06.01.2015 Views

Toto Spa Costruzioni Generali

Toto Spa Costruzioni Generali

Toto Spa Costruzioni Generali

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Project Details<br />

Barberino di Mugello Lotto 13<br />

Contract: Construction of A1<br />

Highway Milano-Napoli – Section<br />

Sasso Marconi- Barberino del<br />

Mugello – Lot 13<br />

-<br />

Category: Motorway<br />

Client: ASPI S.p.a.<br />

Total Amount : 270 euro mio<br />

% <strong>Toto</strong>: 100%<br />

Status: 89% Completed<br />

End: 2012<br />

Description Of Works: Construction<br />

of a new 3 lanes Highway Km 6,15, n.<br />

3 twin tunnels (total length: 3430 m), n.<br />

3 steel viaducts (total length: 1243 m),<br />

n. 1 balanced cantilever viaduct L= 598<br />

m max height of the piers 80 m) n. 4<br />

Cut and cover tunnels (tot. length<br />

357m)<br />

Company Profile<br />

14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!