FINANCE: KEY ISSUES AND GUIDING PRINCIPLES<br />
Quality FMRs must be submitted on time with both physical and financial progress fully reflected.<br />
1. Status of 15% Contribution of state share:<br />
Year<br />
Amounts required on basis<br />
of releases<br />
(Rs. in Crore)<br />
Amount Credited in<br />
SHS Bank A/C<br />
(Rs. in Crore)<br />
Short/<br />
(Excess) (Rs.<br />
In Crore)<br />
2007-08 9.25 0.00 9.25<br />
2008-09 11.33 13.65 -2.32<br />
2009-10 20.37 14.80 5.57<br />
2010-11 19.98 20.00 -0.02<br />
2011-12 34.80 23.00 11.80<br />
Total 95.73 71.45 24.28<br />
The above shortfall is 25% of the amount required to be credited on the basis of releases<br />
during the period 2007-08 to 2011-12. State is to ensure that state’s outstanding share is<br />
deposited. Further, with effect from 2012-13, State’s share would be 10%.<br />
2. Refund of RCH-I: The State should refund the unspent balance of Rs. 3.18 Crore under RCH-I.<br />
3. Before the release of funds up to 100% of BE of your state for the year 2012-13, State needs to<br />
provide Utilization Certificates against the grant released to the State up to 2010-11. The details<br />
for such pending UCs is as under:<br />
Pending utilisation certificates (Amount Rs. in Crore)<br />
<strong>Program</strong>me 2009-10 2010-11 TOTAL<br />
RCH-II 4.53 19.19 23.72<br />
<strong>Mission</strong> flexipool 0 0 0<br />
4. Release of 100% of funds for the year 2012-13 would be contingent on the state providing<br />
utilisation certificates up to 2010-11.<br />
5. The appointment of Concurrent Auditor for the year 2012-13 is a prerequisite for release of 2nd<br />
tranche of funds.<br />
6. Timely submission of Statutory Audit Report for the year 2011-12 is a must for release of 2nd<br />
tranche of funds.<br />
7. State is required to comply with the instructions and/or guidelines issued for maintenance of<br />
bank account vide D. O. No. G-27017/21/2010-NRHM-F dated January 23, 2012.<br />
8. State should provide a confirmation of submission of Action Taken Report/ Compliance Report on<br />
the FMR Analysis (2011-12) and Audit Report Analysis for FY 2010-11.<br />
9. The State should provide the executive summary in the prescribed format and the action taken<br />
thereon.<br />
Approval of State <strong>Program</strong>me Implementation Plan- Himachal Pradesh, 2012-13 Page - 4 -