NOTICE INVITING EXPRESSION OF INTEREST (EOI)<br />

FOR<br />

CONSULTANCY SERVICES<br />

FOR<br />

DEVELOPING BARGE JETTY EITHER AT ANY GROIN OFF EMRIP<br />

ROAD OR EASTER SIDE OF THIRUVOTRIYUR PARKING YARD<br />

FOR<br />

PORT OF CHENNAI<br />

EOI NUMBER:<br />

EOI/CON/03<br />

DATED: 15 TH MARCH 2012


<strong>Chennai</strong> <strong>Port</strong> Trust – ISO 9001:2008 & ISPS Compliant<br />

Table <strong>of</strong> Contents<br />

1. IMPORTANT DATES ......................................................................................................................... 3<br />

2. CLARIFICATIONS AND CORRESPONDENCE .............................................................................. 3<br />

3. OBJECTIVE OF THE CALL FOR EXPRESSION OF INTEREST ................................................... 4<br />

4. BACKGROUND INFORMATION: .................................................................................................... 4<br />

5. DESCRIPTION OF THE PROJECT: .................................................................................................. 5<br />

6. PROBABLE LAYOUT: ...................................................................................................................... 6<br />

7. EXISTING FACILITIES ..................................................................................................................... 6<br />

8. DELIVERABLES FROM THE EOI: .................................................................................................. 6<br />

9. EXPECTED BENEFITS FROM THE PROJECT ............................................................................... 6<br />

10. HOW TO EXPRESS INTEREST ........................................................................................................ 6<br />

11. FURTHER PROGRESSION ............................................................................................................... 7<br />

ANNEXURE-I SAMPLE FORMAT OF EXPRESSION OF INTEREST ................................................ 8<br />

EOI / CON / 03 D<strong>at</strong>ed 15 th March 2012 Page | 2


<strong>Chennai</strong> <strong>Port</strong> Trust – ISO 9001:2008 & ISPS Compliant<br />

1. IMPORTANT DATES<br />

ACTIVITY TIME DATE<br />

ISSUE OF THIS EXPRESSION OF INTEREST 15:00 15 TH March 2012<br />

POSTING DATE 15:00 15 TH March 2012<br />

SUBMISSION OF EOI 16:00 11 th April 2012<br />

OPENING OF EOI 10:00 12 th April 2012<br />

2. CLARIFICATIONS AND CORRESPONDENCE<br />

CONTACT PERSON<br />

DEPUTY CHIEF ENGINEER (MAJOR PROJECTS)<br />

CONTACT ADDRESS CIVIL ENGINEERING DEPARTMENT,<br />

3 RD FLOOR, OLD ADMINISTRATIVE BUILDING OFFICE;<br />

NO:1, RAJAJI SALAI;<br />

CHENNAI PORT TRUST;<br />

CHENNAI – 600 001;<br />

TAMILNADU.<br />

INDIA<br />

TELEPHONE NUMBER +91 44 – 25390750<br />

FAX NUMBER +91 44 – 25361849<br />

EMAIL ID<br />

chptpppeoi@gmail.com<br />

EOI / CON / 03 D<strong>at</strong>ed 15 th March 2012 Page | 3


<strong>Chennai</strong> <strong>Port</strong> Trust – ISO 9001:2008 & ISPS Compliant<br />

3. OBJECTIVE OF THE CALL FOR EXPRESSION OF<br />

INTEREST<br />

The purpose <strong>of</strong> this EOI is to identify a consultant interested in assisting <strong>Chennai</strong> <strong>Port</strong><br />

to analyse and find viable and cost effective commercial uses for the <strong>groin</strong>s built on<br />

EMRIP road or Eastern side <strong>of</strong> Thirvotriyur Parking yard. The objectives for the<br />

consultancy services are:<br />

• Conversion <strong>of</strong> <strong>groin</strong>s into Jetties / Ramps: Identify the <strong>groin</strong>s th<strong>at</strong> may be<br />

converted / retr<strong>of</strong>itted to oper<strong>at</strong>e as jetties / ramps for commercial use.<br />

• Viable and Cost effective usage <strong>of</strong> the <strong>groin</strong>s. To identify possible<br />

commercial uses <strong>of</strong> the various <strong>groin</strong>s constructed along the EMRIP road or<br />

Eastern side <strong>of</strong> Thirvotriyur Parking yard.<br />

• Ensure continuity <strong>of</strong> the objectives <strong>of</strong> the <strong>groin</strong> construction: The <strong>groin</strong>s<br />

were constructed to protect the coast from sea erosion. Commercializ<strong>at</strong>ion <strong>of</strong><br />

these <strong>groin</strong>s should ensure th<strong>at</strong> the objective <strong>of</strong> controlling sea erosion is met.<br />

4. BACKGROUND INFORMATION:<br />

Several <strong>groin</strong>s were constructed as part <strong>of</strong> the efforts to comb<strong>at</strong> sea erosion along<br />

the coast line along EMRIP road or Eastern side <strong>of</strong> Thirvotriyur Parking yard towards<br />

the north <strong>of</strong> <strong>Chennai</strong> <strong>Port</strong>. The sea erosion has reduced considerably leading to small<br />

stretches <strong>of</strong> beach form<strong>at</strong>ion. <strong>Chennai</strong> <strong>Port</strong> is keen to explore the possibility <strong>of</strong><br />

making commercial use <strong>of</strong> these <strong>groin</strong>s constructed <strong>at</strong> a huge cost and <strong>at</strong> the same<br />

time provide opportunities for the expansion <strong>of</strong> its oper<strong>at</strong>ions.<br />

<strong>Chennai</strong> <strong>Port</strong> is committed to the promotion <strong>of</strong> Ecologically Sustainable Development.<br />

The intended objectives <strong>of</strong> commercializing the usage <strong>of</strong> the <strong>groin</strong>s have to be<br />

accomplished without jeopardizing the original objectives <strong>of</strong> the <strong>groin</strong>.<br />

The <strong>groin</strong>s may be converted into Jetties / Ramps / piers for handling cargoes such<br />

as hazardous cargoes, small parcels <strong>of</strong> bulk cargoes like edible oils, dry bulk cargoes<br />

etc and bunkering services. In addition, <strong>barge</strong> services may be oper<strong>at</strong>ed to meet the<br />

requirements <strong>of</strong> mother vessels such as providing ship stores, w<strong>at</strong>er, fuels etc.<br />

Further, oil bunkering for vessels calling for the nearby ports is a viable commercial<br />

option providing a retail source for CPCL’s products.<br />

In this scenario, <strong>Chennai</strong> <strong>Port</strong> is desiring to utilize the services <strong>of</strong> consultants with<br />

expertise in this field to develop a str<strong>at</strong>egic plan for utilizing the various <strong>groin</strong>s for<br />

commercial use without compromising the original objectives <strong>of</strong> shore protections.<br />

EOI / CON / 03 D<strong>at</strong>ed 15 th March 2012 Page | 4


<strong>Chennai</strong> <strong>Port</strong> Trust – ISO 9001:2008 & ISPS Compliant<br />

Figure 1: Loc<strong>at</strong>ion <strong>of</strong> various <strong>groin</strong>s to the North <strong>of</strong> <strong>Chennai</strong> <strong>Port</strong><br />

5. DESCRIPTION OF THE PROJECT:<br />

It is proposed to solicit consultants having the competency to submit probable<br />

commercial usage <strong>of</strong> the <strong>groin</strong>s. Evalu<strong>at</strong>e the implic<strong>at</strong>ions <strong>of</strong> the proposed<br />

development <strong>of</strong> the <strong>groin</strong>s and adjacent land areas. The role <strong>of</strong> the consultant is to<br />

enable <strong>Chennai</strong> <strong>Port</strong> to identify an ecologically sustainable development <strong>of</strong> these<br />

<strong>groin</strong>s for commercial use to increase the throughput and revenue <strong>of</strong> <strong>Chennai</strong> <strong>Port</strong>.<br />

Build the model documents (RFQs / PPP models) to identify a consultant to enable<br />

<strong>Chennai</strong> <strong>Port</strong> to manage the project. Follow all st<strong>at</strong>utory procedures to award the<br />

contract for the project and ensure the implement<strong>at</strong>ion. The EOI is flo<strong>at</strong>ed to elicit<br />

inform<strong>at</strong>ion <strong>of</strong> the following.<br />

1. Identify Ecologically Sustainable Development <strong>of</strong> Groins: Converting these<br />

<strong>groin</strong>s to Jetties or Ramps or Piers to handle cargoes arriving in <strong>barge</strong>s or<br />

small crafts. E.g Building the Jetties: <strong>Chennai</strong> <strong>Port</strong> intends to build the Jetties<br />

to handle the <strong>barge</strong>s.<br />

2. Commercializ<strong>at</strong>ion <strong>of</strong> usage <strong>of</strong> these Jetties: The commercial use <strong>of</strong> these<br />

jetties may be for<br />

a. General Cargoes: Cargoes such dry bulk, edible oils, petroleum<br />

products etc.<br />

b. Hazardous cargo: Presently, when hazardous or explosives are handled<br />

by <strong>Chennai</strong> <strong>Port</strong> we need to provide exclusive and segreg<strong>at</strong>ed space.<br />

We may explore the possibility <strong>of</strong> using these <strong>groin</strong>s to handle<br />

hazardous cargo or explosives as it is away from normal oper<strong>at</strong>ions.<br />

c. Oil bunkering: Explore the possibility <strong>of</strong> providing the fuel requirements<br />

for vessels calling <strong>at</strong> <strong>Chennai</strong> <strong>Port</strong> and other neighbouring ports<br />

through <strong>barge</strong>s.<br />

<strong>Chennai</strong> <strong>Port</strong> may <strong>either</strong> venture independently or in collabor<strong>at</strong>ion with Petroleum<br />

companies to realize the full potential <strong>of</strong> this proposal.<br />

In addition, the promotion plans for marketing the developed <strong>jetty</strong> may be<br />

submitted.<br />

EOI / CON / 03 D<strong>at</strong>ed 15 th March 2012 Page | 5


<strong>Chennai</strong> <strong>Port</strong> Trust – ISO 9001:2008 & ISPS Compliant<br />

6. PROBABLE LAYOUT:<br />

The <strong>groin</strong> or <strong>groin</strong>s may be considered in groups to be developed as one or m<strong>any</strong><br />

jetties or piers or ramps to achieve the st<strong>at</strong>ed objectives.<br />

7. EXISTING FACILITIES<br />

<strong>Chennai</strong> port has the following transport infrastructure.<br />

a. Groins: There are 10 <strong>groin</strong>s along EMRIP road or Eastern side <strong>of</strong> Thirvotriyur<br />

Parking yard towards the north <strong>of</strong> <strong>Chennai</strong> <strong>Port</strong>.<br />

b. Land space abutting the <strong>groin</strong>s: The land area raised out <strong>of</strong> reclam<strong>at</strong>ion as<br />

well as abutting these <strong>groin</strong>s may be considered.<br />

8. DELIVERABLES FROM THE EOI:<br />

<strong>Chennai</strong> <strong>Port</strong>s expects the following deliverables from the EOI. The deliverables<br />

needs to fulfil the objectives mentioned for the EOI.<br />

a. A conceptual plan detailing various models <strong>of</strong> converting the <strong>groin</strong>s for<br />

commercial use.<br />

b. A comprehensive promotion plan to market the cre<strong>at</strong>ed facilities.<br />

c. Project plan with estim<strong>at</strong>ed cost with timeline. (The plan may be in phases<br />

with or without a consultant to manage the project.)<br />

9. EXPECTED BENEFITS FROM THE PROJECT<br />

The expected benefits <strong>of</strong> the traffic r<strong>at</strong>ionaliz<strong>at</strong>ion are listed below:<br />

i. Conversion <strong>of</strong> protection <strong>groin</strong>s to commercial use.<br />

ii. Enhance cargo handling capacity <strong>of</strong> <strong>Chennai</strong> <strong>Port</strong>.<br />

iii. Facilit<strong>at</strong>e handling small crafts and <strong>barge</strong>s.<br />

iv. Effective use <strong>of</strong> scarce real est<strong>at</strong>e,<br />

v. Increased cargo handling opportunities: Cre<strong>at</strong>ing this civil infrastructure will<br />

provide a protection wall to control dust pollution. Thereby <strong>Chennai</strong> port can<br />

continue to handle more cargo even explosives and encourage bunkering <strong>of</strong> w<strong>at</strong>er<br />

and fuels to vessels calling <strong>at</strong> <strong>Chennai</strong> <strong>Port</strong> and other ports.<br />

vi. Revenue out <strong>of</strong> investments made for comb<strong>at</strong>ting sea erosion.<br />

10. HOW TO EXPRESS INTEREST<br />

Interested parties may submit their conceptual plans for the scheme along with the<br />

comp<strong>any</strong> pr<strong>of</strong>ile, major works undertaken particularly <strong>of</strong> similar n<strong>at</strong>ure, etc. the<br />

parties are free to add <strong>any</strong> additional inform<strong>at</strong>ion concerning the scheme. For <strong>any</strong><br />

clarific<strong>at</strong>ions, interested parties may contact “The Deputy Chief Engineer (Major<br />

Projects)” <strong>of</strong> <strong>Chennai</strong> <strong>Port</strong>.<br />

EOI / CON / 03 D<strong>at</strong>ed 15 th March 2012 Page | 6


<strong>Chennai</strong> <strong>Port</strong> Trust – ISO 9001:2008 & ISPS Compliant<br />

11. FURTHER PROGRESSION<br />

The port depending upon the extent <strong>of</strong> the EOI, will proceed further with the process<br />

<strong>of</strong> selecting a consultant.<br />

EOI / CON / 03 D<strong>at</strong>ed 15 th March 2012 Page | 7


<strong>Chennai</strong> <strong>Port</strong> Trust – ISO 9001:2008 & ISPS Compliant<br />

ANNEXURE-I SAMPLE FORMAT OF EXPRESSION OF<br />

INTEREST<br />

EXPRESSION OF INTEREST<br />

Ref No:<br />

D<strong>at</strong>ed<br />

To<br />

The Deputy Civil Engineer (Major Projects),<br />

Civil Engineering Dept,<br />

3 rd Floor, Old Administr<strong>at</strong>ive Office,<br />

No:1; Rajaji Salai;<br />

<strong>Chennai</strong> <strong>Port</strong> Trust;<br />

<strong>Chennai</strong> – 600 001<br />

Tamil Nadu<br />

Ref: EOI No: EOI/CON/03 D<strong>at</strong>ed 15 th March 2012<br />

Dear Sir,<br />

1. Having examined the notice inviting Expression <strong>of</strong> Interest (EOI) number: EOI /<br />

CON / 03 d<strong>at</strong>ed 15 th March 2012, the receipt <strong>of</strong> which is hereby acknowledged,<br />

we, the undersigned, and submit our <strong><strong>of</strong>f</strong>er in full conformity with the said the<br />

call for EOI.<br />

2. We undertake, if our bid is accepted, to present our conceptual plan and<br />

facilit<strong>at</strong>e <strong>Chennai</strong> <strong>Port</strong> to develop a terms <strong>of</strong> reference as and when requested<br />

by <strong>Chennai</strong> <strong>Port</strong> to its best s<strong>at</strong>isfaction.<br />

3. We have read the provisions <strong>of</strong> the EOI and confirm th<strong>at</strong> these are acceptable<br />

to us. All necessary clarific<strong>at</strong>ions, if <strong>any</strong>, have been sought for by us and duly<br />

clarified in writing, by <strong>Chennai</strong> <strong>Port</strong>, <strong>Chennai</strong>. We understand th<strong>at</strong> <strong>any</strong> other<br />

ambiguous clauses in the EOI, if <strong>any</strong>, are subject to interpret<strong>at</strong>ion <strong>of</strong> <strong>Chennai</strong><br />

<strong>Port</strong>.<br />

4. If our EOI is accepted, we assure guaranteed sharing <strong>of</strong> the inform<strong>at</strong>ion rel<strong>at</strong>ed<br />

to the conceptual plan required by <strong>Chennai</strong> <strong>Port</strong> from time to time.<br />

5. We undertake th<strong>at</strong>, in competing for the above EOI, we will strictly observe the<br />

laws against fraud and corruption in force in India, namely, “Prevention <strong>of</strong><br />

Corruption Act”.<br />

6. We agree th<strong>at</strong> <strong>Chennai</strong> <strong>Port</strong> holds the right to the inform<strong>at</strong>ion shared through<br />

this EOI and we permit / do not permit <strong>Chennai</strong> <strong>Port</strong> to use the same as<br />

deemed appropri<strong>at</strong>e by it.<br />

7. We fully understand th<strong>at</strong> the submission <strong>of</strong> this EOI does not bestow upon us<br />

<strong>any</strong> rights to us in <strong>any</strong> further tenders arising out <strong>of</strong> this conceptual plan. Such<br />

tenders may be governed under the terms <strong>of</strong> reference as deemed essential for<br />

th<strong>at</strong>.<br />

8. This call for Expression <strong>of</strong> Interest does not constitute a solicit<strong>at</strong>ion. <strong>Chennai</strong><br />

<strong>Port</strong> reserves the right to change or cancel the requirement <strong>at</strong> <strong>any</strong> time during<br />

EOI / CON / 03 D<strong>at</strong>ed 15 th March 2012 Page | 8


<strong>Chennai</strong> <strong>Port</strong> Trust – ISO 9001:2008 & ISPS Compliant<br />

the EOI. <strong>Chennai</strong> <strong>Port</strong> also reserves the right to require compliance with<br />

additional conditions as and when issuing the final solicit<strong>at</strong>ion documents.<br />

Submitting a reply to a call for EOI does not autom<strong>at</strong>ically guarantee receipt <strong>of</strong><br />

the solicit<strong>at</strong>ion documents when issued. Invit<strong>at</strong>ions to bid or requests for<br />

proposals and <strong>any</strong> subsequent purchase order or contract will be issued in<br />

accordance with the rules and procedures <strong>of</strong> <strong>Chennai</strong> <strong>Port</strong>.<br />

Signed By:………………………………….<br />

In the capacity <strong>of</strong> ……………………………….<br />

Duly authorized to sign this EOI for and on behalf <strong>of</strong><br />

…………………………………………………………………..<br />

(Name <strong>of</strong> the Firm submitting the EOI)<br />

D<strong>at</strong>ed:<br />

Place:<br />

EOI / CON / 03 D<strong>at</strong>ed 15 th March 2012 Page | 9


<strong>Chennai</strong> <strong>Port</strong> Trust – ISO 9001:2008 & ISPS Compliant<br />

SECTION-1: GENERAL INFORMATION OF THE BIDDER<br />

1 Name <strong>of</strong> BIDDER<br />

2 Address<br />

3 Telephone Number<br />

4 Fax Number<br />

5 Email<br />

6 Web Site<br />

7 Legal st<strong>at</strong>us<br />

8 D<strong>at</strong>e <strong>of</strong> Establishment<br />

9 Relevant Quality<br />

Certific<strong>at</strong>ions <strong>at</strong>tained by<br />

Firm, if <strong>any</strong><br />

10 Contact Person Details:<br />

Name<br />

E-mail<br />

Phone<br />

SIGNATURE OF THE BIDDER<br />

SEAL OF TH EBIDDER<br />

SECTION-2: DETAILS OF THE BIDDER’S ORGANIZATION<br />

The details <strong>of</strong> the bidders’ organiz<strong>at</strong>ion / associ<strong>at</strong>es / sub contractors including the present<br />

business.<br />

SECTION-3: TURNOVER DETAILS OF THE BIDDER’S ORGANIZATION<br />

NAME OF THE BIDDER: .<br />

Particulars <strong>of</strong> the Turnover in the LAST THREE financial years in Promotional<br />

activities and services<br />

Year Turnover <strong>of</strong> the bidder in Pr<strong>of</strong>it after<br />

infrastructure, facility, Tax (in Rs<br />

hardware, networking, system crores)<br />

integr<strong>at</strong>ion and services (in Rs<br />

crores)<br />

SIGNATURE OF THE BIDDER<br />

SEAL OF TH EBIDDER<br />

EOI / CON / 03 D<strong>at</strong>ed 15 th March 2012 Page | 10


<strong>Chennai</strong> <strong>Port</strong> Trust – ISO 9001:2008 & ISPS Compliant<br />

SECTION-4: PARTICULARS OF MAJOR WORK SIMILAR NATURE<br />

IMPLEMENTED<br />

Name <strong>of</strong> the BIDDER:<br />

Particulars <strong>of</strong> Major works <strong>of</strong> Similar N<strong>at</strong>ure<br />

Sl.No. Name <strong>of</strong> Contact person, Year <strong>of</strong> Total End user<br />

organiz<strong>at</strong>ion address, contact implement<strong>at</strong>ion project certific<strong>at</strong>e<br />

Telephone, email cost Y/N<br />

Executive Summary <strong>of</strong> the above mentioned work enclosed<br />

Sign<strong>at</strong>ure <strong>of</strong> the Bidder<br />

Seal <strong>of</strong> the bidder<br />

SECTION-5: PARTICULARS OF SIMILAR MAJOR WORKS MANAGED BY<br />

BIDDER<br />

Name <strong>of</strong> the BIDDER:<br />

Particulars <strong>of</strong> Projects<br />

Sl.No. Name <strong>of</strong> Contact person, Year <strong>of</strong> Dur<strong>at</strong>ion Total End user<br />

organiz<strong>at</strong>ion address, contact implemen <strong>of</strong> project certific<strong>at</strong>e<br />

Telephone, t<strong>at</strong>ion managem cost Y/N<br />

email<br />

ent<br />

Executive Summary <strong>of</strong> the above mentioned projects enclosed.<br />

EOI / CON / 03 D<strong>at</strong>ed 15 th March 2012 Page | 11


SECTION-6: TECHNICAL PROPOSAL MEETING THE EOI REQUIREMENTS<br />

Detailed Technical Proposal meeting the EOI requirements covering detailed specific<strong>at</strong>ions<br />

<strong>of</strong> Approach, infrastructure, facility, management and services being <strong><strong>of</strong>f</strong>ered.<br />

SECTION-7: PROJECT MANAGEMENT DETAILS<br />

Schedule and Project Management Plan for major work<br />

SECTION-8: FACILITIES EXPECTED FROM CHENNAI PORT<br />

Facilities sought from <strong>Chennai</strong> <strong>Port</strong><br />

SECTION-9: ANY OTHER INFORMATION OF RELEVANCE<br />

Any other relevant m<strong>at</strong>ter.<br />

CHENNAI PORT