ROP Booklet - National Rural Health Mission Program ...
ROP Booklet - National Rural Health Mission Program ...
ROP Booklet - National Rural Health Mission Program ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
SN.<br />
Indicator<br />
Target /<br />
ELA-<br />
2012-13<br />
Minimum Level of<br />
Achievement<br />
By Sep. 2012<br />
By March<br />
2013<br />
Shimla<br />
(twice/<br />
week) and L<br />
& Spiti (no<br />
FDS)<br />
4.5 Fixed Day Services for Sterilisation All DH NA 100%<br />
Remarks<br />
mentioned<br />
number of<br />
facilities<br />
SN. Indicator Current Status<br />
1 Goal Indicators:<br />
1.1 Total Fertility Rate (TFR)<br />
1.2<br />
Contraceptive Prevalence Rate<br />
(CPR)<br />
1.3 Unmet Need<br />
2 Service delivery:<br />
2.1 IUCD - Total<br />
2.2<br />
Post-partum IUCD (subset of<br />
IUCD-total)<br />
2.3 Female Sterilisation<br />
2.4<br />
Post-partum sterilisation (subset<br />
of tubectomy)<br />
2.5 Male sterilisation<br />
3 Input/ facility operationalization:<br />
3.1 Fixed Day service delivery:<br />
3.1.1 IUCD (daily at DH, SDH, CHC)<br />
5 YEARS PROJECTION OF KEY INDICATORS<br />
1.8<br />
(SRS-2010)<br />
68.1<br />
(DLHS-3)<br />
14.9<br />
(DLHS-3)<br />
21220<br />
(HMIS: 2010-<br />
11)<br />
21020<br />
(HMIS: 2010-<br />
11)<br />
597<br />
(HMIS: 2010-<br />
11)<br />
2618<br />
(HMIS: 2010-<br />
11)<br />
Weekly except<br />
Shimla (twice/<br />
week) and L &<br />
Target/ ELA<br />
2012-13 2013-14 2014-15 2015-16 2016-17<br />
Maintain TFR level<br />
70.0 73.0 75.0 77.0 80.0<br />
12.0 11.0 10.0 8.0 7.0<br />
30000 32500 35000 37500 40000<br />
1000 1500 2500 3500 4000<br />
27000 28000 29000 30000 31000<br />
1000 1500 2500 3000 3500<br />
6000 6250 6500 6750 7000<br />
Weekly<br />
@ PHC<br />
+ CHC<br />
Weekly<br />
@ PHC<br />
+ CHC<br />
Weekly<br />
@ PHC<br />
+ CHC<br />
Weekly<br />
@ PHC<br />
+ CHC<br />
All SHC<br />
Approval of <strong>Program</strong>me Implementation Plan-Himachal Pradesh, 2012-13 Page 40