CONCRETE PIPE & BOX CULVERT INSTALLATION - American ...
CONCRETE PIPE & BOX CULVERT INSTALLATION - American ...
CONCRETE PIPE & BOX CULVERT INSTALLATION - American ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
ALIGN <strong>PIPE</strong><br />
Align bell and spigot of<br />
pipes to be jointed. Before<br />
homing the joint, check<br />
that the gasket is in<br />
contact with the entry<br />
taper around the entire<br />
circumference.<br />
Improper alignment can<br />
dislodged gasket<br />
causing leaks or<br />
possibly break the bell.<br />
a guide and do not replace or supersede project<br />
specifications, contract documents, or specific<br />
manufacturer’s recommendations.<br />
Mastic<br />
Mastic sealants consist of rubber compounds or<br />
bitumen and inert mineral filler, which are usually<br />
applied at ambient temperatures. The joint surfaces<br />
are thoroughly cleaned, dried and prepared in<br />
accordance with the manufacturer’s recommendations.<br />
A sufficient amount of sealant should be used<br />
to fill the annular joint space with some squeeze<br />
out. During cold weather, better workability of the<br />
mastic sealant can be obtained if the mastic and<br />
joint surfaces are warmed.<br />
Mortar<br />
Mortar consists of portland cement paste, sand<br />
42<br />
<strong>American</strong> Concrete Pipe Association • www.concrete-pipe.org