The benefits and ramifications of each of the options are summarised below.<br />

Option Benefits Ramifications<br />

Partial Reconstruction • Reduced cost<br />

• Poorly draining soil remains<br />

• Reduced time required<br />

• Need for regular deep aeration<br />

• Can be done in normal offseason<br />

works<br />

• Provides improved surface<br />

• Increased potential usage<br />

Full Reconstruction • Provides premier quality surface<br />

• Replaces poorly performing soil<br />

drainage and irrigation systems<br />

• Increased durability of turf<br />

• Increased potential usage<br />

• Higher cost<br />

• Longer construction period<br />

• Works may impact on normal<br />

use agreements<br />

The potential usage for each option is summarised in the following table.<br />

Option Winter Summer<br />

Current condition 10 hours / week 15 hours / week<br />

Partial reconstruction 15 hours / week 20 hours / week<br />

Full reconstruction 20 hours / week 25 hours / week<br />

5.2 Maintenance & Renovation<br />

There is a need to review and to likely increase the maintenance inputs for the field to ensure that<br />

a durable turf surface is provided and the investment of any improvements is safe guarded.<br />

Renovation of the playing surface is required at the end of the NRL season to repair any damage<br />

sustained and rejuvenate the surface in preparation for the next football season. This procedure<br />

may require intensive operations such as scarifying, turf sodding, topdressing etc. and would<br />

necessitate the field being out of play for up to 4 weeks.<br />

The following cost estimates are provided to cover a standard level of maintenance & renovation<br />

for a high quality sportsfield.<br />

Item<br />

Cost<br />

Mowing (x 70 cuts) $25,000<br />

Fertilising (x 8) $6,000<br />

Pest control (weeds, insects: x 3) $5,000<br />

Aeration (verti drain x 2, slicing x 4) $5,000<br />

Renovation - Scarifying $1,000<br />

Renovation - Overseeding $3,000<br />

Renovation - Topdressing $7,000<br />

Renovation - Surface repair - sod (200m 2 ) $1,500<br />

Repair - irrigation system $3,000<br />

Miscellaneous $3,000<br />

Total Cost $59,500<br />

Note; this does not include the cost of water<br />

<strong>Brookvale</strong> <strong>Oval</strong> <strong>Investigation</strong> Final Report (February 2010) Page 14