The Imess programme will also have an<br />

impact on existing vehicles as exemplified by<br />

this Piranha 8x8 fitted with Imess connecting<br />

points in the ceiling. (Armasuisse)<br />

armour capable of protecting the soldier both<br />

from stabs and high-velocity ammo. The<br />

protected surface is adapted to the mission’s<br />

requirements, the body armour being<br />

composed of a jacket, a collar and a groin<br />

protector. A portable hydration pack from<br />

Source in Israel completes the Imess kit.<br />

The first five new standard-compliant<br />

prototypes will be delivered in Q2 <strong>2013</strong>. Five<br />

more are expected in Q3. The delivery of the<br />

remaining systems covered by the contract is<br />

planned for the first quarter of 2014. The<br />

platoon-level system will then undergo a<br />

second field trial, followed in 2015 by an<br />

extended technical/operational test phase.<br />

Late 2015 will see the beginning of a 300-day<br />

long-term test in daily operation by infantry<br />

conscripts that will end in 2016. In parallel all<br />

required basic documents, such as<br />

deployment concept, training concept,<br />

system logistics management concept etc.,<br />

will be finalised, to be prepared for a possible<br />

series procurement from late 2016 on.<br />

So far and until end 2016 the Imess<br />

project funding is granted by the credit for<br />

military “Project Planning, Evaluation and<br />

Procurement Preparations”. Until now<br />

funds worth CHF 37 million were approved<br />

for the project. To this day a little over CHF<br />

36 million were turned into contracts. At the<br />

moment the Swiss Armed Forces have no<br />

definite plans, with respect to budget year<br />

and procurement size, for a major<br />

procurement of Imess production systems.<br />

TYTAN<br />

A team of 14 companies headed by Bumar is<br />

still awaiting a decision by the Polish<br />

authorities about the future of the Tytan<br />

programme, as currently the requirements<br />

drafted in 2009 have not yet been<br />

confirmed, nor under the technical neither<br />

under the operational point of view. In Fall<br />

2012 the new small arms family, developed<br />

by Fabryka Broni “Łucznik”, part of Bumar<br />

<strong>Soldier</strong>; pre-production samples of the<br />

MSBS 5,56 mm (da Modułowy System<br />

Broni Strzeleckiej for light modular weapon<br />

The bullpup version of the MSBS, the<br />

assault rifle proposed by Fabryka Broni<br />

“Lucznik” for the Polish Tytan programme.<br />

(<strong>Armada</strong>/P. Valpolini)<br />

22 <strong>Compendium</strong> <strong>Modern</strong> <strong>Soldier</strong> Programme <strong>2013</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!