Eastern Irrigation District Directors Meetings 2009 December 21 ...

Eastern Irrigation District Directors Meetings 2009 December 21 ...

Eastern Irrigation District Directors Meetings 2009 December 21 ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Eastern</strong> <strong>Irrigation</strong> <strong>District</strong> <strong>Directors</strong> <strong>Meetings</strong> <strong>2009</strong><br />

installation fee on new installs, beginning <strong>December</strong> 22, <strong>2009</strong>. Seconded by R. Owen.<br />

CARRIED<br />

4.0 Report on CRWUA Conference<br />

P. Hemsing, N. Johnson, F. George and R. Owen attended the Colorado River Water Users<br />

Association annual conference in Las Vegas, <strong>December</strong> 8 th – 11 th . <strong>Directors</strong> commented that the<br />

conference was better than last year, commenting on sessions such as board/management/staff<br />

relationships, drought situations, water conservation, global warming and ethics.<br />

5.0 Rock Lake Speedway<br />

An email to the Chairman was received from Bert Dyck, current representative of “Rock Lake<br />

Speed Way”, formally known as “Brooks & <strong>District</strong> Auto Racing Association”, in response to an<br />

article appearing in a local newspaper November 22 nd . B. Chrumka will respond by letter<br />

informing Mr. Dyck that the Board of <strong>Directors</strong> reviewed and maintains its decision of October<br />

2006 which stated that the land near Rock Lake Reservoir is not suitable to this type of venture.<br />

7.0 Revised Farm Improvement Policy<br />

Discussion took place on the infrastructure grant portion of the Farm Improvement Policy. This<br />

policy is to be brought to the upcoming Board Retreat, with suggested revisions.<br />

[10:49 a.m. I. Friesen entered the meeting.]<br />

8.0 Engineering<br />

8.01 Project Status<br />

Project Name<br />

Detailed<br />

Design<br />

Complete<br />

EID Capital Construction Projects<br />

ROW<br />

Signed<br />

Comments<br />

M Tilley √ 100% - complete (except clean up)<br />

17 Springhill √ 100% - complete (except clean up)<br />

09-08A Springhill √ 100% - complete (except clean up)<br />

27 Rolling Hills √ 100% - earthworks complete, ready for armour<br />

Bow Slope √ 100% - concrete structures raised near complete,<br />

earthworks west side of Hwy 36 near complete<br />

V Tilley √ 100% - earthworks complete, ready for armour<br />

One Tree √ 100% - earthworks near complete<br />

Rolling Hills Spill #2 √ 100% - earthworks construction started, roughly 2<br />

weeks remain<br />

01-06 Bow Slope √ 100% - ready for construction<br />

20 Rolling Hills √ 100% - ready for construction<br />

Jamison Lake Drain √ 100% - ready for construction (start date Jan 4 10)<br />

John Ware √ 25% - landowner issues still outstanding<br />

05-AH North Bantry 75% 0% - project not approved<br />

<strong>December</strong> <strong>21</strong>, <strong>2009</strong> Page 104