April 2010<br />
GUIDANCE<br />
Ozone Depleting Compounds: By following the current VA specifications <strong>and</strong> other VA<br />
guidance, this goal should be easily achieved.<br />
Recycled Content <strong>and</strong> Bio-based Content: Follow the requirements based in the Guiding<br />
Principle for this requirement unless VA st<strong>and</strong>ards for functionality, cleanability, <strong>and</strong> longevity<br />
are compromised.<br />
Construction Waste: All construction waste that can be recycled or salvaged, preferably on<br />
site if possible, should be done if lifecycle cost effective. Identify early in the project which<br />
materials will be recycled.<br />
Construction Waste Revenue: According to Public Law 103-329, Sec 608, revenue<br />
generated through recycling <strong>and</strong> waste prevention program activities can be retained for VA use<br />
by VHA Facility Directors. Construction materials that can be recycled are covered under this<br />
law. <strong>The</strong> Project Team will have to identify those construction items to be recycled, <strong>and</strong> the VA<br />
Project Manager will have to appropriately negotiate with the General Contractor to assure that<br />
the appropriate value of the material is accounted for <strong>and</strong> available to the government.<br />
DELIVERABLES<br />
5.1 & 5.2 Report on amount of recycled <strong>and</strong> Bio-based content used<br />
Determine compliance as per instructions <strong>and</strong> provide summary calculations<br />
<strong>and</strong> backup material. If unable to meet goal, provide explanation as to why.<br />
5.3 Report on Construction Waste Recycling<br />
Identify possible waste recycling options early in the project. Create<br />
recycling plan <strong>and</strong> report by type <strong>and</strong> amount throughout project delivery.<br />
Provide final summary at project completition.<br />
SUSTAINABILITY & ENERGY REDUCTION MANUAL Page |1- 18