INFRASTRUCTURE ANALYSIS
INFRASTRUCTURE ANALYSIS
INFRASTRUCTURE ANALYSIS
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
DISCIPLINE<br />
BUILDING SERIES<br />
DRAWING SERIES<br />
LEVEL<br />
PROJECT DESIGN STAGE<br />
DESIGNED<br />
DRAWING No.<br />
DRAWN<br />
CHECKED<br />
ZONE<br />
PROJECT No.<br />
DATE<br />
SCALE<br />
ORIG. SIZE<br />
REV<br />
TO SITE MAIN DISTRIBUTION BOARD LOCATED<br />
AT THE ENTRANCE OF THE SITE<br />
EXISTING MDB SUBMAINS<br />
7<br />
EXISTING 10 PAIR TELSTRA CABLES<br />
Appendix A – Existing<br />
Services Infrastructure<br />
EXISTING 50MM<br />
PE WATERMAIN<br />
SEPTIC<br />
TANK<br />
KIOSK DB<br />
TELSTRA MAIN DISTRIBUTION FRAME<br />
CONTROL ROOM DISTRIBUTION BOARD<br />
MAIN DISTRIBUTION BOARD<br />
SEPTIC<br />
TANK<br />
CAVERN DB<br />
IN CAVERN BUILDING<br />
A 03/09/12 PRELIMINARY ISSUE MOR<br />
REV DATE SUMMARY OF REVISION BY<br />
CIVIL<br />
01 - SITE<br />
EXISTING SERVICES<br />
FOR COMMENT 231040<br />
A1<br />
MOR<br />
MOR<br />
MB<br />
03/09/12<br />
1 : 500<br />
231040-SK-CV-001<br />
AURECON PROJECT No. 231040<br />
A<br />
QUARRY AMPHITHEATRE<br />
Project 232040 File Quarry Amphitheatre Servicing Report.docx 5 November 2012 Revision 2<br />
QUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORT<br />
NOVEMBER 2012 REVISION B<br />
PG 151