow the established UPWP approval/amendment process.<br />

6. TIP/STIP Administrative Modifications<br />

These are defined by items 1-4 of the NDOT administrative modification process as set out on Page 3 (See Figure C):<br />

i) RTC staff (Assistant Planning Manager) adjust the TIP and request NDOT to make corresponding administrative modification<br />

to the STIP.<br />

ii) EAC notified on consent agenda.<br />

iii) No formal RTC Board action required<br />

RTC TIP/STIP Administrative Modification Procedures Initiated by RTC – Figure C<br />

Minor TIP/STIP Administrative<br />

Modification Items 5-8 &10<br />

RTC Staff<br />

Initiates<br />

Modification<br />

RTC Staff<br />

Notifies<br />

NDOT<br />

No RTC Board<br />

Action<br />

Required<br />

Minor TIP/STIP Administrative<br />

Modification Item 9<br />

RTC Staff<br />

Initiates<br />

UPWP Amend<br />

EAC Notified<br />

by Non-<br />

Consent<br />

RTC Notified<br />

by Consent<br />

RTC Staff<br />

Notifies<br />

NDOT<br />

TIP/STIP Administrative Modification<br />

Item 1-4<br />

RTC Staff<br />

Initiates<br />

Modification<br />

EAC Notified<br />

by Consent<br />

RTC Staff<br />

Notifies<br />

NDOT<br />

TIP and STIP administrative modifications do not require RTC Board action. The RTC authorizes the General Manager or his<br />

designee to initiate TIP administrative modifications on behalf of the RTC and to forward such modifications to NDOT for<br />

incorporation into the STIP. The RTC will be informed of such TIP modifications by consent agenda.<br />

5


NDOT Amendment Process As Per NDOT Statewide <strong>Transportation</strong> <strong>System</strong> Projects (TSP)<br />

Applies:<br />

1. When there is a significant change in the design or scope of any project identified in the STIP/RTIP.<br />

2. When a regionally significant project is added or deleted.<br />

3. When there are changes in the funding category that alter the overall financial reasonableness of the STIP/RTIP, or when a<br />

privately funded project is changed to public funding.<br />

4. When there is a positive change in cost over $5 Million and greater than 20 percent of the estimated dollar amount of the<br />

project is requested /anticipated.<br />

The following procedures are followed by RTC in response to the NDOT amendment process. When RTC initiates the amendment<br />

process, RTC staff inform NDOT of the intention to request an amendment and then follow the procedures identified below.<br />

7. TIP/STIP Administrative Amendments for “Exempt” Projects<br />

This applies to actions that involve only “Exempt” activities as defined in 40 CFR Part 93 (See Figure D):<br />

As shown in Figure D, slightly different procedures are followed for actions involving amendments to funding, for the addition/<br />

deletion of “exempt” projects, or for actions affecting fiscal constraint:<br />

For changes in funding sources or funding amounts that exceed the limits of an adjustment as set out on Page 3 but do not call into<br />

question the overall fiscal balance of the TIP program:<br />

i) NDOT, RTC or a sponsoring agency requests an administrative amendment to the TIP<br />

ii) RTC staff confirm “exempt” status and that there is no effect on fiscal constraint<br />

iii) RTC staff amend the TIP and request NDOT to make corresponding amendment to the STIP.<br />

iv) EAC notified on consent agenda.<br />

v) No formal RTC Board action required<br />

For changes in funding amounts that potentially affect the overall fiscal balance of the TIP program:<br />

i) NDOT, RTC or a sponsoring agency requests an administrative amendment to the TIP<br />

ii) RTC staff prepare a statement confirming the amendment is consistent with fiscal constraint<br />

iii) EAC notified on non-consent<br />

iv) RTC Board approves the amendment and requests NDOT to make corresponding amendment to STIP for FHWA approval<br />

6


For changes that add, delete or change the scope of projects require RTC Board action:<br />

i) NDOT, RTC or a sponsoring agency requests an administrative amendment to the TIP<br />

ii) RTC staff confirm “exempt” status<br />

iii) EAC notified on non-consent<br />

iv) RTC Board approves the amendment and requests NDOT to make corresponding amendment to STIP for FHWA approval<br />

Note: The administrative amendment does not come into effect until NDOT has incorporated the amendment into STIP and FHWA<br />

has approved the STIP amendment.<br />

RTC - TIP/STIP Administrative Amendment Procedures for Exempt Activities– Figure D<br />

Positive Change in cost over $5 M & ><br />

20 % of the Original amount (No<br />

Change in project)<br />

EAC notified<br />

by consent<br />

*Staff<br />

confirmation<br />

to NDOT<br />

Change from private to local/state<br />

public funding; &Change from private,<br />

local, or state funding to federal funding<br />

EAC notified<br />

by consent<br />

*Staff<br />

confirmation<br />

to NDOT<br />

Change to design, scope, alignment or<br />

year of implementation of an exempt<br />

project<br />

EAC notified<br />

by nonconsent<br />

EAC notified<br />

by consent<br />

General Manager<br />

letter to NDOT<br />

Change in funding affecting fiscal<br />

constraint<br />

Statement of<br />

fiscal<br />

reasonableness<br />

EAC notified<br />

by non-consent<br />

RTC approval<br />

General Manager<br />

Letter to NDOT<br />

Add/Delete "Exempt Project"<br />

Confirm<br />

project is<br />

Exempt<br />

EAC notified<br />

by nonconsent<br />

RTC approval<br />

General Manager<br />

Letter to NDOT<br />

* Staff – Director of Planning Services<br />

For TIP administrative amendments that do not require RTC Board action, the RTC authorizes the General Manager or his designee to<br />

approve these amendments. However, the RTC will be informed of these administrative amendments by consent agenda.<br />

7


8. TIP/STIP amendments approved on the basis of a conformity statement<br />

8.1 “Non-<strong>Regional</strong>ly Significant” Amendments<br />

This applies to non- exempt activities that do not involve the following (see Figure E):<br />

a) the design concept, scope or alignment of <strong>Regional</strong>ly Significant projects,<br />

b) the horizon year completion date of <strong>Regional</strong>ly Significant projects, or<br />

c) the implementation of <strong>Transportation</strong> Control Measures identified in the SIPs.<br />

To expedite program delivery, RTC will in certain cases approve a TIP amendment based on a conformity statement that the proposed<br />

amendment will have such minimal effect on emissions that a full conformity analysis is not warranted. RTC staff will determine on a<br />

case-by-case basis if the proposed amendment requires a conformity statement or a new conformity analysis. RTC will consult with<br />

NDOT and FHWA together or separately as appropriate in making this determination.<br />

8.2 “External” TIP/STIP amendments<br />

This applies to actions that affect the design concept, scope or alignment of <strong>Regional</strong>ly Significant projects that are outside the area<br />

included in the travel demand forecast model network, but are within an air quality non-attainment area (see Figure E):<br />

i) NDOT, RTC or a sponsoring agency requests an amendment to the TIP<br />

ii) RTC staff prepares a conformity statement justifying why the existing conformity finding is not affected by the proposed<br />

amendment. In the case of “external” projects, estimates of VMT and emissions will be developed in conjunction with NDOT<br />

using methods consistent with those approved by the FHWA for the RTP conformity finding.<br />

iii) RTC will hold a 30 day public notification and comment period.<br />

iv) EAC recommends adoption of amendment.<br />

v) RTC Board approves the amendment and requests NDOT to make corresponding amendment to STIP for FHWA approval<br />

RTC - TIP/STIP Amendment Procedures Requiring Conformity Statement – Figure E<br />

Applies to actions that affect the design<br />

concept, scope or alignment of <strong>Regional</strong>ly<br />

Significant projects that are not included<br />

in the travel demand model network.<br />

RTC Staff<br />

Prepares<br />

Conformity<br />

Statement<br />

30 Day<br />

Public<br />

Notice<br />

EAC<br />

Notified by<br />

Non-consent<br />

RTC<br />

Notified by<br />

Consent<br />

General<br />

Manager<br />

Letter to<br />

NDOT<br />

8


9. TIP/STIP Amendments requiring conformity analysis<br />

Applies to actions that involve any of the following (See Figure F):<br />

a) Addition/deletion of <strong>Regional</strong>ly Significant Projects.<br />

b) Change the design concept, scope or alignment of <strong>Regional</strong>ly Significant projects included in the modeled conformity analysis.<br />

c) Change the horizon year completion date of <strong>Regional</strong>ly Significant projects.<br />

d) Change the implementation of <strong>Transportation</strong> Control Measures identified in the SIPs.<br />

i) NDOT, RTC or a sponsoring agency requests an amendment to the TIP<br />

ii) RTC staff prepares a conformity analysis and makes a conformity determination.<br />

iii) RTC holds a 45-day public notification and comment period, including a Public Hearing.<br />

iv) EAC recommends adoption of amendment.<br />

v) RTC Board approves the amendment and requests NDOT to make corresponding amendment to STIP for FHWA approval<br />

Notes: 1. The amendment or administrative amendment does not come into effect until NDOT has incorporated the amendment into<br />

STIP and FHWA has approved the STIP amendment.<br />

2. It may take 16-24 weeks from the time a request is received by RTC to process an amendment request requiring conformity<br />

analysis<br />

RTC – TIP/STIP Amendment Procedures Requiring Conformity– Figure F<br />

Change the horizon year<br />

completion date of <strong>Regional</strong>ly<br />

Significant projects,<br />

Change the implementation of<br />

<strong>Transportation</strong> Control<br />

Measures identified in the SIPs.<br />

A regionally significant project<br />

is added or deleted. Or the<br />

design concept, scope or<br />

alignment is changed.<br />

Conformity<br />

Analysis<br />

45 Day<br />

Public<br />

Notice<br />

Public<br />

Hearing<br />

EAC<br />

notified by<br />

non-consent<br />

RTC Adopt<br />

General<br />

Manager<br />

Letter to<br />

NDOT<br />

9


Acronyms<br />

RTC – <strong>Regional</strong> <strong>Transportation</strong> Commission of Southern Nevada<br />

NDOT – Nevada Department of <strong>Transportation</strong><br />

FHWA – Federal Highway Administration<br />

EAC – Executive Advisory Committee<br />

RTP – <strong>Regional</strong> <strong>Transportation</strong> Plan<br />

TIP – <strong>Transportation</strong> Improvement Program<br />

RTIP – <strong>Regional</strong> <strong>Transportation</strong> Improvement Program<br />

STIP – Statewide <strong>Transportation</strong> Improvement Program<br />

TSP – Statewide <strong>Transportation</strong> <strong>System</strong> Projects<br />

SIP – State Implementation Plan<br />

10