Status of the Proton Engineering Frontier Project
Status of the Proton Engineering Frontier Project
Status of the Proton Engineering Frontier Project
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Accelerator Development<br />
q <strong>Status</strong> <strong>of</strong> Accelerator Development<br />
v Fully developed & integrated up to 20 MeV<br />
v Fabricated up to 57 MeV Tanks<br />
v 3 tanks (57~91 MeV) is under fabrication<br />
Completed 2009<br />
Step 1<br />
(’02.07 ~ ’05.06)<br />
Step 2<br />
(’05.07 ~ ’08.03)<br />
Control & Diagnostics<br />
Step 3<br />
(’08.04 ~ ’12.03)<br />
RF RF<br />
RF RF<br />
RF RF<br />
RF RF<br />
RF RF<br />
RF RF<br />
RF RF<br />
RF RF<br />
RF RF<br />
IS<br />
RFQ<br />
DTL21~DTL24<br />
MEBT<br />
20~33<br />
DTL101<br />
33~45<br />
DTL102<br />
45~57<br />
57~69<br />
69~80<br />
80~91<br />
91~102<br />
DTL103 DTL104 DTL105 DTL106 DTL107<br />
20 MeV Beam<br />
100 MeV Beam<br />
7