Zero Visibility Operations Planning - DrillSafe
Zero Visibility Operations Planning - DrillSafe
Zero Visibility Operations Planning - DrillSafe
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Solution Criteria<br />
• To overcome the potential problems associated with<br />
Strong Currents and <strong>Zero</strong> <strong>Visibility</strong> a solution had to meet<br />
the following criteria;<br />
1. Determine Relative location of equipment on seabed<br />
(not absolute location)<br />
2. Wireless inclination measurements on TGB and PGB<br />
3. “Pictures” in a zero visibility environment<br />
4. ROV Friendly<br />
5. Easily Deployable<br />
6. Cost Effective (Stena Clyde spread rate on Petrel-7<br />
~$25,000/hour)<br />
13