Intelligent Transportation System (ITS) Support - Regional ...
Intelligent Transportation System (ITS) Support - Regional ...
Intelligent Transportation System (ITS) Support - Regional ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Regional</strong><br />
<strong>Transportation</strong><br />
Commission of<br />
Southern<br />
Nevada<br />
<strong>Transportation</strong> Improvement Program<br />
2009 - 2012
TRANSPORTATION IMPROVEMENT PROGRAM<br />
FISCAL YEARS 2009-2012<br />
NARRATIVE, ANALYSIS<br />
AND PROJECT SUMMARIES<br />
Draft Final November, 2008<br />
REGIONAL TRANSPORTATION COMMISSION<br />
OF SOUTHERN NEVADA<br />
600 SO. GRAND CENTRAL PARKWAY<br />
LAS VEGAS, NEVADA 89106-4512<br />
(702) 676-1500<br />
The preparation of this document was financed, in part, by a grant from the United States<br />
Department of <strong>Transportation</strong>, Federal Transit Administration under Section 8 of the Urban<br />
Mass <strong>Transportation</strong> Act of 1964, as amended, and the Federal Highway Administration<br />
under Title 23, Section 134 of the United States Code.
Acknowledgments<br />
REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA<br />
City of Boulder City Councilman Roger Tobler<br />
City of Henderson Councilman Andy Hafen<br />
City of Las Vegas Councilman Larry Brown, Chairman<br />
City of Las Vegas Mayor Oscar Goodman<br />
City of Mesquite Councilman David Bennett<br />
City of North Las Vegas Councilman Robert L. Eliason<br />
Clark County Commissioner Chip Maxfield, Vice Chairman<br />
Clark County Commissioner Bruce L. Woodbury<br />
State of Nevada Director, NDOT Susan Martinovich, (Ex-Officio)<br />
EXECUTIVE ADVISORY COMMITTEE<br />
TRANSPORTATION ACCESS ADVISORY COMMITTEE<br />
City of Boulder City Brok Armantrout Joseph Bifano, Vice Chairman James Speed<br />
City of Boulder City Scott Hansen, Chairman Karen Bishop Ralph Steele<br />
City of Henderson Stephanie Garcia-Vause Janie Brown Mary Ann Hantout<br />
City of Henderson Robert Murnane, P.E. Corie Craig Mary Ann Wainwright<br />
City of Las Vegas Jorge Cervantes Alfreda Ferrell Gerry Petuya<br />
City of Las Vegas Margo Wheeler Jessie Harris Jerry Sim<br />
City of Mesquite J. Allen Bell, P.E. Gary Shade Jean Peyton, Chairwoman<br />
City of Mesquite<br />
Cathrine Lorbeer<br />
City of North Las Vegas Frank Fiori<br />
City of North Las Vegas Qiong Liu, P.E.,<br />
Clark County Denis Cederburg, P.E. Vice<br />
Chairman<br />
Clark County<br />
Barbara Ginoulias<br />
NDOT<br />
Rudy Malfabon<br />
REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA STAFF<br />
General Manager<br />
Deputy General Manager<br />
Assistant General Manager, Administrative Services<br />
Assistant General Manager, MPO<br />
Assistant General Manager, Transit<br />
Assistant General Manager, HR/Safety & Security<br />
Assistant General Manager Governmental Affairs<br />
Director of Planning Services<br />
Director of Engineering Services<br />
Director of FAST<br />
Manager Planning<br />
Manager Planning<br />
Manager Planning<br />
Manager Engineering<br />
Manager of Public Information<br />
Principal <strong>Transportation</strong> Planner<br />
Principal <strong>Transportation</strong> Planner<br />
Senior <strong>Transportation</strong> Planner<br />
Senior <strong>Transportation</strong> Planner<br />
Senior <strong>Transportation</strong> Planner<br />
Senior <strong>Transportation</strong> Planner<br />
<strong>Transportation</strong> Planner<br />
Jacob L. Snow<br />
Tina Quigley<br />
M.J. Maynard<br />
Fred A. Ohene<br />
Mark Wells<br />
Jerry Keating<br />
Tracy Bower<br />
Bruce Turner<br />
Mike Hand<br />
Glenn Grayson<br />
Martyn James<br />
Jerry Duke<br />
Beth Xie<br />
Mike Hand<br />
Jackie Dennis<br />
Paulette Carolin<br />
Mohammad Farhan<br />
Philip Banea<br />
Maria G. Rodriguez<br />
Lijuan Su<br />
Hui Shen<br />
David A. Boocher<br />
TRANSPORTATION IMPROVEMENT PROGRAM 2009-2012<br />
DRAFT FINAL NOVEMBER 2008
Table of Contents<br />
1 Introduction...................................................................................................1<br />
2 The <strong>Regional</strong> <strong>Transportation</strong> Commission ..................................................2<br />
3 SAFETEA-LU Planning Factors......................................................................3<br />
4 <strong>Transportation</strong> Improvement Program Development and Amendment<br />
Process..........................................................................................................5<br />
5 Project Selection Process ............................................................................7<br />
6 Public Participation.......................................................................................8<br />
7 Financial Plan................................................................................................9<br />
Fund Sourcce Balance Sheets...................................................................................... 10<br />
8 Project List ................................................................................................. 14<br />
Table 1: List of Projects by Sponsoring Agency............................................................ 15<br />
Table 2: List of Projects by Fund Source ...................................................................... 51<br />
MAPS<br />
Map 1: Street and Highway Projects............................................................................. 45<br />
Map 2: <strong>Intelligent</strong> <strong>Transportation</strong> <strong>System</strong>s (ITS) Projects and Operational<br />
Improvements................................................................................................................ 46<br />
Map 3: Alternate Mode (Bicycle and Pedestrian) and Environmental Projects .......... 47<br />
Map 4: Transit and Park-and-Ride Projects.................................................................. 48<br />
Map 5: Projects outside the Las Vegas Valley – Boulder City, Laughlin and Mesquite<br />
........................................................................................................................................ 49<br />
Map 6: Downtown Las Vegas – Street and Highway, Alternate Mode and<br />
Environmental Projects....................................................................................................50<br />
APPENDIX<br />
I: Administrative Modification and Amendment Process<br />
TRANSPORTATION IMPROVEMENT PROGRAM 2009-2012<br />
DRAFT FINAL NOVEMBER 2008
1: Introduction<br />
The <strong>Transportation</strong> Improvement Program is a<br />
document that identifies transportation projects that<br />
are expected to receive federal funding over the next<br />
four years. Approval of the program by the federal<br />
agencies provides authorization for state and local<br />
agencies to request federal funding.<br />
This <strong>Transportation</strong> Improvement Program for<br />
Federal Fiscal Years 2009-2012 (TIP) is prepared by<br />
the <strong>Regional</strong> <strong>Transportation</strong> Commission of<br />
Southern Nevada in compliance with the<br />
Metropolitan Planning Rules and Regulations issued<br />
under 23CFR Part 450 and 49CFR Part 613.<br />
The technical assumptions and analyses which<br />
support the RTP and TIP are set out in detail in the<br />
RTP appendices. These include:<br />
The regional travel demand model parameters<br />
and methods;<br />
The regional estimates and projections of<br />
population and employment and the related<br />
planning variables used as inputs to the model;<br />
The projection of funding that is reasonably<br />
expected to be available to support the plan;<br />
The Air Quality Conformity Analysis; and<br />
The projected sources of funding.<br />
The TIP identifies all transportation projects in the<br />
Las Vegas region that are expected to be funded<br />
during the years 2009-2012 wholly or in part<br />
through Federal Highway Administration (FHWA) or<br />
Federal Transit Administration (FTA) programs, all<br />
“<strong>Regional</strong>ly Significant” projects regardless of fund<br />
source, as well as any other projects expected to<br />
involve Federal action.<br />
The Las Vegas region comprises the whole of Clark<br />
County, Nevada. Much of the county is designated<br />
as an air quality non-attainment area by the U.S.<br />
Environmental Protection Agency, and all<br />
transportation plans and programs are required to<br />
be in conformity with State and Federal Regulations<br />
for Air Quality.<br />
The projects identified in this TIP are either taken<br />
from, or are consistent with, the <strong>Regional</strong><br />
<strong>Transportation</strong> Plan for 2009-2030 (RTP). The draft<br />
of the TIP, the RTP and the related air quality<br />
Conformity Finding were made available for public<br />
review and comment for a 45-day period starting on<br />
September 2, 2008, and running through October<br />
16, 2008. This TIP includes corrections and<br />
modifications made in response to comments<br />
received. Documentation of comments and a<br />
summary of how the RTC responded are set out in<br />
Appendix 2 to the RTP.<br />
1<br />
TRANSPORTATION IMPROVEMENT PROGRAM 2009-2012<br />
DRAFT FINAL, NOVEMBER 2008
2: The <strong>Regional</strong> <strong>Transportation</strong><br />
Commission<br />
The <strong>Regional</strong> <strong>Transportation</strong> Commission of<br />
Southern Nevada (RTC) is a regional government<br />
organization comprised of elected officials appointed<br />
from each of the local governments within Clark<br />
County, Nevada. The RTC, as the designated<br />
Metropolitan Planning Organization (MPO) for<br />
Southern Nevada, performs the following functions:<br />
• Oversees the federally mandated transportation<br />
planning process for the region;<br />
• Directs the expenditure of funds generated from<br />
the Federal Transit Administration, the Federal<br />
Highway Trust Fund, the County Option Motor<br />
Vehicle Fuel Tax for regional street and highway<br />
construction, and the County Sales Tax designated<br />
for transportation;<br />
• Ensures that transportation plans and programs<br />
conform to approved air quality standards;<br />
• Provides public mass transportation within<br />
Southern Nevada, which is presently supported by<br />
a sales tax;<br />
• Administers the region’s trip reduction program,<br />
Club Ride Commuter Services; and<br />
• Designs, develops, and manages<br />
traffic<br />
management systems including signal timing and<br />
coordination, ramp metering and dynamic<br />
messaging.<br />
As the MPO, the RTC is responsible to the State and<br />
federal governments for maintaining a continuing,<br />
cooperative and comprehensive transportation<br />
planning process. Under the Nevada Revised<br />
Statues, the Metropolitan Planning Area comprises<br />
the whole of Clark County and includes both the Las<br />
Vegas Urbanized Area and the various outlying<br />
communities and rural portions of the County. The<br />
geographic area of Clark County is often referred to<br />
as “Southern Nevada” except when discussing the<br />
specific functions or attributes of the county as a<br />
unit of government.<br />
Membership on the RTC is set by state<br />
law and consists of two members from<br />
the Board of Clark County<br />
Commissioners, two members from the<br />
city council of the largest incorporated<br />
city (presently, the City of Las Vegas), and<br />
one member from the city council of every<br />
other incorporated city in the county. The<br />
Director of the Nevada Department of<br />
<strong>Transportation</strong> participates in a nonvoting<br />
capacity<br />
2<br />
REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA
3: Planning Factors<br />
The 2006 Safe, Accountable, Flexible, Efficient<br />
<strong>Transportation</strong> Equity Act – A Legacy for Users<br />
(SAFETEA-LU) established a number of factors to be<br />
taken into account by MPOs in developing their<br />
regional transportation plans and programs. There<br />
follows a brief summary of these factors and their<br />
relation to the draft TIP. A fuller discussion of the<br />
transportation issues and challenges facing the<br />
region is to be found in Chapter 3 of the 2009-2030<br />
<strong>Regional</strong> <strong>Transportation</strong> Plan.<br />
<strong>Support</strong> the economic vitality of the metropolitan<br />
area, especially by enabling global competitiveness,<br />
productivity, and efficiency.<br />
Both short and long range planning process and<br />
projects support the economic vitality of the RTC’s<br />
region by improving transportation infrastructure.<br />
For example, the TIP includes projects like North 5 th<br />
Street in North Las Vegas, which integrate land-use<br />
and transportation in a major developing corridor.<br />
Capacity improvement projects sponsored by the<br />
Nevada Department of <strong>Transportation</strong> such as US<br />
95 North, I-15 North Design Build, I-15 Express<br />
Lanes, and Lake Mead Pkwy in Henderson will<br />
enhance the connectivity and mobility in the<br />
metropolitan area as well as through the<br />
metropolitan region. The CC.215 Bruce Woodbury<br />
Beltway and Airport Connector interchange at I-215<br />
are other locally funded regionally significant<br />
projects that will enhance system connectivity and<br />
efficiency. These projects are the building blocks to<br />
support economic vitality in the Las Vegas Valley and<br />
make it competitive both regionally and globally.<br />
A new airport at Ivanpah has been proposed to meet<br />
the long-term growth in air travel to and from the<br />
region. This proposal is currently undergoing<br />
environmental study, and highway network<br />
improvements are identified in the TIP to support<br />
this proposed airport.<br />
Increase the safety of the transportation system for<br />
motorized and non-motorized users<br />
Safety and security of the transportation system is<br />
one of the high priorities in the RTC region. The RTC<br />
has devised a congestion management system<br />
process to identify transportation improvement<br />
locations. The process considers factors, such as the<br />
impact of safety, accessibility, and mobility. Bus<br />
turn-out and dedicated lanes for bus and bicycle<br />
projects increase the safety of the transportation<br />
system in the region. Street improvement projects<br />
funded under RTC programs take into account the<br />
need for proper cross sections which include curb<br />
and gutters and sidewalks.<br />
<strong>Intelligent</strong> <strong>Transportation</strong> <strong>System</strong> (ITS) projects<br />
further improve the operation and performance of<br />
the transportation network providing increased<br />
safety as well as efficiency. Freeway Service Patrol<br />
funding is programmed to continue the operation to<br />
help the stranded motorists.<br />
Blue Diamond Road (SR 160) will be improved to<br />
increase the traveler’s safety in this corridor. The<br />
Nevada Department of <strong>Transportation</strong> (NDOT) has<br />
developed the Nevada Strategic Highway Safety Plan<br />
(SHSP) to address safety issues in Nevada. This TIP<br />
has identified safety funds for the projects to be<br />
selected based on the strategies identified in SHSP.<br />
RTC will be partnering with NDOT and other area<br />
agencies to enhance safety of the transportation<br />
system in the region.<br />
Increase the Security of the transportation system<br />
for motorized and non-motorized users<br />
Recent training of the RTC staff to the course titled<br />
as the “Terrorist Activity Recognition and Reaction”<br />
is one the important step to enhance security of the<br />
transportation system in the metropolitan region.<br />
The Freeway and Arterial <strong>System</strong> of <strong>Transportation</strong><br />
(FAST) in the Las Vegas Valley has the state of the<br />
art technology to monitor the metropolitan region’s<br />
highway system. The monitoring system provides<br />
enhanced security to the highway network and an<br />
opportunity for quick response for incident<br />
management.<br />
Increase the accessibility and mobility options<br />
available to people and freight.<br />
Street and intersection improvements in the TIP will<br />
increase the accessibility and mobility for both<br />
individuals and commercial cargo carriers in the<br />
MPO area. ITS deployment enhances the movement<br />
of freight and people as well as quality of life.<br />
Installation of bus shelters, construction and<br />
implementation of the downtown connector will<br />
provide enhanced mobility options for people.<br />
NDOT’s I-15 Express lane project, allied to the<br />
improvements to I-15 North now under construction,<br />
3<br />
TRANSPORTATION IMPROVEMENT PROGRAM 2009-2012<br />
DRAFT FINAL, NOVEMBER 2008
will enhance the truck freight movement through the<br />
region.<br />
The South Strip Bus Transfer Terminal offers long<br />
term parking and ride to the airport for the travelers<br />
departing from McCarran International Airport.<br />
Other Park and Ride projects identified in the TIP will<br />
further enhance the mobility options for the<br />
metropolitan community.<br />
The proposed privately funded extension of the Las<br />
Vegas Monorail to McCarran Airport will enable the<br />
citizens and visitors to utilize mobility options.<br />
Protect and enhance the environment, promote<br />
energy conservation, and improve quality of life.<br />
Projects such as Bicycle Lanes and Bus Turn-Out<br />
Improvements are part of RTC’s commitment to<br />
enhance the environment and conserve energy by<br />
alleviating congestion which in turn improves quality<br />
of life. The Bicycle and Pedestrian plan will provide<br />
the tools to identify strategies and projects to<br />
promote and implement this SAFETEA-LU planning<br />
factor. Local Gas Tax funds are allocated for Bus<br />
turn projects.<br />
The NDOT Master Landscape Plan considers the use<br />
of landscaping elements that are native to the region<br />
keeping the regional environmental characteristics.<br />
The RTC transit fleet uses alternative fuel technology<br />
to improve air quality. Park and ride projects in the<br />
TIP are complemented by the RTC’s Club Ride<br />
program as a coordinated effort to promote<br />
carpooling and transit use, thus improving air quality<br />
and promoting energy conservation.<br />
improve the operation on the I-15 South and US 95<br />
North. Unified Planning Work Program (UPWP)<br />
contains studies, such as “Analysis of Alternatives<br />
for Accommodating Trucks on Southern Nevada<br />
Urban Freeways”, Las Vegas Blvd. North Land-use,<br />
Transit, and pedestrian studies are looking into on<br />
how to efficiently manage and operate system.<br />
Other studies in the UPWP are the “Planning Process<br />
for Evaluation and Optimization of Ramp Metering”<br />
and Las Vegas Valley Arterial Development Study’” to<br />
identify the tools and data to promote and<br />
implement efficient system management and<br />
operation. This TIP contains Intersection<br />
improvement projects, ITS, I-15 Express lanes, I-15<br />
North Design Build and US 95 Project which will<br />
enhance system efficiency and operation.<br />
Emphasize the preservation of the existing<br />
transportation system.<br />
Local funds are allocated to rehabilitate the roadway<br />
network and system. Interstate maintenance funds<br />
are identified in the TIP to maintain the existing<br />
highway network system. NDOT allows for the costs<br />
of maintaining the state highway system in deciding<br />
the level of state resources that can be committed to<br />
the capital improvement program. Some State and<br />
RTC Gas Tax funds are dispersed directly to the local<br />
jurisdictions, and may be used for local system<br />
maintenance.<br />
Enhance the integration and connectivity of the<br />
transportation system, across and between modes,<br />
for people and freight.<br />
Implementation of the park and ride projects and<br />
High Occupancy Vehicle (HOV) lanes will enhance<br />
the integration and connectivity of the transportation<br />
system. ADA accessible ramps, bus station and turn<br />
out improvement (Bus Bays) project in the TIP and<br />
CIP will enhance integration and connectivity for the<br />
non-motorized users.<br />
Promote efficient system management and<br />
operation.<br />
This TIP contains intersection improvement projects<br />
which will enhance management and operation of<br />
the arterial system. NDOT’s HOV lane projects will<br />
4<br />
REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA
4: The <strong>Transportation</strong> Improvement<br />
Program Development and<br />
Amendment Process<br />
In compliance with the federal regulations, the TIP is<br />
updated at least every four years. These updates<br />
are developed by the RTC in coordination with the<br />
local and state transportation agencies. After<br />
adoption by the RTC, the TIP is incorporated into the<br />
Nevada’s Statewide <strong>Transportation</strong> Improvement<br />
Program (STIP) which is then submitted to the<br />
federal agencies for their approval.<br />
The <strong>Regional</strong> <strong>Transportation</strong> Plan (RTP) is also<br />
required to be updated every four years, and it is the<br />
normal practice of the RTC to update both<br />
documents through a single process. This process<br />
also includes the required air quality conformity<br />
finding. As a practical matter, the rate of<br />
development in the region is such that the RTC has<br />
typically updated the RTP and TIP every two years.<br />
This TIP for 2009-2012 has thus been prepared in<br />
parallel with the development of the 2009-2030<br />
RTP. Drafts of both documents were being made<br />
available for public review and comment at the same<br />
time, and it is expected they will move jointly through<br />
the local and federal approval process.<br />
One consequence of this is that the projects in this<br />
TIP are for the most part taken directly from the<br />
projects identified for funding in the first four<br />
program years of the RTP. In some cases the RTP<br />
identifies general types of activities, and as these<br />
are moved forward into the TIP, the latter identifies<br />
the specific projects to be undertaken in the first<br />
and second years of the program. In other cases,<br />
the TIP may provide more detail of project phasing.<br />
An important restriction is that all projects requiring<br />
air quality analysis must be identified in the RTP and<br />
made part of the conformity analysis before they can<br />
be moved into the TIP.<br />
First, there are times when projects slip back in the<br />
program or, alternatively, need to be advanced. This<br />
may be due to funding issues, to unexpected<br />
problems with implementation, or may be the result<br />
of opportunities to accelerate the implementation of<br />
needed projects.<br />
Second, as projects in the TIP and STIP move closer<br />
to implementation, they frequently require changes<br />
to costs and funding sources.<br />
Federal regulations for revising the STIP are set out<br />
in 40CFR Part 23 §450.326, “TIP Revision and<br />
Relationship to STIP”, In accordance with these<br />
regulations, NDOT has developed an Administrative<br />
Modification and Amendment Process that governs<br />
the procedures that need to be followed before<br />
changes to the STIP may be approved.<br />
Modification and Amendment Process<br />
This process is in two parts, reflecting two levels of<br />
changes recognized in federal regulation.<br />
Minor changes to the STIP are considered to be<br />
“administrative modifications”, which require<br />
minimal review prior to incorporation into the<br />
approved STIP.<br />
More substantive changes are termed<br />
“amendments”.<br />
NDOT has defined the conditions that must be<br />
satisfied for a change to be considered an<br />
administrative modification (see box on the next<br />
page).<br />
Projects are selected for inclusion in the RTP on the<br />
basis of the established procedures of the RTC and<br />
the Nevada Department of <strong>Transportation</strong>. These<br />
procedures also govern the prioritization of projects<br />
for funding.<br />
TIP Amendments<br />
The TIP requires periodic amendment for two<br />
reasons.<br />
5<br />
TRANSPORTATION IMPROVEMENT PROGRAM 2009-2012<br />
DRAFT FINAL, NOVEMBER 2008
Administrative Modification Process<br />
The Administrative Modification process applies when:<br />
1. There is a change in a public funding category<br />
with no change in the priority of a project in the<br />
STIP/RTIP.<br />
2. A project is moved from the third or fourth to the<br />
first or second year or a project is moved from the<br />
second to the first year of the STIP/RTIP. (Project<br />
to be completed sooner/Project is moved forward)<br />
3. A project is moved from the first to the second,<br />
third or fourth year of the STIP/RTIP or is moved<br />
from the second or third year to the fourth year.<br />
(i.e the project is completed later or moved back<br />
in the program.)<br />
4. A positive cost estimate change of less than $5<br />
Million is requested or anticipated.<br />
5. A positive cost estimate change is<br />
requested/anticipated that is greater than $5<br />
Million, but less than 20 percent of the estimated<br />
dollar amount of the project.<br />
6. A positive or negative change in the unprogrammed<br />
balance forward is received.<br />
7. A positive or negative change in the anticipated<br />
fund allocation is received.<br />
8. A project is added to use Federal Funds for<br />
repayment of previously authorized work and all<br />
repayments will come from unallocated funds.<br />
9. A new planning study is identified.<br />
10. A project is Advance Constructed.<br />
RTC normally concurs in administrative<br />
modifications, since these are matters that by<br />
definition do not affect the RTP or the air quality<br />
conformity analysis, are unlikely to materially affect<br />
the funding assumptions in the RTP, and do not<br />
normally involve any other issues that would be of<br />
concern to the RTC.<br />
Amendment Process<br />
The Amendment process applies when:<br />
1. There is a significant change in the design or<br />
scope of any project identified in the STIP/RTIP.<br />
2. A regionally significant project is added or deleted.<br />
3. There are significant changes in the funding<br />
category that alter the overall financial<br />
reasonableness of the STIP/RTIP, or when a<br />
privately funded project is changed to public<br />
funding.<br />
4. There is a positive change in cost over $5 million<br />
and greater than 20 percent of the estimated<br />
dollar amount of the project is<br />
requested/anticipated<br />
The RTC has adopted procedures relating to<br />
amendments that reflect the NDOT process from the<br />
standpoint of the MPO responsible for developing<br />
and maintaining the TIP. Appendix I shows the<br />
“<strong>Transportation</strong> Improvement Program and<br />
Statewide <strong>Transportation</strong> Improvement Program<br />
Administrative Modification and Amendment<br />
Process” document approved by the RTC.<br />
These RTC procedures recognize several levels of<br />
amendment, depending on four criteria:<br />
1. consistency with the RTP;<br />
2. whether the project has “exempt” or “nonexempt”<br />
status under the procedures governing<br />
air quality analysis;<br />
3. consistency with the fiscal assumptions upon<br />
which the RTP was based; and<br />
4. whether there are other issues requiring<br />
elevation to the RTC Board.<br />
The aim is to allow for adequate consideration of<br />
issues that affect the MPO, without imposing<br />
unnecessary delay on the process.<br />
Any proposed action beyond these conditions will<br />
trigger the following amendment process, as defined<br />
in the following box:<br />
6<br />
REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA
5: The Project Selection Process<br />
The RTC employs the following process to prioritize<br />
the projects included in the TIP. To be considered for<br />
evaluation, projects must be:<br />
1. on the federal functional classification road<br />
system, and<br />
2 in the <strong>Regional</strong> <strong>Transportation</strong> Plan (RTP).<br />
The draft <strong>Regional</strong> <strong>Transportation</strong> Plan for 2009-<br />
2030 forms the basis for the four-year program of<br />
projects identified in the draft TIP. The projects<br />
listed in the TIP are consistent with the finding of air<br />
quality conformity on the draft RTP and are also<br />
fiscally constrained within the resources expected to<br />
be available as documented in the draft RTP and<br />
summarized in Section 7 below.<br />
Chapter 4 of the RTP sets out the goals and<br />
objectives of the RTC and describes how they form<br />
the framework for selecting the projects for inclusion<br />
in the Plan.<br />
Selecting projects for the TIP<br />
In the context of the goals of the agency, four<br />
concerns in particular guide the selection of projects<br />
to be advanced from the RTP into the TIP:<br />
1. maintenance of the existing system;<br />
2. safety<br />
3. mitigating congestion; and<br />
3. the need to keep up with growth.<br />
These factors influence different programs in<br />
different ways.<br />
Priorities for the RTC High-Speed Lane Mile program<br />
were established at a time when growth issues<br />
predominated. Other Q.10 programs address a<br />
wider range of factors including ITS development,<br />
bus turnouts and bike lanes.<br />
Priorities for NDOT projects include safety (SR.160),<br />
reconstruction of deteriorated roadways (I-15 North),<br />
development of ITS infrastructure and the promotion<br />
of carpooling and transit though the construction of<br />
carpool lanes (US.95 North). AB 595 funding has to<br />
be spent on projects in the US-95/I-15 corridor. The<br />
first phase of the I-15 South project will focus on<br />
ramp reconfiguration and operational improvements<br />
such as collector-distributor lanes, but will allow for<br />
long-term addition of carpool lanes in later phases.<br />
RTC has prioritized the STP (Urban) program mainly<br />
as a complement to the Q.10 programs, while<br />
projects under the CMAQ were selected based on<br />
cost-effectiveness in reducing emissions.<br />
RTC Transit projects focus on the development of<br />
innovative services to provide attractive alternatives<br />
to auto travel while not neglecting the need to<br />
maintain the existing transit system<br />
Congestion Management<br />
Federal regulations require that RTC uses a process<br />
to address congestion management in a way that<br />
“provides for safe and effective integrated<br />
management and operation of the multimodal<br />
transportation system”. The regulations identify<br />
specific congestion management strategies for<br />
consideration, including:<br />
Travel demand management,<br />
Traffic operational improvements,<br />
Public transportation improvements,<br />
ITS technologies, and, where necessary,<br />
Additional system capacity.<br />
These factors are taken into account in existing RTC<br />
and NDOT procedures, and are reflected in the<br />
prioritization of projects in this TIP.<br />
RTC and the local entities are working to improve<br />
existing project prioritization procedures that reflect<br />
this integrated multimodal congestion management<br />
process. To fully address congestion and maintain<br />
mobility in the core of the region is going to require<br />
exactly the sort of mix of multi-modal and<br />
operational strategies envisaged under the federal<br />
congestion management process. It is expected that<br />
these improved procedures will guide the selection<br />
of projects in the next TIP, for 2010-2013.<br />
Public procedures<br />
Projects proposed for inclusion in the TIP may be<br />
further refined through the public participation<br />
process discussed in Section 6. The RTC Advisory<br />
Committees reviews all projects for their local and<br />
regional benefits prior to recommending the TIP for<br />
adoption by the RTC Board.<br />
7<br />
TRANSPORTATION IMPROVEMENT PROGRAM 2009-2012<br />
DRAFT FINAL, NOVEMBER 2008
6: Public Participation<br />
The RTC is committed to educating and informing<br />
the public on local transportation issues. The RTC<br />
plans and conducts public meetings and hearings to<br />
provide citizens with the opportunity to give input<br />
and receive information on transportation projects<br />
and policies. At least one formal public hearing is<br />
held prior to adoption of a new RTP, TIP or Public<br />
participation Plan update and, as appropriate, for<br />
the major plan or TIP amendments. These hearings<br />
are supplemented by informal public meetings<br />
during consultation on the draft documents.<br />
The primary public participation activities currently<br />
used by the RTC include:<br />
• Board of Commissioners,<br />
• Advisory Committees and Subcommittees,<br />
• Public Meetings/Hearings,<br />
• Website,<br />
• Public Comment and Response to<br />
Comments and<br />
• Project Advisory Committees<br />
On-gong public information activities include:<br />
• The RTC website,<br />
• <strong>Transportation</strong> Fairs,<br />
• Neighborhood Planning Meetings,<br />
• On the Move Television Show,<br />
• On the Move Newsletter,<br />
• Community & Public Meetings,<br />
• Media Relations and<br />
• Special events<br />
The projects included in the TIP for 2009-12 are all<br />
taken from the <strong>Regional</strong> <strong>Transportation</strong> Plan for<br />
2009-2030, which has been developed through a<br />
process of inter-agency coordination and public<br />
review and comment.<br />
The TIP for 2009-12 was made available for public<br />
review and comment. In accordance with federal<br />
law and the RTC's adopted public participation<br />
policy, a 45-day public comment period opened at<br />
on Tuesday, September 2, 2008. The public was<br />
encouraged to submit comments to the RTC in<br />
writing or by e-mail through Thursday, October 16,<br />
2008. The TIP, RTP and Appendices were available<br />
in both hard copy and CD format and were posted on<br />
the RTC’s website. Many individuals and interested<br />
parties were notified of the availability of the draft<br />
documents. During the consultation period a<br />
number of public meetings were held, as well as a<br />
public hearing in the RTP building.<br />
Details of the public outreach activities on the Plan,<br />
the comments received and the disposition of those<br />
comments are set out in Appendix 2 to the RTP and<br />
are presented to the RTC Board for consideration<br />
prior to approval of the RTP and TIP.<br />
The TIP and RTP, as modified in response to<br />
comments received, are available from the RTC on<br />
request and may be viewed online at the RTC’s<br />
website (http://www.rtcsouthernnevada.com/).<br />
All RTC Committee meetings are open to the public<br />
and notice is provided in accordance with the State<br />
of Nevada Open Meeting Law (NRS Chapter 241).<br />
Committee agendas and agenda backup materials,<br />
as well as technical and other reports documenting<br />
the development, refinement and update of the<br />
plan, TIP and other planning studies, are made<br />
available upon request. Public comment on<br />
products of the planning process is accepted in<br />
either written or oral format at all committee<br />
meetings.<br />
8<br />
REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA
7: The Financial Plan<br />
Under SAFETEA-LU, the cost of projects included in<br />
the TIP must be consistent with the funds that can<br />
reasonably be expected to be available over the fouryear<br />
program period and reflect year of expenditure<br />
cost estimates. In agreement with NDOT and the<br />
federal agencies, a 3.4 percent inflation rate is used<br />
to determine year of expenditure cost estimates.<br />
A full explanation of the assumptions underlying the<br />
Financial Plan is set out in the RTP, which<br />
demonstrates the consistency of proposed<br />
transportation investments with already available<br />
and projected revenue sources between 2009 and<br />
2030, while showing that existing and proposed<br />
revenues also cover all forecast operation and<br />
maintenance costs.<br />
In developing the TIP, allowance was made for<br />
revised project costs and revenue projections in<br />
each program area to ensure that the TIP preserves<br />
consistency between programmed project costs and<br />
projected revenues. The selection of projects<br />
included for funding under federal programs<br />
administered by NDOT was made jointly by RTC and<br />
NDOT in accord with the procedures discussed in<br />
Section 5. The selection of projects under federal<br />
programs allocated to Southern Nevada are<br />
constrained by projected allocations to the Las<br />
Vegas non-attainment area under each program.<br />
As noted in the RTP, NDOT has made extensive use<br />
of Assembly Bill 595 Bond funding to advance the<br />
implementation of projects. Governor Gibbons<br />
signed AB 595 in June 2007 to provide funds for<br />
critically needed transportation projects. The<br />
principal on past bond issues is now being repaid<br />
out of current program revenues under the NHS and<br />
STP (Statewide) programs, considerably reducing the<br />
funding available for current projects. In addition,<br />
allowance has to be made for projects elsewhere in<br />
the state. Similar considerations apply to revenues<br />
from the State Gas Tax, which are needed to cover<br />
Bond debt service costs as well as current projects.<br />
The selection of projects for inclusion in the TIP<br />
takes account of current projections of revenues, the<br />
schedule of bond prepayments and debt service,<br />
and state-wide needs.<br />
The Fund Source Balance Sheets set out on the<br />
following pages show that the scheduled costs of<br />
projects funded in 2009-2012 are consistent with<br />
anticipated federal, state, and local resources.<br />
As discussed in the RTP, the locally funded regionally<br />
significant projects identified in the RTP and TIP are<br />
only part of a large program of projects funded under<br />
RTC Gas Tax and “Question 10” revenues. The<br />
projects identified for RTC local funding in the TIP for<br />
2009-2012 are selected from the financially<br />
constrained RTC Capital Improvement Program and<br />
are consistent with the planning assumptions made<br />
in the RTP.<br />
Other Local<br />
2%<br />
TIP Funding Sources<br />
Private<br />
13%<br />
RTC<br />
50%<br />
Federal<br />
19%<br />
Bonded against<br />
Federal<br />
0%<br />
State<br />
16%<br />
9<br />
TRANSPORTATION IMPROVEMENT PROGRAM 2009-2012<br />
DRAFT FINAL, NOVEMBER 2008
TIP Fund Source Balance Sheets<br />
Fund Source Balance Sheet<br />
2009 2010 2011 2012 Total<br />
Federal Highway Program Funds allocated to the State of Nevada<br />
National Highway <strong>System</strong> (NHS)<br />
Balance forward $100,000 $108,000 $798,000 $2,488,000 $100,000<br />
Anticipated allocation $68,518,000 $60,500,000 $60,500,000 $60,500,000 $250,018,000<br />
Contingency $14,000,000 $5,000,000 $5,000,000 $5,000,000 $29,000,000<br />
Bond repayment $45,000,000 $47,000,000 $50,000,000 $48,000,000 $190,000,000<br />
Available for programming $9,618,000 $8,608,000 $6,298,000 $9,988,000 $31,118,000<br />
Scheduled elsewhere in Nevada $810,000 $810,000 $810,000 $810,000 $3,240,000<br />
Scheduled in TIP $8,700,000 $7,000,000 $3,000,000 $3,000,000 $21,700,000<br />
Balance available $108,000 $798,000 $2,488,000 $6,178,000 $6,178,000<br />
Interstate Maintenance Program - for information only; individual projects are not scheduled in the TIP<br />
Anticipated statewide allocation $43,475,000 $35,000,000 $35,000,000 $35,000,000 $148,475,000<br />
Bridge Program - for information only; individual projects are not scheduled in the TIP<br />
Anticipated statewide allocation $10,950,000 $10,950,000 $11,000,000 $11,000,000 $43,900,000<br />
Safety Program - for information only; individual projects are not scheduled in the TIP<br />
Anticipated statewide allocation $10,500,000 $11,000,000 $11,000,000 $11,000,000 $43,500,000<br />
Surface <strong>Transportation</strong> Program - Statewide (STP-NV)<br />
Balance Forward $0 $2,038,000 $1,538,000 $8,038,000 $0<br />
Anticipated allocation $21,438,000 $18,500,000 $18,500,000 $18,500,000 $76,938,000<br />
Contingency $6,000,000 $5,000,000 $5,000,000 $5,000,000 $21,000,000<br />
Bond repayment $12,500,000 $7,000,000 $7,000,000 $7,000,000 $33,500,000<br />
Available for programming $2,938,000 $8,538,000 $8,038,000 $14,538,000 $22,438,000<br />
Scheduled elsewhere in Nevada $0 $0 $0 $0 $0<br />
Scheduled in TIP $900,000 $7,000,000 $0 $0 $7,900,000<br />
Balance available $2,038,000 $1,538,000 $8,038,000 $14,538,000 $14,538,000<br />
Surface <strong>Transportation</strong> Enhancement Program (STP-E)<br />
Scheduled in TIP $3,605,750 $0 $0 $0 $3,605,750<br />
Federal Highway Program Funds allocated to Southern Nevada<br />
Includes funds allocated to the Las Vegas <strong>Transportation</strong> Management Area, to Urbanized Areas in<br />
Clark County, to the Las Vegas Non-Attainment Area, or earmarked for projects in Southern Nevada.<br />
Surface <strong>Transportation</strong> Program - Urban (STP-Clark County)<br />
Balance Forward $0 $501,818 $3,262,618 $2,872,218 $0<br />
Anticipated allocation $23,501,000 $20,000,000 $20,400,000 $20,808,000 $84,709,000<br />
Contingency $1,800,000 $2,000,000 $2,040,000 $2,080,800 $7,920,800<br />
Available for programming $21,701,000 $18,501,818 $21,622,618 $21,599,418 $76,788,200<br />
Scheduled in TIP $21,199,182 $15,239,200 $18,750,400 $20,861,600 $76,050,382<br />
Balance available $501,818 $3,262,618 $2,872,218 $737,818 $737,818<br />
Congestion Mitigation and Air Quality Program (CMAQ)<br />
Balance Forward $7,500,000 $2,380,000 $3,267,800 $3,715,800 $7,500,000<br />
Anticipated allocation $16,237,000 $15,500,000 $15,500,000 $15,500,000 $62,737,000<br />
Contingency $4,000,000 $1,550,000 $1,550,000 $1,550,000 $8,650,000<br />
Available for programming $19,737,000 $16,330,000 $17,217,800 $17,665,800 $61,587,000<br />
Scheduled in TIP $17,357,000 $13,062,200 $13,502,000 $17,158,000 $61,079,200<br />
Balance available $2,380,000 $3,267,800 $3,715,800 $507,800 $507,800<br />
10<br />
REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA
Fund Source Balance Sheet (contd) 2009 2010 2011 2012 Total<br />
Federal Highway Discretionary Program Funds allocated to projects in Southern Nevada<br />
Public, Federal and Forest Lands Highways Programs<br />
Balance forward $0 $1,960,000 $0 $0 $0<br />
Public Lands Highways $31,921,000 $0 $0 $0 $31,921,000<br />
Federal Lands Highways $3,100,000 $26,900,000 $610,000 $12,600,000 $43,210,000<br />
Forest Highways $0 $0 $0 $0 $0<br />
Available for programming $35,021,000 $28,860,000 $610,000 $12,600,000 $75,131,000<br />
Scheduled in TIP $33,061,000 $28,860,000 $610,000 $12,600,000 $75,131,000<br />
Balance available $1,960,000 $0 $0 $0 $0<br />
Other FHWA Discretionary Programs<br />
Balance forward $0 $0 $0 $0 $0<br />
Interstate Maintenance Discretionary $1,351,300 $0 $0 $0 $1,351,300<br />
<strong>Transportation</strong>, Community and <strong>System</strong><br />
Preservation Program $980,000 $0 $0 $0 $980,000<br />
Available for programming $2,331,300 $0 $0 $0 $2,331,300<br />
Scheduled in TIP $2,331,300 $0 $0 $0 $2,331,300<br />
Balance available $0 $0 $0 $0 $0<br />
Federal Funds earmarked for highway and transit projects in Southern Nevada<br />
FFY2002 Appropriations $500,000 $0 $0 $0 $500,000<br />
FFY2004 Appropriations $7,700,000 $0 $0 $0 $7,700,000<br />
SAFETEA-LU High Priority Projects $90,193,372 $0 $0 $0 $90,193,372<br />
SAFETEA-LU <strong>Transportation</strong> Improvements $44,263,975 $0 $0 $0 $44,263,975<br />
FFY2006 Appropriations $148,500 $0 $0 $0 $148,500<br />
FFY2008 Appropriations $1,176,000 $0 $0 $0 $1,176,000<br />
Anticipated Appropriations $980,000 $0 $0 $0 $980,000<br />
Available $144,961,847 $0 $0 $0 $144,961,847<br />
Scheduled highway projects $132,340,704 $11,121,143 $0 $0 $143,461,847<br />
Scheduled transit projects $1,500,000 $0 $0 $0 $1,500,000<br />
Scheduled in TIP $133,840,704 $11,121,143 $0 $0 $144,961,847<br />
Balance available $11,121,143 $0 $0 $0 $0<br />
Federal Transit Administration Funds allocated to Southern Nevada<br />
S.5307 Urbanized Area Formula Program<br />
Balance Forward $0 $527,155 $89,364 $70,769 $0<br />
Anticipated allocation $25,097,852 $25,599,809 $26,111,805 $26,634,041 $103,443,508<br />
Transfers in $3,182,400 $3,182,400<br />
Contingency<br />
Available for programming $28,280,252 $26,126,964 $26,201,169 $26,704,811 $106,625,908<br />
Enhancement projects $480,000 $776,000 $304,000 $312,000 $1,872,000<br />
Security-related projects $288,000 $296,000 $304,000 $312,000 $1,200,000<br />
General formula projects $26,985,097 $24,965,600 $25,522,400 $25,692,000 $103,165,097<br />
Scheduled in TIP $27,753,097 $26,037,600 $26,130,400 $26,316,000 $106,237,097<br />
Balance available $527,155 $89,364 $70,769 $388,811 $388,811<br />
S.5309 Bus and Bus-Related Discretionary Program<br />
Balance Forward $8,453,613 $0 $0 $0 $8,453,613<br />
Anticipated allocation $0 $0 $0 $0 $0<br />
Available for programming $8,453,613 $0 $0 $0 $8,453,613<br />
Scheduled in TIP $8,453,613 $0 $0 $0 $8,453,613<br />
Balance $0 $0 $0 $0<br />
$0<br />
S.5309 New Starts Program<br />
Balance Forward $992,000 $0 $0 $0 $992,000<br />
Anticipated allocation $0 $0 $0 $0 $0<br />
Available for programming $992,000 $0 $0 $0 $992,000<br />
Scheduled in TIP $992,000 $0 $0 $0 $992,000<br />
Balance $0 $0 $0 $0<br />
$0<br />
11<br />
TRANSPORTATION IMPROVEMENT PROGRAM 2009-2012<br />
DRAFT FINAL, NOVEMBER 2008
Fund Source Balance Sheet (contd) 2009 2010 2011 2012 Total<br />
Federal Transit Administration Funds allocated to Southern Nevada (contd)<br />
S.5316, S.5317 Job Access and Reverse Commute and New Freedom Programs<br />
Balance Forward $0 $0 $0 $0 $0<br />
S.5316 anticipated allocation $755,823 $786,056 $817,498 $850,198 $3,209,575<br />
S.5317 anticipated allocation $487,675 $507,182 $527,469 $548,568 $2,070,894<br />
Available for programming $1,243,498 $1,293,238 $1,344,967 $1,398,766 $5,280,469<br />
S.5316 $755,823 $786,056 $817,498 $850,198 $3,209,575<br />
S.5317 $487,675 $507,182 $527,469 $548,568 $2,070,894<br />
Scheduled in TIP $1,243,498 $1,293,238 $1,344,967 $1,398,766 $5,280,469<br />
Balance available $0 $0 $0 $0 $0<br />
Federal Transit Program Funds allocated to the State of Nevada<br />
S.5311 Small Urban and Rural Public <strong>Transportation</strong> Program<br />
Balance forward $7,548,792 $8,084,160 $8,331,746 $8,252,532 $7,548,792<br />
Anticipated allocation $4,875,981 $5,022,260 $5,172,928 $5,328,116 $20,399,285<br />
Available for programming $12,424,773 $13,106,420 $13,504,674 $13,580,648 $27,948,077<br />
Scheduled elsewhere in Nevada $2,965,737 $3,262,310 $3,588,542 $3,947,396 $13,763,985<br />
Scheduled in TIP $1,374,876 $1,512,364 $1,663,600 $1,829,960 $6,380,800<br />
Balance available $8,084,160 $8,331,746 $8,252,532 $7,803,292 $7,803,292<br />
Federal Railroad Administration Funds<br />
FRA Funding<br />
Scheduled in TIP $0 $3,000,000 $0 $0 $3,000,000<br />
State Funds allocated to projects in Southern Nevada<br />
Bonded Funds<br />
Anticipated bond proceeds $112,945,000 $112,945,000<br />
Scheduled elsewhere in Nevada $102,945,000 $102,945,000<br />
Scheduled in TIP $10,000,000 $10,000,000<br />
Balance $0 $0<br />
NDOT State Gas Tax<br />
Financing Costs $60,000,000 $60,000,000 $55,000,000 $52,000,000 $227,000,000<br />
Scheduled elsewhere in Nevada $28,950,000 $750,000 $750,000 $750,000 $31,200,000<br />
Scheduled in TIP $46,500,000 $12,000,000 $0 $0 $58,500,000<br />
AB 595 Funds<br />
Balance Forward $3,600,000 $8,920,412 $26,513,060 $23,952,425 $3,600,000<br />
Car rental tax supplement $3,690,000 $3,782,250 $3,876,806 $3,973,726 $15,322,783<br />
Ad Valorem Property Tax $9,130,412 $14,380,399 $20,132,558 $26,423,983 $70,067,351<br />
Program revenues $12,820,412 $18,162,649 $24,009,364 $30,397,709 $85,390,134<br />
Bond Proceeds $7,500,000 $0 $126,500,000 $0 $134,000,000<br />
LVCVA Bond Proceeds $272,000,000 $0 $0 $0 $272,000,000<br />
Financing Proceeds $279,500,000 $0 $126,500,000 $0 $406,000,000<br />
Total for Capital Program $295,920,412 $27,083,060 $177,022,425 $54,350,134 $494,990,134<br />
Financing Costs $0 $570,000 $570,000 $10,184,000 $11,324,000<br />
Available for programming $295,920,412 $26,513,060 $176,452,425 $44,166,134 $483,666,134<br />
Scheduled in TIP $287,000,000 $0 $152,500,000 $4,000,000 $443,500,000<br />
Balance $8,920,412 $26,513,060 $23,952,425 $40,166,134 $40,166,134<br />
Nevada State General Fund<br />
Scheduled in TIP $0 $0 $16,000,000 $0 $16,000,000<br />
12<br />
REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA
RTC Funds<br />
RTC Gas Tax Program<br />
Balance Forward $30,252,634 $250,783 $254,679 $254,361 $30,252,634<br />
Fuel Tax Revenues $71,955,268 $72,674,821 $73,401,569 $74,135,585 $292,167,244<br />
Other revenues $8,705,053 $8,005,016 $8,005,094 $6,755,087 $31,470,249<br />
Program revenues $80,660,321 $80,679,837 $81,406,663 $80,890,672 $323,637,493<br />
Financing Proceeds $154,650,000 $214,940,000 $1,280,000 $4,650,000 $375,520,000<br />
Total for Capital Program $235,310,321 $295,619,837 $82,686,663 $85,540,672 $699,157,493<br />
Financing Costs $40,412,172 $217,433,441 $34,387,856 $45,091,897 $337,325,366<br />
Program overheads $19,900,000 $20,582,500 $21,299,125 $22,051,581 $83,833,206<br />
Available for programming $205,250,783 $57,854,679 $27,254,361 $18,651,555 $308,251,555<br />
Scheduled in TIP $67,586,000 $16,565,000 $2,927,000 $0 $87,078,000<br />
Other non-regionally significant projects $134,564,794 $41,063,000 $19,039,000 $18,476,000 $213,142,794<br />
Balance $3,099,989 $226,679 $5,288,361 $175,555 $8,030,761<br />
Q.10 Programs<br />
Balance Forward $15,385,626 $135,331 $11,623,241 $1,190,586 $15,385,626<br />
Sales Tax Revenues $43,625,000 $44,933,750 $46,281,763 $47,670,215 $182,510,728<br />
Other revenues $21,489,856 $22,134,452 $22,798,412 $23,482,309 $89,905,029<br />
Revenues $65,114,856 $67,068,202 $69,080,175 $71,152,524 $272,415,757<br />
Financing Proceeds $97,126,757 $56,552,252 $49,348,265 $231,684,054 $434,711,328<br />
Total for Capital Program $162,241,613 $123,620,454 $118,428,440 $302,836,578 $707,127,085<br />
Financing Costs $14,920,699 $12,063,135 $14,013,893 $196,455,175 $237,452,901<br />
Operating costs of Q.10 Programs $13,924,965 $14,886,408 $15,879,202 $16,981,401 $61,671,976<br />
Available for programming $148,781,576 $96,806,241 $100,158,586 $90,590,589 $423,387,834<br />
Scheduled in TIP $88,338,130 $68,176,000 $82,102,000 $55,063,000 $293,679,130<br />
Other non-regionally significant projects $60,308,115 $17,007,000 $16,866,000 $16,729,776 $110,910,891<br />
Balance $135,331 $11,623,241 $1,190,586 $18,797,813 $18,797,813<br />
RTC Transit Program<br />
Balance Forward $99,645,146 $59,023,937 $1,772,520 $12,281 $99,645,146<br />
Sales Tax Revenues $130,875,000 $136,764,375 $142,918,772 $149,350,117 $559,908,263<br />
Bus and Rapid Transit farebox revenues $52,075,000 $60,700,000 $71,868,000 $77,592,942 $262,235,942<br />
Paratransit recvenues $775,000 $800,000 $825,000 $850,000 $3,250,000<br />
Other revenues $3,750,000 $5,039,341 $5,845,910 $6,562,109 $21,197,360<br />
Revenues $187,475,000 $203,303,716 $221,457,682 $234,355,168 $846,591,566<br />
Financing Proceeds $0 $0 $0 $0 $0<br />
Total for Transit <strong>System</strong> $287,120,146 $262,327,654 $223,230,202 $234,367,449 $946,236,712<br />
Bus system operations $97,388,248 $102,257,660 $102,257,660 $105,325,390 $407,228,959<br />
Paratransit system operations $30,134,299 $31,490,342 $32,907,408 $34,388,241 $128,920,291<br />
Fuel $30,000,000 $30,900,000 $31,827,000 $32,781,810 $125,508,810<br />
Other operating costs $17,477,453 $18,001,777 $18,541,830 $19,098,085 $73,119,144<br />
Administartive overhead $25,320,121 $29,211,154 $30,963,823 $32,821,652 $118,316,751<br />
Transit system costs $200,320,121 $211,860,933 $216,497,721 $224,415,179 $853,093,955<br />
Financing Costs $0 $0 $0 $0 $0<br />
Available for capital program $86,800,024 $50,466,720 $6,732,481 $9,952,270 $93,142,757<br />
Scheduled in TIP $27,776,087 $48,694,200 $6,720,200 $6,769,400 $89,959,887<br />
Balance $59,023,937 $1,772,520 $12,281 $3,182,870 $3,182,870<br />
Other local funds<br />
Clark County Beltway Program<br />
Scheduled in TIP $512,459,000 $287,474,000 $324,340,000 $32,600,000 $1,156,873,000<br />
Other local public funds<br />
Clark County Department of Avaiation / FAA $1,500,000 $25,200,000 $4,000,000 $15,300,000 $46,000,000<br />
Other local funds $9,069,498 $912,852 $949,365 $10,987,340 $21,919,055<br />
Scheduled in TIP $10,569,498 $26,112,852 $4,949,365 $26,287,340 $67,919,055<br />
Private development funds<br />
Las Vegas Monorail Corporation funding<br />
Las Vegas Monorail Corp $150,000,000 $75,000,000 $75,000,000 $50,000,000 $350,000,000<br />
TIFIA loan proceeds (for LVMC) $0 $25,000,000 $25,000,000 $50,000,000 $100,000,000<br />
Scheduled in TIP $150,000,000 $100,000,000 $100,000,000 $100,000,000 $450,000,000<br />
Other private development funds<br />
Scheduled in TIP $0 $0 $92,500,000 $0 $92,500,000<br />
Total Scheduled in TIP $1,461,040,735 $673,147,797 $847,039,932 $307,884,066 $3,289,112,530<br />
13<br />
TRANSPORTATION IMPROVEMENT PROGRAM 2009-2012<br />
DRAFT FINAL, NOVEMBER 2008
8: The <strong>Transportation</strong> Improvement<br />
Program 2009-2012: Project lists<br />
and Maps<br />
A list of the projects included in the TIP for FY 2009-<br />
2012, begins on page 15.<br />
The TIP includes all regionally significant projects<br />
scheduled for funding in the four fiscal years, 2009<br />
to 2012, regardless of funding source (see box).<br />
<strong>Regional</strong>ly Significant Projects<br />
The term <strong>Regional</strong>ly Significant Project is<br />
defined in Federal Regulation to mean a project<br />
that is on a facility which serves regional<br />
transportation needs, including, at a minimum,<br />
all principal arterial highways and all fixed<br />
guideway transit facilities that offer a<br />
significant alternative to regional highway<br />
travel.<br />
The TIP is also required to include all projects<br />
that are proposed for federal funding or may<br />
involve other federal action. (“Federal” in this<br />
case means funding or actions by the Federal<br />
Highway and Federal Transit Administrations).<br />
appear when incorporated into the Nevada<br />
Statewide <strong>Transportation</strong> Improvement Program.<br />
Project implementation<br />
The TIP identifies projects for funding. For<br />
construction projects, it shows if the funding is for<br />
construction or just for the earlier stages, such as<br />
preliminary engineering or the acquisition of rightof-way.<br />
Typically, projects are built within a year or<br />
so of being funded, and the anticipated completion<br />
date of each project is shown for information in the<br />
tables.<br />
Larger projects may be built over a long time frame,<br />
and project schedules are liable to change. Anyone<br />
requiring information about the implementation or<br />
construction schedule for specific projects should<br />
contact the sponsoring agency.<br />
In Table 1, TIP projects are listed by sponsoring<br />
jurisdiction. Projects having multiple fund sources<br />
are grouped together under each project.<br />
The location of projects included in the TIP is<br />
illustrated on a set of maps that follow the project<br />
listing:<br />
Street and Highway Projects<br />
<strong>Intelligent</strong> <strong>Transportation</strong> <strong>System</strong> (ITS) Projects<br />
and other operational improvements<br />
Alternate Mode (Bicycle and Pedestrian)<br />
Projects and environmental improvements<br />
Transit Projects<br />
TIP projects outside of the Las Vegas Valley<br />
Downtown Las Vegas Detail<br />
Area-wide projects are noted on the maps.<br />
For convenience, the TIP projects are also listed in<br />
Table 2 by funding source in the order that they will<br />
14<br />
REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA
<strong>Regional</strong> <strong>Transportation</strong> Commission of Southern Nevada<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Clark County<br />
Table 1: Projects by Sponsoring Entity<br />
Project # 108 Location: Cactus Ave. at I-15 From: Dean Martin Dr. To: Las Vegas Blvd.<br />
Description: Construct an interchange<br />
FYComplete: 2013 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$50,133,080<br />
CL200516<br />
FY04 Appropriations Act, S.115 $200,000 $0<br />
$0 $0<br />
Interstate Maintenance Discretionary $861,300 $0<br />
$0 $0<br />
Q10 High Speed Lane Miles Program $2,799,000 $0<br />
$5,157,000 $7,272,000<br />
SAFETEA-LU High Priority Projects $6,843,780 $0<br />
$0 $0<br />
STP Clark County $0 $0<br />
$9,000,000 $18,000,000<br />
Project # 506 Location: CC-215 Northern Beltway From: Tenaya Way To: Decatur Blvd.<br />
Description: Upgrade to 6-lane freeway with interchanges at Jones Blvd. and Decatur Blvd. and an overpass at Bradley Rd FYComplete: 2010 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $150,360,000<br />
Clark County Beltway Program $150,360,000 $0<br />
$0 $0<br />
Project # 507 Location: CC-215 Northern Beltway From: Decatur Blvd. To: North Fifth St.<br />
Description: Upgrade to 6-lane freeway with interchanges at Revere St and North 5th St.<br />
FYComplete: 2011 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $115,599,000<br />
Clark County Beltway Program $115,599,000 $0<br />
$0 $0<br />
Project # 508 Location: CC-215 Northern Beltway From: North Fifth St. To: Range Rd.<br />
Description: Upgrade to 6-lane freeway with interchanges at Losee Rd., Pecos Rd., Lamb Blvd., and Range Rd.<br />
FYComplete: 2011 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $118,700,000<br />
Clark County Beltway Program $118,700,000 $0<br />
$0 $0<br />
Project # 509 Location: CC-215 Northern Beltway From: @ I-15 To:<br />
Description: Upgrade to system-to-system interchange and widen to 6 lanes<br />
FYComplete: 2013<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$118,721,143<br />
CL200835<br />
Clark County Beltway Program $0 $0<br />
$107,600,000 $0<br />
SAFETEA-LU High Priority Projects $0 $11,121,143 $0 $0<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 15
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Clark County<br />
Table 1: Projects by Sponsoring Entity<br />
Project # 926 Location: CC-215 Northern Beltway @ US.95 From: Hualapai Way To: Tenaya Way<br />
Description: Upgrade to system-to-systsem interchange and widen to 6 lanes<br />
FYComplete: 2013 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$228,009,643<br />
CL200704<br />
Clark County Beltway Program $0 $0<br />
$216,740,000 $0<br />
FY06 Appropriations Act, S.112 $148,500 $0<br />
$0 $0<br />
SAFETEA-LU High Priority Projects $11,121,143 $0<br />
$0 $0<br />
Project # 504 Location: CC-215 Western Beltway From: Alta Dr To: north of Summerlin Pkwy<br />
Description: Construct interchanges at Far Hills Ave and Summerlin Pkwy and widen to 6 lanes from Charleston Blvd to Summerlin<br />
Pkwy.<br />
FYComplete: 2010 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $127,800,000<br />
Clark County Beltway Program $127,800,000 $0<br />
$0 $0<br />
Project # 510 Location: CC-215 Western Beltway From: Craig Rd. To: Hualapai Way (North)<br />
Description: Upgrade to 6-lane freeway with interchanges at Lone Mountain Rd and Ann Rd and an overpass at Centennial Pkwy. FYComplete: 2012 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $134,300,000<br />
Clark County Beltway Program $0 $134,300,000 $0 $0<br />
Project # 2709 Location: Durango Dr. From: CC-215 Southern Beltway To: Desert Inn Rd.<br />
Description: Signal interconnects and timing infrastructure<br />
FYComplete: 2011 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$1,365,000<br />
CL200834<br />
CMAQ $700,000 $665,000 $0 $0<br />
Project # 2746 Location: Eastern Ave From: Serene Ave To: Flamingo Rd<br />
Description: ITS and signal infrastructure improvements<br />
FYComplete: 2010 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $4,958,000<br />
Q10 Traffic Signals & ITS Programs $4,958,000 $0<br />
$0 $0<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 16
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Clark County<br />
Table 1: Projects by Sponsoring Entity<br />
Project # 221 Location: I-215 Southern Beltway From: @ Airport Connector To:<br />
Description: Upgrade Interchange, expand mainline from I-15 to Windmill Ln.<br />
FYComplete: 2012<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$181,477,930<br />
CL200483<br />
CCDOA $0 $23,000,000 $0 $0<br />
Clark County Beltway Program $0 $153,174,000 $0 $0<br />
SAFETEA-LU High Priority Projects $5,303,930 $0<br />
$0 $0<br />
Project # 228 Location: I-215 Southern Beltway From: Eastern Ave. To: Windmill Ln.<br />
Description: Widen from 6 to 8 lanes<br />
FYComplete: 2013 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $32,600,000<br />
Clark County Beltway Program $0 $0<br />
$0 $32,600,000<br />
Project # 1584 Location: I-215 Southern Beltway From: at Eastern Ave To:<br />
Description: Interchange landscaping<br />
FYComplete: 2009<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $498,750<br />
STP Enhancements $498,750 $0<br />
$0 $0<br />
Project # 3002 Location: Laughlin From: Needles Hwy. To: Bullhead City, AZ<br />
Description: Construct new Colorado River bridge and related road works<br />
FYComplete: 2013 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$56,398,505<br />
CL2006108<br />
Public Lands Highways $1,000,000 $0<br />
$0 $0<br />
Q10 High Speed Lane Miles Program $0 $0<br />
$5,000,000 $25,000,000<br />
SAFETEA-LU <strong>Transportation</strong> Improvements $15,398,505 $0<br />
$0 $0<br />
Western AZ Council of Governments $0 $0<br />
$0 $10,000,000<br />
Project # 1573 Location: Ozone Non-Attainment Area - Clark County From: To:<br />
Description: Various measures to reduce Ozone emissions, to be determined in the Ozone SIP<br />
FYComplete: 2013<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$5,300,000<br />
CL2006110<br />
CMAQ $0 $0<br />
$2,600,000 $2,700,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 17
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Clark County<br />
Table 1: Projects by Sponsoring Entity<br />
Project # 551 Location: Rainbow Blvd. From: CC-215 Southern Beltway To: Tropicana Ave.<br />
Description: Widen from 4 to 6 lanes<br />
FYComplete: 2011 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$3,640,000<br />
CL200666<br />
Q10 High Speed Lane Miles Program $500,000 $2,095,000 $1,045,000 $0<br />
Project # 2702 Location: Silverado Ranch Blvd. From: @ Dean Martin Dr To:<br />
Description: Develop a park-and-ride lot and related facilities to serve the I-15 South corridor<br />
FYComplete: 2009<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$1,000,000<br />
CL200667<br />
STP Clark County $1,000,000 $0<br />
$0 $0<br />
Project # 112 Location: SR 604 Las Vegas Blvd. South From: SR 146 St.Rose Pkwy To: Serene Ave.<br />
Description: Widen to 6 Lanes<br />
FYComplete: 2010 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$3,500,000<br />
CL200613<br />
STP Clark County $3,500,000 $0<br />
$0 $0<br />
Project # 113 Location: SR 604 Las Vegas Blvd. South From: Serene Ave. To: Sunset Rd.<br />
Description: Widen to 6 Lanes<br />
FYComplete: 2010 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$2,552,182<br />
CL200517<br />
STP Clark County $2,552,182 $0<br />
$0 $0<br />
Project # 2733 Location: Tropicana Ave From: Rainbow Blvd To: Wynn Rd<br />
Description: ITS and signal infrastructure improvements<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $169,000<br />
Q10 Traffic Signals & ITS Programs $169,000 $0<br />
$0 $0<br />
Total for Clark County $570,013,090 $324,355,143 $347,142,000 $95,572,000 Total Scheduled: $1,337,082,233<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 18
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Clark County Dept of Air Quality and Environmental Management<br />
Table 1: Projects by Sponsoring Entity<br />
Project # 2707 Location: Off-road diesel engine retrofit program From: To:<br />
Description: Off-road diesel engine retrofits<br />
FYComplete: 2020<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$726,200<br />
CL200836<br />
CMAQ $365,000 $361,200 $0 $0<br />
Project # 1572 Location: Truck stops - various locations From: To:<br />
Description: Truck stop electrification to reduce emissions from trucks parked at various facilities<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$1,280,000<br />
CL2006113<br />
CMAQ $640,000 $640,000 $0 $0<br />
Total for Clark County Dept of Air Quality and En $1,005,000 $1,001,200 $0 $0<br />
Total Scheduled: $2,006,200<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 19
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Clark County Dept of Aviation<br />
Table 1: Projects by Sponsoring Entity<br />
Project # 4202 Location: I-15 From: @ MP 3 To:<br />
Description: Construct Ivanpah interchange on I-15 to access the airport<br />
FYComplete: 2011<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $9,100,000<br />
CCDOA and FAA Combination $0 $0<br />
$1,300,000 $7,800,000<br />
Project # 4266 Location: Ivanpah Expwy From: Proposed Ivanpah Valley Airport To: I-15 near MP 22<br />
Description: PE and RoW for new expressway from Ivanpah Airport to I-15 south of Sloan Rd, including interchange with I-15 FYComplete: 2012 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $9,000,000<br />
CCDOA and FAA Combination $1,500,000 $2,000,000 $2,500,000 $3,000,000<br />
Project # 4203 Location: SR. 604 Las Vegas Blvd South From: Proposed Ivanpah Valley Airport To: Jean<br />
Description: Construct Las Vegas Blvd. South as 2-lane arterial roadway from Ivanpah Airport to Jean<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $4,900,000<br />
CCDOA $0 $200,000 $200,000 $4,500,000<br />
Total for Clark County Dept of Aviation $1,500,000 $2,200,000 $4,000,000 $15,300,000 Total Scheduled: $23,000,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 20
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
City of Henderson<br />
Table 1: Projects by Sponsoring Entity<br />
Project # 4232 Location: Eastern Ave. From: Serene To: Sunridge<br />
Description: Signal and intersection improvements<br />
FYComplete: 2009<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $280,000<br />
Q10 Traffic Signals & ITS Programs $280,000 $0<br />
$0 $0<br />
Project # 4025 Location: I-15 From: @ Starr Av. To:<br />
Description: PE and RW for new Interchange<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$7,333,780<br />
CL200901<br />
Interstate Maintenance Discretionary $490,000 $0<br />
$0 $0<br />
SAFETEA-LU High Priority Projects $6,843,780 $0<br />
$0 $0<br />
Project # 134 Location: I-515 From: @ Galleria Dr. To:<br />
Description: Construct interchange and construct Galleria Dr. 4 lanes between Stephanie and Boulder Hwy.<br />
FYComplete: 2011<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$61,926,000<br />
CL200435<br />
Q10 High Speed Lane Miles Program $40,009,000 $11,531,000 $0 $0<br />
RTC Gas Tax - Area-Wide Program $10,386,000 $0<br />
$0 $0<br />
Project # 843 Location: SR 564 Lake Mead Pkwy. From: Boulder Highway To: Lake Mead National Recreation<br />
Area<br />
Description: Widen to 6 lanes<br />
FYComplete: 2012 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$41,072,080<br />
CL200521<br />
FY08 Appropriations Act, S.129 $196,000 $0<br />
$0 $0<br />
Public Lands Highways $14,000,000 $0<br />
$0 $0<br />
SAFETEA-LU High Priority Projects $3,764,080 $0<br />
$0 $0<br />
STP Clark County $0 $14,500,000 $8,000,000 $0<br />
STP Enhancements $612,000 $0<br />
$0 $0<br />
Project # 1585 Location: Sunset Rd From: at I-515 To:<br />
Description: Interchange landscaping<br />
FYComplete: 2009<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $650,000<br />
STP Enhancements $650,000 $0<br />
$0 $0<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 21
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
City of Henderson<br />
Table 1: Projects by Sponsoring Entity<br />
Total for City of Henderson $77,230,860 $26,031,000 $8,000,000 $0<br />
Total Scheduled: $111,261,860<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 22
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
City of Las Vegas<br />
Table 1: Projects by Sponsoring Entity<br />
Project # 740 Location: Bonneville Ave. / Clark Ave. Couplet From: Main St. To: Charleston Blvd.<br />
Description: Convert to one-way couplet, 3 lanes in each direction; add landscaping between Casino Center Dr and Las Vegas Blvd FYComplete: 2010 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $13,114,000<br />
RTC Gas Tax $6,900,000 $5,564,000 $0 $0<br />
STP Enhancements $650,000 $0<br />
$0 $0<br />
Project # 1561 Location: City of Las Vegas From: Union Park To: Main St<br />
Description: Construct pedestrian overbridge across UPRR<br />
FYComplete: 2009<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$3,500,000<br />
CL2006105<br />
FY04 Appropriations Act, S.115 $500,000 $0<br />
$0 $0<br />
Local Funds $3,000,000 $0<br />
$0 $0<br />
Project # 2747 Location: Craig Rd From: Tenaya Way To: Decatur Blvd<br />
Description: ITS and signal infrastructure improvements<br />
FYComplete: 2010 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $511,000<br />
Q10 Traffic Signals & ITS Programs $511,000 $0<br />
$0 $0<br />
Project # 129 Location: Horse Dr. @ US-95 From: Grand Canyon Dr. To: Fort Apache Rd.<br />
Description: Construct 6-lane overpass with an interchange at US.95<br />
FYComplete: 2011 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$42,345,268<br />
CL200476<br />
Q10 High Speed Lane Miles Program $4,280,000 $15,000,000 $0 $0<br />
RTC Gas Tax - Area-Wide Program $16,043,000 $2,916,000 $0 $0<br />
SAFETEA-LU High Priority Projects $4,106,268 $0<br />
$0 $0<br />
Project # 4267 Location: Kyle Canyon Rd. From: at US.95 To:<br />
Description: PE and RoW for interchange at Kyle Canyon Rd and US95<br />
FYComplete: 2012<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $6,854,000<br />
RTC Gas Tax $1,000,000 $2,927,000 $2,927,000 $0<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 23
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
City of Las Vegas<br />
Table 1: Projects by Sponsoring Entity<br />
Project # 1578 Location: Rainbow Blvd. From: Desert Inn Rd. To: US-95<br />
Description: Intersection improvements at Desert Inn Rd, Oakey Blvd, Charleston Blvd and Alta Dr.<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$7,350,000<br />
CL200669<br />
CMAQ $2,600,000 $900,000 $0 $0<br />
Q10 Bus Turnout Program $1,500,000 $0<br />
$0 $0<br />
Q10 High Speed Lane Miles Program $200,000 $2,150,000 $0 $0<br />
Project # 1579 Location: Rainbow Blvd. From: at Sahara Ave To:<br />
Description: Intersection improvements<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$5,300,000<br />
CL200902<br />
CMAQ $0 $3,100,000 $0 $0<br />
Q10 High Speed Lane Miles Program $0 $800,000 $1,400,000 $0<br />
Project # 2708 Location: Rancho Dr. From: Sahara Ave. To: Rainbow Blvd.<br />
Description: Signal interconnects and timing infrastructure<br />
FYComplete: 2010 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$5,480,000<br />
CL200837<br />
CMAQ $5,480,000 $0<br />
$0 $0<br />
Project # 4263 Location: Sheep Mountain Pkwy. From: @ US-95 & CC-215 Western Beltway To:<br />
Description: PE and right-of-way for the construction of interchanges<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $14,999,000<br />
RTC Gas Tax - Area-Wide Program $14,999,000 $0<br />
$0 $0<br />
Project # 4271 Location: Sheep Mountain Pkwy. From: CC-215 Western Beltway near Ann Rd To: I-15 North<br />
Description: Reserve Right-of-Way for future roadway<br />
FYComplete: 2011<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $0<br />
City of Las Vegas (BLM Reservation) $0 $0<br />
$0 $0<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 24
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
City of Las Vegas<br />
Table 1: Projects by Sponsoring Entity<br />
Project # 4027 Location: Sheep Mountian Pkwy. From: CC-215 Western Beltway near Ann Rd To: I-15<br />
Description: PE and NEPA process/environmental assessment for new roadway<br />
FYComplete: 2009<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$9,356,000<br />
CL20090151<br />
FY08 Appropriations Act, S.129 $735,000 $0<br />
$0 $0<br />
Q10 High Speed Lane Miles Program $5,353,000 $600,000 $0 $0<br />
RTC Gas Tax $2,668,000 $0<br />
$0 $0<br />
Project # 4089 Location: Stewart Ave From: Main St. To: Maryland Parkway<br />
Description: Landscaping and roadway rehabilitation<br />
FYComplete: 2009 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $3,424,000<br />
RTC Gas Tax $924,000 $1,900,000 $0 $0<br />
STP Enhancements $600,000 $0<br />
$0 $0<br />
Project # 894 Location: Summerlin Pkwy. From: CC-215 Western Beltway To: US-95<br />
Description: Widen to 8 lanes<br />
FYComplete: 2015<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$3,560,000<br />
CL200668<br />
Q10 High Speed Lane Miles Program $560,000 $0<br />
$0 $3,000,000<br />
Total for City of Las Vegas $72,609,268 $35,857,000 $4,327,000 $3,000,000 Total Scheduled: $115,793,268<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 25
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Las Vegas Monorail Company<br />
Table 1: Projects by Sponsoring Entity<br />
Project # 4200 Location: Las Vegas Monorail From: McCarren International Airport To: MGM Hotel Monorail Station<br />
Description: Design/permit/construct dual quideway monorail from the existing Las Vegas Monorail Station<br />
FYComplete: 2012 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $450,000,000<br />
LVMC funding $150,000,000 $75,000,000 $75,000,000 $50,000,000<br />
TIFIA $0 $25,000,000 $25,000,000 $50,000,000<br />
Total for Las Vegas Monorail Company $150,000,000 $100,000,000 $100,000,000 $100,000,000 Total Scheduled: $450,000,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 26
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
City of Mesquite<br />
Table 1: Projects by Sponsoring Entity<br />
Project # 961 Location: I-15 From: @ Mile Post 108 To:<br />
Description: Construct new interchange to serve Mesquite Airport<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$6,843,780<br />
CL200603<br />
SAFETEA-LU High Priority Projects $6,843,780 $0<br />
$0 $0<br />
Project # 4140 Location: I-15 From: @ Mile Post 118 Pioneer Blvd.<br />
To:<br />
Extension<br />
Description: Construct new interchange (PE)<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$4,684,378<br />
CL200801<br />
Local Funds $4,000,000 $0<br />
$0 $0<br />
SAFETEA-LU High Priority Projects $684,378 $0<br />
$0 $0<br />
Total for City of Mesquite $11,528,158 $0 $0 $0<br />
Total Scheduled: $11,528,158<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 27
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Nevada Department of <strong>Transportation</strong><br />
Table 1: Projects by Sponsoring Entity<br />
Project # 4158 Location: CC 215 Interchanges From: I-215 from the Airport Connector To: I-15 North<br />
Description: PE for the construction of four regional beltway interchanges<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$1,078,000<br />
CL200923<br />
Public Lands Highways $1,078,000 $0<br />
$0 $0<br />
Project # 163 Location: FAST Freeway Management <strong>System</strong> From: To:<br />
Description: Institution and operation of a Freeway & Arterial Management <strong>System</strong> of <strong>Transportation</strong> (FAST) (PE, RW, Const.) FYComplete: 2012<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$39,000,000<br />
CL2000104<br />
National Highway <strong>System</strong> $1,500,000 $1,500,000 $1,500,000 $1,500,000<br />
NDOT State Gas Tax $32,000,000 $0<br />
$0 $0<br />
SAFETEA-LU High Priority Projects $1,000,000 $0<br />
$0 $0<br />
Project # 235 Location: Freeway Service Patrol From: To:<br />
Description: Operation of a motorist assistance program on I-15 from the Jean Interchange to the Apex Interchange and on US 95/I-<br />
515 from Railroad Pass to SR.157<br />
FYComplete: 2030<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$6,000,000<br />
CL2003128<br />
National Highway <strong>System</strong> $1,500,000 $1,500,000 $1,500,000 $1,500,000<br />
Project # 166 Location: I-15 From: I-515/US-95 Interchange (Spaghetti To: SR.573 Craig Rd.<br />
Bowl)<br />
Description: Widen from 6 to 10 lanes from US 95/I-515 to Lake Mead Blvd.; Widen from 4 to 8 Lanes from Lake Mead Blvd. to SR<br />
573 Craig Road.<br />
FYComplete: 2011 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$7,000,000<br />
CL200473<br />
Public Lands Highways $7,000,000 $0<br />
$0 $0<br />
Project # 4023 Location: I-15 From: Las Vegas Valley To:<br />
Description: PE and Right-of-Way for various widening and interchange improvements<br />
FYComplete: 2012<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$6,843,780<br />
CL200804<br />
SAFETEA-LU High Priority Projects $6,843,780 $0<br />
$0 $0<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 28
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Nevada Department of <strong>Transportation</strong><br />
Table 1: Projects by Sponsoring Entity<br />
Project # 4138 Location: I-15 From: Sahara Ave. To: I-515/US 95 Interchange (Spaghetti<br />
Bowl)<br />
Description: PE and Right-of-Way for widening to 10 lanes, to include HOV lanes, plus auxiliary lanes and collector/distributer roads FYComplete: 2010 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$5,000,000<br />
CL200365<br />
National Highway <strong>System</strong> $5,000,000 $0<br />
$0 $0<br />
Project # 4142 Location: I-15 From: Russell Rd. To: Sahara Ave.<br />
Description: Widen from 8 to 10 lanes including 2 express lanes each way and 3 general purpose lanes each way<br />
FYComplete: 2010 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $3,000,000<br />
Public Lands Highways $3,000,000 $0<br />
$0 $0<br />
Project # 4159 Location: I-15 From: at US 93 (North) To:<br />
Description: PE for construction of an interchange<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$686,000<br />
CL200922<br />
Public Lands Highways $686,000 $0<br />
$0 $0<br />
Project # 4270 Location: I-15 From: SR.573 Craig Rd To: Speedway Blvd<br />
Description: PE for widening to 6 lanes<br />
FYComplete: 2011 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$980,000<br />
CL200916<br />
<strong>Transportation</strong>, Community & <strong>System</strong> Preservation $980,000 $0<br />
$0 $0<br />
Project # 4151 Location: I-15 / US 95 From: I-15 south of Oakey Blvd To: US 95 east of Rancho Dr<br />
Description: Project Neon Phase 1: PE for the construction of system-to-system direct connect HOV ramps, including add/drop<br />
lanes at Oakey/Wyoming<br />
FYComplete: 2010 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$15,000,000<br />
CL201203<br />
AB 595 Bonded $15,000,000 $0<br />
$0 $0<br />
Project # 4157 Location: I-15 Corridor Study From: CA stateline To: Mesquite<br />
Description: Corridor Study, NV<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$245,000<br />
CL200924<br />
Public Lands Highways $245,000 $0<br />
$0 $0<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 29
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Nevada Department of <strong>Transportation</strong><br />
Table 1: Projects by Sponsoring Entity<br />
Project # 246 Location: I-15 South Design Build From: SR 160 Blue Diamond Rd. To: Tropicana Ave.<br />
Description: Phase 1: Widen from 6 to 8 lanes, to include HOV lanes and auxiliary lanes<br />
FYComplete: 2012 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$272,980,000<br />
CL200917<br />
Anticipated appropriations $980,000 $0<br />
$0 $0<br />
LVCVA Bonded $272,000,000 $0<br />
$0 $0<br />
Project # 4253 Location: I-215/ SR 564 (Lake Mead Pkwy.) From: I-215 @ Green Valley Pkwy. To: SR.564 @ Boulder Hwy<br />
Description: Develop and integrate ITS infrastructure<br />
FYComplete: 2010 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$4,887,000<br />
CL20110006<br />
CMAQ $4,887,000 $0<br />
$0 $0<br />
Project # 203 Location: I-515 From: Foothills Grade Separation To: I-15 / US 95 Interchange (Spaghetti<br />
Bowl)<br />
Description: Conduct NEPA process and preliminary engineering<br />
FYComplete: 2009 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$4,000,000<br />
CL200354<br />
National Highway <strong>System</strong> $0 $4,000,000 $0 $0<br />
Project # 4155 Location: I-515 From: I-215 To: SR 159 Charleston Blvd.<br />
Description: FAST package B1: ITS infrastructure<br />
FYComplete: 2011 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$12,000,000<br />
CL201004<br />
CMAQ $0 $7,000,000 $5,000,000 $0<br />
Project # 4156 Location: I-515 From: I-215 To: SR 159 Charleston Blvd.<br />
Description: FAST package B2: ITS infrastructure<br />
FYComplete: 2012 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$10,000,000<br />
CL200925<br />
CMAQ $0 $0<br />
$2,000,000 $8,000,000<br />
Project # 2904 Location: Inter-city passenger rail From: Los Angeles To: Las Vegas<br />
Description: Acquisition of conventional passenger rail equipment<br />
FYComplete: 2012 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$3,000,000<br />
CL20100115<br />
Federal Railroad Administration $0 $3,000,000 $0 $0<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 30
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Nevada Department of <strong>Transportation</strong><br />
Table 1: Projects by Sponsoring Entity<br />
Project # 4244 Location: Kyle Canyon Rd. From: To:<br />
Description: Replace Bridge<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$3,100,000<br />
CL20090150<br />
Federal Lands Highways $2,300,000 $800,000 $0 $0<br />
Project # 4246 Location: Lake Mead NRA; PRA LAME 1 (10) From: Northshore Rd. To:<br />
Description: Rehabiltate<br />
FYComplete: 2011<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$12,610,000<br />
CL201104<br />
Federal Lands Highways $0 $0<br />
$10,000 $12,600,000<br />
Project # 4245 Location: Lake Mead NRA; PRA LAME 1 (9) & 11 (1) From: Northshore and Echo Bay Access Rds. To:<br />
Description: Rehabiltate<br />
FYComplete: 2012<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$13,300,000<br />
CL201005<br />
Federal Lands Highways $0 $12,700,000 $600,000 $0<br />
Project # 4147 Location: Martin Luther King Blvd. / Industrial Rd. Connector Proje From: Industrial Rd. south of Wyoming Ave To: M.L.King Blvd. at Palomino Ln.<br />
Description: Preliminary Engineering and Right-of-Way for a 6-lane overpass across I-15 with grade separation at Oakey/Wyoming FYComplete: 2011 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$14,343,780<br />
CL200002<br />
AB 595 Bonded $0 $0<br />
$7,500,000 $0<br />
SAFETEA-LU High Priority Projects $6,843,780 $0<br />
$0 $0<br />
Project # 4243 Location: Northshore Rd. (Lake Mead NRA) From: Northshore Road and Various Routes To:<br />
Description: Rehabilitate Mile 26-40 (Construction Engineering)<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$1,200,000<br />
CL200480<br />
Federal Lands Highways $800,000 $400,000 $0 $0<br />
Project # 4028 Location: SR 160 Blue Diamond Rd. From: Durango Dr. To: SR.159 Red Rock Canyon Road<br />
Description: Widen from 2 to 4 lanes with a raised median island<br />
FYComplete: 2012 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$12,500,000<br />
CL200745<br />
NDOT State Gas Tax $12,500,000 $0<br />
$0 $0<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 31
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Nevada Department of <strong>Transportation</strong><br />
Table 1: Projects by Sponsoring Entity<br />
Project # 4238 Location: SR 160 Blue Diamond Rd. From: Rainbow Blvd. To: Durango Dr.<br />
Description: Widen from 2 to 4 lanes<br />
FYComplete: 2011 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $3,500,000<br />
Private Developers $0 $0<br />
$3,500,000 $0<br />
Project # 4018 Location: SR 160 Pahrump Valley Rd. From: SR.159 Red Rock Canyon Road To: Mountain Springs<br />
Description: Widen from 2 to 4 Lanes<br />
FYComplete: 2013 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$108,370,000<br />
CL200749<br />
Nevada State General Funds $0 $0<br />
$16,000,000 $0<br />
Private Developers $0 $0<br />
$89,000,000 $0<br />
Public Lands Highways $1,470,000 $0<br />
$0 $0<br />
STP Clark County $1,000,000 $0<br />
$0 $0<br />
STP Statewide $900,000 $0<br />
$0 $0<br />
Project # 179 Location: US 93 Boulder City Corridor From: 0.5 mi east of Lake Shore Dr. To: Foothills Grade Separation<br />
Description: Preliminary Engineering and right-of-way for a 4-lane freeway<br />
FYComplete: 2007 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$27,758,801<br />
CL200802<br />
FY08 Appropriations Act, S.129 $245,000 $0<br />
$0 $0<br />
SAFETEA-LU High Priority Projects $4,843,780 $0<br />
$0 $0<br />
SAFETEA-LU <strong>Transportation</strong> Improvements $22,670,021 $0<br />
$0 $0<br />
Project # 252 Location: US 93 Hoover Dam Bypass (Mike O' Callaghan - Pat Till From: 1.8 mile east of Colorado River (AZ) To: 2.1 mile west of Colorado River (<br />
NV)<br />
Description: Surfacing, signing & guardrails<br />
FYComplete: 2011 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$14,960,000<br />
CL200650<br />
Federal Lands Highways $0 $13,000,000 $0 $0<br />
Public Lands Highways $0 $1,960,000 $0 $0<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 32
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Nevada Department of <strong>Transportation</strong><br />
Table 1: Projects by Sponsoring Entity<br />
Project # 4139 Location: US 93/95 From: US 93/95 Jct. To: Foothills Grade Separation<br />
Description: Boulder City Corridor Phase 1: PE and right-of-way for the construction of a new freeway<br />
FYComplete: 2010 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$6,992,000<br />
CL200802<br />
FY04 Appropriations Act, S.115 $6,000,000 $0<br />
$0 $0<br />
Public Lands Highways $992,000 $0<br />
$0 $0<br />
Project # 4019 Location: US 95 North From: Martin Luther King Boulevard To: Rainbow Interchange<br />
Description: Landscaping<br />
FYComplete: 2009 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$10,000,000<br />
CL2007103<br />
NDOT Bonded Funds $10,000,000 $0<br />
$0 $0<br />
Project # 4030 Location: US 95 Sierra Club Lawsuit Settlement Agreement From: To:<br />
Description: Nationwide MSAT Study (PE)<br />
FYComplete: 2009<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$700,000<br />
CL2007105<br />
National Highway <strong>System</strong> $700,000 $0<br />
$0 $0<br />
Project # 201 Location: US 95 South From: CA State Line To: SR 163 Laughlin Hwy.<br />
Description: Widen to a 4-lane divided highway<br />
FYComplete: 2011 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$5,000,000<br />
CL201001<br />
NDOT State Gas Tax $0 $5,000,000 $0 $0<br />
Project # 256 Location: US-95 North From: SR 578 Washington Av. To: Ann Rd.<br />
Description: US-95 North Package 1: Widen from 6 to 8 lanes, to include HOV lanes add auxiliary lanes. Braid both the northbound<br />
and southbound ramps at the Rancho/Ann Rd. interchange. (PE, RW, Const.)<br />
FYComplete: 2013<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$156,463,332<br />
CL200661<br />
AB 595 Bonded $0 $0<br />
$145,000,000 $0<br />
SAFETEA-LU High Priority Projects $11,463,332 $0<br />
$0 $0<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 33
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Nevada Department of <strong>Transportation</strong><br />
Table 1: Projects by Sponsoring Entity<br />
Project # 257 Location: US-95 North From: Ann Rd. To: SR.157 Kyle Canyon Rd.<br />
Description: US-95 North Package 2: Ann to Centennial: Widen from 6 to 8 lanes. Add auxiliary lanes. Centennial to Durango:<br />
Widen from 4 to 8 lanes. Durango to Kyle Canyon: Widen from 4 to 6 lanes. (PE.)<br />
FYComplete: 2011 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$4,000,000<br />
CL201101<br />
AB 595 Bonded $0 $0<br />
$0 $4,000,000<br />
Project # 239 Location: Warm Springs Rd. From: Dean Martin Drive To: SR.604 Las Vegas Blvd. South<br />
Description: SR-160 Phase 3: Construct a new 6-lane roadway with sidewalk and bicycle facilities and a grade separation over I-15 FYComplete: 2009 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$14,000,000<br />
CL200503<br />
NDOT State Gas Tax $0 $7,000,000 $0 $0<br />
STP Statewide $0 $7,000,000 $0 $0<br />
Total for Nevada Department of <strong>Transportation</strong> $436,427,693 $64,860,000 $271,610,000 $27,600,000 Total Scheduled: $800,497,693<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 34
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
City of North Las Vegas<br />
Table 1: Projects by Sponsoring Entity<br />
Project # 1581 Location: Cheyenne Ave. From: at Commerce St. To:<br />
Description: Traffic Signal Modifications<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$300,000<br />
CL200670<br />
STP Clark County $300,000 $0<br />
$0 $0<br />
Project # 4145 Location: Cheyenne Ave. From: US 95 To: Nellis Blvd.<br />
Description: Restripe to 6 lanes, where possible<br />
FYComplete: 2010 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$13,000,000<br />
CL200362<br />
NDOT State Gas Tax $2,000,000 $0<br />
$0 $0<br />
STP Clark County $11,000,000 $0<br />
$0 $0<br />
Project # 140 Location: City of North Las Vegas - various locations From: To:<br />
Description: Modify traffic signals and lane configuration to construct dual lefts at Las Vegas Blvd./Civic Center Dr., Las Vegas<br />
Blvd./Carey Ave. & Civic Center Dr./Carey Ave.<br />
FYComplete: 2009<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$1,115,000<br />
CL200518<br />
STP Clark County $1,115,000 $0<br />
$0 $0<br />
Project # 1582 Location: Craig Rd From: Revere St. To: North 5th St.<br />
Description: Median landscaping<br />
FYComplete: 2009 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $595,000<br />
STP Enhancements $595,000 $0<br />
$0 $0<br />
Project # 4035 Location: North 5th St. From: Owens Ave. To: Cheyenne Ave.<br />
Description: Construct 8-lane roadway with overpass at I-15 and new interchange at Cheyenne Ave, including transit lanes, gradeseparated<br />
pedestrian crossings and multi-use trails; Reconfigure Main St./Owens Ave./Las Vegas Blvd. intersections.<br />
FYComplete: 2012 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $105,368,130<br />
Q10 High Speed Lane Miles Program $24,319,130 $20,000,000 $40,000,000 $18,291,000<br />
RTC Gas Tax $0 $2,758,000 $0 $0<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 35
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
City of North Las Vegas<br />
Table 1: Projects by Sponsoring Entity<br />
Project # 143 Location: SR 573 Craig Rd @ I-15 From: Berg St. To: Pecos Rd.<br />
Description: Widen from 4 to 6 lanes with a Railroad Grade Separation and Interchange Improvements<br />
FYComplete: 2009 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$21,851,449<br />
CL199710<br />
Public Lands Highways $490,000 $0<br />
$0 $0<br />
RTC Gas Tax $5,500,000 $500,000 $0 $0<br />
RTC Gas Tax - Area-Wide Program $9,166,000 $0<br />
$0 $0<br />
SAFETEA-LU <strong>Transportation</strong> Improvements $6,195,449 $0<br />
$0 $0<br />
Total for City of North Las Vegas $60,680,579 $23,258,000 $40,000,000 $18,291,000 Total Scheduled: $142,229,579<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 36
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
<strong>Regional</strong> <strong>Transportation</strong> Commission<br />
Table 1: Projects by Sponsoring Entity<br />
Project # 2020 Location: Boulder Hwy: Bus Rapid Transit From: College Dr To: Downtown Las Vegas<br />
Description: Roadway reconstruction and intersection improvements to accommodate Rapid Transit operations in the Boulder Hwy<br />
corridor<br />
FYComplete: 2012 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $66,125,000<br />
FTA S.5307 Formula $0 $18,500,000 $0 $0<br />
Q10 RTC Projects $500,000 $14,500,000 $28,000,000 $0<br />
RTC Sales Tax $0 $4,625,000 $0 $0<br />
Project # 2022 Location: Boulder Hwy: Bus Rapid Transit From: College Dr To: Downtown Las Vegas<br />
Description: Construct shelters and ancillary equipment for Rapid Transit operations in the Boulder Hwy corridor<br />
FYComplete: 2012 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $5,564,300<br />
FTA S.5307 Formula $0 $0<br />
$4,000,000 $0<br />
FTA S.5309 Bus Discretionary $451,440 $0<br />
$0 $0<br />
RTC Sales Tax $112,860 $0<br />
$1,000,000 $0<br />
Project # 1508 Location: BPE On-Street Bike Projects: 2009-12 From: To:<br />
Description: Installation of Bicycle Lanes & Routes in Various Locations<br />
FYComplete: 2009<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $6,900,000<br />
Q10 Bicycle Lane Program $2,400,000 $1,500,000 $1,500,000 $1,500,000<br />
Project # 1569 Location: Bus fleet From: To:<br />
Description: Install triple bike racks on fixed-route transit vehicles<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$150,000<br />
CL2006114<br />
CMAQ $150,000 $0<br />
$0 $0<br />
Project # 2048 Location: Bus fleet replacement program From: To:<br />
Description: Acquire 78 buses for the fixed-route bus replacement program<br />
FYComplete: 2012<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $47,351,000<br />
FTA S.5307 Formula $11,667,200 $0<br />
$10,240,000 $15,973,600<br />
RTC Sales Tax $2,916,800 $0<br />
$2,560,000 $3,993,400<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 37
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
<strong>Regional</strong> <strong>Transportation</strong> Commission<br />
Table 1: Projects by Sponsoring Entity<br />
Project # 2006 Location: Bus Rapid Transit - fleet expansion From: To:<br />
Description: Acquire 50 vehicles for the expansion of the Ace Rapid Transit fleet<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $60,000,000<br />
RTC Sales Tax $18,000,000 $42,000,000 $0 $0<br />
Project # 2010 Location: Central City Intermodal <strong>Transportation</strong> Terminal From: To:<br />
Description: Development of a new intermodal transportation center to serve downtown Las Vegas<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $6,417,521<br />
FTA S.5307 Formula $2,682,697 $0<br />
$0 $0<br />
FTA S.5309 Bus Discretionary $2,451,320 $0<br />
$0 $0<br />
RTC Sales Tax $1,283,504 $0<br />
$0 $0<br />
Project # 2807 Location: Clark County From: To:<br />
Description: Development and operation of a same day paratransit service<br />
FYComplete: 2012<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $351,350<br />
FTA S.5317 "New Freedom" $175,675 $0<br />
$0 $0<br />
Local Funds $175,675 $0<br />
$0 $0<br />
Project # 2703 Location: Durango Dr. From: @ Westcillf Dr. To:<br />
Description: Develop a park-and-ride lot, including transit passenger facilities, to serve the Summerlin Pkwy corridor<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$3,978,000<br />
CL200664<br />
FTA S.5307 Formula $3,182,400 $0<br />
$0 $0<br />
RTC Sales Tax $795,600 $0<br />
$0 $0<br />
Project # 2744 Location: Las Vegas Area From: To:<br />
Description: <strong>Regional</strong> Intersection Traffic Flow Improvements<br />
FYComplete: 2030<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$3,150,000<br />
CL20110006<br />
CMAQ $0 $0<br />
$500,000 $550,000<br />
STP Clark County $0 $0<br />
$1,000,000 $1,100,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 38
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
<strong>Regional</strong> <strong>Transportation</strong> Commission<br />
Table 1: Projects by Sponsoring Entity<br />
Project # 2745 Location: Las Vegas Area From: To:<br />
Description: <strong>Regional</strong> Pedestrian Realm Enhancements<br />
FYComplete: 2030<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$2,100,000<br />
CL20120003<br />
CMAQ $0 $0<br />
$0 $1,100,000<br />
STP Clark County $0 $0<br />
$0 $1,000,000<br />
Project # 2748 Location: Las Vegas Area From: To:<br />
Description: Electric Bike Pilot Project in downtown Las Vegas<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$100,000<br />
CL20090156<br />
CMAQ $100,000 $0<br />
$0 $0<br />
Project # 2801 Location: Las Vegas Area From: To:<br />
Description: Projects to be selected under the RTC Coordinated Public Transit - Human Services <strong>Transportation</strong> Plan<br />
FYComplete: 2012<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $4,907,504<br />
FTA S.5316 Job Access and Reverse Commute $0 $786,056 $817,498 $850,198<br />
Local Funds $0 $786,056 $817,498 $850,198<br />
Project # 2802 Location: Las Vegas Area From: To:<br />
Description: Projects to be selected under the RTC Coordinated Public Transit - Human Services <strong>Transportation</strong> Plan<br />
FYComplete: 2012<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $1,979,024<br />
FTA S.5317 "New Freedom" $0 $507,182 $527,469 $548,568<br />
Local Funds $0 $126,796 $131,867 $137,142<br />
Project # 2805 Location: Las Vegas Area From: To:<br />
Description: Institute regular paratransit service for disabled workers<br />
FYComplete: 2012<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $1,511,646<br />
FTA S.5316 Job Access and Reverse Commute $755,823 $0<br />
$0 $0<br />
Local Funds $755,823 $0<br />
$0 $0<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 39
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
<strong>Regional</strong> <strong>Transportation</strong> Commission<br />
Table 1: Projects by Sponsoring Entity<br />
Project # 2806 Location: Las Vegas Area From: To:<br />
Description: Development and operation of a centralized information and referral service for human services transportation clients. FYComplete: 2012<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $390,000<br />
FTA S.5317 "New Freedom" $312,000 $0<br />
$0 $0<br />
Local Funds $78,000 $0<br />
$0 $0<br />
Project # 2603 Location: Las Vegas Blvd From: Sunset Rd To: Downtown Las Vegas<br />
Description: Upgrade transit shelters, TVMs and security systems at selected transit stops on the Las Vegas Strip<br />
FYComplete: 2010 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $600,000<br />
FTA S.5307 Formula Enhancements $480,000 $0<br />
$0 $0<br />
RTC Sales Tax $120,000 $0<br />
$0 $0<br />
Project # 3001 Location: Laughlin From: Needles Hwy. To: Bullhead City, AZ<br />
Description: Planning and NEPA process for new Colorado River crossing<br />
FYComplete: 2010 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$2,566,418<br />
CL2006108<br />
SAFETEA-LU High Priority Projects $2,566,418 $0<br />
$0 $0<br />
Project # 2905 Location: Laughlin / Mesquite From: To:<br />
Description: Acquire two senior transportation vehicles for SNTC operations<br />
FYComplete: 0<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $122,500<br />
FTA S.5309 Bus Discretionary $98,000 $0<br />
$0 $0<br />
RTC Sales Tax $24,500 $0<br />
$0 $0<br />
Project # 2033 Location: Paratransit fleet expansion From: To:<br />
Description: Acquire 22 vehicles for the expansion of paratransit operations.<br />
FYComplete: 2009<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $2,004,000<br />
FTA S.5307 Formula $1,603,200 $0<br />
$0 $0<br />
RTC Sales Tax $400,800 $0<br />
$0 $0<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 40
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
<strong>Regional</strong> <strong>Transportation</strong> Commission<br />
Table 1: Projects by Sponsoring Entity<br />
Project # 2055 Location: Paratransit fleet expansion From: To:<br />
Description: Acquire 60 vehicles for the expansion of paratransit operations.<br />
FYComplete: 2012<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $5,370,000<br />
FTA S.5307 Formula $980,800 $545,600 $1,361,600 $1,408,000<br />
RTC Sales Tax $245,200 $136,400 $340,400 $352,000<br />
Project # 2052 Location: Paratransit fleet replacement From: To:<br />
Description: Acquire 257 vehicles for the paratransit fleet replacement program<br />
FYComplete: 2012<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $26,775,000<br />
FTA S.5307 Formula $3,668,800 $3,520,000 $8,320,800 $5,910,400<br />
RTC Sales Tax $917,200 $880,000 $2,080,200 $1,477,600<br />
Project # 2706 Location: Park-and-Ride lots - various locations From: To:<br />
Description: Development of park-and-ride lots<br />
FYComplete: 2015<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$6,000,000<br />
CL200903<br />
FTA S.5307 Formula $0 $2,400,000 $0 $2,400,000<br />
RTC Sales Tax $0 $600,000 $0 $600,000<br />
Project # 2051 Location: <strong>Regional</strong> express transit system development From: various locations To:<br />
Description: Operating support for freeway express transit routes<br />
FYComplete: 2017<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$400,000<br />
CL20120004<br />
CMAQ $0 $0<br />
$0 $400,000<br />
Project # 2046 Location: <strong>Regional</strong> transit bus stop and shelter program From: To:<br />
Description: Enhancements to transit shelters including TVMs, signage, passenger amenities, landscaping and related sidewalk<br />
improvements<br />
FYComplete: 2012<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $1,140,000<br />
FTA S.5307 Formula Enhancements $0 $296,000 $304,000 $312,000<br />
RTC Sales Tax $0 $74,000 $76,000 $78,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 41
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
<strong>Regional</strong> <strong>Transportation</strong> Commission<br />
Table 1: Projects by Sponsoring Entity<br />
Project # 2602 Location: <strong>Regional</strong> transit system facilities From: various locations To:<br />
Description: Upgrade and replacement of security systems at RTC facilities<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $360,000<br />
FTA S.5307 Formula Security $288,000 $0<br />
$0 $0<br />
RTC Sales Tax $72,000 $0<br />
$0 $0<br />
Project # 2601 Location: <strong>Regional</strong> transit system security systems From: various locations To:<br />
Description: Security systems for the regional transit system<br />
FYComplete: 2030<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $1,140,000<br />
FTA S.5307 Formula Security $0 $296,000 $304,000 $312,000<br />
RTC Sales Tax $0 $74,000 $76,000 $78,000<br />
Project # 4265 Location: Southern Nevada FAST <strong>System</strong> From: To:<br />
Description: ITS and signal timing coordination on regional freeway and arterial roadways<br />
FYComplete: 2030<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$6,000,000<br />
CL20110007<br />
CMAQ $0 $0<br />
$3,000,000 $3,000,000<br />
Project # 2019 Location: Summerlin Center From: To:<br />
Description: Installation of transit shelters and ancillary equipment at the Summerlin Transit Center<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $600,000<br />
FTA S.5307 Formula Enhancements $0 $480,000 $0 $0<br />
RTC Sales Tax $0 $120,000 $0 $0<br />
Project # 2012 Location: Sunset Rd. From: east of Decatur Blvd. To:<br />
Description: Development of the Sunset Transit Maintenance Facility<br />
FYComplete: 2009<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $9,749,476<br />
FTA S.5309 Bus Discretionary $5,352,853 $0<br />
$0 $0<br />
FTA S.5309 New Starts $992,000 $0<br />
$0 $0<br />
FY02 Appropriations Act, S.330 $500,000 $0<br />
$0 $0<br />
FY04 Appropriations Act, S.115 $1,000,000 $0<br />
$0 $0<br />
RTC Sales Tax $1,904,623 $0<br />
$0 $0<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 42
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
<strong>Regional</strong> <strong>Transportation</strong> Commission<br />
Table 1: Projects by Sponsoring Entity<br />
Project # 210 Location: TDM Program From: To:<br />
Description: <strong>Transportation</strong> Demand Management products and services that promote the reduction of Single Occupant Vehicles on<br />
the region's roads in order to improve traffic congestion and air quality<br />
FYComplete:<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$5,320,000<br />
CL200308-L<br />
CMAQ $385,000 $396,000 $402,000 $408,000<br />
RTC Sales Tax $183,000 $184,800 $187,600 $190,400<br />
STP Clark County $732,000 $739,200 $750,400 $761,600<br />
Project # 2742 Location: University of Nevada Las Vegas From: To:<br />
Description: Bike Locker Program<br />
FYComplete: 2012<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$100,000<br />
CL20090157<br />
CMAQ $100,000 $0<br />
$0 $0<br />
Project # 2803 Location: University of Nevada Las Vegas From: To:<br />
Description: Construct a bus transfer center to serve the main UNLV campus<br />
FYComplete: 2013<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $2,000,000<br />
FTA S.5307 Formula $0 $0<br />
$1,600,000 $0<br />
RTC Sales Tax $0 $0<br />
$400,000 $0<br />
Project # 2701 Location: US 95 From: @ Durango Dr To:<br />
Description: Develop of a park-and-ride lot, including transit passenger facilities, to serve the US.95 corridor.<br />
FYComplete: 2010<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$4,000,000<br />
CL200610<br />
FTA S.5307 Formula $3,200,000 $0<br />
$0 $0<br />
RTC Sales Tax $800,000 $0<br />
$0 $0<br />
Project # 2005 Location: US 95: Express transit service From: Durango Dr To: Downtown Las Vegas<br />
Description: Operating support for freeway express transit routes<br />
FYComplete: 2013 PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012<br />
Total Scheduled:<br />
$2,950,000<br />
CL2008104<br />
CMAQ $1,950,000 $0<br />
$0 $1,000,000<br />
Total for <strong>Regional</strong> <strong>Transportation</strong> Commission $77,511,211 $94,073,090 $70,297,332 $46,291,106 Total Scheduled: $288,172,739<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 43
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Southern Nevada Transit Coalition<br />
Table 1: Projects by Sponsoring Entity<br />
Project # 2809 Location: Clark and Nye Counties From: To:<br />
Description: Operating and administrative support for transit operations between Pahrump and Las Vegas<br />
FYComplete: 2012<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $1,663,223<br />
FTA S.5311 Non-Urbanized Area Formula $358,376 $394,214 $433,635 $476,998<br />
Project # 2903 Location: Laughlin From: To:<br />
Description: Development and construction of building for Southern Nevada Transit Coalition public transit operations<br />
FYComplete: 2009<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $1,160,000<br />
Colorado River Commission $1,000,000 $0<br />
$0 $0<br />
FTA S.5309 Bus Discretionary $100,000 $0<br />
$0 $0<br />
Local Funds $60,000 $0<br />
$0 $0<br />
Project # 2808 Location: Laughlin / Mesquite From: To:<br />
Description: Operating and administrative support for transit operations in Mesquite and Laughlin<br />
FYComplete: 2012<br />
PE ROW CON<br />
Fund Sources FY2009 FY2010 FY2011 FY2012 Total Scheduled: $4,717,577<br />
FTA S.5311 Non-Urbanized Area Formula $1,016,500 $1,118,150 $1,229,965 $1,352,962<br />
Total for Southern Nevada Transit Coalition $2,534,876 $1,512,364 $1,663,600 $1,829,960 Total Scheduled: $7,540,800<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T1 - 44
FUND SOURCE ORDER LISTED IN TABLE-2<br />
Surface <strong>Transportation</strong> Program (STP) Clark County<br />
Congestion Mitigation and Air Quality (CMAQ)<br />
AB 595 Bonded<br />
Clark County Department of Aviation (CCDOA)<br />
Clark County Department of Aviation and FAA Combination<br />
Clark County Beltway Program<br />
Colorado River Commission<br />
FTA 5307 Formula<br />
FTA 5307 Formula Enhancements<br />
FTA 5307 Formula Security<br />
FTA 5309 Bus Discretionary<br />
FTA 5309 New Starts<br />
FTA 5316 Job Access and Reverse Commute Program<br />
FTA 5317 New Freedom<br />
Local Funds<br />
LVCVA Bonded<br />
Private Developers<br />
Q10 Bicycle Lane Program<br />
Q10 High Speed Lane Miles Program<br />
Q10 Traffic Signals and ITS Programs<br />
Q10 RTC Projects<br />
RTC Gas Tax<br />
RTC Gas Tax Area-Wide Program<br />
RTC Sales Tax<br />
TIFIA<br />
Western AZ Council of Governments<br />
National Highway <strong>System</strong> (NHS)<br />
STP Statewide<br />
SAFETEA-LU High Priority Projects<br />
SAFETEA-LU <strong>Transportation</strong> Improvements<br />
NDOT Bonded Projects<br />
Federal Lands Highways<br />
Public Lands Highways<br />
Interstate Maintenance Discretionary<br />
Nevada State General Fund<br />
<strong>Transportation</strong>, Community & <strong>System</strong> Preservation<br />
NDOT State Gas Tax<br />
FY 02 Appropriations Act, Section 330<br />
FY 04 Appropriations Act, Section 115 Funding<br />
FY 06 Appropriations Act, Section 112 Funding<br />
FY 08 Appropriations Act, Section 129<br />
Anticipated Appropriations<br />
FTA 5311 Non-Urbanized Area Formula<br />
TRANSPORTATION IMPROVEMENT PROGRAM FOR FY 2009-2012
Federal Railroad Administration<br />
LVMC Funding<br />
STP Enhancements<br />
Q10 Bus Turnout Program<br />
City of Las Vegas (BLM Reservation)<br />
TRANSPORTATION IMPROVEMENT PROGRAM FOR FY 2009-2012
<strong>Regional</strong> <strong>Transportation</strong> Commission of Southern Nevada<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
STP Clark County<br />
Project # :108 Location: Cactus Ave. at I-15<br />
From: Dean Martin Dr.<br />
To: Las Vegas Blvd.<br />
Description: Construct an interchange<br />
Project # :1581 Location: Cheyenne Ave.<br />
From: at Commerce St.<br />
To:<br />
Description: Traffic Signal Modifications<br />
Project # :4145 Location: Cheyenne Ave.<br />
From: US 95<br />
To: Nellis Blvd.<br />
Description: Restripe to 6 lanes, where possible<br />
Project # :140 Location: City of North Las Vegas - various locations<br />
From:<br />
To:<br />
Description: Modify traffic signals and lane configuration to construct dual lefts at Las<br />
Vegas Blvd./Civic Center Dr., Las Vegas Blvd./Carey Ave. & Civic Center<br />
Dr./Carey Ave.<br />
Project # :2744 Location: Las Vegas Area<br />
From:<br />
To:<br />
Description: <strong>Regional</strong> Intersection Traffic Flow Improvements<br />
Project # :2745 Location: Las Vegas Area<br />
From:<br />
To:<br />
Description: <strong>Regional</strong> Pedestrian Realm Enhancements<br />
Project Sponsor: Clark County NDOTID: CL200516 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$9,000,000<br />
FY 2012<br />
$18,000,000<br />
Total Scheduled<br />
$27,000,000<br />
Project Sponsor: North Las Vegas NDOTID: CL200670 PE RoW CONST.<br />
FY 2009<br />
$300,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$300,000<br />
Project Sponsor: North Las Vegas NDOTID: CL200362 PE RoW CONST.<br />
FY 2009<br />
$11,000,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$11,000,000<br />
Project Sponsor: North Las Vegas NDOTID: CL200518 PE RoW CONST.<br />
FY 2009<br />
$1,115,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$1,115,000<br />
Project Sponsor: RTC NDOTID: CL20110006 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$1,000,000<br />
FY 2012<br />
$1,100,000<br />
Total Scheduled<br />
$2,100,000<br />
Project Sponsor: RTC NDOTID: CL20120003 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$1,000,000<br />
Total Scheduled<br />
$1,000,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 51
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :2702 Location: Silverado Ranch Blvd.<br />
From: @ Dean Martin Dr<br />
To:<br />
Description: Develop a park-and-ride lot and related facilities to serve the I-15 South<br />
corridor<br />
Project # :4018 Location: SR 160 Pahrump Valley Rd.<br />
From: SR.159 Red Rock Canyon Road<br />
To: Mountain Springs<br />
Description: Widen from 2 to 4 Lanes<br />
Project # :843 Location: SR 564 Lake Mead Pkwy.<br />
From: Boulder Highway<br />
To: Lake Mead National Recreation Area<br />
Description: Widen to 6 lanes<br />
Project # :112 Location: SR 604 Las Vegas Blvd. South<br />
From: SR 146 St.Rose Pkwy<br />
To: Serene Ave.<br />
Description: Widen to 6 Lanes<br />
Project # :113 Location: SR 604 Las Vegas Blvd. South<br />
From: Serene Ave.<br />
To: Sunset Rd.<br />
Description: Widen to 6 Lanes<br />
Project # :210 Location: TDM Program<br />
From:<br />
To:<br />
Description: <strong>Transportation</strong> Demand Management products and services that promote the<br />
reduction of Single Occupant Vehicles on the region's roads in order to<br />
improve traffic congestion and air quality<br />
Project Sponsor: Clark County NDOTID: CL200667 PE RoW CONST.<br />
FY 2009<br />
$1,000,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$1,000,000<br />
Project Sponsor: NDOT NDOTID: CL200749 PE RoW CONST.<br />
FY 2009<br />
$1,000,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$1,000,000<br />
Project Sponsor: Henderson NDOTID: CL200521 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$14,500,000<br />
FY 2011<br />
$8,000,000<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$22,500,000<br />
Project Sponsor: Clark County NDOTID: CL200613 PE RoW CONST.<br />
FY 2009<br />
$3,500,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$3,500,000<br />
Project Sponsor: Clark County NDOTID: CL200517 PE RoW CONST.<br />
FY 2009<br />
$2,552,182<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$2,552,182<br />
Project Sponsor: RTC NDOTID: CL200308-L PE RoW CONST.<br />
FY 2009<br />
$732,000<br />
FY 2010<br />
$739,200<br />
FY 2011<br />
$750,400<br />
FY 2012<br />
$761,600<br />
Total Scheduled<br />
$2,983,200<br />
Total for STP Clark County $21,199,182 $15,239,200 $18,750,400 $20,861,600<br />
$76,050,382<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 52
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
CMAQ<br />
Project # :1569 Location: Bus fleet<br />
From:<br />
To:<br />
Description: Install triple bike racks on fixed-route transit vehicles<br />
Project # :2709 Location: Durango Dr.<br />
From: CC-215 Southern Beltway<br />
To: Desert Inn Rd.<br />
Description: Signal interconnects and timing infrastructure<br />
Project # :4253 Location: I-215/ SR 564 (Lake Mead Pkwy.)<br />
From: I-215 @ Green Valley Pkwy.<br />
To: SR.564 @ Boulder Hwy<br />
Description: Develop and integrate ITS infrastructure<br />
Project # :4155 Location: I-515<br />
From: I-215<br />
To: SR 159 Charleston Blvd.<br />
Description: FAST package B1: ITS infrastructure<br />
Project # :4156 Location: I-515<br />
From: I-215<br />
To: SR 159 Charleston Blvd.<br />
Description: FAST package B2: ITS infrastructure<br />
Project # :2744 Location: Las Vegas Area<br />
From:<br />
To:<br />
Description: <strong>Regional</strong> Intersection Traffic Flow Improvements<br />
Project # :2745 Location: Las Vegas Area<br />
From:<br />
To:<br />
Description: <strong>Regional</strong> Pedestrian Realm Enhancements<br />
Project Sponsor: RTC NDOTID: CL2006114 PE RoW CONST.<br />
FY 2009<br />
$150,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$150,000<br />
Project Sponsor: Clark County NDOTID: CL200834 PE RoW CONST.<br />
FY 2009<br />
$700,000<br />
FY 2010<br />
$665,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$1,365,000<br />
Project Sponsor: NDOT NDOTID: CL20110006 PE RoW CONST.<br />
FY 2009<br />
$4,887,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$4,887,000<br />
Project Sponsor: NDOT NDOTID: CL201004 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$7,000,000<br />
FY 2011<br />
$5,000,000<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$12,000,000<br />
Project Sponsor: NDOT NDOTID: CL200925 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$2,000,000<br />
FY 2012<br />
$8,000,000<br />
Total Scheduled<br />
$10,000,000<br />
Project Sponsor: RTC NDOTID: CL20110006 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$500,000<br />
FY 2012<br />
$550,000<br />
Total Scheduled<br />
$1,050,000<br />
Project Sponsor: RTC NDOTID: CL20120003 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$1,100,000<br />
Total Scheduled<br />
$1,100,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 53
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :2748 Location: Las Vegas Area<br />
From:<br />
To:<br />
Description: Electric Bike Pilot Project in downtown Las Vegas<br />
Project # :2707 Location: Off-road diesel engine retrofit program<br />
From:<br />
To:<br />
Description: Off-road diesel engine retrofits<br />
Project # :1573 Location: Ozone Non-Attainment Area - Clark County<br />
From:<br />
To:<br />
Description: Various measures to reduce Ozone emissions, to be determined in the Ozone<br />
SIP<br />
Project # :1578 Location: Rainbow Blvd.<br />
From: Desert Inn Rd.<br />
To: US-95<br />
Description: Intersection improvements at Desert Inn Rd, Oakey Blvd, Charleston Blvd and<br />
Alta Dr.<br />
Project # :1579 Location: Rainbow Blvd.<br />
From: at Sahara Ave<br />
To:<br />
Description: Intersection improvements<br />
Project # :2708 Location: Rancho Dr.<br />
From: Sahara Ave.<br />
To: Rainbow Blvd.<br />
Description: Signal interconnects and timing infrastructure<br />
Project # :2051 Location: <strong>Regional</strong> express transit system development<br />
From: various locations<br />
To:<br />
Description: Operating support for freeway express transit routes<br />
Project Sponsor: RTC NDOTID: CL20090156 PE RoW CONST.<br />
FY 2009<br />
$100,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$100,000<br />
Project Sponsor: DAQEM NDOTID: CL200836 PE RoW CONST.<br />
FY 2009<br />
$365,000<br />
FY 2010<br />
$361,200<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$726,200<br />
Project Sponsor: Clark County NDOTID: CL2006110 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$2,600,000<br />
FY 2012<br />
$2,700,000<br />
Total Scheduled<br />
$5,300,000<br />
Project Sponsor: Las Vegas NDOTID: CL200669 PE RoW CONST.<br />
FY 2009<br />
$2,600,000<br />
FY 2010<br />
$900,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$3,500,000<br />
Project Sponsor: Las Vegas NDOTID: CL200902 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$3,100,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$3,100,000<br />
Project Sponsor: Las Vegas NDOTID: CL200837 PE RoW CONST.<br />
FY 2009<br />
$5,480,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$5,480,000<br />
Project Sponsor: RTC NDOTID: CL20120004 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$400,000<br />
Total Scheduled<br />
$400,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 54
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :4265 Location: Southern Nevada FAST <strong>System</strong><br />
From:<br />
To:<br />
Description: ITS and signal timing coordination on regional freeway and arterial roadways<br />
Project # :210 Location: TDM Program<br />
From:<br />
To:<br />
Description: <strong>Transportation</strong> Demand Management products and services that promote the<br />
reduction of Single Occupant Vehicles on the region's roads in order to<br />
improve traffic congestion and air quality<br />
Project # :1572 Location: Truck stops - various locations<br />
From:<br />
To:<br />
Description: Truck stop electrification to reduce emissions from trucks parked at various<br />
facilities<br />
Project # :2742 Location: University of Nevada Las Vegas<br />
From:<br />
To:<br />
Description: Bike Locker Program<br />
Project # :2005 Location: US 95: Express transit service<br />
From: Durango Dr<br />
To: Downtown Las Vegas<br />
Description: Operating support for freeway express transit routes<br />
Project Sponsor: RTC NDOTID: CL20110007 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$3,000,000<br />
FY 2012<br />
$3,000,000<br />
Total Scheduled<br />
$6,000,000<br />
Project Sponsor: RTC NDOTID: CL200308-L PE RoW CONST.<br />
FY 2009<br />
$385,000<br />
FY 2010<br />
$396,000<br />
FY 2011<br />
$402,000<br />
FY 2012<br />
$408,000<br />
Total Scheduled<br />
$1,591,000<br />
Project Sponsor: DAQEM NDOTID: CL2006113 PE RoW CONST.<br />
FY 2009<br />
$640,000<br />
FY 2010<br />
$640,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$1,280,000<br />
Project Sponsor: RTC NDOTID: CL20090157 PE RoW CONST.<br />
FY 2009<br />
$100,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$100,000<br />
Project Sponsor: RTC NDOTID: CL2008104 PE RoW CONST.<br />
FY 2009<br />
$1,950,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$1,000,000<br />
Total Scheduled<br />
$2,950,000<br />
Total for CMAQ $17,357,000 $13,062,200 $13,502,000 $17,158,000<br />
$61,079,200<br />
AB 595 Bonded<br />
Project # :4151 Location: I-15 / US 95<br />
From: I-15 south of Oakey Blvd<br />
To: US 95 east of Rancho Dr<br />
Description: Project Neon Phase 1: PE for the construction of system-to-system direct<br />
connect HOV ramps, including add/drop lanes at Oakey/Wyoming<br />
Project Sponsor: NDOT NDOTID: CL201203 PE RoW CONST.<br />
FY 2009<br />
$15,000,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$15,000,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 55
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :4147 Location: Martin Luther King Blvd. / Industrial Rd. Connector<br />
Project Neon Phase 2<br />
From: Industrial Rd. south of Wyoming Ave<br />
To: M.L.King Blvd. at Palomino Ln.<br />
Description: Preliminary Engineering and Right-of-Way for a 6-lane overpass across I-15<br />
with grade separation at Oakey/Wyoming<br />
Project # :256 Location: US-95 North<br />
From: SR 578 Washington Av.<br />
To: Ann Rd.<br />
Description: US-95 North Package 1: Widen from 6 to 8 lanes, to include HOV lanes add<br />
auxiliary lanes. Braid both the northbound and southbound ramps at the<br />
Rancho/Ann Rd. interchange. (PE, RW, Const.)<br />
Project # :257 Location: US-95 North<br />
From: Ann Rd.<br />
To: SR.157 Kyle Canyon Rd.<br />
Description: US-95 North Package 2: Ann to Centennial: Widen from 6 to 8 lanes. Add<br />
auxiliary lanes. Centennial to Durango: Widen from 4 to 8 lanes. Durango to<br />
Kyle Canyon: Widen from 4 to 6 lanes. (PE.)<br />
Project Sponsor: NDOT NDOTID: CL200002 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$7,500,000<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$7,500,000<br />
Project Sponsor: NDOT NDOTID: CL200661 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$145,000,000<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$145,000,000<br />
Project Sponsor: NDOT NDOTID: CL201101 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$4,000,000<br />
Total Scheduled<br />
$4,000,000<br />
Total for AB 595 Bonded $15,000,000 $0 $152,500,000 $4,000,000<br />
$171,500,000<br />
CCDOA<br />
Project # :221 Location: I-215 Southern Beltway<br />
From: @ Airport Connector<br />
To:<br />
Description: Upgrade Interchange, expand mainline from I-15 to Windmill Ln.<br />
Project # :4203 Location: SR. 604 Las Vegas Blvd South<br />
From: Proposed Ivanpah Valley Airport<br />
To: Jean<br />
Description: Construct Las Vegas Blvd. South as 2-lane arterial roadway from Ivanpah<br />
Airport to Jean<br />
Project Sponsor: Clark County NDOTID: CL200483 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$23,000,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$23,000,000<br />
Project Sponsor: DoA NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$200,000<br />
FY 2011<br />
$200,000<br />
FY 2012<br />
$4,500,000<br />
Total Scheduled<br />
$4,900,000<br />
Total for CCDOA $0 $23,200,000 $200,000 $4,500,000<br />
$27,900,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 56
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
CCDOA and FAA Combination<br />
Project # :4202 Location: I-15<br />
From: @ MP 3<br />
To:<br />
Description: Construct Ivanpah interchange on I-15 to access the airport<br />
Project # :4266 Location: Ivanpah Expwy<br />
From: Proposed Ivanpah Valley Airport<br />
To: I-15 near MP 22<br />
Description: PE and RoW for new expressway from Ivanpah Airport to I-15 south of Sloan<br />
Rd, including interchange with I-15<br />
Project Sponsor: DoA NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$1,300,000<br />
FY 2012<br />
$7,800,000<br />
Total Scheduled<br />
$9,100,000<br />
Project Sponsor: DoA NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$1,500,000<br />
FY 2010<br />
$2,000,000<br />
FY 2011<br />
$2,500,000<br />
FY 2012<br />
$3,000,000<br />
Total Scheduled<br />
$9,000,000<br />
Total for CCDOA and FAA Combination $1,500,000 $2,000,000 $3,800,000 $10,800,000<br />
$18,100,000<br />
Clark County Beltway Program<br />
Project # :506 Location: CC-215 Northern Beltway<br />
From: Tenaya Way<br />
To: Decatur Blvd.<br />
Description: Upgrade to 6-lane freeway with interchanges at Jones Blvd. and Decatur Blvd.<br />
and an overpass at Bradley Rd<br />
Project # :507 Location: CC-215 Northern Beltway<br />
From: Decatur Blvd.<br />
To: North Fifth St.<br />
Description: Upgrade to 6-lane freeway with interchanges at Revere St and North 5th St.<br />
Project # :508 Location: CC-215 Northern Beltway<br />
From: North Fifth St.<br />
To: Range Rd.<br />
Description: Upgrade to 6-lane freeway with interchanges at Losee Rd., Pecos Rd., Lamb<br />
Blvd., and Range Rd.<br />
Project # :509 Location: CC-215 Northern Beltway<br />
From: @ I-15<br />
To:<br />
Description: Upgrade to system-to-system interchange and widen to 6 lanes<br />
Project Sponsor: Clark County NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$150,360,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$150,360,000<br />
Project Sponsor: Clark County NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$115,599,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$115,599,000<br />
Project Sponsor: Clark County NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$118,700,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$118,700,000<br />
Project Sponsor: Clark County NDOTID: CL200835 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$107,600,000<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$107,600,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 57
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :926 Location: CC-215 Northern Beltway @ US.95<br />
From: Hualapai Way<br />
To: Tenaya Way<br />
Description: Upgrade to system-to-systsem interchange and widen to 6 lanes<br />
Project # :504 Location: CC-215 Western Beltway<br />
From: Alta Dr<br />
To: north of Summerlin Pkwy<br />
Description: Construct interchanges at Far Hills Ave and Summerlin Pkwy and widen to 6<br />
lanes from Charleston Blvd to Summerlin Pkwy.<br />
Project # :510 Location: CC-215 Western Beltway<br />
From: Craig Rd.<br />
To: Hualapai Way (North)<br />
Description: Upgrade to 6-lane freeway with interchanges at Lone Mountain Rd and Ann Rd<br />
and an overpass at Centennial Pkwy.<br />
Project # :221 Location: I-215 Southern Beltway<br />
From: @ Airport Connector<br />
To:<br />
Description: Upgrade Interchange, expand mainline from I-15 to Windmill Ln.<br />
Project # :228 Location: I-215 Southern Beltway<br />
From: Eastern Ave.<br />
To: Windmill Ln.<br />
Description: Widen from 6 to 8 lanes<br />
Project Sponsor: Clark County NDOTID: CL200704 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$216,740,000<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$216,740,000<br />
Project Sponsor: Clark County NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$127,800,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$127,800,000<br />
Project Sponsor: Clark County NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$134,300,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$134,300,000<br />
Project Sponsor: Clark County NDOTID: CL200483 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$153,174,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$153,174,000<br />
Project Sponsor: Clark County NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$32,600,000<br />
Total Scheduled<br />
$32,600,000<br />
Total for Clark County Beltway Program $512,459,000 $287,474,000 $324,340,000 $32,600,000<br />
$1,156,873,000<br />
Colorado River Commission<br />
Project # :2903 Location: Laughlin<br />
From:<br />
To:<br />
Description: Development and construction of building for Southern Nevada Transit<br />
Coalition public transit operations<br />
Project Sponsor: SNTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$1,000,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$1,000,000<br />
Total for Colorado River Commission $1,000,000 $0 $0<br />
$0<br />
$1,000,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 58
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
FTA S.5307 Formula<br />
Project # :2020 Location: Boulder Hwy: Bus Rapid Transit<br />
From: College Dr<br />
To: Downtown Las Vegas<br />
Description: Roadway reconstruction and intersection improvements to accommodate<br />
Rapid Transit operations in the Boulder Hwy corridor<br />
Project # :2022 Location: Boulder Hwy: Bus Rapid Transit<br />
From: College Dr<br />
To: Downtown Las Vegas<br />
Description: Construct shelters and ancillary equipment for Rapid Transit operations in the<br />
Boulder Hwy corridor<br />
Project # :2048 Location: Bus fleet replacement program<br />
From:<br />
To:<br />
Description: Acquire 78 buses for the fixed-route bus replacement program<br />
Project # :2010 Location: Central City Intermodal <strong>Transportation</strong> Terminal<br />
From:<br />
To:<br />
Description: Development of a new intermodal transportation center to serve downtown Las<br />
Vegas<br />
Project # :2703 Location: Durango Dr.<br />
From: @ Westcillf Dr.<br />
To:<br />
Description: Develop a park-and-ride lot, including transit passenger facilities, to serve the<br />
Summerlin Pkwy corridor<br />
Project # :2033 Location: Paratransit fleet expansion<br />
From:<br />
To:<br />
Description: Acquire 22 vehicles for the expansion of paratransit operations.<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$18,500,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$18,500,000<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$4,000,000<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$4,000,000<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$11,667,200<br />
FY 2010<br />
$0<br />
FY 2011<br />
$10,240,000<br />
FY 2012<br />
$15,973,600<br />
Total Scheduled<br />
$37,880,800<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$2,682,697<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$2,682,697<br />
Project Sponsor: RTC NDOTID: CL200664 PE RoW CONST.<br />
FY 2009<br />
$3,182,400<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$3,182,400<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$1,603,200<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$1,603,200<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 59
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :2055 Location: Paratransit fleet expansion<br />
From:<br />
To:<br />
Description: Acquire 60 vehicles for the expansion of paratransit operations.<br />
Project # :2052 Location: Paratransit fleet replacement<br />
From:<br />
To:<br />
Description: Acquire 257 vehicles for the paratransit fleet replacement program<br />
Project # :2706 Location: Park-and-Ride lots - various locations<br />
From:<br />
To:<br />
Description: Development of park-and-ride lots<br />
Project # :2803 Location: University of Nevada Las Vegas<br />
From:<br />
To:<br />
Description: Construct a bus transfer center to serve the main UNLV campus<br />
Project # :2701 Location: US 95<br />
From: @ Durango Dr<br />
To:<br />
Description: Develop of a park-and-ride lot, including transit passenger facilities, to serve<br />
the US.95 corridor.<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$980,800<br />
FY 2010<br />
$545,600<br />
FY 2011<br />
$1,361,600<br />
FY 2012<br />
$1,408,000<br />
Total Scheduled<br />
$4,296,000<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$3,668,800<br />
FY 2010<br />
$3,520,000<br />
FY 2011<br />
$8,320,800<br />
FY 2012<br />
$5,910,400<br />
Total Scheduled<br />
$21,420,000<br />
Project Sponsor: RTC NDOTID: CL200903 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$2,400,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$2,400,000<br />
Total Scheduled<br />
$4,800,000<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$1,600,000<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$1,600,000<br />
Project Sponsor: RTC NDOTID: CL200610 PE RoW CONST.<br />
FY 2009<br />
$3,200,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$3,200,000<br />
Total for FTA S.5307 Formula $26,985,097 $24,965,600 $25,522,400 $25,692,000<br />
$103,165,097<br />
FTA S.5307 Formula Enhancements<br />
Project # :2603 Location: Las Vegas Blvd<br />
From: Sunset Rd<br />
To: Downtown Las Vegas<br />
Description: Upgrade transit shelters, TVMs and security systems at selected transit stops<br />
on the Las Vegas Strip<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$480,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$480,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 60
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :2046 Location: <strong>Regional</strong> transit bus stop and shelter program<br />
From:<br />
To:<br />
Description: Enhancements to transit shelters including TVMs, signage, passenger<br />
amenities, landscaping and related sidewalk improvements<br />
Project # :2019 Location: Summerlin Center<br />
From:<br />
To:<br />
Description: Installation of transit shelters and ancillary equipment at the Summerlin Transit<br />
Center<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$296,000<br />
FY 2011<br />
$304,000<br />
FY 2012<br />
$312,000<br />
Total Scheduled<br />
$912,000<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$480,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$480,000<br />
Total for FTA S.5307 Formula Enhancements $480,000 $776,000 $304,000 $312,000<br />
$1,872,000<br />
FTA S.5307 Formula Security<br />
Project # :2602 Location: <strong>Regional</strong> transit system facilities<br />
From: various locations<br />
To:<br />
Description: Upgrade and replacement of security systems at RTC facilities<br />
Project # :2601 Location: <strong>Regional</strong> transit system security systems<br />
From: various locations<br />
To:<br />
Description: Security systems for the regional transit system<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$288,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$288,000<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$296,000<br />
FY 2011<br />
$304,000<br />
FY 2012<br />
$312,000<br />
Total Scheduled<br />
$912,000<br />
Total for FTA S.5307 Formula Security $288,000 $296,000 $304,000 $312,000<br />
$1,200,000<br />
FTA S.5309 Bus Discretionary<br />
Project # :2022 Location: Boulder Hwy: Bus Rapid Transit<br />
From: College Dr<br />
To: Downtown Las Vegas<br />
Description: Construct shelters and ancillary equipment for Rapid Transit operations in the<br />
Boulder Hwy corridor<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$451,440<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$451,440<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 61
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :2010 Location: Central City Intermodal <strong>Transportation</strong> Terminal<br />
From:<br />
To:<br />
Description: Development of a new intermodal transportation center to serve downtown Las<br />
Vegas<br />
Project # :2903 Location: Laughlin<br />
From:<br />
To:<br />
Description: Development and construction of building for Southern Nevada Transit<br />
Coalition public transit operations<br />
Project # :2905 Location: Laughlin / Mesquite<br />
From:<br />
To:<br />
Description: Acquire two senior transportation vehicles for SNTC operations<br />
Project # :2012 Location: Sunset Rd.<br />
From: east of Decatur Blvd.<br />
To:<br />
Description: Development of the Sunset Transit Maintenance Facility<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$2,451,320<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$2,451,320<br />
Project Sponsor: SNTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$100,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$100,000<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$98,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$98,000<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$5,352,853<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$5,352,853<br />
Total for FTA S.5309 Bus Discretionary $8,453,613 $0 $0<br />
$0<br />
$8,453,613<br />
FTA S.5309 New Starts<br />
Project # :2012 Location: Sunset Rd.<br />
From: east of Decatur Blvd.<br />
To:<br />
Description: Development of the Sunset Transit Maintenance Facility<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$992,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$992,000<br />
Total for FTA S.5309 New Starts $992,000 $0 $0<br />
$0<br />
$992,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 62
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
FTA S.5316 Job Access and Reverse Commute<br />
Project # :2801 Location: Las Vegas Area<br />
From:<br />
To:<br />
Description: Projects to be selected under the RTC Coordinated Public Transit - Human<br />
Services <strong>Transportation</strong> Plan<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$786,056<br />
FY 2011<br />
$817,498<br />
FY 2012<br />
$850,198<br />
Total Scheduled<br />
$2,453,752<br />
Project # :2805 Location: Las Vegas Area<br />
From:<br />
To:<br />
Description: Institute regular paratransit service for disabled workers<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$755,823<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$755,823<br />
Total for FTA S.5316 Job Access and Reverse Commute $755,823 $786,056 $817,498 $850,198<br />
$3,209,575<br />
FTA S.5317 "New Freedom"<br />
Project # :2807 Location: Clark County<br />
From:<br />
To:<br />
Description: Development and operation of a same day paratransit service<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$175,675<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$175,675<br />
Project # :2802 Location: Las Vegas Area<br />
From:<br />
To:<br />
Description: Projects to be selected under the RTC Coordinated Public Transit - Human<br />
Services <strong>Transportation</strong> Plan<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$507,182<br />
FY 2011<br />
$527,469<br />
FY 2012<br />
$548,568<br />
Total Scheduled<br />
$1,583,219<br />
Project # :2806 Location: Las Vegas Area<br />
From:<br />
To:<br />
Description: Development and operation of a centralized information and referral service for<br />
human services transportation clients.<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$312,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$312,000<br />
Total for FTA S.5317 "New Freedom" $487,675 $507,182 $527,469 $548,568<br />
$2,070,894<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 63
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Local Funds<br />
Project # :1561 Location: City of Las Vegas<br />
From: Union Park<br />
To: Main St<br />
Description: Construct pedestrian overbridge across UPRR<br />
Project # :2807 Location: Clark County<br />
From:<br />
To:<br />
Description: Development and operation of a same day paratransit service<br />
Project # :4140 Location: I-15<br />
From: @ Mile Post 118 Pioneer Blvd. Extension<br />
To:<br />
Description: Construct new interchange (PE)<br />
Project # :2801 Location: Las Vegas Area<br />
From:<br />
To:<br />
Description: Projects to be selected under the RTC Coordinated Public Transit - Human<br />
Services <strong>Transportation</strong> Plan<br />
Project # :2802 Location: Las Vegas Area<br />
From:<br />
To:<br />
Description: Projects to be selected under the RTC Coordinated Public Transit - Human<br />
Services <strong>Transportation</strong> Plan<br />
Project # :2805 Location: Las Vegas Area<br />
From:<br />
To:<br />
Description: Institute regular paratransit service for disabled workers<br />
Project # :2806 Location: Las Vegas Area<br />
From:<br />
To:<br />
Description: Development and operation of a centralized information and referral service for<br />
human services transportation clients.<br />
Project Sponsor: Las Vegas NDOTID: CL2006105 PE RoW CONST.<br />
FY 2009<br />
$3,000,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$3,000,000<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$175,675<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$175,675<br />
Project Sponsor: Mesquite NDOTID: CL200801 PE RoW CONST.<br />
FY 2009<br />
$4,000,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$4,000,000<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$786,056<br />
FY 2011<br />
$817,498<br />
FY 2012<br />
$850,198<br />
Total Scheduled<br />
$2,453,752<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$126,796<br />
FY 2011<br />
$131,867<br />
FY 2012<br />
$137,142<br />
Total Scheduled<br />
$395,805<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$755,823<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$755,823<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$78,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$78,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 64
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :2903 Location: Laughlin<br />
From:<br />
To:<br />
Description: Development and construction of building for Southern Nevada Transit<br />
Coalition public transit operations<br />
Project Sponsor: SNTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$60,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$60,000<br />
Total for Local Funds $8,069,498 $912,852 $949,365 $987,340<br />
$10,919,055<br />
LVCVA Bonded<br />
Project # :246 Location: I-15 South Design Build<br />
From: SR 160 Blue Diamond Rd.<br />
To: Tropicana Ave.<br />
Description: Phase 1: Widen from 6 to 8 lanes, to include HOV lanes and auxiliary lanes<br />
Project Sponsor: NDOT NDOTID: CL200917 PE RoW CONST.<br />
FY 2009<br />
$272,000,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$272,000,000<br />
Total for LVCVA Bonded $272,000,000 $0 $0<br />
$0<br />
$272,000,000<br />
Private Developers<br />
Project # :4238 Location: SR 160 Blue Diamond Rd.<br />
From: Rainbow Blvd.<br />
To: Durango Dr.<br />
Description: Widen from 2 to 4 lanes<br />
Project # :4018 Location: SR 160 Pahrump Valley Rd.<br />
From: SR.159 Red Rock Canyon Road<br />
To: Mountain Springs<br />
Description: Widen from 2 to 4 Lanes<br />
Project Sponsor: NDOT NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$3,500,000<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$3,500,000<br />
Project Sponsor: NDOT NDOTID: CL200749 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$89,000,000<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$89,000,000<br />
Total for Private Developers $0 $0 $92,500,000<br />
$0<br />
$92,500,000<br />
Q10 Bicycle Lane Program<br />
Project # :1508 Location: BPE On-Street Bike Projects: 2009-12<br />
From:<br />
To:<br />
Description: Installation of Bicycle Lanes & Routes in Various Locations<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$2,400,000<br />
FY 2010<br />
$1,500,000<br />
FY 2011<br />
$1,500,000<br />
FY 2012<br />
$1,500,000<br />
Total Scheduled<br />
$6,900,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 65
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Total for Q10 Bicycle Lane Program $2,400,000 $1,500,000 $1,500,000 $1,500,000<br />
$6,900,000<br />
Q10 High Speed Lane Miles Program<br />
Project # :108 Location: Cactus Ave. at I-15<br />
From: Dean Martin Dr.<br />
To: Las Vegas Blvd.<br />
Description: Construct an interchange<br />
Project # :129 Location: Horse Dr. @ US-95<br />
From: Grand Canyon Dr.<br />
To: Fort Apache Rd.<br />
Description: Construct 6-lane overpass with an interchange at US.95<br />
Project # :134 Location: I-515<br />
From: @ Galleria Dr.<br />
To:<br />
Description: Construct interchange and construct Galleria Dr. 4 lanes between Stephanie<br />
and Boulder Hwy.<br />
Project # :3002 Location: Laughlin<br />
From: Needles Hwy.<br />
To: Bullhead City, AZ<br />
Description: Construct new Colorado River bridge and related road works<br />
Project # :4035 Location: North 5th St.<br />
From: Owens Ave.<br />
To: Cheyenne Ave.<br />
Description: Construct 8-lane roadway with overpass at I-15 and new interchange at<br />
Cheyenne Ave, including transit lanes, grade-separated pedestrian crossings<br />
and multi-use trails; Reconfigure Main St./Owens Ave./Las Vegas Blvd.<br />
intersections.<br />
Project # :551 Location: Rainbow Blvd.<br />
From: CC-215 Southern Beltway<br />
To: Tropicana Ave.<br />
Description: Widen from 4 to 6 lanes<br />
Project Sponsor: Clark County NDOTID: CL200516 PE RoW CONST.<br />
FY 2009<br />
$2,799,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$5,157,000<br />
FY 2012<br />
$7,272,000<br />
Total Scheduled<br />
$15,228,000<br />
Project Sponsor: Las Vegas NDOTID: CL200476 PE RoW CONST.<br />
FY 2009<br />
$4,280,000<br />
FY 2010<br />
$15,000,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$19,280,000<br />
Project Sponsor: Henderson NDOTID: CL200435 PE RoW CONST.<br />
FY 2009<br />
$40,009,000<br />
FY 2010<br />
$11,531,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$51,540,000<br />
Project Sponsor: Clark County NDOTID: CL2006108 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$5,000,000<br />
FY 2012<br />
$25,000,000<br />
Total Scheduled<br />
$30,000,000<br />
Project Sponsor: North Las Vegas NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$24,319,130<br />
FY 2010<br />
$20,000,000<br />
FY 2011<br />
$40,000,000<br />
FY 2012<br />
$18,291,000<br />
Total Scheduled<br />
$102,610,130<br />
Project Sponsor: Clark County NDOTID: CL200666 PE RoW CONST.<br />
FY 2009<br />
$500,000<br />
FY 2010<br />
$2,095,000<br />
FY 2011<br />
$1,045,000<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$3,640,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 66
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :1578 Location: Rainbow Blvd.<br />
From: Desert Inn Rd.<br />
To: US-95<br />
Description: Intersection improvements at Desert Inn Rd, Oakey Blvd, Charleston Blvd and<br />
Alta Dr.<br />
Project # :1579 Location: Rainbow Blvd.<br />
From: at Sahara Ave<br />
To:<br />
Description: Intersection improvements<br />
Project # :4027 Location: Sheep Mountian Pkwy.<br />
From: CC-215 Western Beltway near Ann Rd<br />
To: I-15<br />
Description: PE and NEPA process/environmental assessment for new roadway<br />
Project # :894 Location: Summerlin Pkwy.<br />
From: CC-215 Western Beltway<br />
To: US-95<br />
Description: Widen to 8 lanes<br />
Project Sponsor: Las Vegas NDOTID: CL200669 PE RoW CONST.<br />
FY 2009<br />
$200,000<br />
FY 2010<br />
$2,150,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$2,350,000<br />
Project Sponsor: Las Vegas NDOTID: CL200902 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$800,000<br />
FY 2011<br />
$1,400,000<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$2,200,000<br />
Project Sponsor: Las Vegas NDOTID: CL20090151 PE RoW CONST.<br />
FY 2009<br />
$5,353,000<br />
FY 2010<br />
$600,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$5,953,000<br />
Project Sponsor: Las Vegas NDOTID: CL200668 PE RoW CONST.<br />
FY 2009<br />
$560,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$3,000,000<br />
Total Scheduled<br />
$3,560,000<br />
Total for Q10 High Speed Lane Miles Program $78,020,130 $52,176,000 $52,602,000 $53,563,000<br />
$236,361,130<br />
Q10 Traffic Signals & ITS Programs<br />
Project # :2747 Location: Craig Rd<br />
From: Tenaya Way<br />
To: Decatur Blvd<br />
Description: ITS and signal infrastructure improvements<br />
Project # :2746 Location: Eastern Ave<br />
From: Serene Ave<br />
To: Flamingo Rd<br />
Description: ITS and signal infrastructure improvements<br />
Project Sponsor: Las Vegas NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$511,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$511,000<br />
Project Sponsor: Clark County NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$4,958,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$4,958,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 67
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :4232 Location: Eastern Ave.<br />
From: Serene<br />
To: Sunridge<br />
Description: Signal and intersection improvements<br />
Project # :2733 Location: Tropicana Ave<br />
From: Rainbow Blvd<br />
To: Wynn Rd<br />
Description: ITS and signal infrastructure improvements<br />
Project Sponsor: Henderson NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$280,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$280,000<br />
Project Sponsor: Clark County NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$169,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$169,000<br />
Total for Q10 Traffic Signals & ITS Programs $5,918,000 $0 $0<br />
$0<br />
$5,918,000<br />
Q10 RTC Projects<br />
Project # :2020 Location: Boulder Hwy: Bus Rapid Transit<br />
From: College Dr<br />
To: Downtown Las Vegas<br />
Description: Roadway reconstruction and intersection improvements to accommodate<br />
Rapid Transit operations in the Boulder Hwy corridor<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$500,000<br />
FY 2010<br />
$14,500,000<br />
FY 2011<br />
$28,000,000<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$43,000,000<br />
Total for Q10 RTC Projects $500,000 $14,500,000 $28,000,000<br />
$0<br />
$43,000,000<br />
RTC Gas Tax<br />
Project # :740 Location: Bonneville Ave. / Clark Ave. Couplet<br />
From: Main St.<br />
To: Charleston Blvd.<br />
Description: Convert to one-way couplet, 3 lanes in each direction; add landscaping<br />
between Casino Center Dr and Las Vegas Blvd<br />
Project # :4267 Location: Kyle Canyon Rd.<br />
From: at US.95<br />
To:<br />
Description: PE and RoW for interchange at Kyle Canyon Rd and US95<br />
Project Sponsor: Las Vegas NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$6,900,000<br />
FY 2010<br />
$5,564,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$12,464,000<br />
Project Sponsor: Las Vegas NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$1,000,000<br />
FY 2010<br />
$2,927,000<br />
FY 2011<br />
$2,927,000<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$6,854,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 68
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :4035 Location: North 5th St.<br />
From: Owens Ave.<br />
To: Cheyenne Ave.<br />
Description: Construct 8-lane roadway with overpass at I-15 and new interchange at<br />
Cheyenne Ave, including transit lanes, grade-separated pedestrian crossings<br />
and multi-use trails; Reconfigure Main St./Owens Ave./Las Vegas Blvd.<br />
intersections.<br />
Project # :4027 Location: Sheep Mountian Pkwy.<br />
From: CC-215 Western Beltway near Ann Rd<br />
To: I-15<br />
Description: PE and NEPA process/environmental assessment for new roadway<br />
Project # :143 Location: SR 573 Craig Rd @ I-15<br />
From: Berg St.<br />
To: Pecos Rd.<br />
Description: Widen from 4 to 6 lanes with a Railroad Grade Separation and Interchange<br />
Improvements<br />
Project # :4089 Location: Stewart Ave<br />
From: Main St.<br />
To: Maryland Parkway<br />
Description: Landscaping and roadway rehabilitation<br />
Project Sponsor: North Las Vegas NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$2,758,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$2,758,000<br />
Project Sponsor: Las Vegas NDOTID: CL20090151 PE RoW CONST.<br />
FY 2009<br />
$2,668,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$2,668,000<br />
Project Sponsor: North Las Vegas NDOTID: CL199710 PE RoW CONST.<br />
FY 2009<br />
$5,500,000<br />
FY 2010<br />
$500,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$6,000,000<br />
Project Sponsor: Las Vegas NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$924,000<br />
FY 2010<br />
$1,900,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$2,824,000<br />
Total for RTC Gas Tax $16,992,000 $13,649,000 $2,927,000<br />
$0<br />
$33,568,000<br />
RTC Gas Tax - Area-Wide Program<br />
Project # :129 Location: Horse Dr. @ US-95<br />
From: Grand Canyon Dr.<br />
To: Fort Apache Rd.<br />
Description: Construct 6-lane overpass with an interchange at US.95<br />
Project # :134 Location: I-515<br />
From: @ Galleria Dr.<br />
To:<br />
Description: Construct interchange and construct Galleria Dr. 4 lanes between Stephanie<br />
and Boulder Hwy.<br />
Project Sponsor: Las Vegas NDOTID: CL200476 PE RoW CONST.<br />
FY 2009<br />
$16,043,000<br />
FY 2010<br />
$2,916,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$18,959,000<br />
Project Sponsor: Henderson NDOTID: CL200435 PE RoW CONST.<br />
FY 2009<br />
$10,386,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$10,386,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 69
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :4263 Location: Sheep Mountain Pkwy.<br />
From: @ US-95 & CC-215 Western Beltway<br />
To:<br />
Description: PE and right-of-way for the construction of interchanges<br />
Project # :143 Location: SR 573 Craig Rd @ I-15<br />
From: Berg St.<br />
To: Pecos Rd.<br />
Description: Widen from 4 to 6 lanes with a Railroad Grade Separation and Interchange<br />
Improvements<br />
Project Sponsor: Las Vegas NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$14,999,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$14,999,000<br />
Project Sponsor: North Las Vegas NDOTID: CL199710 PE RoW CONST.<br />
FY 2009<br />
$9,166,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$9,166,000<br />
Total for RTC Gas Tax - Area-Wide Program $50,594,000 $2,916,000 $0<br />
$0<br />
$53,510,000<br />
RTC Sales Tax<br />
Project # :2020 Location: Boulder Hwy: Bus Rapid Transit<br />
From: College Dr<br />
To: Downtown Las Vegas<br />
Description: Roadway reconstruction and intersection improvements to accommodate<br />
Rapid Transit operations in the Boulder Hwy corridor<br />
Project # :2022 Location: Boulder Hwy: Bus Rapid Transit<br />
From: College Dr<br />
To: Downtown Las Vegas<br />
Description: Construct shelters and ancillary equipment for Rapid Transit operations in the<br />
Boulder Hwy corridor<br />
Project # :2048 Location: Bus fleet replacement program<br />
From:<br />
To:<br />
Description: Acquire 78 buses for the fixed-route bus replacement program<br />
Project # :2006 Location: Bus Rapid Transit - fleet expansion<br />
From:<br />
To:<br />
Description: Acquire 50 vehicles for the expansion of the Ace Rapid Transit fleet<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$4,625,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$4,625,000<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$112,860<br />
FY 2010<br />
$0<br />
FY 2011<br />
$1,000,000<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$1,112,860<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$2,916,800<br />
FY 2010<br />
$0<br />
FY 2011<br />
$2,560,000<br />
FY 2012<br />
$3,993,400<br />
Total Scheduled<br />
$9,470,200<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$18,000,000<br />
FY 2010<br />
$42,000,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$60,000,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 70
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :2010 Location: Central City Intermodal <strong>Transportation</strong> Terminal<br />
From:<br />
To:<br />
Description: Development of a new intermodal transportation center to serve downtown Las<br />
Vegas<br />
Project # :2703 Location: Durango Dr.<br />
From: @ Westcillf Dr.<br />
To:<br />
Description: Develop a park-and-ride lot, including transit passenger facilities, to serve the<br />
Summerlin Pkwy corridor<br />
Project # :2603 Location: Las Vegas Blvd<br />
From: Sunset Rd<br />
To: Downtown Las Vegas<br />
Description: Upgrade transit shelters, TVMs and security systems at selected transit stops<br />
on the Las Vegas Strip<br />
Project # :2905 Location: Laughlin / Mesquite<br />
From:<br />
To:<br />
Description: Acquire two senior transportation vehicles for SNTC operations<br />
Project # :2033 Location: Paratransit fleet expansion<br />
From:<br />
To:<br />
Description: Acquire 22 vehicles for the expansion of paratransit operations.<br />
Project # :2055 Location: Paratransit fleet expansion<br />
From:<br />
To:<br />
Description: Acquire 60 vehicles for the expansion of paratransit operations.<br />
Project # :2052 Location: Paratransit fleet replacement<br />
From:<br />
To:<br />
Description: Acquire 257 vehicles for the paratransit fleet replacement program<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$1,283,504<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$1,283,504<br />
Project Sponsor: RTC NDOTID: CL200664 PE RoW CONST.<br />
FY 2009<br />
$795,600<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$795,600<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$120,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$120,000<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$24,500<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$24,500<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$400,800<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$400,800<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$245,200<br />
FY 2010<br />
$136,400<br />
FY 2011<br />
$340,400<br />
FY 2012<br />
$352,000<br />
Total Scheduled<br />
$1,074,000<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$917,200<br />
FY 2010<br />
$880,000<br />
FY 2011<br />
$2,080,200<br />
FY 2012<br />
$1,477,600<br />
Total Scheduled<br />
$5,355,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 71
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :2706 Location: Park-and-Ride lots - various locations<br />
From:<br />
To:<br />
Description: Development of park-and-ride lots<br />
Project # :2046 Location: <strong>Regional</strong> transit bus stop and shelter program<br />
From:<br />
To:<br />
Description: Enhancements to transit shelters including TVMs, signage, passenger<br />
amenities, landscaping and related sidewalk improvements<br />
Project # :2602 Location: <strong>Regional</strong> transit system facilities<br />
From: various locations<br />
To:<br />
Description: Upgrade and replacement of security systems at RTC facilities<br />
Project # :2601 Location: <strong>Regional</strong> transit system security systems<br />
From: various locations<br />
To:<br />
Description: Security systems for the regional transit system<br />
Project # :2019 Location: Summerlin Center<br />
From:<br />
To:<br />
Description: Installation of transit shelters and ancillary equipment at the Summerlin Transit<br />
Center<br />
Project # :2012 Location: Sunset Rd.<br />
From: east of Decatur Blvd.<br />
To:<br />
Description: Development of the Sunset Transit Maintenance Facility<br />
Project # :210 Location: TDM Program<br />
From:<br />
To:<br />
Description: <strong>Transportation</strong> Demand Management products and services that promote the<br />
reduction of Single Occupant Vehicles on the region's roads in order to<br />
improve traffic congestion and air quality<br />
Project Sponsor: RTC NDOTID: CL200903 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$600,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$600,000<br />
Total Scheduled<br />
$1,200,000<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$74,000<br />
FY 2011<br />
$76,000<br />
FY 2012<br />
$78,000<br />
Total Scheduled<br />
$228,000<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$72,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$72,000<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$74,000<br />
FY 2011<br />
$76,000<br />
FY 2012<br />
$78,000<br />
Total Scheduled<br />
$228,000<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$120,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$120,000<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$1,904,623<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$1,904,623<br />
Project Sponsor: RTC NDOTID: CL200308-L PE RoW CONST.<br />
FY 2009<br />
$183,000<br />
FY 2010<br />
$184,800<br />
FY 2011<br />
$187,600<br />
FY 2012<br />
$190,400<br />
Total Scheduled<br />
$745,800<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 72
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :2803 Location: University of Nevada Las Vegas<br />
From:<br />
To:<br />
Description: Construct a bus transfer center to serve the main UNLV campus<br />
Project # :2701 Location: US 95<br />
From: @ Durango Dr<br />
To:<br />
Description: Develop of a park-and-ride lot, including transit passenger facilities, to serve<br />
the US.95 corridor.<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$400,000<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$400,000<br />
Project Sponsor: RTC NDOTID: CL200610 PE RoW CONST.<br />
FY 2009<br />
$800,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$800,000<br />
Total for RTC Sales Tax $27,776,087 $48,694,200 $6,720,200 $6,769,400<br />
$89,959,887<br />
TIFIA<br />
Project # :4200 Location: Las Vegas Monorail<br />
From: McCarren International Airport<br />
To: MGM Hotel Monorail Station<br />
Description: Design/permit/construct dual quideway monorail from the existing Las Vegas<br />
Monorail Station<br />
Project Sponsor: LVMC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$25,000,000<br />
FY 2011<br />
$25,000,000<br />
FY 2012<br />
$50,000,000<br />
Total Scheduled<br />
$100,000,000<br />
Total for TIFIA $0 $25,000,000 $25,000,000 $50,000,000<br />
$100,000,000<br />
Western AZ Council of Governments<br />
Project # :3002 Location: Laughlin<br />
From: Needles Hwy.<br />
To: Bullhead City, AZ<br />
Description: Construct new Colorado River bridge and related road works<br />
Project Sponsor: Clark County NDOTID: CL2006108 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$10,000,000<br />
Total Scheduled<br />
$10,000,000<br />
Total for Western AZ Council of Governments $0 $0 $0<br />
$10,000,000<br />
$10,000,000<br />
National Highway <strong>System</strong><br />
Project # :163 Location: FAST Freeway Management <strong>System</strong><br />
From:<br />
To:<br />
Description: Institution and operation of a Freeway & Arterial Management <strong>System</strong> of<br />
<strong>Transportation</strong> (FAST) (PE, RW, Const.)<br />
Project Sponsor: NDOT NDOTID: CL2000104 PE RoW CONST.<br />
FY 2009<br />
$1,500,000<br />
FY 2010<br />
$1,500,000<br />
FY 2011<br />
$1,500,000<br />
FY 2012<br />
$1,500,000<br />
Total Scheduled<br />
$6,000,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 73
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :235 Location: Freeway Service Patrol<br />
From:<br />
To:<br />
Description: Operation of a motorist assistance program on I-15 from the Jean Interchange<br />
to the Apex Interchange and on US 95/I-515 from Railroad Pass to SR.157<br />
Project # :4138 Location: I-15<br />
From: Sahara Ave.<br />
To: I-515/US 95 Interchange (Spaghetti Bowl)<br />
Description: PE and Right-of-Way for widening to 10 lanes, to include HOV lanes, plus<br />
auxiliary lanes and collector/distributer roads<br />
Project # :203 Location: I-515<br />
From: Foothills Grade Separation<br />
To: I-15 / US 95 Interchange (Spaghetti Bowl)<br />
Description: Conduct NEPA process and preliminary engineering<br />
Project # :4030 Location: US 95 Sierra Club Lawsuit Settlement Agreement<br />
From:<br />
To:<br />
Description: Nationwide MSAT Study (PE)<br />
Project Sponsor: NDOT NDOTID: CL2003128 PE RoW CONST.<br />
FY 2009<br />
$1,500,000<br />
FY 2010<br />
$1,500,000<br />
FY 2011<br />
$1,500,000<br />
FY 2012<br />
$1,500,000<br />
Total Scheduled<br />
$6,000,000<br />
Project Sponsor: NDOT NDOTID: CL200365 PE RoW CONST.<br />
FY 2009<br />
$5,000,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$5,000,000<br />
Project Sponsor: NDOT NDOTID: CL200354 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$4,000,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$4,000,000<br />
Project Sponsor: NDOT NDOTID: CL2007105 PE RoW CONST.<br />
FY 2009<br />
$700,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$700,000<br />
Total for National Highway <strong>System</strong> $8,700,000 $7,000,000 $3,000,000 $3,000,000<br />
$21,700,000<br />
STP Statewide<br />
Project # :4018 Location: SR 160 Pahrump Valley Rd.<br />
From: SR.159 Red Rock Canyon Road<br />
To: Mountain Springs<br />
Description: Widen from 2 to 4 Lanes<br />
Project # :239 Location: Warm Springs Rd.<br />
From: Dean Martin Drive<br />
To: SR.604 Las Vegas Blvd. South<br />
Description: SR-160 Phase 3: Construct a new 6-lane roadway with sidewalk and bicycle<br />
facilities and a grade separation over I-15<br />
Project Sponsor: NDOT NDOTID: CL200749 PE RoW CONST.<br />
FY 2009<br />
$900,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$900,000<br />
Project Sponsor: NDOT NDOTID: CL200503 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$7,000,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$7,000,000<br />
Total for STP Statewide $900,000 $7,000,000 $0<br />
$0<br />
$7,900,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 74
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
SAFETEA-LU High Priority Projects<br />
Project # :108 Location: Cactus Ave. at I-15<br />
From: Dean Martin Dr.<br />
To: Las Vegas Blvd.<br />
Description: Construct an interchange<br />
Project # :509 Location: CC-215 Northern Beltway<br />
From: @ I-15<br />
To:<br />
Description: Upgrade to system-to-system interchange and widen to 6 lanes<br />
Project # :926 Location: CC-215 Northern Beltway @ US.95<br />
From: Hualapai Way<br />
To: Tenaya Way<br />
Description: Upgrade to system-to-systsem interchange and widen to 6 lanes<br />
Project # :163 Location: FAST Freeway Management <strong>System</strong><br />
From:<br />
To:<br />
Description: Institution and operation of a Freeway & Arterial Management <strong>System</strong> of<br />
<strong>Transportation</strong> (FAST) (PE, RW, Const.)<br />
Project # :129 Location: Horse Dr. @ US-95<br />
From: Grand Canyon Dr.<br />
To: Fort Apache Rd.<br />
Description: Construct 6-lane overpass with an interchange at US.95<br />
Project # :961 Location: I-15<br />
From: @ Mile Post 108<br />
To:<br />
Description: Construct new interchange to serve Mesquite Airport<br />
Project # :4023 Location: I-15<br />
From: Las Vegas Valley<br />
To:<br />
Description: PE and Right-of-Way for various widening and interchange improvements<br />
Project Sponsor: Clark County NDOTID: CL200516 PE RoW CONST.<br />
FY 2009<br />
$6,843,780<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$6,843,780<br />
Project Sponsor: Clark County NDOTID: CL200835 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$11,121,143<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$11,121,143<br />
Project Sponsor: Clark County NDOTID: CL200704 PE RoW CONST.<br />
FY 2009<br />
$11,121,143<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$11,121,143<br />
Project Sponsor: NDOT NDOTID: CL2000104 PE RoW CONST.<br />
FY 2009<br />
$1,000,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$1,000,000<br />
Project Sponsor: Las Vegas NDOTID: CL200476 PE RoW CONST.<br />
FY 2009<br />
$4,106,268<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$4,106,268<br />
Project Sponsor: Mesquite NDOTID: CL200603 PE RoW CONST.<br />
FY 2009<br />
$6,843,780<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$6,843,780<br />
Project Sponsor: NDOT NDOTID: CL200804 PE RoW CONST.<br />
FY 2009<br />
$6,843,780<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$6,843,780<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 75
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :4025 Location: I-15<br />
From: @ Starr Av.<br />
To:<br />
Description: PE and RW for new Interchange<br />
Project # :4140 Location: I-15<br />
From: @ Mile Post 118 Pioneer Blvd. Extension<br />
To:<br />
Description: Construct new interchange (PE)<br />
Project # :221 Location: I-215 Southern Beltway<br />
From: @ Airport Connector<br />
To:<br />
Description: Upgrade Interchange, expand mainline from I-15 to Windmill Ln.<br />
Project # :3001 Location: Laughlin<br />
From: Needles Hwy.<br />
To: Bullhead City, AZ<br />
Description: Planning and NEPA process for new Colorado River crossing<br />
Project # :4147 Location: Martin Luther King Blvd. / Industrial Rd. Connector<br />
Project Neon Phase 2<br />
From: Industrial Rd. south of Wyoming Ave<br />
To: M.L.King Blvd. at Palomino Ln.<br />
Description: Preliminary Engineering and Right-of-Way for a 6-lane overpass across I-15<br />
with grade separation at Oakey/Wyoming<br />
Project # :843 Location: SR 564 Lake Mead Pkwy.<br />
From: Boulder Highway<br />
To: Lake Mead National Recreation Area<br />
Description: Widen to 6 lanes<br />
Project # :179 Location: US 93 Boulder City Corridor<br />
From: 0.5 mi east of Lake Shore Dr.<br />
To: Foothills Grade Separation<br />
Description: Preliminary Engineering and right-of-way for a 4-lane freeway<br />
Project Sponsor: Henderson NDOTID: CL200901 PE RoW CONST.<br />
FY 2009<br />
$6,843,780<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$6,843,780<br />
Project Sponsor: Mesquite NDOTID: CL200801 PE RoW CONST.<br />
FY 2009<br />
$684,378<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$684,378<br />
Project Sponsor: Clark County NDOTID: CL200483 PE RoW CONST.<br />
FY 2009<br />
$5,303,930<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$5,303,930<br />
Project Sponsor: RTC NDOTID: CL2006108 PE RoW CONST.<br />
FY 2009<br />
$2,566,418<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$2,566,418<br />
Project Sponsor: NDOT NDOTID: CL200002 PE RoW CONST.<br />
FY 2009<br />
$6,843,780<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$6,843,780<br />
Project Sponsor: Henderson NDOTID: CL200521 PE RoW CONST.<br />
FY 2009<br />
$3,764,080<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$3,764,080<br />
Project Sponsor: NDOT NDOTID: CL200802 PE RoW CONST.<br />
FY 2009<br />
$4,843,780<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$4,843,780<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 76
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :256 Location: US-95 North<br />
From: SR 578 Washington Av.<br />
To: Ann Rd.<br />
Description: US-95 North Package 1: Widen from 6 to 8 lanes, to include HOV lanes add<br />
auxiliary lanes. Braid both the northbound and southbound ramps at the<br />
Rancho/Ann Rd. interchange. (PE, RW, Const.)<br />
Project Sponsor: NDOT NDOTID: CL200661 PE RoW CONST.<br />
FY 2009<br />
$11,463,332<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$11,463,332<br />
Total for SAFETEA-LU High Priority Projects $79,072,229 $11,121,143 $0<br />
$0<br />
$90,193,372<br />
SAFETEA-LU <strong>Transportation</strong> Improvements<br />
Project # :3002 Location: Laughlin<br />
From: Needles Hwy.<br />
To: Bullhead City, AZ<br />
Description: Construct new Colorado River bridge and related road works<br />
Project # :143 Location: SR 573 Craig Rd @ I-15<br />
From: Berg St.<br />
To: Pecos Rd.<br />
Description: Widen from 4 to 6 lanes with a Railroad Grade Separation and Interchange<br />
Improvements<br />
Project # :179 Location: US 93 Boulder City Corridor<br />
From: 0.5 mi east of Lake Shore Dr.<br />
To: Foothills Grade Separation<br />
Description: Preliminary Engineering and right-of-way for a 4-lane freeway<br />
Project Sponsor: Clark County NDOTID: CL2006108 PE RoW CONST.<br />
FY 2009<br />
$15,398,505<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$15,398,505<br />
Project Sponsor: North Las Vegas NDOTID: CL199710 PE RoW CONST.<br />
FY 2009<br />
$6,195,449<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$6,195,449<br />
Project Sponsor: NDOT NDOTID: CL200802 PE RoW CONST.<br />
FY 2009<br />
$22,670,021<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$22,670,021<br />
Total for SAFETEA-LU <strong>Transportation</strong> Improvements $44,263,975 $0 $0<br />
$0<br />
$44,263,975<br />
NDOT Bonded Funds<br />
Project # :4019 Location: US 95 North<br />
From: Martin Luther King Boulevard<br />
To: Rainbow Interchange<br />
Description: Landscaping<br />
Project Sponsor: NDOT NDOTID: CL2007103 PE RoW CONST.<br />
FY 2009<br />
$10,000,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$10,000,000<br />
Total for NDOT Bonded Funds $10,000,000 $0 $0<br />
$0<br />
$10,000,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 77
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Federal Lands Highways<br />
Project # :4244 Location: Kyle Canyon Rd.<br />
From:<br />
To:<br />
Description: Replace Bridge<br />
Project Sponsor: NDOT NDOTID: CL20090150 PE RoW CONST.<br />
FY 2009<br />
$2,300,000<br />
FY 2010<br />
$800,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$3,100,000<br />
Project # :4246 Location:<br />
From: Northshore Rd.<br />
To:<br />
Description: Rehabiltate<br />
Lake Mead NRA; PRA LAME 1 (10)<br />
Project Sponsor: NDOT NDOTID: CL201104 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$10,000<br />
FY 2012<br />
$12,600,000<br />
Total Scheduled<br />
$12,610,000<br />
Project # :4245 Location: Lake Mead NRA; PRA LAME 1 (9) & 11 (1)<br />
From: Northshore and Echo Bay Access Rds.<br />
To:<br />
Description: Rehabiltate<br />
Project # :4243 Location: Northshore Rd. (Lake Mead NRA)<br />
From: Northshore Road and Various Routes<br />
To:<br />
Description: Rehabilitate Mile 26-40 (Construction Engineering)<br />
Project # :252 Location: US 93 Hoover Dam Bypass (Mike O' Callaghan - Pat<br />
Tillman Memorial Bridge)<br />
From: 1.8 mile east of Colorado River (AZ)<br />
To: 2.1 mile west of Colorado River ( NV)<br />
Description: Surfacing, signing & guardrails<br />
Project Sponsor: NDOT NDOTID: CL201005 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$12,700,000<br />
FY 2011<br />
$600,000<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$13,300,000<br />
Project Sponsor: NDOT NDOTID: CL200480 PE RoW CONST.<br />
FY 2009<br />
$800,000<br />
FY 2010<br />
$400,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$1,200,000<br />
Project Sponsor: NDOT NDOTID: CL200650 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$13,000,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$13,000,000<br />
Total for Federal Lands Highways $3,100,000 $26,900,000 $610,000 $12,600,000<br />
$43,210,000<br />
Public Lands Highways<br />
Project # :4158 Location: CC 215 Interchanges<br />
From: I-215 from the Airport Connector<br />
To: I-15 North<br />
Description: PE for the construction of four regional beltway interchanges<br />
Project Sponsor: NDOT NDOTID: CL200923 PE RoW CONST.<br />
FY 2009<br />
$1,078,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$1,078,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 78
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :166 Location: I-15<br />
From: I-515/US-95 Interchange (Spaghetti Bowl)<br />
To: SR.573 Craig Rd.<br />
Description: Widen from 6 to 10 lanes from US 95/I-515 to Lake Mead Blvd.; Widen from 4<br />
to 8 Lanes from Lake Mead Blvd. to SR 573 Craig Road.<br />
Project # :4142 Location: I-15<br />
From: Russell Rd.<br />
To: Sahara Ave.<br />
Description: Widen from 8 to 10 lanes including 2 express lanes each way and 3 general<br />
purpose lanes each way<br />
Project # :4159 Location: I-15<br />
From: at US 93 (North)<br />
To:<br />
Description: PE for construction of an interchange<br />
Project # :4157 Location: I-15 Corridor Study<br />
From: CA stateline<br />
To: Mesquite<br />
Description: Corridor Study, NV<br />
Project # :3002 Location: Laughlin<br />
From: Needles Hwy.<br />
To: Bullhead City, AZ<br />
Description: Construct new Colorado River bridge and related road works<br />
Project # :4018 Location: SR 160 Pahrump Valley Rd.<br />
From: SR.159 Red Rock Canyon Road<br />
To: Mountain Springs<br />
Description: Widen from 2 to 4 Lanes<br />
Project # :843 Location: SR 564 Lake Mead Pkwy.<br />
From: Boulder Highway<br />
To: Lake Mead National Recreation Area<br />
Description: Widen to 6 lanes<br />
Project Sponsor: NDOT NDOTID: CL200473 PE RoW CONST.<br />
FY 2009<br />
$7,000,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$7,000,000<br />
Project Sponsor: NDOT NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$3,000,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$3,000,000<br />
Project Sponsor: NDOT NDOTID: CL200922 PE RoW CONST.<br />
FY 2009<br />
$686,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$686,000<br />
Project Sponsor: NDOT NDOTID: CL200924 PE RoW CONST.<br />
FY 2009<br />
$245,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$245,000<br />
Project Sponsor: Clark County NDOTID: CL2006108 PE RoW CONST.<br />
FY 2009<br />
$1,000,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$1,000,000<br />
Project Sponsor: NDOT NDOTID: CL200749 PE RoW CONST.<br />
FY 2009<br />
$1,470,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$1,470,000<br />
Project Sponsor: Henderson NDOTID: CL200521 PE RoW CONST.<br />
FY 2009<br />
$14,000,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$14,000,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 79
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :143 Location: SR 573 Craig Rd @ I-15<br />
From: Berg St.<br />
To: Pecos Rd.<br />
Description: Widen from 4 to 6 lanes with a Railroad Grade Separation and Interchange<br />
Improvements<br />
Project # :252 Location: US 93 Hoover Dam Bypass (Mike O' Callaghan - Pat<br />
Tillman Memorial Bridge)<br />
From: 1.8 mile east of Colorado River (AZ)<br />
To: 2.1 mile west of Colorado River ( NV)<br />
Description: Surfacing, signing & guardrails<br />
Project # :4139 Location: US 93/95<br />
From: US 93/95 Jct.<br />
To: Foothills Grade Separation<br />
Description: Boulder City Corridor Phase 1: PE and right-of-way for the construction of a<br />
new freeway<br />
Project Sponsor: North Las Vegas NDOTID: CL199710 PE RoW CONST.<br />
FY 2009<br />
$490,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$490,000<br />
Project Sponsor: NDOT NDOTID: CL200650 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$1,960,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$1,960,000<br />
Project Sponsor: NDOT NDOTID: CL200802 PE RoW CONST.<br />
FY 2009<br />
$992,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$992,000<br />
Total for Public Lands Highways $29,961,000 $1,960,000 $0<br />
$0<br />
$31,921,000<br />
Interstate Maintenance Discretionary<br />
Project # :108 Location: Cactus Ave. at I-15<br />
From: Dean Martin Dr.<br />
To: Las Vegas Blvd.<br />
Description: Construct an interchange<br />
Project # :4025 Location: I-15<br />
From: @ Starr Av.<br />
To:<br />
Description: PE and RW for new Interchange<br />
Project Sponsor: Clark County NDOTID: CL200516 PE RoW CONST.<br />
FY 2009<br />
$861,300<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$861,300<br />
Project Sponsor: Henderson NDOTID: CL200901 PE RoW CONST.<br />
FY 2009<br />
$490,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$490,000<br />
Total for Interstate Maintenance Discretionary $1,351,300 $0 $0<br />
$0<br />
$1,351,300<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 80
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Nevada State General Funds<br />
Project # :4018 Location: SR 160 Pahrump Valley Rd.<br />
From: SR.159 Red Rock Canyon Road<br />
To: Mountain Springs<br />
Description: Widen from 2 to 4 Lanes<br />
Project Sponsor: NDOT NDOTID: CL200749 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$16,000,000<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$16,000,000<br />
Total for Nevada State General Funds $0 $0 $16,000,000<br />
$0<br />
$16,000,000<br />
<strong>Transportation</strong>, Community & <strong>System</strong> Preservation<br />
Project # :4270 Location: I-15<br />
From: SR.573 Craig Rd<br />
To: Speedway Blvd<br />
Description: PE for widening to 6 lanes<br />
Project Sponsor: NDOT NDOTID: CL200916 PE RoW CONST.<br />
FY 2009<br />
$980,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$980,000<br />
Total for <strong>Transportation</strong>, Community & <strong>System</strong> Preservation $980,000 $0 $0<br />
$0<br />
$980,000<br />
NDOT State Gas Tax<br />
Project # :4145 Location: Cheyenne Ave.<br />
From: US 95<br />
To: Nellis Blvd.<br />
Description: Restripe to 6 lanes, where possible<br />
Project # :163 Location: FAST Freeway Management <strong>System</strong><br />
From:<br />
To:<br />
Description: Institution and operation of a Freeway & Arterial Management <strong>System</strong> of<br />
<strong>Transportation</strong> (FAST) (PE, RW, Const.)<br />
Project # :4028 Location: SR 160 Blue Diamond Rd.<br />
From: Durango Dr.<br />
To: SR.159 Red Rock Canyon Road<br />
Description: Widen from 2 to 4 lanes with a raised median island<br />
Project Sponsor: North Las Vegas NDOTID: CL200362 PE RoW CONST.<br />
FY 2009<br />
$2,000,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$2,000,000<br />
Project Sponsor: NDOT NDOTID: CL2000104 PE RoW CONST.<br />
FY 2009<br />
$32,000,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$32,000,000<br />
Project Sponsor: NDOT NDOTID: CL200745 PE RoW CONST.<br />
FY 2009<br />
$12,500,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$12,500,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 81
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :201 Location: US 95 South<br />
From: CA State Line<br />
To: SR 163 Laughlin Hwy.<br />
Description: Widen to a 4-lane divided highway<br />
Project # :239 Location: Warm Springs Rd.<br />
From: Dean Martin Drive<br />
To: SR.604 Las Vegas Blvd. South<br />
Description: SR-160 Phase 3: Construct a new 6-lane roadway with sidewalk and bicycle<br />
facilities and a grade separation over I-15<br />
Project Sponsor: NDOT NDOTID: CL201001 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$5,000,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$5,000,000<br />
Project Sponsor: NDOT NDOTID: CL200503 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$7,000,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$7,000,000<br />
Total for NDOT State Gas Tax $46,500,000 $12,000,000 $0<br />
$0<br />
$58,500,000<br />
FY02 Appropriations Act, S.330<br />
Project # :2012 Location: Sunset Rd.<br />
From: east of Decatur Blvd.<br />
To:<br />
Description: Development of the Sunset Transit Maintenance Facility<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$500,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$500,000<br />
Total for FY02 Appropriations Act, S.330 $500,000 $0 $0<br />
$0<br />
$500,000<br />
FY04 Appropriations Act, S.115<br />
Project # :108 Location: Cactus Ave. at I-15<br />
From: Dean Martin Dr.<br />
To: Las Vegas Blvd.<br />
Description: Construct an interchange<br />
Project # :1561 Location: City of Las Vegas<br />
From: Union Park<br />
To: Main St<br />
Description: Construct pedestrian overbridge across UPRR<br />
Project # :2012 Location: Sunset Rd.<br />
From: east of Decatur Blvd.<br />
To:<br />
Description: Development of the Sunset Transit Maintenance Facility<br />
Project Sponsor: Clark County NDOTID: CL200516 PE RoW CONST.<br />
FY 2009<br />
$200,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$200,000<br />
Project Sponsor: Las Vegas NDOTID: CL2006105 PE RoW CONST.<br />
FY 2009<br />
$500,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$500,000<br />
Project Sponsor: RTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$1,000,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$1,000,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 82
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :4139 Location: US 93/95<br />
From: US 93/95 Jct.<br />
To: Foothills Grade Separation<br />
Description: Boulder City Corridor Phase 1: PE and right-of-way for the construction of a<br />
new freeway<br />
Project Sponsor: NDOT NDOTID: CL200802 PE RoW CONST.<br />
FY 2009<br />
$6,000,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$6,000,000<br />
Total for FY04 Appropriations Act, S.115 $7,700,000 $0 $0<br />
$0<br />
$7,700,000<br />
FY06 Appropriations Act, S.112<br />
Project # :926 Location: CC-215 Northern Beltway @ US.95<br />
From: Hualapai Way<br />
To: Tenaya Way<br />
Description: Upgrade to system-to-systsem interchange and widen to 6 lanes<br />
Project Sponsor: Clark County NDOTID: CL200704 PE RoW CONST.<br />
FY 2009<br />
$148,500<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$148,500<br />
Total for FY06 Appropriations Act, S.112 $148,500 $0 $0<br />
$0<br />
$148,500<br />
FY08 Appropriations Act, S.129<br />
Project # :4027 Location: Sheep Mountian Pkwy.<br />
From: CC-215 Western Beltway near Ann Rd<br />
To: I-15<br />
Description: PE and NEPA process/environmental assessment for new roadway<br />
Project # :843 Location: SR 564 Lake Mead Pkwy.<br />
From: Boulder Highway<br />
To: Lake Mead National Recreation Area<br />
Description: Widen to 6 lanes<br />
Project # :179 Location: US 93 Boulder City Corridor<br />
From: 0.5 mi east of Lake Shore Dr.<br />
To: Foothills Grade Separation<br />
Description: Preliminary Engineering and right-of-way for a 4-lane freeway<br />
Project Sponsor: Las Vegas NDOTID: CL20090151 PE RoW CONST.<br />
FY 2009<br />
$735,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$735,000<br />
Project Sponsor: Henderson NDOTID: CL200521 PE RoW CONST.<br />
FY 2009<br />
$196,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$196,000<br />
Project Sponsor: NDOT NDOTID: CL200802 PE RoW CONST.<br />
FY 2009<br />
$245,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$245,000<br />
Total for FY08 Appropriations Act, S.129 $1,176,000 $0 $0<br />
$0<br />
$1,176,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 83
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Anticipated appropriations<br />
Project # :246 Location: I-15 South Design Build<br />
From: SR 160 Blue Diamond Rd.<br />
To: Tropicana Ave.<br />
Description: Phase 1: Widen from 6 to 8 lanes, to include HOV lanes and auxiliary lanes<br />
Project Sponsor: NDOT NDOTID: CL200917 PE RoW CONST.<br />
FY 2009<br />
$980,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$980,000<br />
Total for Anticipated appropriations $980,000 $0 $0<br />
$0<br />
$980,000<br />
FTA S.5311 Non-Urbanized Area Formula<br />
Project # :2809 Location: Clark and Nye Counties<br />
From:<br />
To:<br />
Description: Operating and administrative support for transit operations between Pahrump<br />
and Las Vegas<br />
Project # :2808 Location: Laughlin / Mesquite<br />
From:<br />
To:<br />
Description: Operating and administrative support for transit operations in Mesquite and<br />
Laughlin<br />
Project Sponsor: SNTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$358,376<br />
FY 2010<br />
$394,214<br />
FY 2011<br />
$433,635<br />
FY 2012<br />
$476,998<br />
Total Scheduled<br />
$1,663,223<br />
Project Sponsor: SNTC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$1,016,500<br />
FY 2010<br />
$1,118,150<br />
FY 2011<br />
$1,229,965<br />
FY 2012<br />
$1,352,962<br />
Total Scheduled<br />
$4,717,577<br />
Total for FTA S.5311 Non-Urbanized Area Formula $1,374,876 $1,512,364 $1,663,600 $1,829,960<br />
$6,380,800<br />
Federal Railroad Administration<br />
Project # :2904 Location: Inter-city passenger rail<br />
From: Los Angeles<br />
To: Las Vegas<br />
Description: Acquisition of conventional passenger rail equipment<br />
Project Sponsor: NDOT NDOTID: CL20100115 PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$3,000,000<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$3,000,000<br />
Total for Federal Railroad Administration $0 $3,000,000 $0<br />
$0<br />
$3,000,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 84
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
LVMC funding<br />
Project # :4200 Location: Las Vegas Monorail<br />
From: McCarren International Airport<br />
To: MGM Hotel Monorail Station<br />
Description: Design/permit/construct dual quideway monorail from the existing Las Vegas<br />
Monorail Station<br />
Project Sponsor: LVMC NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$150,000,000<br />
FY 2010<br />
$75,000,000<br />
FY 2011<br />
$75,000,000<br />
FY 2012<br />
$50,000,000<br />
Total Scheduled<br />
$350,000,000<br />
Total for LVMC funding $150,000,000 $75,000,000 $75,000,000 $50,000,000<br />
$350,000,000<br />
STP Enhancements<br />
Project # :740 Location: Bonneville Ave. / Clark Ave. Couplet<br />
From: Main St.<br />
To: Charleston Blvd.<br />
Description: Convert to one-way couplet, 3 lanes in each direction; add landscaping<br />
between Casino Center Dr and Las Vegas Blvd<br />
Project # :1582 Location: Craig Rd<br />
From: Revere St.<br />
To: North 5th St.<br />
Description: Median landscaping<br />
Project # :1584 Location: I-215 Southern Beltway<br />
From: at Eastern Ave<br />
To:<br />
Description: Interchange landscaping<br />
Project # :843 Location: SR 564 Lake Mead Pkwy.<br />
From: Boulder Highway<br />
To: Lake Mead National Recreation Area<br />
Description: Widen to 6 lanes<br />
Project # :4089 Location: Stewart Ave<br />
From: Main St.<br />
To: Maryland Parkway<br />
Description: Landscaping and roadway rehabilitation<br />
Project Sponsor: Las Vegas NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$650,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$650,000<br />
Project Sponsor: North Las Vegas NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$595,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$595,000<br />
Project Sponsor: Clark County NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$498,750<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$498,750<br />
Project Sponsor: Henderson NDOTID: CL200521 PE RoW CONST.<br />
FY 2009<br />
$612,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$612,000<br />
Project Sponsor: Las Vegas NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$600,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$600,000<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 85
<strong>Transportation</strong> Improvement Program for FY 2009-2012<br />
Table 2: Projects by Fund Source<br />
Project # :1585 Location: Sunset Rd<br />
From: at I-515<br />
To:<br />
Description: Interchange landscaping<br />
Project Sponsor: Henderson NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$650,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$650,000<br />
Total for STP Enhancements $3,605,750 $0 $0<br />
$0<br />
$3,605,750<br />
Q10 Bus Turnout Program<br />
Project # :1578 Location: Rainbow Blvd.<br />
From: Desert Inn Rd.<br />
To: US-95<br />
Description: Intersection improvements at Desert Inn Rd, Oakey Blvd, Charleston Blvd and<br />
Alta Dr.<br />
Project Sponsor: Las Vegas NDOTID: CL200669 PE RoW CONST.<br />
FY 2009<br />
$1,500,000<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$1,500,000<br />
Total for Q10 Bus Turnout Program $1,500,000 $0 $0<br />
$0<br />
$1,500,000<br />
City of Las Vegas (BLM Reservation)<br />
Project # :4271 Location: Sheep Mountain Pkwy.<br />
From: CC-215 Western Beltway near Ann Rd<br />
To: I-15 North<br />
Description: Reserve Right-of-Way for future roadway<br />
Project Sponsor: Las Vegas NDOTID:<br />
PE RoW CONST.<br />
FY 2009<br />
$0<br />
FY 2010<br />
$0<br />
FY 2011<br />
$0<br />
FY 2012<br />
$0<br />
Total Scheduled<br />
$0<br />
Total for City of Las Vegas (BLM Reservation) $0 $0 $0<br />
$0<br />
$0<br />
Fiscal Year (FY):<br />
Total Funds Scheduled in the <strong>Transportation</strong> Improvement Program for FY 2009 - 2012<br />
2009 2010 2011 2012 Total Scheduled<br />
Total scheduled $1,461,040,735 $673,147,797 $847,039,932 $307,884,066 $3,289,112,530<br />
<strong>Transportation</strong> Improvement Program for FY 2009-2012 Page T2 - 86
<strong>Regional</strong> <strong>Transportation</strong> Commission of Southern Nevada<br />
APPENDIX-I
<strong>Transportation</strong> Improvement Program (TIP) and Statewide <strong>Transportation</strong><br />
Improvement Program (STIP) Administrative Modification and Amendment<br />
Process<br />
November 14, 2007
Table of Contents Page Number<br />
Background---------------------------------------------------------------------------------------------------------------------------------------- 2<br />
NDOT Administrative Modification Process As Per NDOT Statewide <strong>Transportation</strong> <strong>System</strong> Projects (TSP) --------------------- 3<br />
NDOT Amendment Process As Per NDOT Statewide <strong>Transportation</strong> <strong>System</strong> Projects (TSP) --------------------------------------- 6<br />
List of Figures<br />
NDOT and RTC Administrative Modification and Amendment Process Hierarchy – Figure A--------------------------------------- 2<br />
NDOT TIP/STIP Administrative Modification Procedures Initiated by NDOT – Figure B--------------------------------------------- 4<br />
RTC TIP/STIP Administrative Modification Procedures Initiated by RTC – Figure C -------------------------------------------------- 5<br />
RTC - TIP/STIP Administrative Amendment Procedures for Exempt Activities– Figure D ------------------------------------------- 7<br />
RTC - TIP/STIP Amendment Procedures Requiring Conformity Statement – Figure E ----------------------------------------------- 8<br />
RTC - TIP/STIP Amendment Procedures Requiring Conformity– Figure F ------------------------------------------------------------- 9<br />
Acronyms --------------------------------------------------------------------------------------------------------------------------------- 10<br />
1
Background<br />
The Las Vegas Metropolitan Area <strong>Transportation</strong> Improvement Program (TIP) is updated at least every four years in coordination<br />
with the area agencies and incorporated into the Nevada’s Statewide <strong>Transportation</strong> Improvement Program (STIP). As the projects in<br />
the TIP and STIP move close to implementation stage, they require changes on a regular basis. The following are the internal<br />
procedures of the Nevada Department of <strong>Transportation</strong> (NDOT) and the <strong>Regional</strong> <strong>Transportation</strong> Commission of Southern Nevada<br />
(RTC) to modify and amend the TIP and STIP to reflect changing regional needs and to streamline the project delivery system.<br />
NDOT has adopted two processes for administrative modifications and amendments, as set out in Figures 2 and 4 of the Statewide<br />
<strong>Transportation</strong> <strong>System</strong> Projects (TSP) For Fiscal Years 2008-2017, October 2007. The RTC accepts the process outlined in the TSP.<br />
However, this process needs to be expanded to define and meet the RTC internal procedures as the designated Metropolitan Planning<br />
Organization for the Clark County.<br />
NDOT and RTC Administrative Modification and Amendment Process Hierarchy – Figure A<br />
“Exempt Actions”<br />
Follow Figure – D<br />
Actions within the scope of<br />
the administrative<br />
modification process<br />
No RTC Action – Modify<br />
TIP – Follow Figure -<br />
B or C<br />
RTC staff adjust TIP and<br />
concur – Follow Figure –<br />
B or C<br />
Actions within the scope of<br />
the amendment process<br />
Amendments requiring<br />
Conformity Statement -<br />
Follow Figure - E<br />
Amendments requiring<br />
Conformity Analysis –<br />
Follow Figure - F<br />
2
NDOT Administrative Modification Process As Per NDOT Statewide <strong>Transportation</strong> <strong>System</strong> Projects (TSP)<br />
Applies:<br />
1. When there is a change in a public funding category with no change in the priority of a project in the STIP/RTIP.<br />
2. When a project is moved from the third or fourth to the first or second year or a project is moved from the second to the first of<br />
the STIP/RTIP. (Project to be completed sooner/Project is moved forward)<br />
3. When moving a project from the first to the second, third or fourth year of the STIP/RTIP or moving a project from the second<br />
or third year to the fourth year. (Project is completed later/Project is moved back.)<br />
4. When a positive cost estimate change is less than $5 Million is requested/anticipated.<br />
5. When a positive cost estimate change is requested/anticipated that is greater than $5 Million, but less than 20 percent of the<br />
estimated dollar amount of the project.<br />
6. When a positive or negative change in the un-programmed balance forward is received.<br />
7. When a positive or negative change in the anticipated fund allocation is received.<br />
8. When a project is added to use Federal Funds for repayment of previously authorized work and all repayments will come from<br />
unallocated funds.<br />
9. When a new planning study is identified.<br />
10. When a project is Advance Constructed.<br />
The following procedures are followed by the RTC in response to the administrative modification process initiated by NDOT.<br />
1. Minor TIP/STIP Administrative Modifications<br />
These are defined by items 5-8 and 10 of the NDOT administrative modification process as set out above (See Figure B):<br />
RTC staff will adjust the TIP upon receipt of NODT notification, and will notify the RTC Board of the adjustment.<br />
i) RTC staff adjust the TIP upon receipt of NDOT notification.<br />
ii) Executive Advisory Committee (EAC) notified of administrative modification on consent agenda.<br />
iii) No formal RTC Board action required.<br />
2. Unified Planning Work Program (UPWP) Amendment<br />
These are defined by item 9 of the NDOT administrative modification process.<br />
i) New NDOT planning studies are included in the UPWP and follow the established UPWP approval/amendment process.<br />
3
3. TIP/STIP Administrative Modifications<br />
These are defined by items 1-4 of the NDOT administrative modification process as set out on Page 3 (See Figure B):<br />
i) RTC staff (Assistant Planning Manager) issue a memo of concurrence unless circumstances require elevation.<br />
ii) EAC notified of concurrence on consent agenda.<br />
iii) No formal RTC Board action required<br />
NDOT TIP/STIP Administrative Modification Procedures Initiated by NDOT – Figure B<br />
Minor TIP/STIP Administrative<br />
Modifications Items 5-8 & 10<br />
NDOT<br />
notifies RTC<br />
No RTC Board<br />
action<br />
required<br />
Minor TIP/STIP Administrative<br />
Modifications Item 9<br />
NDOT<br />
notifies RTC<br />
Amend UPWP<br />
EAC notified<br />
by Non-<br />
Consent<br />
RTC notified<br />
by Consent<br />
TIP/STIP Administrative Modification<br />
Item 1-4<br />
NDOT<br />
notifies RTC<br />
RTC staff<br />
concurs<br />
EAC notified<br />
by Consent<br />
RTC notified<br />
by Consent<br />
TIP and STIP administrative modifications do not require RTC Board action. The RTC authorizes the General Manager or his<br />
designee to approve administrative modifications requested by NDOT and sponsoring agencies. However, the RTC will be informed<br />
of the TIP adjustments by consent agenda.<br />
The following procedures are followed by the RTC staff when the administrative modification process is initiated by RTC.<br />
4. Minor TIP/STIP Administrative Modifications<br />
These are defined by items 5-8 and 10 of the NDOT administrative modification process as set out on Page 3 (See Figure C):<br />
i) RTC staff (Assistant Planning Manager) adjust the TIP and request NDOT to make corresponding administrative modification<br />
to the STIP.<br />
ii) EAC notified on consent agenda.<br />
iii) No formal RTC Board action required<br />
4
5. Unified Planning Work Program (UPWP) Amendment<br />
These are defined by item 9 of the NDOT administrative modification process as set out on Page 3:<br />
i) New RTC planning studies are included in the UPWP and follow the established UPWP approval/amendment process.<br />
6. TIP/STIP Administrative Modifications<br />
These are defined by items 1-4 of the NDOT administrative modification process as set out on Page 3 (See Figure C):<br />
i) RTC staff (Assistant Planning Manager) adjust the TIP and request NDOT to make corresponding administrative modification<br />
to the STIP.<br />
ii) EAC notified on consent agenda.<br />
iii) No formal RTC Board action required<br />
RTC TIP/STIP Administrative Modification Procedures Initiated by RTC – Figure C<br />
Minor TIP/STIP Administrative<br />
Modification Items 5-8 &10<br />
RTC Staff<br />
Initiates<br />
Modification<br />
RTC Staff<br />
Notifies<br />
NDOT<br />
No RTC Board<br />
Action<br />
Required<br />
Minor TIP/STIP Administrative<br />
Modification Item 9<br />
RTC Staff<br />
Initiates<br />
UPWP Amend<br />
EAC Notified<br />
by Non-<br />
Consent<br />
RTC Notified<br />
by Consent<br />
RTC Staff<br />
Notifies<br />
NDOT<br />
TIP/STIP Administrative Modification<br />
Item 1-4<br />
RTC Staff<br />
Initiates<br />
Modification<br />
EAC Notified<br />
by Consent<br />
RTC Staff<br />
Notifies<br />
NDOT<br />
TIP and STIP administrative modifications do not require RTC Board action. The RTC authorizes the General Manager or his<br />
designee to initiate TIP administrative modifications on behalf of the RTC and to forward such modifications to NDOT for<br />
incorporation into the STIP. The RTC will be informed of such TIP modifications by consent agenda.<br />
5
NDOT Amendment Process As Per NDOT Statewide <strong>Transportation</strong> <strong>System</strong> Projects (TSP)<br />
Applies:<br />
1. When there is a significant change in the design or scope of any project identified in the STIP/RTIP.<br />
2. When a regionally significant project is added or deleted.<br />
3. When there are changes in the funding category that alter the overall financial reasonableness of the STIP/RTIP, or when a<br />
privately funded project is changed to public funding.<br />
4. When there is a positive change in cost over $5 Million and greater than 20 percent of the estimated dollar amount of the<br />
project is requested /anticipated.<br />
The following procedures are followed by RTC in response to the NDOT amendment process. When RTC initiates the amendment<br />
process, RTC staff inform NDOT of the intention to request an amendment and then follow the procedures identified below.<br />
7. TIP/STIP Administrative Amendments for “Exempt” Projects<br />
This applies to actions that involve only “Exempt” activities as defined in 40 CFR Part 93 (See Figure D):<br />
As shown in Figure D, slightly different procedures are followed for actions involving amendments to funding, for the addition/<br />
deletion of “exempt” projects, or for actions affecting fiscal constraint:<br />
For changes in funding sources or funding amounts that exceed the limits of an adjustment as set out on Page 3 but do not call into<br />
question the overall fiscal balance of the TIP program:<br />
i) NDOT, RTC or a sponsoring agency requests an administrative amendment to the TIP<br />
ii) RTC staff confirm “exempt” status and that there is no effect on fiscal constraint<br />
iii) RTC staff amend the TIP and request NDOT to make corresponding amendment to the STIP.<br />
iv) EAC notified on consent agenda.<br />
v) No formal RTC Board action required<br />
For changes in funding amounts that potentially affect the overall fiscal balance of the TIP program:<br />
i) NDOT, RTC or a sponsoring agency requests an administrative amendment to the TIP<br />
ii) RTC staff prepare a statement confirming the amendment is consistent with fiscal constraint<br />
iii) EAC notified on non-consent<br />
iv) RTC Board approves the amendment and requests NDOT to make corresponding amendment to STIP for FHWA approval<br />
6
For changes that add, delete or change the scope of projects require RTC Board action:<br />
i) NDOT, RTC or a sponsoring agency requests an administrative amendment to the TIP<br />
ii) RTC staff confirm “exempt” status<br />
iii) EAC notified on non-consent<br />
iv) RTC Board approves the amendment and requests NDOT to make corresponding amendment to STIP for FHWA approval<br />
Note: The administrative amendment does not come into effect until NDOT has incorporated the amendment into STIP and FHWA<br />
has approved the STIP amendment.<br />
RTC - TIP/STIP Administrative Amendment Procedures for Exempt Activities– Figure D<br />
Positive Change in cost over $5 M & ><br />
20 % of the Original amount (No<br />
Change in project)<br />
EAC notified<br />
by consent<br />
*Staff<br />
confirmation<br />
to NDOT<br />
Change from private to local/state<br />
public funding; &Change from private,<br />
local, or state funding to federal funding<br />
EAC notified<br />
by consent<br />
*Staff<br />
confirmation<br />
to NDOT<br />
Change to design, scope, alignment or<br />
year of implementation of an exempt<br />
project<br />
EAC notified<br />
by nonconsent<br />
EAC notified<br />
by consent<br />
General Manager<br />
letter to NDOT<br />
Change in funding affecting fiscal<br />
constraint<br />
Statement of<br />
fiscal<br />
reasonableness<br />
EAC notified<br />
by non-consent<br />
RTC approval<br />
General Manager<br />
Letter to NDOT<br />
Add/Delete "Exempt Project"<br />
Confirm<br />
project is<br />
Exempt<br />
EAC notified<br />
by nonconsent<br />
RTC approval<br />
General Manager<br />
Letter to NDOT<br />
* Staff – Director of Planning Services<br />
For TIP administrative amendments that do not require RTC Board action, the RTC authorizes the General Manager or his designee to<br />
approve these amendments. However, the RTC will be informed of these administrative amendments by consent agenda.<br />
7
8. TIP/STIP amendments approved on the basis of a conformity statement<br />
8.1 “Non-<strong>Regional</strong>ly Significant” Amendments<br />
This applies to non- exempt activities that do not involve the following (see Figure E):<br />
a) the design concept, scope or alignment of <strong>Regional</strong>ly Significant projects,<br />
b) the horizon year completion date of <strong>Regional</strong>ly Significant projects, or<br />
c) the implementation of <strong>Transportation</strong> Control Measures identified in the SIPs.<br />
To expedite program delivery, RTC will in certain cases approve a TIP amendment based on a conformity statement that the proposed<br />
amendment will have such minimal effect on emissions that a full conformity analysis is not warranted. RTC staff will determine on a<br />
case-by-case basis if the proposed amendment requires a conformity statement or a new conformity analysis. RTC will consult with<br />
NDOT and FHWA together or separately as appropriate in making this determination.<br />
8.2 “External” TIP/STIP amendments<br />
This applies to actions that affect the design concept, scope or alignment of <strong>Regional</strong>ly Significant projects that are outside the area<br />
included in the travel demand forecast model network, but are within an air quality non-attainment area (see Figure E):<br />
i) NDOT, RTC or a sponsoring agency requests an amendment to the TIP<br />
ii) RTC staff prepares a conformity statement justifying why the existing conformity finding is not affected by the proposed<br />
amendment. In the case of “external” projects, estimates of VMT and emissions will be developed in conjunction with NDOT<br />
using methods consistent with those approved by the FHWA for the RTP conformity finding.<br />
iii) RTC will hold a 30 day public notification and comment period.<br />
iv) EAC recommends adoption of amendment.<br />
v) RTC Board approves the amendment and requests NDOT to make corresponding amendment to STIP for FHWA approval<br />
RTC - TIP/STIP Amendment Procedures Requiring Conformity Statement – Figure E<br />
Applies to actions that affect the design<br />
concept, scope or alignment of <strong>Regional</strong>ly<br />
Significant projects that are not included<br />
in the travel demand model network.<br />
RTC Staff<br />
Prepares<br />
Conformity<br />
Statement<br />
30 Day<br />
Public<br />
Notice<br />
EAC<br />
Notified by<br />
Non-consent<br />
RTC<br />
Notified by<br />
Consent<br />
General<br />
Manager<br />
Letter to<br />
NDOT<br />
8
9. TIP/STIP Amendments requiring conformity analysis<br />
Applies to actions that involve any of the following (See Figure F):<br />
a) Addition/deletion of <strong>Regional</strong>ly Significant Projects.<br />
b) Change the design concept, scope or alignment of <strong>Regional</strong>ly Significant projects included in the modeled conformity analysis.<br />
c) Change the horizon year completion date of <strong>Regional</strong>ly Significant projects.<br />
d) Change the implementation of <strong>Transportation</strong> Control Measures identified in the SIPs.<br />
i) NDOT, RTC or a sponsoring agency requests an amendment to the TIP<br />
ii) RTC staff prepares a conformity analysis and makes a conformity determination.<br />
iii) RTC holds a 45-day public notification and comment period, including a Public Hearing.<br />
iv) EAC recommends adoption of amendment.<br />
v) RTC Board approves the amendment and requests NDOT to make corresponding amendment to STIP for FHWA approval<br />
Notes: 1. The amendment or administrative amendment does not come into effect until NDOT has incorporated the amendment into<br />
STIP and FHWA has approved the STIP amendment.<br />
2. It may take 16-24 weeks from the time a request is received by RTC to process an amendment request requiring conformity<br />
analysis<br />
RTC – TIP/STIP Amendment Procedures Requiring Conformity– Figure F<br />
Change the horizon year<br />
completion date of <strong>Regional</strong>ly<br />
Significant projects,<br />
Change the implementation of<br />
<strong>Transportation</strong> Control<br />
Measures identified in the SIPs.<br />
A regionally significant project<br />
is added or deleted. Or the<br />
design concept, scope or<br />
alignment is changed.<br />
Conformity<br />
Analysis<br />
45 Day<br />
Public<br />
Notice<br />
Public<br />
Hearing<br />
EAC<br />
notified by<br />
non-consent<br />
RTC Adopt<br />
General<br />
Manager<br />
Letter to<br />
NDOT<br />
9
Acronyms<br />
RTC – <strong>Regional</strong> <strong>Transportation</strong> Commission of Southern Nevada<br />
NDOT – Nevada Department of <strong>Transportation</strong><br />
FHWA – Federal Highway Administration<br />
EAC – Executive Advisory Committee<br />
RTP – <strong>Regional</strong> <strong>Transportation</strong> Plan<br />
TIP – <strong>Transportation</strong> Improvement Program<br />
RTIP – <strong>Regional</strong> <strong>Transportation</strong> Improvement Program<br />
STIP – Statewide <strong>Transportation</strong> Improvement Program<br />
TSP – Statewide <strong>Transportation</strong> <strong>System</strong> Projects<br />
SIP – State Implementation Plan<br />
10