10.01.2015 Views

Eastern Irrigation District Directors Meetings 2009 December 21 ...

Eastern Irrigation District Directors Meetings 2009 December 21 ...

Eastern Irrigation District Directors Meetings 2009 December 21 ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Eastern</strong> <strong>Irrigation</strong> <strong>District</strong> <strong>Directors</strong> <strong>Meetings</strong> <strong>2009</strong><br />

8.06 Farm Crossing – Gail Kelly – North Branch Canal<br />

This item was deferred to next month’s meeting, as the Farm Improvement Policy will be<br />

discussed at the upcoming Board Retreat.<br />

8.07 IRP Annual Rolling 3-Year Plan<br />

Mr. Friesen presented the <strong>District</strong>’s IRP 3 Year Plan for the construction years 2010/11 to<br />

2012/13. Completed projects and continuing projects are listed in the report, with new projects as<br />

follows:<br />

IRP Annual Rolling 3-Year Plan<br />

Year Project Estimated Expenditure<br />

Proposed Year 1 North Bantry Canal (Reach #2) $10,000,000<br />

Proposed Year 2 North Bantry Canal (Reach #3) $8,000,000<br />

Proposed Year 3 West Bantry Canal $5,000,000<br />

<strong>2009</strong>-12-228 Moved by P. Hemsing that the Board approve the IRP Annual Rolling 3-Year Plan for the<br />

years 2010/11 to 2012/13. Seconded by R. Owen. CARRIED.<br />

[11:14 a.m. I. Friesen exited the meeting, J. Meador entered.]<br />

9.0 Operations<br />

9.01 Farm Imrovements<br />

J. Meador presented the following Farm Improvements.<br />

9.01.1 L. De Jager – NE 24-14-14 W4M<br />

Current assessment is 150 acres (136 under pivot); new corner arm pivot area is 150 acres. This<br />

Farm Improvement calls for the conversion of 14 acres flood to pivot. The Water User received a<br />

grant in 2005 for the 136 acres flood to pivot and was deducted $200/acre for keeping the<br />

corners. He is now eligible for $60/acre on these corners, for a Farm Improvement Grant of<br />

$840.<br />

<strong>2009</strong>-12-229 Moved by P. Hemsing that the Board approve the Farm Improvement for L. De Jager for<br />

the conversion of 14 acres flood to pivot in the NE 24-14-14 W4M. The Farm Improvement<br />

Grant payable to the Water User is $840. Seconded by T. Livingston. CARRIED<br />

9.01.2 L. De Jager – NW 32-13-13 W4M & SW 05-14-13 W4M<br />

Current assessment is 45 acres; new wiper pivot area is 55 acres. This Farm Improvement calls<br />

for the conversion of 45 acres wheels to low pressure pivot, complete with drop tubes and no cold<br />

weather shut-off. The pivot must be piped from delivery to pump site. 10 additional acres are<br />

needed; these acres are gained through efficiency from wheels to pivot and are at a capital<br />

assets charge of $300/acre. The Farm Improvement Grant payable to the Water User is $1,350.<br />

The capital assets charge is $3,000. New assessment on this quarter is 55 acres.<br />

<strong>2009</strong>-12-230 Moved by P. Hemsing that the Board approve the Farm Improvement for L. De Jager for<br />

the conversion of 45 acres wheels to pivot in NW 32-13-13 W4M & SW 05-14-13 W4M. The<br />

Farm Improvement Grant payable to the Water User is $1,350. The capital assets charge is<br />

$3,000. Seconded by R. Owen. CARRIED<br />

9.01.3 Johnson Farms Ltd. – W ½ 10-19-14 W4M<br />

Current assessment is 125 acres in the NW and 50 acres in the SW 10-19-14 W4M. New pivot<br />

area is 127 acres in the NW and 54 acres in the SW 10-19-14 W4M (there are 13 acres of<br />

<strong>December</strong> <strong>21</strong>, <strong>2009</strong> Page 106

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!