Combined Heat and Power<br />

Workshop<br />

CHP and MUSH<br />

<strong>Richard</strong> <strong>Damecour</strong><br />

<strong>FVB</strong> <strong>Energy</strong> <strong>Inc</strong>.<br />

April<br />

2013


<strong>FVB</strong> <strong>Energy</strong> <strong>Inc</strong>.<br />

‣ <strong>Richard</strong> <strong>Damecour</strong>, P.Eng., MBA,<br />

CEO<br />

‣ Consulting firm specializing in<br />

Community <strong>Energy</strong> & CHP.<br />

‣ A global l district i t energy firm with<br />

offices in Sweden, the U.S. and<br />

Canada.


Small Scale Generation<br />

‣ Less Than 5 MW<br />

‣ Imbedded in the Municipal Grid<br />

‣ Typically Natural Gas Fired<br />

Reciprocating Engines


Cogeneration - 3 Key Issues<br />

‣ THERMAL FIRST<br />

‣ ELECTRICAL INTERCONNECTION<br />

‣ CONTRACT FOR ELECTRICTY


8,761<br />

8,388<br />

8,010<br />

7,635<br />

7,135<br />

120%<br />

100%<br />

80%<br />

60%<br />

40%<br />

20%<br />

0%<br />

Boilers<br />

Thermal First<br />

CHP<br />

2,885<br />

3,264<br />

3,760<br />

4,635<br />

4,135<br />

5,010<br />

5,460<br />

5,885<br />

6,260<br />

6,760<br />

Hours<br />

2,010<br />

2,510<br />

760<br />

336<br />

1,635<br />

1,135<br />

0<br />

Capacity


Connection Process is Still Onerous<br />

‣ Getting Better as Utilities Gain<br />

Experience in Dealing With<br />

Connections<br />

‣ Many Now Have Published<br />

Connection Requirements based<br />

on Distribution Code<br />

‣ Small Utilities Have Banded<br />

Together & Obtained The<br />

Experience


INITIAL<br />

CONSULTATION<br />

CONNECTION<br />

IMPACT<br />

ASSESMENT<br />

LDC<br />

CONNECTION<br />

COST<br />

ESTIMATE<br />

HYDRO ONE<br />

IESO<br />

DESIGN<br />

&<br />

BUILD<br />

CONNECT,<br />

OPERATE<br />

& MAINTAIN


Potential Electricity Cost Avoidance<br />

ITEM<br />

<strong>Energy</strong> Charge<br />

Transmission<br />

Network<br />

Transmission<br />

Connection<br />

Wholesale Market<br />

Services<br />

Debt Retirement<br />

Distribution Charge<br />

Distribution Losses<br />

AVOID<br />

YES<br />

YES<br />

NO<br />

YES<br />

NO<br />

NO<br />

YES


Potential Electricity Cost Avoidance<br />

CHARGE<br />

AMOUNT<br />

HOEP $33<br />

Global Adjustment $50<br />

Transmission Network* $7 /MWh<br />

Wholesale Market Services $6 / MWh<br />

Distribution Losses (4%)* $3 /MWh<br />

Total $99 /MWh


Durham College - UOIT<br />

‣ Durham College Established in 1967<br />

‣ 5,000 Full Time Students<br />

‣ University of Ontario Institute of<br />

Technology Established in 2005<br />

‣ 5,000 Full Time Students


Durham College - UOIT


Positive Attributes of Durham<br />

College as a CHP Host<br />

‣ High Quality Host<br />

‣ Uses Low Quality <strong>Energy</strong><br />

‣ Behind The Meter<br />

‣ Site Control


UOIT/Durham College CHP<br />

Take or Pay Versus Heat Demand<br />

2,500<br />

h<br />

MWh per Mont<br />

2,000<br />

1,500<br />

1,000<br />

500<br />

0<br />

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec


Summary of Risk Mitigation<br />

Risks<br />

Mitigation<br />

Thermal Load<br />

Take or Pay Contract<br />

Equipment Failure<br />

Proven Technology<br />

Equipment Guarantees<br />

O/M Contract<br />

Project Cost Overrun<br />

Contingencies<br />

i<br />

Site Control<br />

Gas Price Hedging:<br />

Match of Purchases to<br />

Consumption<br />

Contract With Marketer


Durham College Benefits<br />

‣ 78% of Natural Gas<br />

Consumption Eliminated<br />

‣ $200K in Projected Savings<br />

‣ 2.3 MW of Secure Supply<br />

‣ Environmentally Beneficial


Barriers for MUSH Sector<br />

‣ Slower Decision Making<br />

‣ Dollars for Capital<br />

‣ Dollars for Studies<br />

‣ Revenue Uncertain<br />

‣ Gas Cost Uncertain<br />

‣ Connection Process Onerous<br />

‣ Facility Managers Authority<br />

‣ Perception of Ugly Facility<br />

‣ Fear of Technology