Accelerator Development<br />
q RF System (see AT-10, AT-16, AT-34, AT-44)<br />
v Configuration <strong>of</strong> PEFP RF System<br />
- a Klystron (CW, 1.1MW) drives DTL-I (4 Tanks)<br />
- 7 Klystrons (pulse, 1.6 MW) drives DTL-II (7 Tanks)<br />
Modulator<br />
Klystron<br />
Circulator<br />
RF window<br />
MEBT RF<br />
MEBT<br />
20 MeV System<br />
DTL107 DTL106 DTL105 DTL104 DTL103 DTL102 DTL101<br />
RCCS<br />
100 MeV Beamline<br />
20 MeV Beamline<br />
Modulator (HVCM type, SNS)<br />
- Drives 2 TH2089K Klystrons<br />
- Output DC voltage : 105kVDC + 10%, -50%<br />
- Output current : 50ADC 10%<br />
- Peak / average power : 5.8MW / 520kW @ 9% duty<br />
- Repetition / pulse width : 60Hz / 1.5ms<br />
- Efficiency : min. 92%<br />
- Pulse waveform : Square wave<br />
- Flat top regulation / voltage droop: 1% / < 1%<br />
- Arc Energy : < 20J<br />
- Input voltage / frequency : 3300VAC / 60Hz<br />