09.01.2015 Views

Status of the Proton Engineering Frontier Project

Status of the Proton Engineering Frontier Project

Status of the Proton Engineering Frontier Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Accelerator Development<br />

q RF System (see AT-10, AT-16, AT-34, AT-44)<br />

v Configuration <strong>of</strong> PEFP RF System<br />

- a Klystron (CW, 1.1MW) drives DTL-I (4 Tanks)<br />

- 7 Klystrons (pulse, 1.6 MW) drives DTL-II (7 Tanks)<br />

Modulator<br />

Klystron<br />

Circulator<br />

RF window<br />

MEBT RF<br />

MEBT<br />

20 MeV System<br />

DTL107 DTL106 DTL105 DTL104 DTL103 DTL102 DTL101<br />

RCCS<br />

100 MeV Beamline<br />

20 MeV Beamline<br />

Modulator (HVCM type, SNS)<br />

- Drives 2 TH2089K Klystrons<br />

- Output DC voltage : 105kVDC + 10%, -50%<br />

- Output current : 50ADC 10%<br />

- Peak / average power : 5.8MW / 520kW @ 9% duty<br />

- Repetition / pulse width : 60Hz / 1.5ms<br />

- Efficiency : min. 92%<br />

- Pulse waveform : Square wave<br />

- Flat top regulation / voltage droop: 1% / < 1%<br />

- Arc Energy : < 20J<br />

- Input voltage / frequency : 3300VAC / 60Hz<br />

12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!