04.01.2015 Views

Zero Visibility Operations Planning - DrillSafe

Zero Visibility Operations Planning - DrillSafe

Zero Visibility Operations Planning - DrillSafe

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Solution Criteria<br />

• To overcome the potential problems associated with<br />

Strong Currents and <strong>Zero</strong> <strong>Visibility</strong> a solution had to meet<br />

the following criteria;<br />

1. Determine Relative location of equipment on seabed<br />

(not absolute location)<br />

2. Wireless inclination measurements on TGB and PGB<br />

3. “Pictures” in a zero visibility environment<br />

4. ROV Friendly<br />

5. Easily Deployable<br />

6. Cost Effective (Stena Clyde spread rate on Petrel-7<br />

~$25,000/hour)<br />

13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!