31.12.2014 Views

MODULAR COURSES OFFERED AT ILP PERAI, PENANG

MODULAR COURSES OFFERED AT ILP PERAI, PENANG

MODULAR COURSES OFFERED AT ILP PERAI, PENANG

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>MODULAR</strong> <strong>COURSES</strong> <strong>OFFERED</strong> <strong>AT</strong> <strong>ILP</strong> <strong>PERAI</strong>, <strong>PENANG</strong><br />

BIL<br />

CODE<br />

COURSE<br />

TITLE<br />

DUR<strong>AT</strong>ION<br />

( HOURS)<br />

D<strong>AT</strong>E CAPACITY CONTENT<br />

COURSE<br />

MANAGER<br />

1 TKS-3A<br />

Computer<br />

Assemble &<br />

Software<br />

Installation<br />

8<br />

2 wk April<br />

1 wk May<br />

10<br />

Maintain computer system work area and setup<br />

computer components, peripherals, operating<br />

system, device drivers and application software<br />

using tools and equipments such as work<br />

order,computer manual, hardware diagnostic tools,<br />

software tools and hand tools so that:<br />

1. Work area safety features checked in accordance<br />

with system requirements.<br />

2. Computer components and peripherals are setup<br />

correctly.<br />

3. Operating system, device drivers and application<br />

software are installed.<br />

Atikah Binti Ab.<br />

Rahman<br />

2 TKS-3B<br />

Upgrade<br />

Computer<br />

System Unit &<br />

Software<br />

8<br />

1 wk Aug<br />

1 wk Sept<br />

15<br />

Upgrade computer system unit components, check<br />

computer system software and update computer<br />

software using instruction manual, hand tools,<br />

device driver instruction manual, application<br />

software instruction manual and report so that:<br />

1. Work order instructions studied, system unit<br />

components to be upgraded prepared, hardware<br />

/software settings verified, system unit components<br />

installed and system unit tested in accordance with<br />

system requirements.<br />

2. Work order instructions obtained, computer bootup<br />

sequence checked, system diagnosed and service<br />

report prepared in accordance with standard<br />

operating procedures.<br />

3. Device driver and existing application software<br />

to update identified, installed and tested in<br />

accordance with system requirements.<br />

Atikah Binti Ab.<br />

Rahman<br />

3 TKS-3D<br />

Computer<br />

Troubleshooting<br />

& Maintenance<br />

8 2 wk Aug 20<br />

Diagnose and scan system error logs/beeps and<br />

threats, comply with company security policy and<br />

execute data backup, maintain computer system<br />

unit and peripherals and store customer<br />

data/information using error detection and anti<br />

virus software, error and software log files,Bootable<br />

disk, virus log sheet, system record, backup<br />

handbooks, standard operating procedure, Security<br />

regulations and policy, equipment, maintenance<br />

and work schedule and instruction, Manuals and<br />

devices so that:<br />

1. System error logs prepared, retrieved, analysed,<br />

threats identified and solved in<br />

Accordance with system requirements and standard<br />

operating procedure.<br />

2. Company security regulation learned, studied,<br />

applied and measures documented in accordance<br />

with company's security policy.<br />

3. Anti-virus software identified, virus scanned,<br />

identified, infected files backed up, cleaned,<br />

system and files restored in accordance with system<br />

requirements.<br />

4. Computer system unit and peripherals prepared<br />

and checked in accordance with system<br />

requirement.<br />

5. Information on data and information acquired,<br />

obtained and prevented and document produced in<br />

accordance with standard operating procedures.<br />

Atikah Binti Ab.<br />

Rahman


BIL<br />

CODE<br />

COURSE<br />

TITLE<br />

DUR<strong>AT</strong>ION<br />

( HOURS)<br />

D<strong>AT</strong>E CAPACITY CONTENT<br />

COURSE<br />

MANAGER<br />

4 TKS-3D<br />

Basic<br />

Networking<br />

8 3 wk Oct 20<br />

Set up computer network cable, design computer<br />

network environment and set up client network<br />

Operating system using networking tools, network<br />

cable, network topology diagram, concentator,<br />

trunking, computer-aided design software network<br />

card drivers, network client software, workstations,<br />

network interface card (nic), server, checklist, and<br />

specification manuals so that:<br />

1. Network cabling materials prepared, network<br />

concentrator crimped and network cable tested in<br />

accordance with specification manuals.<br />

2. Computer network topology prepared, selected<br />

and implemented in accordance with Standard<br />

network environments.<br />

3. Workstation specifiacations prepared, network<br />

interface card (nic) installed and Configured, clientto-server<br />

link tested and configuration procedures<br />

recorded in accordance with standard network<br />

procedures.<br />

Atikah Binti Ab.<br />

Rahman<br />

5 TKS-3E Internet 8<br />

4 wk Aug<br />

4 wk Sept<br />

20<br />

Cara & keperluan penyambungan ke internet<br />

Langkah-langkah mendapatkan internet<br />

Cara-cara membuka internet & cara muat<br />

turun(download) fail<br />

Atikah Binti Ab.<br />

Rahman<br />

1 AUTO-01<br />

Perform Vehicle<br />

Maintenance<br />

and aircond<br />

repair<br />

16<br />

3 wk Feb<br />

4wk Feb<br />

2 wk Jun<br />

3 wk Jun<br />

10<br />

Perform vechicle maintenanace, how to read<br />

maintenance chart, making service and small<br />

maintenance<br />

Zaidi bin Abd.<br />

Rahman<br />

2 AUTO-02<br />

Repair Manual<br />

Drive Train<br />

(Clutch System)<br />

16<br />

1 wk Mar<br />

3 wk Mar<br />

3 wk July<br />

4 wk July<br />

10<br />

Basic clucth operation,component and<br />

troubleshooting<br />

Zaidi bin Abd.<br />

Rahman<br />

3 AUTO-03<br />

Repair Brake<br />

System<br />

16<br />

2 wk Apr<br />

4 wk Apr<br />

2 wk Sept<br />

4 wk Sept<br />

10<br />

Basic braking system, the component,operation and<br />

repair brake problem<br />

Zaidi bin Abd.<br />

Rahman<br />

4 AUTO-04<br />

Repair Steering<br />

system<br />

16<br />

1 wk May<br />

4 wk May<br />

2 wk Oct<br />

4 wk Oct<br />

10<br />

Basic steering system, the component, operration<br />

and repair streering problem<br />

Zaidi bin Abd.<br />

Rahman<br />

5 AUTO-05<br />

Perform Engine<br />

Repair<br />

24<br />

3 wk Mar<br />

4 wk Mar<br />

3 wk Sept<br />

4 wk Sept<br />

5 wk Sept<br />

10<br />

Basic engine system, the component, operation and<br />

how to overhaul engine and solve the problem<br />

Zaidi bin Abd.<br />

Rahman<br />

6 AUTO-06<br />

Repair<br />

suspension<br />

system<br />

16<br />

3 wk Jun<br />

5 wk Jun<br />

3 wk Oct<br />

1 wk Nov<br />

10<br />

Basic suspension system, the component ,operation<br />

and repair suspension system<br />

Zaidi bin Abd.<br />

Rahman<br />

7 AUTO-07<br />

Carburation<br />

system<br />

16<br />

3 wk May<br />

3 wk July<br />

2 wk Nov<br />

4 wk Nov<br />

10<br />

Basic carburation system , the component,<br />

operation and to make good combustion on<br />

caburetion<br />

Zaidi bin Abd.<br />

Rahman<br />

8 AUTO-08 Engine diesel 16<br />

3 wk Apr<br />

5 wk Apr<br />

1 wk Dec<br />

2 wk Dec<br />

10<br />

Basic diesel system , the component , operation and<br />

solve diesel problem<br />

Zaidi bin Abd.<br />

Rahman<br />

9 AUTO-09<br />

Service Vehicle<br />

Electrical<br />

system<br />

16<br />

1 wk July<br />

2 wk July<br />

3 wk Dec<br />

4 wk Dec<br />

10<br />

Basic vehicle electrical system, the component,<br />

operation and troubleshooting.<br />

Zaidi bin Abd.<br />

Rahman


BIL<br />

CODE<br />

COURSE<br />

TITLE<br />

DUR<strong>AT</strong>ION<br />

( HOURS)<br />

D<strong>AT</strong>E CAPACITY CONTENT<br />

COURSE<br />

MANAGER<br />

10 AUTO-10<br />

Automotif<br />

preventive<br />

Maintenance<br />

16<br />

2 wk Feb<br />

2 wk Mar<br />

2 wk Apr<br />

1 wk May<br />

2 wk Jun<br />

2 wk July<br />

2 wk Sept<br />

2 wk Oct<br />

2 wk Nov<br />

3 wk Dec<br />

10<br />

Perform vechicle maintenanace , how to read<br />

maintenance chart , making service and small<br />

maintenance<br />

Zaidi bin Abd.<br />

Rahman

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!